    ALL INDIA TARIFF

    ON 

    CONTRACTOR’S ALL RISKS INSURANCE

    TARIFF ADVISORY COMMITTEEADOR HOUSE, MUMBAI

    ----------------------------------Tariff Advisory Committee 1

    1-1-01

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    2/40

    THE TARIFF ADVISORY COMMITTEE

    (HEREINAFTER CALLED THE COMMITTEE) HAS

    LAID DOWN RULES, REGULATIONS, RATES,

    ADVANTAGES, TERMS AND CONDITIONS, AS

    CONTAINED HEREIN, FOR TRANSACTION OF

    CONTRACTOR’S ALL RISKS INSURANCE BUSINESS

    IN INDIA IN ACCORDANCE WITH THE PROVISIONS

    OF PART II B OF THE INSURANCE ACT, 1938

    ANY BREACH OF TARIFF SHALL BE DEALT WITH AS

    PER THE RELEVANT PROVISIONS OF THE

    INSURANCE ACT, 1938

      CONTRACTOR’S ALL RISKS INSURANCE POLICY 

    INDEX

    ----------------------------------Tariff Advisory Committee

    1-1-01

    2

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    3/40

    Contents Page

    !

    "!

    #ENERAL RULES $ RE#ULATIONS%

    STANDARD POLICY FORM %

    &! PROPOSAL FOR MACHINERY INSURANCE %

    '! RATIN# SCHEDULE %

    '! #(o)* I % E+et(-a+ Ma.-ne(/ -nsta++e0 -nP+ants ot.e( t.an Co+0 Sto(agesan0 Ie P+ants!

    '!" #(o)* II % Me.an-a+ Ite1s Ma.-neso11on to a++ In0)st(-es!

    '!& #(o)* III % Ma.-ne(/ -n Co+0 Sto(agesan0 Ie

      P+ants'!' #(o)* IV 2 Fe(t-+-3e( *+ants 4 *et(o.e1-a+

      P+ants4 Re5ne(-es

    '!6! De+-ne0 +-st o7 Ma.-nes

    '!8 E9ess

    '!: Esa+at-on P(o;-s-on

    '!< O*t-on to -ns)(e )n0e( MB4EEI

    6 ADDITIONAL RATES %

    8 ENDORSEMENTS %

    PROPOSAL FORM

    ----------------------------------Tariff Advisory Committee

    1-1-01

    3

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    4/40

    ------------------------------------------------------------------------------------Co. Ltd.

    PROPOSAL AND =UESTIONNAIRE FOR CONTRACTOR>S ALL RISKS

    INSURANCE

    (The liability of the Company does not commence until this proposal has beenaccepted by the Company and the premium paid)

    Information given herein will be treated in strict Condence.

    ut a (√ ) mar! wherever applicable.

    S!No!

    Deta-+s Ans?e(

    ". a) #ame $ %ddress of the rincipal

     Trade or business

    a)

    b) #ame $ %ddress of the Contractor Trade or business

    b)

    c) #ame $ %ddress of the &ub Cont-ractor' if any' Trade or usiness

    c)

    THE INSURED INTERESTS -

    . *hose Interests are to be Insured+

    ,. THE CONTRACT @ORKS -

    a) ull description of the Contract

    b) lease give details -

    i) uilding (type of construction'number of storeys etc.)

    ii) lasting operationiii) /cavation wor!iv) ile drivingv) Tunnelingvi) 0am Construction or diversion of 

    water

    vii)1thers (&pecify)

    Note - % site plan of contract wor!smay be enclosed.

    2. i) Is this a contract3&ub-contractforming part of an over allconstruction pro4ect

     5es #o.

    ----------------------------------Tariff Advisory Committee

    1-1-01

    4

    PrincipalContractor Sub-

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    5/40

    ii) If yes' give name of the ro4ect

    6. a) *ill the construction be carried outby your own personnel+ 5es #o.

     b) If not' by whom+ b)

    c) ast e/perience of the Contractor c)

    7.   a) *ill any sub-contractors be ta!ingpart in the wor! of construction+

     5es #o.

     b) If yes' what is their position asregards this insurance+

    b)

    THE CONTRACT SITE -

    8.   a) Location of Contract site a)

    b) #earest port and3or 9ailway &tationand distance.

    b)

    Note - % complete lay out of the sitemay be enclosed

    :. a) %re any &pecial 9is!s of one or moreof the following involved+

    a)

    i) arth;ua!e-ire $ &hoc!ii) Landslide39oc!slide3 &ubsidence

    iii) lood3Inundationiv) &torm3Tempest3ected by any of the ma4or perilsspecied in (a) above+

    d)

    ----------------------------------Tariff Advisory Committee

    1-1-01

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    6/40

    ?. @ive full details regarding geologicalcondition including sub soil

    "A. a) rief description of the arrangementsmade for storage of construction

    materials and e;uipments - whetherin open or closed premises.

    a)

    b) i) *ill there be a watch and wardround the cloc!+

    b) (i)

    ii) If not' what precautions will beta!en against theft' maliciousdamage etc.

    ii)

    "". THE INSURANCE -

    a) stimated construction periode/cluding maintenance period (coverto commence from the date of rstarrival of consignment material atsite or commencement of wor!whichever is earlier)

    a) . . ..

    from

    Bonths

    to . . . .

    b) Cover re;uired during maintenanceperiod' if any

    a) . . . .months'

      from.. To..

    c) robable date on which constructionis e/pected to be completed

    c)

    d) eriod of Insurance re;uired d). . . . months'  from To..

    ".   a)

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    7/40

    Note%lease attach schedule of ;uantities and rates and3or values (Permanent &Temporary works including all materials to be incorporated therein)

    a) Contract rice 9s. . . . . . . . . .

    b) Baterials or items supplied by therincipal 9s. . . . . . . . . .

    c) %ny additional items not includedin (a) and (b) above 9s. . . . . . . . . .

    d) Landed cost of imported items asat construction site (pleasespecify whether included in (a)and3or (b) above)

      at /change 9ate -------------

    9s. . . . . . . . . .

    TOTAL VALUE OF CONSTRUCTION ! ! ! 9s

    ii) Construction lant $ Bachinery to beused at the construction site (0etailsas per attached sheet)

    9s. . . . . . . . . .

    iii) Clearance $ 9emoval of 0ebris 9s. . . . . . . . . .

    iv) InsuredDs own surrounding property. 9s. . . . . . . . . .

    v) /tra charges for /press reight(e/cluding %ir reight) overtime&unday $

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    8/40

    lace.................0ate.................. roposer=s&ignature.....................

    Set-on ' o7 Ins)(ane At &<

    PROHIBITION OF REBATES %

    ". #o person shall allow or o>er to allow' either directly or indirectly as aninducement to any person to ta!e out or renew or continue an insurance inrespect of any !ind of ris! relating to lives or property in India' any rebate of the whole or part of the commission payable or any rebate of the premiumshown in the policyF nor shall any person ta!ing out or renewing or continuinga policy accept any rebate' e/cept such rebate as may be allowed in accordancewith the published prospectus or tables of the Insurer.

    . %ny person ma!ing default in complying with the provisions of this section shallbe punishable with ne' which may e/tend to ve hundred rupees.

