Tank Standards and Part 4 SP001 Inspections

Embed Size (px)

DESCRIPTION

Tank Standards and Part 4 SP001 Inspections

Citation preview

  • 1Flammable Liquid Aboveground Storage Tank WorkshopFebruary 2, 2011February 2, 2011Ab d T k F b i ti St d dAboveground Tank Fabrication StandardsDana Schmidt, PEProject EngineerSteel Tank Institute, div. of STI/SPFA

    Aboveground Storage Tank TypesAboveground Storage Tank Types

    y Portable containers

    y Shop-fabricated

    y Field-erected

    Portable containersPortable containers

    Portable containersPortable containers 3 types of Portable Containers3 types of Portable Containers

    1. Metal and plastic drums2. IBC (Intermediate Bulk Container)3. IM (Intermodal) or UN (United Nations)

    portable tankportable tank

  • 2Metal and plastic drumsMetal and plastic drums NFPA 30 Portable Container NFPA 30 Portable Container RequirementsRequirementsy Metal containers

    Metal IBC, Metal portable tanks Conform to USDOT Hazardous Materials

    Regulation 49 CFR*, ORP t 6 f UN R d ti th Part 6 of UN Recommendations on the Transport of Dangerous Goods

    y *see http://www.access.gpo.gov/nara/cfr/waisidx_04/49cfr178_04.html

    IBC (Intermediate Bulk Container)IBC (Intermediate Bulk Container) NFPA 30 Portable Container NFPA 30 Portable Container RequirementsRequirementsy Rigid nonmetallic IBC

    USDOT Hazardous Materials Regulations, 49 CFR

    Part 6 of UN Recommendations on the Transport of Dangerous Goods for Classes 31H1, 31H2, 31HZ1

    IM or UN portable tankIM or UN portable tankShop Fabricated Aboveground Shop Fabricated Aboveground Storage Tanks StandardsStorage Tanks Standards

  • 350,000 Gallons50,000 Gallons

    IndoorVertical Fire Rated

    Generator

    Outdoor

    Generator

    Diked

    AST StandardsAST Standardsfor Shop Fabricated Tanksfor Shop Fabricated Tanks

    y API - American Petroleum Institute API 12F API 650 Appendix J API 650, Appendix Jy UL - Underwriters

    Laboratories UL 142 UL 2085

    API SpecificationsAPI Specifications

    y API 12F Specification for Shop Welded Tanks for

    Storage of Production Liquids Vertical, cylindrical onlyy API 650, Appendix J

    Shop Assembled Welded Steel Tanks for Oil Storage

    Vertical, cylindrical only

    API 12FAPI 12F

    y Table 1 Tank Dimensions includes: Capacity Outside diameter Heightg Connection details

    API 12FAPI 12F

    y Specifies steel thickness BOTTOM: 1/4 in. (except sump to be 3/8 in.) SHELL: 3/16 in. or 1/4 in. as requested by purchaser DECK (TOP): same as shell except 15 ft.-6 in. diameter tanks to be 1/4 in.

  • 4A, B & C Dimensions areall provided in copy of API12 F Table 1 at back ofbinder.

    Vent LineConnection

    Overflow LineConnections

    A

    Fill LineConnection

    Aux LineConnection API 12 F Tank

    Layout

    Note: All capacities are inbarrels not gallons.

    (1 barrel = 42 gals.)24" x 36"Clean Out

    PipelineConnection

    BC

    D

    Drain LineConnection

    API 12F continuedAPI 12F continued

    y Emergency venting per Table C-1 based on tank dimensions given in Table 1y Pressure testing with air at 1 1/2 times

    design pressure and apply soap solutiondesign pressure and apply soap solutiony Nameplate

    Manufacturer, serial number, year built Nominal diameter, height, capacity Thickness of bottom, shell, deck Design pressure

    API 12F PaintingAPI 12F Painting

    y Metal primer requiredy Finish coating optional

    API 650, Appendix JAPI 650, Appendix J

    y Limited to 20 ft. diametery Steel thickness:

    BOTTOM: 1/4 in. SHELLS: calculations required andSHELLS: calculations required and

    Diameter Minimum

    to 10.5 ft. 3/16 in.

    over 10.5 ft. 1/4 in.

    ROOFS: calculations requiredcone, dome and umbrella

    API 650, Appendix J API 650, Appendix J Shell thicknessShell thickness

    CAE

    GHDt +=)000,21)(()1(6.2

    t = minimum thickness G = liquid specific gravityD = nominal diameter E = joint efficiencyH = liquid level CA = corrosion allowance

    Diameter Minimumto 10.5 ft. 3/16 in.over 10.5 ft. 1/4 in.

