Suo-Motu Determination of Tariff for Generation and Distribution Order dated 11-12-2014
Tamil Nadu Electricity Regulatory Commission Page 246
December 2014
In this context, Commission directs TANGEDCO to provide the monthly energy
demand and availability and its plan of scheduling power in accordance to MoD on
quarterly basis. For power procurement from unapproved sources, TANGEDCO is directed
to take prior approval of the Commission before purchasing energy.
Summary of power purchase costs
4.141 The summary of power purchase costs approved by the Commission for FY 2014-15
from own generation and other sources after considering MoD is tabulated below:
Table 185: Summary of power purchase cost approved by the Commission for FY 2014-15
Source Units (MU)
Capacity
Charges(Rs.
Crore)
Energy
Charges (Rs.
Crore)
Energy
Charges
(Rs./ Unit )
Total Cost
(Rs. Crore)
Own Generation Stations
Ennore TPS - 276 - 3.34 276
Tuticorin TPS 7,183 468 2,324 3.24 2,792
Mettur TPS 6,005 329 1,871 3.12 2,200
North Chennai TPS 4,502 376 1,204 2.67 1,580
NCTPS Stage-II** (Unit
1) 4,059 586 1,107 2.73 1,693
NCTPS Stage-II** (Unit
2) 3,725 379 1,016 2.73 1,395
MTPS Stage-III** - 671 - 3.37 671
Total Thermal 25,474 3,085 7,522 2.95 10,607
Tirumakottai GTPS 706 82 153 2.16 235
Kuttalam GTPS 651 91 146 2.25 237
Basin Bridge GTPS - 51 - 20.62 51
Valuthur GTPS 1,243 163 267 2.15 429
Total Gas 2,599 387 565 2.18 952
Erode HEP 1,365 332 0.0 0.00 332
Kadamparai HEP - 79 - - 79
Kundah HEP 2,257 206 0.2 0.00 206
Tirunelveli HEP 964 120 0.3 0.00 120
Total Hydro 4,586 736 0.53 0.00 736
Wind mills 12 3 - - 3
Total Own Generation 32,671 4,211 8,088 2.48 12,299
Central Generation Stations
NTPC SR (I&II) 3,983 225 837 2.10 1,062
NTPC SR III 996 94 264 2.65 357
NLC TS - I 3,469 274 715 2.06 988
NLC TS - II 3,235 185 690 2.13 875
NLC TS Expansion I 1,469 194 445 3.03 639
NTPC Talcher 3,323 284 524 1.58 808
NTPC Simhadri 1,532 269 363 2.37 632
Suo-Motu Determination of Tariff for Generation and Distribution Order dated 11-12-2014
Tamil Nadu Electricity Regulatory Commission Page 247
December 2014
Source Units (MU)
Capacity
Charges(Rs.
Crore)
Energy
Charges (Rs.
Crore)
Energy
Charges
(Rs./ Unit )
Total Cost
(Rs. Crore)
MAPS 1,573 - 332 2.11 332
KAIGA 1,211 - 375 3.10 375
NTPC Vallur - Unit 1 &
Unit 2 4,882 745 1,257 2.57 2,002
Kudankulum - Unit 1` 2,188 - 777 3.55 777
New Plants 4,988 873 1,247 2.50 2,120
NTPC ER 363 34 95 2.61 129
Total CGS 33,212 3,176 7,920 2.38 11,097
Renewables
Wind 5,228 - 1,783 3.41 1,783
Biomass 6 - 3 4.25 3
Cogeneration 817 - 293 3.59 293
Captive - - - 3.75 -
Solar 97 - 52 5.37 52
Total Renewable 6,148 - 2,131 3.47 2,131
IPPs
Samalpatti - 135 - - 135
Madurai Power Corpn - 136 - - 136
Pillaiperumalnallur - 122 - - 122
STCMS - Neyveli 1,660 347 384 2.32 731
LANCO Power (Aban co) 783 120 156 2.00 277
PIONEER Power co.
(Penna) 356 55 73 2.04 128
Total IPPs 2,799 915 614 2.19 1,528
Case 1 - Bidding (MTOA)
Jindal Power 1,752 385 476 2.72 861
Adani Power 1,182 296 390 3.30 686
Lanco Power (NETS) 876 215 213 2.43 428
NTPC NVVN 35 - 16 4.43 16
Total Other sources 3,845 896 1,095 2.85 1,991
PGCIL charges
PGCIL - ER & SR 855
PGCIL - Reactive Energy
Charges 25
Total transmission
charges 880
Total Power Purchases 46,004 4,987 11,760 2.56 17,627
Total Own generation &
Power Purchase 78,675 9,198 19,848 2.52 29,926