    CONTRACTOR>S ALL RISKS INSURANCE POLICY 

    Issuing 1Gce

    %gency olicy #o

    THE SCHEDULE

     The Company HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHI#&9%#C C1B%#5 LIBIT0

    T.e Ins)(e0 2

    ----------------------------------Tariff Advisory Committee

    1-1-01

    #

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    9/40

    a) #ame $ %ddress of the rincipal

    b) #ame $ %ddress of the Contractor(s)

    c) Location of contract site

    Pe(-o0 o7 Ins)(ane 

    rom . . . . . . . . . . . . to . . . . . . . . . . .. plus . . . . . . months maintenance period.

    remium (&ub4ect to ad4ustment on completion of the pro4ect)

    9upees . . . . . . .

    0escription of contract wor!s J

     Insured Items &um Insured

    SECTION I 2 MATERIAL DAMA#E 2

    ". Contract wor!s (ermanent and Temporary wor!sincluding all materials to be incorporated therein) J

    "." Contract price

    ". Baterials or items supplied by the rincipal

    9s. . . . . .

    . %ny other wor!s' $ installations not included in "." and". above (eg camp' colony' stores etc as per listenclosed)

    ,. Construction lant $ Bachinery (Bemo. 7) (as per listenclosed)

    ----------------------------------Tariff Advisory Committee

    1-1-01

    $

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    10/40

    2. /tensions (on irst loss Indemnity basis) J

    2." /press reight' 1vertime (Bemo 6)

    2. rincipal=s &urrounding roperty (Bemo 8)2., 0ebris removal (of insured property)

    2.2 %ny other e/tension (e.g. scalation' %ir reight'

    %ddl. Custom 0uty' Baintenance visits or

    e/tended maintenance cover as per forms

    attached )

    --------------------------------------------------------------------

    --------------------------------------------------------------------

    --------------------------------------------------------------------

    TOTAL FOR SECTION ! ! 9s. . . . . . .

    SECTION II 2 THIRD PARTY LIABILITY 2

    ". Limit of indemnity in respect of any one accident orseries of accidents arising out of one event.

    2%  Total limit of &ection II during policy period. 

    9s. . . . . .

    9s. . . . . .

    EXCESSES FOR SECTIONS I $ II

    ". for &torage $ Construction claims

    . for Baintenance period claims

    ,. for Ba4or peril claims as per Bemo : of &ection I

    9s. . . . . . each claim

    9s. . . . . . each claim

    9s. . . . . . each claim

    &I@#0 1#

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    11/40

    proposal by completing a proposal form which together with any other statementsmade in writing by the Insured for the purpose of this policy' is deemed to beincorporated hereto.

    #1* T

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    12/40

    %t the latest' the insurance shall e/pire on the date specied in the &chedule but if the wor! of construction included in the insurance is not completed within the timespecied hereunder' the Company may e/tend the period of insurance but theInsured shall pay to the Company additional premium at rates to be prescribed bythe Company.

    #ENERAL CONDITIONS 2

    ". The due observance and fulllment of the terms of this olicy in so far as theyrelate to anything to be done or complied with by the Insured and the truth of 

    ----------------------------------Tariff Advisory Committee

    1-1-01

    12

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    13/40

    the statement and answers in the ;uestionnaire and proposal made by theInsured shall be a condition precedent to any liability of the company.

    . The &chedule and the &ection(s) shall be deemed to be incorporated in andform part of this olicy and e/pression Mthis olicy= wherever used in thiscontract shall be read as including the &chedule and the &ection(s). %ny word

    or e/pression to which a specic meaning has been attached in any part of this olicy or of the &chedule or of the &ection(s) shall bear such meaningwherever it may appear.

    ,. The Insured shall at his own e/pense ta!e all reasonable precautions andcomply with all reasonable recommendations of the Company to prevent loss'damage or liability and comply with statutory re;uirements andmanufacturersD recommendations.

    2. a) 9epresentatives of the Company shall at any reasonable time have theright to inspect and e/amine the ris! and the Insured shall provide therepresentatives of the Company with all details and information necessary

    for the assessment of the ris!. 

    (b) The Insured shall immediately notify the Company by Telegram and inwritingof any material change in the ris! and cause at his own e/pense

    suchadditional precautions to be ta!en as circumstances may re;uire and

    thescope of cover and3or premium shall' if necessary' be ad4usted

    accordingly.

    #o material alteration shall be made or admitted by the Insured where by theris! is increased unless the continuance of the Insurance be conrmed inwriting by the Company.

    6. In the event of any occurrence' which might give rise to a claim under thisolicy' the Insured shall J

    a) Immediately notify the Company by Telephone or Telegram as well as inwriting giving an indication as to the nature and e/tent of loss ordamageF

     b) ta!e all steps within his power to minimise the e/tent of the loss or

    damageF 

    c) preserve the parts a>ected and ma!e them available for inspection by arepresentative or &urveyor deputed by the companyF

     d) furnish all such information and documentary evidence as the Company

    may re;uireF

    ----------------------------------Tariff Advisory Committee

    1-1-01

    13

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    14/40

     e) inform the police authorities in case of loss or damage due to theft or

    burglary.

     The Company shall not in any case be liable for loss' damage or liability of whichno notice has been received by the Company within "2 days of its occurrence.

     

    pon notication being given to the Company under this condition the Insuredmay carry out the repair or replacement of any minor damage not e/ceeding 9s.'6AA3-. In all other cases a representative of the Company shall have theopportunity of inspecting the loss or damage before any repairs or alterationsare a>ected. If a representative of the Company does not carry out theinspection within a period of time which could be considered as ade;uate underthe circumstances the Insured is entitled to proceed with the repairs orreplacement.

      The liability of the Company under this olicy in respect of any item sustaining

    damage shall cease if said item is not repaired properly without delay.

    7. The Insured shall at the e/pense of the Company do and concur in doing andpermit to be done all such acts and things as may be necessary or re;uired bythe Company in the interest of any rights or remedies' or of obtaining relief orindemnity from parties (other than those Insured under this olicy) to which theCompany shall be or would become entitled or subrogated upon their paying foror ma!ing good any loss or damage under this olicy' whether such acts andthings shall be or become necessary or re;uired before or after the InsuredDsindemnication by the Company.

    8. If any dispute or di>erence shall arise as to the ;uantum to be paid under thisolicy (liability being otherwise admitted) such di>erence shall independently of all other ;uestions be referred to the decision of a sole arbitrator' to beappointed in writing by the parties to or' if they cannot agree upon a singlearbitrator within ,A days of any party invo!ing %rbitration' the same shall bereferred to a panel of three %rbitrators comprising of two %rbitrators - one to beappointed by each of the parties to the dispute3di>erence' and the third%rbitrator to be appointed by such two %rbitrators and arbitration shall beconducted under and in accordance with the provisions of the %rbitration andConciliation %ct "??7.

    It is clearly agreed and understood that no di>erence or dispute shall bereferable to arbitration as hereinbefore provided' if the Company has disputed ornot accepted liability under or in respect of this olicy.

    It is hereby e/pressly stipulated and declared that it shall be a conditionprecedent to any right of action or suit upon this olicy that the award by such%rbitrator3%rbitrators of the amount of the loss or damage shall be rst obtained.

    ----------------------------------Tariff Advisory Committee

    1-1-01

    14

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    15/40

    :. If a claim is in any respect fraudulent' or if any false declaration is made or usedin support thereof' or if any fraudulent means or devices are used by the Insuredor any one acting on his behalf to obtain any benet under this olicy' or if aclaim is made and re4ected and no action or suit is commenced within threemonths after such re4ection or' in case of arbitration ta!ing place as providedtherein' within three months after the %rbitrator or %rbitrators or mpire have

    made their award' all benets under this olicy shall be forfeited.