  • 5API 650, App. J (continued)API 650, App. J (continued)

    y Relies on Fire Codes for emergency venting requirementsy Pressure testing

    diameters to 12 ft.=5 psigdiameters to 12 ft. 5 psig diameters over 12 ft.=2 to 3 psigy Nameplate

    API 650, App. J, serial number, year built Nominal diameter, height, maximum capacity Design pressure, temperature, liquid level

    API 650, App. J (continued)API 650, App. J (continued)

    y Does include: Qualified welders requirement X-ray of some welds and magnetic particle

    testing of nozzles

    y Does not include: requirements for secondary containment requirements for painting

    Underwriters LaboratoriesUnderwriters Laboratories

    y UL 142 Steel Aboveground Tanks for Flammable and Combustible Liquids

    y UL 2085 Protected y UL 2085 Protected Aboveground Tanks for Flammable and Combustible Liquids

    y UL 2244 Aboveground Flammable Liquid Tank Systems

    y Atmospheric Tank -0.5 to 1 psig

    y Single wally Double wally Steel Diked Tanks

    Open or Closed Top

    UL 142ISBN 1-55989-385-0

    Steel Aboveground Tanks forFlammable and CombustibleLiquids

    y Carbon or stainless steel

    y Stationary use only

    Underwriters LaboratoriesUnderwriters LaboratoriesUL 142UL 142

    y Capacities up to 50,000 gallons

    y Specifies steel thicknesses Primary tank Secondary tank Shells and heads

    UL 142 Steel thicknessUL 142 Steel thickness

  • 6Underwriters LaboratoriesUnderwriters LaboratoriesUL 142UL 142y Performance testing required for:

    Rectangular tanks Optional support designs Ladders and other optional tank accessoriespy Manufacturing tests required:

    Air test at 1-1/2 to 5 psig with soap suds (based on tank type)

    Hydrostatic pressure (with water)

    STI AST Technologies (UL 142)STI AST Technologies (UL 142)

    Underwriters LaboratoriesUnderwriters LaboratoriesUL 142UL 142

    y Horizontal Cylindrical Steel thickness specified, including shell and heads Optional support design requires testing or calculations Diameters to 12 feet Air test at 5 psi Air test at 5 psi

    Underwriters LaboratoriesUnderwriters LaboratoriesUL 142UL 142

    y Vertical cylindrical Steel thickness specified Manufacturing air test at 1 1/2

    to 2 1/2 psi Dished or conical roof required

    Underwriters LaboratoriesUnderwriters LaboratoriesUL 142UL 142

    y Rectangular Requires performance

    testing to prove design Manufacturing air test at

    18 Performance18.1 Hydrostatic strength test18.1.1 The tank shall be tested to demonstrate that the strength of the assembly and the welded joints are inaccordance with these requirements.

    3 psi 18.1.2 The tank shall not rupture or leak when subjected to the Hydrostatic Strength Test, Section 40.18.2 Top load test18.2.1 After being subjected to the Top Load Test, Section 41, the tank shall then be subjected to the Leakage Test,Section 39, and shall not leak.

    Open Diked Tanks (F911)Open Diked Tanks (F911)

  • 7Diked Tanks with Rainshields Diked Tanks with Rainshields Closed Diked Tanks Closed Diked Tanks

    UL 142 SupportsUL 142 Supports

    y Maximum height of 12 inches

    y Must withstand 2 times the weight of a times the weight of a full tank

    y Design using calculations approved by UL

    y Design using Performance Test

    UL 142 WeldingUL 142 Welding

    y Specifies weld joint designsy Does not require

    qualified welders

    UL 142 Venting RequirementsUL 142 Venting Requirements

    y Normal vents Allow air to enter the tank when fluid is being

    withdrawn and also exhausts air when the tank is being filled

    Required on Primary tank (each compartment)

    Size per Table 8.2 in UL 142

    UL 142 Emergency VentingUL 142 Emergency Venting

    y Emergency vents Prevent damage to the tank by allowing

    excess pressure to be vented. They are designed to relieve excess pressure in the event of an emergency, such as a fire.

