Upload
scot-barnett
View
214
Download
0
Embed Size (px)
Citation preview
Tariff Change Recommendations to the
Commercial Practices Committee
From the Regional Tariff Working Group
RTWG Roster
Company RepresentativeAEP-West Mr. Dennis Bethel Member (TO)
Arkansas Electric CooP. Corp. Mr. Ricky Bittle Chair (TC)Coral Power Trading Mr. Rick Rucker Member (TC)Dynegy Marketing and Trade Ms. Kim Casey Member (TC)Empire District Elect. Co. Mr. Rick McCord Member (TO)ENRON Power Marketing, Inc. Mr. Ron McNamara Member (TC) East Texas Electric Cooperative Mr. Wayne Miller Member (TC)Jonesboro City Water and Light Mr. Rick Henley Member (TC)Kansas City Power & Light Mr. Ron Kite Member (TO)KPL, Western Resources, Inc. Mr. Dennis Reed Vice-Chair (TO)Missouri Public Svc. Comm. Mr. Mike Proctor MemberOG+E Electric Services Mr. John Gunesch Jr. Member (TO)Oklahoma Municipal Power Mr. Gene Anderson Member (TC)Southwest Power Pool Mr. Pat Bourne SecretarySouthwestern Power Admin. Mr. James Sherwood Member (TO)Southwestern Public Service Co. Mr. David Grover Member (TO)Tenaska Power Services Co. Mr. Mark Foreman Member (TC)Western Farmers Electric Mr. Gary Roulet Member (TO)
Recommended Changes Revise Attachment P – Timing Requirements
for Reservations & Schedules Incorporate NERC Next-Hour-Market
Provisions Include new Attachment Y – Flexible Use
Transmission Service (Experimental) Revise Scheduling Penalty Provisions -(Sec.
13.7) Revise NERC TLR Procedures Revise Sections 2.2 and 22 – Reservation
Priority and Right of First Refusal
Revise Attachment P Background
– Attachment P Timing Specifications are not compliant with FERC Order 638
– Although present Attachment P specifications may be arguably better than Order 638 specifications, standardization with adjoining Transmission Providers was viewed to be the greater good
Recommendation– Approve the revisions which reflect compliance
Include Next-Hour-Market Provisions
Background– NERC has proposed tariff modifications which
have been approved by the FERC Recommendation
– Approve incorporation of the FERC approved language into the SPP OATT to Facilitate Next-Hour-Market activities
Add New Attachment Y Background
– The EOC has approved a phased implementation of the proposal to increase transmission system utilization
– The proposed new Attachment Y provides for a one-year experimental implementation of the first phase
Recommendation– Approve the addition of Attachment Y to the
SPP OATT
Scheduling Penalty Change
Background– The proposed change reduces the penalty to
200% of actual excess use– SPP scheduling software has been modified to
reject tags that are in excess of the corresponding reservation
Recommendation– Approve the proposed revisions to Sec. 13.7
Revise TLR Procedures Background
– NERC has revised its TLR Procedures– NERC has recently revised its IDC to
implement the new procedures– Procedures included in the SPP OATT as
Attachment R require replacement Recommendation
– Approve a revision to Attachment R which states that currently effective NERC TLR Procedures are incorporated by reference
Sections 2.2 and 22 ROFR Issues
Background– ROFR issues discussed extensively at the
RTWG– These revisions clarify the rights and
obligations of both incumbent and new customers
Sections 2.2 ROFR Issues
Change Time Frame to Respond to a competing request– Notify Both there is a competing Request– System Impact Study– Current User with ROFR must respond within 60
days of notification of a contingent service agreement
– Customer given reservation pays for System Impact Study, If competing request is awarded any service it pays
Sections 22 ROFR Issues
Clarify that requesting a change in path for an existing firm transmission reservation with remaining term of less than 1 year does not have ROFR– Treated as a new request
Sections 2.2 and 22 ROFR Issues
Recommendation– Approve the proposed revisions to Sec.2.2 and
Sec. 22
Ongoing Consideration of Major Issues
Tariff modifications for state retail restructuring programs
Pro Forma Generation Interconnection Agreement
Consistent standards for rate basing transmission facilities
Ultimate rate design for SPP Tariff