    ?. If at the time any claim arises under this olicy there be any other insurancecovering the same loss' damage or liability the Company shall not be liable topay or contribute more than their rateable proportion of any claim for such loss'damage or liability.

    "A. This insurance may be terminated at the re;uest of the Insured at any time inwhich case the Insurers will refund appropriate premium amount sub4ect to thefollowing conditions -

     i) Claims e/perience under the policy as on date of cancellation should be less

    than 7A E of rewor!ed premium. 

    ii) MThe une/pired period is not less than , months or 6 E of the policy periodwhichever is less=.

     iii) Testing period should not have commenced.

     This insurance may also at any time be terminated at the option of the Companyby "6 days notice to that e>ect being given to the Insured in which case theCompanies shall be liable to repay on demand a rateable proportion of thepremium for the une/pired term from the date of cancellation.

    SECTION I % MATERIAL DAMA#E %

     The Company hereby agrees with the Insured (sub4ect to the e/clusions andconditions contained herein or endorsed hereon) that if' at any time during theperiod of insurance stated in the said &chedule' or during any further period of e/tension thereof the property (e/cept pac!ing materials of any !ind) or any partthereof described in the said &chedule be lost' damaged or destroyed by any cause'other than those specically e/cluded hereunder' in a manner necessitatingreplacement or repair the Company will pay or ma!e good all such loss or damageupto an amount not e/ceeding in respect of each of the items specied in the&chedule the sum set opposite thereto and not e/ceeding in the whole the total suminsured hereby.

     The Company will also reimburse the Insured for the cost of clearance and removal

    of debris following upon any event giving rise to an admissible claim under this

    olicy but not e/ceeding in all the sum (if any) set opposite thereto in the &chedule.

    ----------------------------------Tariff Advisory Committee

    1-1-01

    1

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    16/40

    EXCLUSIONS TO SECTION % I

     The Company' shall not' however' be liable for J

    a) the rst amount of the loss arising out of each and every occurrence shown as/cess in the &cheduleF

    b) loss discovered only at the time of ta!ing an inventoryF

    c) normal wear and tear' gradual deterioration due to atmospheric conditions orlac! of use or obsolescence or otherwise' rust' scratching of painted or polishedsurfaces or brea!age of glassF

    d) loss or damage due to faulty designF

    e) the cost of replacement' repair or rectication of defective material and3orwor!manship' but this e/clusion shall be limited to the items immediatelya>ected and shall not be deemed to e/clude loss of or damage to correctly

    e/ecuted items resulting from an accident due to such defective material and3or wor!manshipF

    f) the cost necessary for rectication or correction of any error during constructionunless resulting in physical loss or damageF

    g) loss of or damage to les' drawings' accounts' bills' currency' stamps'deeds' evidence of debt' notes' securities' che;ues' pac!ing materials such ascases' bo/es' cratesF

    h) any damage or penalties on account of the InsuredDs non-fulllment of theterms of delivery or completion under his Contract of construction or of anyobligations assumed there under or lac! of performance including conse;uentialloss of any !ind or description or for any aesthetic defects or operationaldecienciesF

    i) loss of or damage to vehicles licensed for general road use or water bornevessels or Bachinery3;uipment mounted or operated or /ed on Noatingvessels3craft3barges or aircraft.

     

    PROVISIONS APPLYIN# TO SECTION % I

    Me1o % SUM INSURED 2 

    It is a re;uirement of this Insurance that the sum of insurance stated in theschedule shall not be less than the completely erected value of the propertyinclusive of freights' custom duty' erection cost and the insured underta!es to

    ----------------------------------Tariff Advisory Committee

    1-1-01

    1!

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    17/40

    increase or decrease the amount of insurance in the event of any materialNuctuation in the level of wages or prices. rovided always that such increase ordecrease shall ta!e e>ect only after the same has been recorded on the policy bythe Company.

    If in the event of the occurrence of a loss' or damage it is found that the &um

    insured representing the completely erected value of the property and3or of particular item involved is less than the amount re;uired to be insured' then theamount recoverable by the insured under this policy shall be reduced in suchproportion as the &um Insured bears to amount re;uired to be insured.

    Me1o " % PREMIUM ADUSTMENT 2 

     The &um Insured under the olicy representing the complete value of the contractwor!s shall be ad4ustable at completion of the construction on the basis of actualvalues to be declared by the insured in respect of freight and handling charges'customs dues and construction cost and di>erence in premium shall be met with bypayment at the rate agreed to or by the insured as the case may be. %ny increase

    or decrease in the rime cost of materials shall not be the sub4ect matter of premium ad4ustment.

    Me1o & % REINSTATEMENT OF SUM INSURED 2 

    In the event of loss or damage the Insurance shall notwithstanding be maintained inforce during the period of insurance for the &um Insured the Insured underta!ing topay a pro-rata additional premium on the full amount of each claim for the loss ordamage from the date of such loss to the e/piry of the period of Insurance.

    Me1o ' % BASIS OF LOSS SETTLEMENT 2 

    In the event of any loss or damage the basis of any settlement under this olicy shall be -

    a) in the case of damage which can be repaired the cost of repairs necessary torestore the property to their condition immediately before the occurrence of the damage less salvage' or

    b) in the case of a total loss - the actual value of the property immediatelybefore the occurrence of the loss less salvageF

    however' only to the e/tent the cost claimed has to be borne by the Insuredand to the e/tent they are included in the &um Insured and provided alwaysthat the provisions and conditions have been complied with.

     %ll damages' which can be repaired' shall be repaired' but if the cost of repairingany damage e;uals or e/ceeds the value of the property immediately before theoccurrence of the damage' the settlement shall be made on the basis providedfor in (b) above.

     

    ----------------------------------Tariff Advisory Committee

    1-1-01

    1"

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    18/40

     The cost of any provisional repairs will be borne by the Company if such repairsconstitute part of the nal repairs and do not increase the total repair e/penses.

      The cost of any alterations' additions and3or improvements shall not berecoverable under this olicy.

     

    Me1o 6 % EXTENSION OF COVER 2 

    %ny e/tra charges incurred for overtime' wor! on holidays' e/press freight(e/cluding air freight) are not covered by this insurance unless agreed upon at anadditional premium to be prescribed by the Company.

    Me1o 8 % CONSTRUCTION PLANT AND MACHINERY 2 

    Loss of or damage to Construction lant and Bachinery e/cludes loss or damagedirectly caused by its own e/plosion or its own mechanical or electrical brea!downor derangement.

    Me1o : % SURROUNDIN# PROPERTY 2 

    Loss of or damage to property located on or ad4acent to the site and belonging to orheld in care custody or control of the rincipal (s) or the Contractor(s) shall only becovered if occurring directly due to the construction of the items insured under&ection I and happening during the period of cover' and provided that a separate&um therefore has been entered in the &chedule under &ection I' for rincipal=ssurrounding specied property. This cover does not apply to construction3erectionmachinery' plants and e;uipment.

