7/30/2019 Tariff Calculation
1/5
Capacity of plant
Capital Cost
Debt/Equity
ROE
Total costEquity
Debt
Interest on Loan
Working Capital
Interest on Working Capital
Depreciation rate
O&M cost
PLF
PAF
Specific Oil Consumption
Price of Oil
GCV of Oil
SHR
Cost of Coal
AUX. Power
plant life
GCV of coal
A Fixed Cost Componants
1 ROE2 Interest On Loan
3 Interest on Working Capital
4 Depreciation
5.28% of capital cost
O&M cost
5 Normative O&M cost
For 660 MW
Cost of Secondary Oil
6 Total Fixed Cost
Total Units Genrated
Fixed cost/unit
Variable Cost
B Heat contribution of oil
SHR
7/30/2019 Tariff Calculation
2/5
Contribution of coal
Specific Coal Consumption
Cost of Specific Coal Consumption
Variable Cost Per Unit at Bus bar
Total Tariff
7/30/2019 Tariff Calculation
3/5
1320 MW
5.61 CR/MW
75/25 75% 25%
15.50%
7400.00 cr1850.00
5550.00
12.50%
10% of total capital 740 10%
11.50%
5.28%
13.00 Lakh/MW
85%
90%
1.00% ML/MW
56000 RS/KL
10000 Kcal/lit
2164.91 kcal/kg
600.00 Rs/tonne
6.00%
25 YRS
3200.00 Kcal/kg
286.75693.75
85.1
390.72 5.28%
13 lakh/mw
171.6 cr
0.01 Rs/Unit
0.01
8845.848 MU
1.840332323
10 KCAL/UNIT
2425
ASSUMPTIONS
7/30/2019 Tariff Calculation
4/5
2415
0.713235294 Kg/unit
0.427941176
(variable cost per unit/(1-aux)
0.467695275
2.308027598 per Unit
7/30/2019 Tariff Calculation
5/5
7400