    Required on x Primary tank andx Secondary tank

  • 8UL 142 Emergency VentingUL 142 Emergency Ventingy Emergency vent device size

    Wetted surface area x Horizontal cylindrical tanks = 75% of total surface

    areax Vertical tanks = shell surface area (and bottom if Vertical tanks shell surface area (and bottom if

    elevated)x Rectangular tanks = surface area of sides and

    bottom Table 8.1 in UL 142 gives x Emergency vent capacity x Size

    UL 142 PaintingUL 142 Painting

    y No paint required on Stainless steel tanks

    y One coat of paint required on Carbon qsteel tanks

    UL 142 LabelUL 142 Label

    y Will have one of these statements: Aboveground Tank for Flammable Liquids

    Ab d T k f Fl bl L d S

    UL Serial No._________

    Aboveground Tank for Flammable Liquids on Supports Secondary Containment Aboveground Tank for Flammable

    Liquids

    Open Top Diked Aboveground Tank for Flammable Liquids Open Top Diked Secondary Containment Aboveground

    Tank for Flammable Liquids

    Closed Top Diked Aboveground Tank for Flammable Liquids

    Closed Top Diked Secondary Containment Aboveground Tank for Flammable Liquids

    Protected Tanky Integral Secondary

    containment Part of the construction of

    the tank, monitorable

    y Insulationy Reduce heat in a fire

    UL 2085ISBN 0-7629-0238-8

    Protected Aboveground Tanks forFlammable and CombustibleLiquids

    y Protection from physical damage

    2 Hour2 Hour2000 Degree2000 Degree2000 Degree2000 DegreeExposureExposure

    Vehicle Impact Resistance OptionVehicle Impact Resistance Option

  • 9Ballistics Resistance OptionBallistics Resistance Option UL 2085UL 2085Tank ConstructionTank Constructiony Refer to UL 142

    Steel thickness Welding Support designpp g Vents Emergency ventsy Must have provisions for monitoring

    interstitial space

    Cutaway of Insulated Tank Cutaway of Insulated Tank TechnologyTechnology Concrete EncasedConcrete Encased

    Cylindrical TanksCylindrical Tanks Rectangular TanksRectangular Tanks

  • 10

    Vertical CylindricalVertical Cylindrical CARB Enhanced Vapor RecoveryCARB Enhanced Vapor Recovery

    y Fireguard passed the Standing Loss Control portion of CARB EVR certification requirement in 2008 y CARB requirement of C equ e e t o

    Emission Factor < 0.57/1000 gallons corresponds to a 90% reduction in emissions As compared to a single-wall tank without a

    P/V vent.

    UL 2085 LabelUL 2085 Label Vaulted Tanks Vaulted Tanks -- UL 2245UL 2245

  • 11

    Generator Base TanksGenerator Base Tanks

    y UL 142 Special Purpose Tank

    y Provides sturdy support for emergency power generatorpower generator

    y Stores fuel supply

    Small FieldSmall Field--erected tankserected tanks

    API 650 API 650 Welded Steel Tanks for Oil StorageWelded Steel Tanks for Oil Storagey Shell courses

    CAS

    GHDtd

    d += )1(6.2 td = design thickness (in.) D = nominal tank diameter (ft.) H = height of liquid (ft.) G = specific gravity CA = corrosion allowance (ft.) Sd = allowable stress (psi)

    Sd

    API 650 API 650 Welded Steel Tanks for Oil StorageWelded Steel Tanks for Oil Storagey Bottom plates

    Minimum 1 projection beyond shell

  • 12

    API 650 Shell openingsAPI 650 Shell openings

    y Reinforcement usually requiredy Spacing specified

    API 650 tanksAPI 650 tanks

    y Nameplate Manufacturer, serial number, year built Nominal diameter, height, capacity Thickness of bottom, shell, deck, , Design pressure

  • 1Flammable Liquid Aboveground Storage Tank WorkshopFebruary 2, 2011February 2, 2011T k I ti STI SP001Tank Inspections per STI SP001Dana Schmidt, PEProject EngineerSteel Tank Institute, div. of STI/SPFA

    Did you know?Did you know?

    y There may be more regulated ASTs than USTs in the U.S.y Tanks under 300,000 gallons likely

    represent 90% of the actual tank units in ep ese t 90% o t e actua ta u ts operationy STI estimates that there are over 4

    million such tanks in existence today

    Risk based inspectionsRisk based inspections

    y Tank owners view - addition of safeguards to reduce or simplify expensive tank inspections makes good business sense. y Regulators view addition of safeguards egu ato s v ew a t o o sa egua s

    minimize and eliminate releases.