    Me1o < % MAOR PERILS4AO# Pe(-+s 2 

     The ma4or peril3%cts of @od claims shall mean claims arising out of J

    a) arth;ua!e - ire $ &hoc!b) Landslide39oc!slide3&ubsidencec) lood3Inundationd) &torm3Tempest3

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    19/40

    Me1o ! THIRD PARTY LIABILITY %

     Third party liability (TL) cover cannot be granted during e/tended maintenance.

    SECTION II % THIRD PARTY LIABILITY %

     The company will indemnify the insured against -

    a) legal liability for accidental loss or damage caused to property of other personsincluding property held in trust by or under custody of the Insured for which heis responsible e/cluding any such property used in connection with constructionthereon.

    b) legal liability (liability under contract e/cepted) for fatal or non-fatal in4ury toany persons other than the InsuredDs own employees or wor!men or employeesof the owner of the wor!s or premises or other rms connected with any other

    construction wor! thereon' or members of the InsuredDs family or of any of theaforesaidF directly conse;uent upon or solely due to the construction of anyproperty described in the &chedule.

    rovided that the total liability of the Company during the period of Insuranceunder this cause shall not e/ceed the limits of Indemnity set opposite thereto inthe &chedule.

    In respect of a claim for compensation to which the indemnity provided hereinapplies' the Company will' in addition' indemnify the Insured against -

    a) all costs and e/penses of litigation recovered by any claimant from the Insured'

    b) all costs and e/penses incurred with the written consent of the Company.

     The e/clusion contained in paragraphs (d)' (f) $ (g) in &ection I of this olicy shallapply also to this &ection.

     EXCLUSIONS TO SECTION II % 

     The Company will not indemnify the Insured in respect of -

    ".  The /cess stated in the &chedule to be borne by the Ins)(e0  in any oneoccurrence related to property damage.

    . /penditure incurred in doing or redoing or ma!ing good or repairing orreplacing anything covered or coverable under &ection I of this olicyF

    ----------------------------------Tariff Advisory Committee

    1-1-01

    1$

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    20/40

    ,. Liability conse;uent upon -

    a) bodily in4ury to or illness of employees or wor!men of the Contractor(s) or therincipal(s) or any other rm connected with the pro4ect which or part of which is insured under &ection I' or members of their familiesF

     

    b) Loss of or damage to property belonging to or held in care custody or controlof the Contractor(s)' the rincipal(s) or any other rm connected with thepro4ect which or part of which is insured under &ection - I' or an employee orwor!man of one of the aforesaidF

     c) any accident caused by vehicles licensed for general road use or by

    waterborne vessels or aircraftF 

    d) any agreement by the Insured to pay any sum by way of indemnity orotherwise unless such liability would have attached also in the absence of such agreement.

    CONDITIONS APPLYIN# TO SECTION II %

    ". #o admission' o>er' promise' payment or indemnity shall be made or given by oron behalf of the Insured without the written consent of the Company who shallbe entitled' if they so desire' to ta!e over and conduct in the name of the Insuredthe defence or settlement of any claim or to prosecute for their own benet inthe name of the Insured any claim for indemnity or damage or otherwise andshall have full discretion in the conduct of any proceeding or in the settlement of any claim and the Insured shall give all such information and assistance as theCompany may re;uire.

    . The company may' so far as any accident is concerned' pay to the Insured thelimit of indemnity for anyone accident3 anyone period' but deducting therefromin such case any sum3s already paid as compensation in respect thereof or anylesser sum for which the claim or claims arising from such accident can besettled and the company shall thereafter be under no further liability in respectof such accident under this section.PART % RATE SCHEDULE FOR CONTRACTORS> ALL RISKS INSURANCE

    HAVIN# SUM INSURED UPTO RS! CRORES

    R-s Co0e

    S!No

    R-s  P(e1-)1 Rates oG

    E9ess % 6 o7 +a-1 a1o)nt

    s)et to M-n1 o7 Rs!

    M-n1

    Rate)*to

    5(st &1ont.s

    A00+! Rate*e( 1ont.e/on0 &1ont.s

    No(1a+AO#4Mao(

    Pe(-+s4Co++a*se

    (") () (,) (2) (6) (7) (8)

    ----------------------------------Tariff Advisory Committee

    1-1-01

    20

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    21/40

    ! Res-0ent-a+ an0 o11e(-a+ )-+0-ngs, OJe )-+0-ngs, S.oo+s,Un-;e(s-t-es, Hote+s, Mote+s, Resta)(ants, Hos*-ta+s, A-(*o(t )-+0-ngs o7 2

    A""A"" a) 1ther than 9CC andnot more than storeys

    ".AA A.A ,'AAA3- "A'AAA3-

    A"A, b) 1ther than 9CC ande/ceeding storeys and upto 6storeys

    ".86 A.A6 6'AAA3- A'AAA3-

    A",A c)9CC framed structurenot more than 6storeys

    ".6A A.A6 6'AAA3- A'AAA3-

    A"2A2, d) 9CC ramed structureabove 6 storeys andupto "A storeys

    .AA A.A, 6'AAA3- A'AAA3-

    -- e) 9CC ramed structureabove "A storeys andupto "6 storeys

    .6 A.A,6 6'AAA3- A'AAA3-

    A"7A?7 f) 9CC ramed structureabove "6 storeys andupto 6 storeys

    ,.AA A.A6 6A'AAA3- 'AA'AAA3-

    A"8"A7 g) 9CC ramed structureabove 6 storeys andupto ,A storeys

    ,.6 A.A6 6A'AAA3- 'AA'AAA3-

    --- h) 9CC ramed structureabove ,A storeys andupto 2A storeys

    ,.6A A.A6 6A'AAA3- 'AA'AAA3-

    --- i) 9CC ramed structureabove 2A storeys andupto 6A storeys

    ,.86 A.A6 6A'AAA3- 'AA'AAA3-

    --- 4) 9CC ramed structureabove 6A storeys andupto 7A storeys

    2.AA A.A6 6A'AAA3- 'AA'AAA3-

    "! T.eate(s, A)0-to(-)1 an0 C-ne1a Ha++s %

    A"A2" a)

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    22/40

    A2A8, d) %dvisory Committee (ngg. sub-committee) for rate of premium to be charged inaddition to the above rates.

    ----------------------------------Tariff Advisory Committee

    1-1-01

    22

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    23/40

    A7"A?8 7 Interior decorationwor!s

    ,.AA A."A "A'AAA3- 2A'AAA3-

    A8"A2 8 9unways' %prons and%ir Ta/iways at%irports.

    .AA A.A6 6'AAA3- A'AAA3-

    %% < F+/o;e(s on Lan0 %

    A:"A8, a) &pan not  e/ceeding"6 m

    .6A A.A, 6'AAA3- A'AAA3-

    A:A?6 b) &pan e/ceeding "6 m ,.AA A.A2 "A'AAA3- 2A'AAA3-

    %%% S)?a/s on Lan0 2

    A?"A8, a) *idth not  e/ceeding"6 m

    .6A A.,A 6'AAA3- A'AAA3-

    A?A?6 b) *idth e/ceeding "6 m ,.AA A.2A "A'AAA3- 2A'AAA3-

    ! Roa0 (-0ges on +an0 1a0e o7 2

    "A"A?7 a) &teel ,.AA A.A6 6'AAA3- A'AAA3-

    "A""7 b) 9CC or re-stressedconcrete

    ,.6A A.A6 "A'AAA3- 2A'AAA3-

    "A,",7 c) 1ther materials 6.AAO A."AO A'AAA3- :A'AAA3-

    O rovisional rates' reference to be made to T%C for nal rate ;uotation.

