Tariff Calculation

Embed Size (px)

Citation preview

  • 7/30/2019 Tariff Calculation

    1/5

    Capacity of plant

    Capital Cost

    Debt/Equity

    ROE

    Total costEquity

    Debt

    Interest on Loan

    Working Capital

    Interest on Working Capital

    Depreciation rate

    O&M cost

    PLF

    PAF

    Specific Oil Consumption

    Price of Oil

    GCV of Oil

    SHR

    Cost of Coal

    AUX. Power

    plant life

    GCV of coal

    A Fixed Cost Componants

    1 ROE2 Interest On Loan

    3 Interest on Working Capital

    4 Depreciation

    5.28% of capital cost

    O&M cost

    5 Normative O&M cost

    For 660 MW

    Cost of Secondary Oil

    6 Total Fixed Cost

    Total Units Genrated

    Fixed cost/unit

    Variable Cost

    B Heat contribution of oil

    SHR

  • 7/30/2019 Tariff Calculation

    2/5

    Contribution of coal

    Specific Coal Consumption

    Cost of Specific Coal Consumption

    Variable Cost Per Unit at Bus bar

    Total Tariff

  • 7/30/2019 Tariff Calculation

    3/5

    1320 MW

    5.61 CR/MW

    75/25 75% 25%

    15.50%

    7400.00 cr1850.00

    5550.00

    12.50%

    10% of total capital 740 10%

    11.50%

    5.28%

    13.00 Lakh/MW

    85%

    90%

    1.00% ML/MW

    56000 RS/KL

    10000 Kcal/lit

    2164.91 kcal/kg

    600.00 Rs/tonne

    6.00%

    25 YRS

    3200.00 Kcal/kg

    286.75693.75

    85.1

    390.72 5.28%

    13 lakh/mw

    171.6 cr

    0.01 Rs/Unit

    0.01

    8845.848 MU

    1.840332323

    10 KCAL/UNIT

    2425

    ASSUMPTIONS

  • 7/30/2019 Tariff Calculation

    4/5

    2415

    0.713235294 Kg/unit

    0.427941176

    (variable cost per unit/(1-aux)

    0.467695275

    2.308027598 per Unit

  • 7/30/2019 Tariff Calculation

    5/5

    7400

    C