    Inspection based on installation Inspection based on installation type and its risk to environmenttype and its risk to environment

    y Tanks offering greatest risk have significantly more g yinspectionsy Tanks with less

    risk have less inspections

    SP001 ScopeSP001 Scope

    y Inspection of aboveground storage tanks Shop-fabricated

    y Storing liquids Flammable or

    Combustible Specific gravity 1.0

    A bi 200F Field-erected Portable containers

    Ambient to 200F Atmospheric pressure

    AST Types in STI SP001AST Types in STI SP001

    y Portable containers

    y Shop-fabricated

    y Field-erected

  • 2Facilities with a mix of tanksFacilities with a mix of tanks Portable containerPortable container

    y Greater than 55 gallons and not intended for fixed installation

    3 types of Portable Containers3 types of Portable Containers

    1. Metal and plastic drums2. IBC (Intermediate Bulk Container)3. IM (Intermodal) or UN (United Nations)

    portable tankportable tank

    ShopShop--Fabricated AST Fabricated AST (per SP001)(per SP001)yWelded metal AST fabricated in a

    manufacturing facility ORy An AST without a nameplate with a

    volume less than or equal to 50,000 vo u e ess t a o equa to 50,000 U.S. gallons

    50,000 Gallons50,000 Gallons

    IndoorVertical Fire Rated

    Generator

    Outdoor

    Generator

    Diked

  • 3AST StandardsAST Standardsfor Shop Fabricated Tanksfor Shop Fabricated Tanks

    y API - American Petroleum Institute API 12F API 650, Appendix J

    y UL - Underwriters Laboratories UL 142 UL 2085

    FieldField--erected AST erected AST (per SP001)(per SP001)

    y Welded metal AST erected on-site where it will be used. y Limited to a maximum shell height of g

    50 feet and a maximum diameter of 30 feety An AST without a nameplate that is more

    than 50,000 U.S. gallons and a maximum shell height of 50 feet and a maximum diameter of 30 feet

    SP001 Key termsSP001 Key terms

    y Release Prevention Barrier (RPB)y Continuous Release Detection Method

    (CRDM)

    Release Prevention Barrier (RPB)Release Prevention Barrier (RPB)y Liquid containment

    barrier Sufficiently

    impervious Under the AST

    y Diverts leaks toward the perimeter of the AST where they can be easily detected

    Release prevention barrier ???Release prevention barrier ??? Continuous Release Detection Method Continuous Release Detection Method (CRDM)(CRDM)A means of detecting a release of

    liquid through inherent design. It is passive because it does not require sensors or power to operate. Liquid releases are visually detected by facility releases are visually detected by facility operators. Tank with Release Prevention Barrier Secondary containment AST including double-

    wall ASTs Elevated AST with release prevention barrier

  • 4Tanks with CRDMTanks with CRDM Spill ControlSpill Control

    y Prevent release of liquid to environmenty Includes:

    Remote impounding Secondary containment dike/bermSecondary containment dike/berm Secondary containment AST Secondary containment system

    Inspection typesInspection typesy Owner monthly inspections

    Check operation of vents, coating, foundation

    y Formal External inspections Certified inspector, but no entry

    y Leak test one time test to determine if container leaking.

    y Formal Internal inspections Entry into tank is necessary for full assessment

    Owners checklistsOwners checklists

    Table of Inspection SchedulesTable of Inspection Schedules

    y Category 1 Spill control CRDM

    y P Owner inspectiony E External by

    y Category 2 Spill control

    y Category 3 No safeguards

    inspectory I Internal by

    inspectory L Leak testing

    Category 1Category 1

    Double-wall Tank Double-bottom Tank

    in Concrete Dike

  • 5Category 2Category 2 Category 3Category 3

    Risk Matrix conceptRisk Matrix concept

    Tank Size Category 1 Category 2 Category 3

    Shop built tanks

    0 - 1100 P P P, E&L(10)

    1101 -5,000

    P P, E&L(10) [P, E&L(5), I(10)]or

    More RiskMore Risk

    More

    More

    [P, E(5) & L(2)]

    5,001 -30,000

    P, E(20) [P, E(10)& I(20)]or

    [P, E(5) & L(10)]

    [P, E&L(5), I(10)]or

    [P, E(5) & L(1)]

    30,001 -50,000

    P, E(20) P, E&L(5), I(15) P, E&L(5), I(10)

    Field erected P, E(5), I(10) P, E(5), I(10) P, E(5), I(10)

    Portable containers

    P P P **

    e Risk

    e Risk

    Formal External and Formal External and Formal Internal InspectionsFormal Internal Inspectionsy Performed by Qualified Tank Inspector

    STI Trained and Certified API Certified (with additional SP001

    certification)

    External inspectionsExternal inspections

    y Containment areay Stairways, laddersy Normal vents

    E

    y UT of accessible areas, near base of tank (internal inspection if y Emergency vents

    y Overfill alarmsy Fire valves

    spect o problems found)

    Internal inspectionsInternal inspections

    y Check all external inspection itemsy UT of entire tank bottom

    elevated tanks do not require entryy UT methodsy UT methods

    UTT point measurements (15 points per sq. ft.) UTS full scan if problems found in UTT

  • 6UT qualificationsUT qualificationsy UTT (15 points per sq. ft.)