    ! B(-0ges on (-;e(s4(ees, 0a1s4oe( 0a1s, a)a 0)ts, ;-a%0)ts, a((ages,st()t)(e ?o(s -n ?ate( 2

    """"8 -- *eir-cum-causeway 7.AA A."A "'6A'AAA3-

    6'AA'AAA3-

    Note - In respect of bridges' the above rates will be applicable only when both sub- structure andsuper-structure are covered. 1therwise reference should be made to the T%C.

    12% IG Rese(;o-(s4Tans o7 1ate(-a+s (1ther than steel) 2

    ""A?, a) &urface and underground

    ,.AA A.,A 6'AAA3- A'AAA3-

    """6 b) 1verhead ,.6A A.2A 6'AAA3- A'AAA3-

      IIG Rese(;o-(s4Tans o7 stee+ 2

    ",A7 a) &urface and underground

    .6 A.A6 6'AAA3- A'AAA3-

    "2A8, b) 1verhead .6A A.A, 6'AAA3- A'AAA3-

    ----------------------------------Tariff Advisory Committee

    1-1-01

    23

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    24/40

    &! T)nne+s 2

    ",""68 I %bove sea level 8.AA A."A 'AA'AAA 6'AA'AAA

    ","78 II elow sea level "A.AA A."A 2'AA'AAA :'AA'AAA

    ",,"28 -- ridges on rivers3cree!s' 0ams' Co>erdams etc.

    7.AA A."A "'6A'AAA 6'AA'AAA

    '! La/-ng o7 o-+4gas *-*e+-nes %

    "2AAA" a) 1n Land rovisional rate 9s."6 per mille

    "2AAA b) nder &ea or 9iver 9eference to be made to T%C for nal rate ;uotation.

    6! @ate( s)**+/ %

    "6"A2, -- @ate( S)**+/

    Installations for housingcoloniesincluding pump housewith pumps' valves andpiping and water supplylines but e/cluding waterstorage tan!s

    .AA A.A, ,'AAA "A'AAA

    Note  - La/-ng o7 @ate( P-*e+-nes @ate( S)**+/ S.e1e % to be rated as per %9 tari> (Cir.#o. %93263?8-"7 dated ""-7-?8)

    8! Se?age 0-s*osa+ 2

    "7"A2, -- &ystem for

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    25/40

    A"A"" A 1ther sundry wor!s forresidential3 commercialbuildings li!e waterproongplastering of walls

    ".AA A.A ,'AAA "A'AAA

    """,8 " %ll other ris!s notcovered above

    6.AAO A."AO A'AAAO :A'AAAO

    "A:? nder ground cableducting

    .86 A.6A A'AAA :A'AAA

    ,"": , #atural 0raughtCooling Towers

    2.AA A."A6 "'AA'AAA 'AA'AAA

    2"""7 2 ile oundations alone inrespect of buildings $other structures

    ,.6A A.A6 "'AA'AAA 'AA'AAA

    6"A:8 6 Canals3 culverts (#otinvolving wor!s under

    water)

    .86 A."A A'AAA :A'AAA

    Note - 9efer Item -6 (9oads) for canals 3 culverts forming part of the 9oad construction

    7AAAA 7 9ailway @augeconversion (Beter gaugeto road gauge)

    ,.AA A.A, "A'AAA 2A'AAA

    8AAAA 8 A)a)+t)(e P(oetP Laying of

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    26/40

    or the purpose of these regulations the &ums Insured on the following items areto be ta!en into account for arriving at total &um Insured for C%9 Insurance J

    a) Barine (Imports)- Landed cost at siteb) Barine (Indigenous)- Landed cost at sitec) Cost of Construction

    d) ermanent Civil ngineering *or!se) erent

    suppliers3contractors3&ub-Contractors 19 the Insureds carry out the wor!themselves departmentally' the Insurances for all such &ub-Contracts aresub4ect of these @eneral 9egulations.

    8! COMPUTATION OF PREMIUM

    remium shall be computed for the total period commencing from

    i) Commencement of wor! ORii) 0ate of arrival of the rst consignment at the site of erection

    whichever is earlier.

    :! STORA#E RATE AT FABRICATORS PREMISES4@ORKSHOP

     This is an e/tension to C%9 olicy and can be covered.&torage 9ate J 9e. A.,A per mille per annum or part thereof /cess 9s. "6AA each claim.

    ----------------------------------Tariff Advisory Committee

    1-1-01

    2!

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    27/40

    Irrespective of the &um Insured for C%9 the following additional rates are to becharged over the C%9 9ate for ris!s located in arth;ua!e Sone (as dened inthe ire Tari>).

    one A**+-a+e (ate oG *e( ann)1

    Sone - I ".AASone J II A.6ASone J III #ilSone J I #il

    Notes % 

    a) These additional rates ta!e care of arth;ua!e (ire and &hoc!) perils only.b) These additional rates are to be charged on pro-rata basis for period shorter

    than one year.c) %ll Ats o7 #o0 *e(-+s ot.e( t.an Ea(t.)ae  (Fire and shock ) are ta!en

    care of in the C%9 9ates prescribed.

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    28/40

    I +a-1one 2II

      Rs! ,4% *e(+a-1

    ) or ris!s situated in arth;ua!e Sone III and I the minimum e/cess forclaims arising out of %1@ perils shall be the e/cess prescribed in Column #o.

    8 of 9ate &chedule.

     The e/cess amounts shall apply separately to each incident giving rise toloss or damage and for this purpose a incident shall not be considered tohave terminated until there have been seven consecutive days freedom fromthe perils concerned and only thereafter will this e/cess amount applyafresh.

    C) In respect of those C%9 9is!s located in arth;ua!e Sone I or II where clientsdo not re;uire the cover for arth;ua!e erils' the e/cess amountapplicable for all %1@ perils other than arth;ua!e (ire and &hoc!) will bethe same as prescribed in Column #o. 8 of the 9ate &chedule.

    0) In respect of those C%9 9is!s where the e/cess prescribed in Column #o. 8of the 9ate &chedule is higher than e/cess amounts prescribed above forSone I and II (viU. 9s. 6'AAA3- per claim for Sone I and 9s. "A'AAA3- perclaim for Sone II) the higher of the two e/cesses should be applied in respectof %1@ Claims.

    ! DISCOUNT FOR HI#HER EXCESS $ VOLUME DISCOUNT %

    AG %ll rates for Contractor=s %ll 9is!s Insurance are sub4ect to minimum /cessper claim and separately for (a) #ormal (b) %1@3Collapse Claims asprescribed.

    0iscounts for opting

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    29/40

      times the minimum /cess 6 E  6 times the minimum /cess "A E"A times the minimum /cess A EA times the minimum /cess ,A E

    Notes J ". These discounts in the arth;ua!e premium only' can be allowedirrespective of whether the increased /cesses for#ormal3Collapse Claims are opted or not for the C%9 Cover.

     . The higher arth;ua!e /cess will ;ualify for discounts in the

    arth;ua!e premium only and not in the C%9 premium' for whichthe provisions under Item #o. (%) above would continue to apply.

    CG  The discounts applicable in the C%9 9ate and3or the arth;ua!e premium ase/plained in (%) and () above for selection of higher /cess amounts arealso applicable' as under' during any /tensions in the policy period -

     

    i) in the e/tension 9ates prescribed of the @eneral 9egulationsF andii) in the additional rates during /tension period for arth;ua!e (Fire &Shock ) perils prescribed under @eneral 9egulations.

    "! CLEARANCE AND REMOVAL OF DEBRIS % 

     The rate applicable for ContractorDs %ll 9is!s cover is to be charged on the limitof &um Insured /ed for MClearance and 9emoval of 0ebrisD.

      The olicy /cesses (#ormal $ %1@3Collapse) should apply for the DClearanceand 9emoval of 0ebrisD claims.

    &! THIRD PARTY LIABILITY COVER %

     The rate as applicable for C%9 Cover is to be charged for Third arty LiabilityCover' upto the following limits -

    AG Fo( Po+--es ?-t. s)1 -ns)(e0 )*to Rs! ! C(o(es %

    %ny one personF%ny one accidentF0uring the entire period of C%9 cover

    pto 9s' ".AA Crore

    BG Fo( *o+--es ?-t. s)1 -ns)(e0 ao;e Rs! ! C(o(es %

    %ny one personF%ny one accidentF0uring the entire period of C%9 cover

    "A E of the completely erectedvalue or 9s. "A.A Crores whichever islower.

    Notes %

    ----------------------------------Tariff Advisory Committee

    1-1-01

    2$

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    30/40

    i) Third arty Liability Insurance in e/cess of above-mentioned limits shouldbe under written in the Biscellaneous 0epartment at the discretion of theInsurer.

    ii) The olicy /cesses (#ormal $ %1@3Collapse Claims) should apply for Third arty Liability roperty 0amage Claims.

    iii) or Third arty Liability Claims arising out of %cts of @od erils the /cessapplicable to %1@ claims should be applied.

     iv) The &um Insured for TL Cover cannot be reinstated after occurrence of a

    loss. The Tari> e/tension rate shall apply for TL cover also duringe/tension period. *hen di>erent sections of the contract wor!s arecovered for di>erent e/tension periods under the policy' the highest of such Tari> e/tension rates shall be charged for TL cover duringe/tension.

    v) The T Liability cover cannot be granted during e/tended maintenance

    '! SURROUNDIN# PROPERTY OF THE INSURED %

    or covering the specied &urrounding roperty of the Insured the rateapplicable will be 6A E of the C%9 rate and this is to be charged on the limit of &um Insured /ed for the &urrounding roperty.

     The olicy /cesses (Normal & !"#$ollapse $laims) should apply for&urrounding roperty also.

    6! ESCALATION PROVISION %

    scalation enet will be limited to a ma/imum of 6AE of the sum insured forC%9 (the escalation limit may be e/pressed either in percentage or in amount)and will be permitted only once at the time of inception of the C%9 olicy.

     %dditional remium is to be charged for Vscalation rovisionD at the ratesprescribed for C%9 but on the 6AE of the amount of escalation. The method of premium calculation will be as under Ja) %ssume the ro4ect &um Insured ... 9s. 2 Croresb) %ssume scalation percentage is "A E i.e. 9s. 2A La!hsc) %dditional remium to be charged at

    the prescribed rate for C%9 coverwill be on 6A E of the scalationro- visional cover i.e. on. ... 9s.A La!hs

    8! ADDITIONAL RATE FOR EXPRESS FREI#HT ( I% F%I"'T $*++)HOLIDAY AND OVERTIME RATES OF THE @A#ES %

     The additional premium for covering /press reight ( ir Freight excluded)'

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    31/40

    :! ADDITIONAL RATE FOR AIR FREI#HT ONLY 2 (e7e( En0t! Fo( A-(F(e-g.t G

     The 9ate and e/cess as under shall be charged e/clusively for items of %irreight only and sub4ect to the limit selected by the Insured for Indemnityagainst %ir reight only J

    Rate ! ! ! 6 on t.e a1o)nt o7 -n0e1n-t/se+ete0

    E9ess ! ! ! 6 o7 t.e A-( F(e-g.t -n)((e0 *e(+a-1

     The En0o(se1ent @o(0-ng for covering the %ir reight will be as under --

    MIt is hereby declared and agreed that the olicy shall also indemnify towards %irreight incurred by the Insured in connection with the idemniable loss underthe olicy.

    In consideration thereof an additional premium of 9s.HHHHHHH is charged hereby.Limit of indemnity shall be 9s.HHHHHH during currency of the olicy.

    ach and every claim shall be sub4ect to a minimum /cess of 6 E of the %irreight incurred over and above the e/cess as applicable under the policy.&ub4ect otherwise to terms' conditions and e/ceptions of the policy=.

    aG ADDITIONAL CUSTOM DUTY %

     The cover for %dditional Custom 0uty will be sub4ect to the following rates' termsand conditions -

     a) the cover for %dditional Custom 0uty will be on irst Loss asis'b) The specic limit for %dditional Custom 0uty-either in percentage or in

    amount - has to be selected by the Insured at the inception of the olicy andcan be reinstated in the event of loss'

    c) The (ate an0 e9ess will be as under - 

    Rate " to e .a(ge0 on t.e A00-t-ona+ C)sto1 D)t/ a1o)ntse+ete0!

    E9ess 6 o7 t.e a01-ss-+e C)sto1 D)t/ -n)((e0, -n a00-t-on tot.e E9ess a1o)nt a**+-a+e 7o( t.e aete0 -te1 )n0e(t.e *o+-/!

    d) ollowing endorsement wording to be used for the purpose -

    MIn consideration of the Insured having paid an additional premium of 9s.HHHHHHH' It is hereby declared and agreed that the insured shall also beindemnied during the currency of this policy' towards the additionalCustom 0uty amount of 9s.HHHHHH which may be incurred by the Insuredover and above the Custom 0uty amount ta!en into account in arriving atthe &um Insured of the a>ected item.

    ----------------------------------Tariff Advisory Committee

    1-1-01

    31

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    32/40

    ach and every claim payable under this e/tension shall be sub4ect to an/cess of 6 Eof the admissible %dditional Custom 0uty incurred and willbe in addition to the e/cess amount applicable for the a>ected item underthe policy.

     The Indemnity for such %dditional Custom 0uty will stand reduced afteroccurrence of the claim unless reinstated by payment of an additional

    premium prescribed by the Company. &ub4ect otherwise to the terms'conditions and e/ceptions of the policy=.

    % separate &um Insured is /ed for CB e;uipments used for such pro4ects.

    i) &um Insured of CB does not e/ceed 6 E of C%9 &um Insured -

    *here the &um Insured for CB e;uipments does not e/ceed 6 E of &I forC%9 Insurance' or 9s. 6 la!hs whichever is lower' the same can be coveredunder the C%9 policy and at rates and e/cesses applicable for C%9.

    ii) &um Insured of CB e/ceeds 6 E of C%9 &um Insured -

    *here the &um Insured for CB e;uipments e/ceeds 6E of &I for C%9Insurance' or 9s. 6 la!hs whichever is lower' the same should be separatelycovered under the Contractor=s lant and Bachinery Insurance olicy and atrates and e/cesses as applicable for CB Insurance.

    ! RATES FOR EXTENSION BEYOND POLICY PERIOD % 

    No(1a+ Pe(-o0 Rate *e( 1-++e

    i) " month or part thereof A.,Aii) /ceeding " month but not e/ceeding months A.6A

    iii) /ceeding months but not e/ceeding , months A.86iv) /ceeding , months but not e/ceeding 7 months ".Av) /ceeding 7 months but not e/ceeding ? months ".86vi) /ceeding ? months but not e/ceeding "

    months.AA

    vii) /ceeding " months but not e/ceeding"6months

    .6

    viii) /ceeding "6 months but not e/ceeding":months

    .6A

    i/) /ceeding ": months but not e/ceeding "months

    .86

    /) /ceeding " months but not e/ceeding2

    months

    ,.AA

    /i) ,A monthsO ,.AA W (,A-2)32 X,.6

    /ii) ,7 monthsO ,.AA W (,7-2)32 X,.6A

    /iii) 2 monthsO ,.AA W (2-2)32 X,.86

    /iv) 2: monthsO ,.AA W (2:-2)32 X----------------------------------Tariff Advisory Committee

    1-1-01

    32

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    33/40

    2.AAand so on for longer e/tensions.

    O Circular no. ngg3@en-2323AAA-"6' dated 1ctober 7' AAAIrrespective of the number of e/tensions availed of by the Insured the abovee/tension rates will apply for each e/tension.

    or ris!s located in arth;ua!e Sones ro-rata e/tra of the additional rates forarth;ua!e (rescribed under Item #o.8 of @eneral 9egulations will also applyfor /tension eriods beyond policy period' in addition to the #ormal /tension9ates for C%9 Cover prescribed above.

    "! CLAIMS DISCOUNTS LOADIN# ON CAR EXTENSION RATES %

    or all proposals having &um Insured above 9s "AA Crores' loading3discount shallapply on e/tension rates under C%9 Tari> depending on the claims e/perienceunder the policy at the time of e/tension.

    C+a-1s e9*e(-ene as on 0ate o7 e9tens-on D-so)nt4Loa0-ng

    pto "A E A Emore than "A E upto ,A E "6 Emore than ,A E upto 7A E "A E

    more than 7A E upto "AA E #ilmore than "AA E upto AA E W "A Emore than AA E upto ,AA E W A E

    more than ,AA E W ,A E

      Notes % 

    i) The above discount3loading for e/tensions to such policies will be applicableonly to the pro4ect ris!s with &I above 9s."AA Crores.

    /tensions to pro4ect ris!s with &I below 9s."AA crores will not be eligible forany discount3loading

    ii) Ba/imum discount allowable on C%9 rate is 7A E ie. The nal rate after alldiscounts are applied should not be less than 2A E of the basic C%9 rate

    "! MAINTENANCE VISITS AND EXTENDED MAINTENANCE COVER %

     The policy can be e/tended to cover the Baintenance isits and /tendedBaintenance. The endorsement wordings and rates and e/cess for those will be

    as under - -G L-1-te0 Ma-ntenane V-s-ts o;e(s Co;e( %

     In consideration of the payment of additional premium by the insured (which

    is included in the total premium set forth in the schedule) it is herebydeclared and agreed that the indemnity provided by this policy is e/tended toinclude Baintenance Cover for the period of HHHHHHH months to be rec!oned

    ----------------------------------Tariff Advisory Committee

    1-1-01

    33

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    34/40

    from the date of completion or handing over provided the policy period hasbeen e/tended till completion or handing over. ective from "3"A3??.

    -;G E9tens-on o7 CAR Po+-/ 7o( Ma-ntenane V-s-ts an0 E9ten0e0Ma-ntenane Co;e(

    In case deletion of Baintenance isits3/tended Baintenance Cover availedat the inception of C%9 policies before attachment of the ris!' refund of 

    ----------------------------------Tariff Advisory Committee

    1-1-01

    34

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    35/40

    premium may be given by retaining 6 E of the premium under thise/tension. In case the ris! is attached no refund shall be allowed for deletionof Baintenance isits3 /tended Baintenance Cover.

    ""! REFUND OF PREMIUM FOR EARLY COMPLETION OF THE PROECT %

    9efund of premium' arising out o, cancellation o, policies under $% insurancedue to abandonment o, pro8ect. double insurance o, same pro8ect etc/ or re,undo, premium due to early completion earlier than the period mentioned in policy&chedule (including testing in respect o, $% policies) whether rated by theInsurer or T$ can be allowed provided the following conditions are fullled($ircular no/ ngg#"en252III#"en26529II#4425. dated Feb/ 65. 3444)J

    i) The period of insurance is ": months and aboveFii) #otice for early completion being given in advance to the insurer before

    completion of the pro4ect.iii) claims e/perience under the policy being less then 7Aiv) The original policy period is not e/ceeding the contract period as per

    contractual clause. In the absence of the e/istence of the contract' thescheduled pro4ect period as per original bar chart should be the policy period. 

     The 1-n-1)1 *e(-o0 for which refund can be claimed shall be , months.

    "&! REFERENCE TO Ta(- A0;! Co11-ttee TACG %

    %ny proposal on ContractorDs %ll 9is!s Insurance with sum insured upto 9s."'6AAcrores shall be rated as per Tari>. 9eference will be made only in case of doubt.

    "'! PROVISIONAL RATE =UOTATIONS FOR CAR INSURANCE HAVIN# SUM%INSURED OVER RS! CRORESG %

    rovisional Yuotations (if any) to the clients for C%9 Insurances having suminsured upto 9s. "'6AA Crores to be made on the following basis of these @eneral9egulations and a reference to be made to T%C (ngineering &ub-Committee)for nal /ing of rates and terms.

    "6! PROVISIONAL RATE %

    %ny rovisional 9ate Yuotations for C%9 Insurances having &um Insured upto9s."6AA crores' not consistent with the above' will be treated as breach of Tari> and dealt with accordingly.

    "8! BREACH o7 TARIFF %

    %ny 9ate Yuotations for C%9 Insurances not consistent with this Tari> will betreated as reach of Tari> and dealt with accordingly.

    ":! #ROSS RATES %

    ----------------------------------Tariff Advisory Committee

    1-1-01

    3

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    36/40

     %ll 9ates specied in the Tari> are @ross 9ates and %gency Commission (ordiscount in lieu of %gency Commission) can be allowed from these @ross 9ates'as per 9ules rescribed by @eneral Insurance Corporation of India from time totime.

     A N N E X U R E

    ENDORSEMENTS -

    ollowing endorsements shall be attached to the policies whenever applicable -

    ! PIPELINE CONSTRUCTION %

    #otwithstanding the conditions and provisions and endorsements of the policy' itis understood and agreed that the following special conditions shall apply -

    a) /cavated material shall be deposited at least one meter away from thetrench.

    b) The length of trenches totally or partially opened at any one time shall nevere/ceed in respect of any one wor! face HH meters all wor! faces= combinedtotal HHHH meters.

    c) ipe shall be secured against heaving or Noating up by covering themsuGciently and as soon as practicable.

    d) The open ends of pipes shall be provisionally sealed at the end of eachwor!ing day or in the event of immediate danger of Nooding' otherwisee/penses for clearing and cleaning of mud-lled pipeline sections shallnot be indemnied.

    e) Loss or damage arising from pressure testing producing tensions e/ceedingthe yield point guaranteed by the manufacturer shall not be covered.f) Loss of testing media shall not be covered.g) Cost incurred in searching for lea!s are indemnied -

    - up to but not e/ceeding the limit per event of HHHHHHHHHHHHHHHH - up to an aggregate limit for the policy period of HHHHHHHHHHHHHHHH 

    however only if the lea!s are a conse;uence of an insured event.

    ----------------------------------Tariff Advisory Committee

    1-1-01

    3!

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    37/40

    h) The Insurer is not liable for any claims due to pollution from any causewhatsoever.

    "! EXCLUSION OF LOSS OF STABILISIN# FLUID %

    #otwithstanding the conditions' provisions and other endorsements of the policy'

    it is agreed and understood that the Insurers shall not be liable to indemnify theInsured in respect of loss of bentonite or other stabilising Nuid even if the;uantity of losses originally e/pected is e/ceeded.

    &! ROAD CONSTRUCTION %%

    It is hereby warranted and agreed that' notwithstanding anything contained inthis policy to the contrary' the following special conditions shall apply -

     The length of the wor!ing area (e/cavation and construction of co>er etc.'however e/cept nal surfacing) shall never e/ceed HHHHH meters at any wor!face and a total of HHHHHHH meters at all wor! faces combined.

    '! PILIN# CONSTRUCTION %

    #otwithstanding the conditions' provisions and other endorsements of the olicy'it is agreed and understood that the Insurers shall not be liable to indemnify theInsured in respect of -

    a) Loss of or damage to piles and3or casings due to misplacement' 4ammingand3or e/traction thereof.

    b) Costs incurred in case of abandoned piling wor!' for any reasons not relatedto accidental loss or damage and mainly due to unforeseen ground conditionswhen piles cannot be driven to the re;uired depth.

    6! ABANDONMENT OF SHAFTS %

    It is hereby agreed and declared that' notwithstanding anything contained in thecontrary' this endorsement e/cludes any loss or damage resulting as aconse;uence of shaft being abandoned due to any reason whatsoever.

    8! CROPS, FORESTS, CULTIVATED AREAS %

    #otwithstanding the conditions' provisions and other endorsements of the olicy'it is agreed and understood that the Insurers shall not be liable to indemnify the

    Insured in respect of any loss' damage or liability directly or indirectly caused tocrops' forests and3or other cultures during the e/ecution of the contract wor!s.

    :! EXISTIN# UNDER#ROUND CABLES %

    #otwithstanding the conditions' provisions and other endorsements of the olicy'it is understood and agreed that the following special conditions shall apply -

    ----------------------------------Tariff Advisory Committee

    1-1-01

    3"

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    38/40

     The Insurers shall not be liable under the olicy to indemnify loss or damage toe/isting underground cables or pipes of any !ind (electric cables' telephonecables' water and gas pipes' sewers and other pipelines' etc.) unless prior to thecommencement of wor!s -

    - the Insured had re;uested and obtained from the public authorities or the

    owners of such an underground system the e/act position of all cables or pipes. - the Insured had traced their e/istence and indicated location.

     The indemnity shall in any case be restricted to the repair costs of such cables orpipes. %ny conse;uential damage shall be e/cluded from the policy cover.

    #otwithstanding the conditions' provisions and other endorsements of the olicyit is understood and agreed that -

    a) The contract wor!s time schedule together with plans' documents andspecications supplied and any other statements made by the Insured withrespect of wor!s programme is deemed to be incorporated herein.

     b)  The Insurers shall not indemnify the Insured in respect of loss or damagecaused by' or arising out of' or aggravated by deviations from the contractwor!s time schedule e/ceeding four wee!s' unless the Insurers had agreed inwriting to such a deviation before a loss occurred.

     This memo applies only to the dam wor!s during period of river diversion.

    ! TEMPORARY ACCESS ROADS %

    Irrespective of the periods of Insurance specied in the olicy' the Insurer willindemnify the Insured only for unforeseen accidental loss or damage totemporary access roads insured under the olicy if such loss or damage occursprior to such roads being completed or ta!en into use for their purpose by thecontractors' whichever ta!es place rst.

    ! SPECIAL CONDITIONS CONCERNIN# THE CONSTRUCTION OF DAMAND @ATER RESERVOIR %

    It is agreed and understood that otherwise sub4ect to the terms' e/clusions'provisions and conditions contained in olicy or endorsed thereon the Insurerswill not indemnify the Insured in respect of -

      • grouting of soft roc! areas and3or other additional safety measure even if their necessity arises only during construction'

    • e/penses incurred for dewatering even if the ;uantities of water originallye/pected are e/ceeded substantially'

    ----------------------------------Tariff Advisory Committee

    1-1-01

    3#

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    39/40

    • loss or damage due to brea!down of the dewatering system if suchbrea!down could have been avoided by suGcient stand-byfacilities'

    • e/penses incurred for additional sealing or water proong and additionalfacilities for the discharge of run o> and or underground water'

    • e/penses incurred for the repairs of eroded slopes or other graded areas' if the Insured has failed to ta!e the measures re;uired or to ta!e themin time'

    • loss or damage due to subsidence if caused by insuGcient compacting'crac!s and lea!age not caused by Insured peril.

    ! SPECIAL CONDITIONS CONCERNIN# SAFETY MEASURES @ITHRESPECT TO PRECIPITATION, FLOOD AND INUNDATION %

    It is agreed and understood that otherwise sub4ect to the terms' e/clusions'provisions and conditions contained in the policy or endorsed thereon' theInsurers shall indemnify the Insured for loss' damage or liability caused directly

    or indirectly by precipitation only if ade;uate precautions have been ta!en indesigning and e/ecuting the pro4ect involved.In this conte/t' ade;uate precautions shall mean that allowance is made forprecipitation' Nood and inundation up to a return period of "A years for thelocation insured and the entire policy period on the basis of statistics preparedby the Beteorological agencies.

     

    Loss' damage or liability resulting from the Insured=s not immediately removingobstruction (e.g. sand' trees) from watercourses' whether carrying water or not'in order to maintain free water Now shall not be idemniable.

    "! SPECIAL CONDITIONS CONCERNIN# REMOVAL OF DEBRIS FROMLANDSLIDES %

    &! ENDORSEMENT FOR ESCALATION PROVISION 2

    or En0o(se1ent @o(0-ng J 9efer ndt. #o.

    MIn consideration of the payment of an additional premium of 9s. HHHHHHH. It ishereby declared and agreed that the Company shall provide for escalation in&um Insured under items of &ection I of the schedule attached to the policyuptoHHHHHHHHHHE of the 1riginal &ite value' the basis of claim settlement shall bethe original &ite value of e>ected e;uipment plus increase in cost of 

    replacement' if any' provided that the increase in the value of such e;uipmentdoes not e/ceed HHHHHHHE of the original site value.

    It is also hereby declared and agreed that in the event of a claim the insuredwould be considered as fully insured upto the &um Insured inclusive of HHHHHHHHH E increase as per selected escalation and under-insurance would apply only inthe event of the cost of replacement of the e>ected e;uipment e/ceeding theoriginal value of selected HHHHHHHHHHHE towards escalation.

    ----------------------------------Tariff Advisory Committee

    1-1-01

    3$

  • 8/18/2019 Tariff for Contractor All Risks Insurance

    40/40

    It is however understood and agreed that the premium collected against priceescalation herein above shall not be sub4ect to refund the premium ad4ustmentclause in the memo of the policy.

    It is further understood and agreed that in case of additional premium

    chargeable during nal ad4ustment' additional escalation premium will becharged to the insured but in case of any premium refundable during nalad4ustment no refund shall be allowed against the escalation premium alreadycharged to the insured=.