    Digital thickness meter Training of minimum one hour (thickness

    ranges, couplants, transducer types)UTS (f ll )y UTS (full scan) Flaw detector Certified per ASNT TC-1A Personnel

    Qualification and Certification in Nondestructive Testing

    Leak tests by qualified personnelLeak tests by qualified personnel

    y Gas pressure decayy Gas pressure with soap bubblesy Gas and soil tracersy Mass measurementy Mass measurementy Level measurementy Hydrostatic test

    Suitability for continued serviceSuitability for continued servicey MIC corrosion Repair immediately. Next

    inspection 2 yearsy Category 3 less than 75%, then repair. Next

    inspection 5 yearsy Category 2 3 in a sq. ft. is less than 75%, or

    l th 50% th i N t i ti 5 less than 50%, then repair. Next inspection 5 years

    y Category 1 - 3 in a sq. ft. is less than 50%, or less than 25%, then repair. Next inspection 5 years

    MIC corrosionMIC corrosion

    Other tank damageOther tank damage

    y Firey Natural disaster flooding, windsy Excessive settlementy Overpressurey Overpressurey Cracking of weldsy Leak

    AST Inspector CertificationAST Inspector Certification

    y Meet experience and education requirementsy Attend seminary Pass examy Pass examy Visual acuity exam

  • 7Experience and educationExperience and education

    y Bachelor of Science degree and at least one year of experience, OR

    y 2 year certificate in

    y Related experience Construction of,

    operation of, or inspection and

    engineering or technology and at least two years of experience, OR

    y High School diploma or equivalent and at least three years of experience.

    maintenance of steel storage tanks, pressure vessels, or steel piping systems.

    Also acceptable is engineers developing SPCC plans

    Seminar topicsSeminar topics

    y Tank Fabrication Standardsy Corrosion Basics

    y Fire codesy Valves and Pipingy Level Monitoring

    y Inspection Techniquesy Regulatory

    Requirements

    gy Electrical Issuesy Hands on

    Demonstrations

    ExamExam 2 sections:x Open bookx AST Standardsx Corrosionx Closed bookClosed bookx Inspection, safety

    80% total with no section under 70%

    Inspection Schedule/TableInspection Schedule/TablePPPeriodic Inspection by Owner Periodic Inspection by Owner EE--External Inspection by Certified Inspector External Inspection by Certified Inspector II--Internal Inspection Internal Inspection LL--Leak TestLeak Test

    Size, Gallons Category 1Category 1 Category 2 Category 3

    Shop built tank

    0 - 1100 P P P, E&L(10)

    1101 -5,000

    P P, E&L(10) [P, E&L(5), I(10)]or

    [P E(5) & L(2)][P, E(5) & L(2)]

    5,001 5,001 --30,00030,000

    P, E(20)P, E(20) [P, E(10)& I(20)]or

    [P, E(5) & L(10)]

    [P, E&L(5), I(10)]or

    [P, E(5) & L(1)]

    30,001 -50,000

    P, E(20) P, E&L(5), I(15) P, E&L(5), I(10)

    Field Erect Tank P, E(5), I(20) P, E(5), I(20) P, E(5), I(20)

    Portable Containers

    P P P **

  • 8Inspection Schedule/TableInspection Schedule/TablePPPeriodic Inspection by Owner Periodic Inspection by Owner EE--External Inspection by Certified Inspector External Inspection by Certified Inspector II--Internal Inspection Internal Inspection LL--Leak TestLeak Test

    Size, Gallons Category 1 Category 2 Category 3Category 3

    Shop built tank

    0 - 1100 P P P, E&L(10)

    1101 -5,000

    P P, E&L(10) [P, E&L(5), I(10)]or

    [P E(5) & L(2)][P, E(5) & L(2)]

    5,001 5,001 --30,00030,000

    P, E(20) [P, E(10)& I(20)]or

    [P, E(5) & L(10)]

    [P, E&L(5), I(10)][P, E&L(5), I(10)]oror

    [P, E(5) & L(1)][P, E(5) & L(1)]

    30,001 -50,000

    P, E(20) P, E&L(5), I(15) P, E&L(5), I(10)

    Field Erect Tank P, E(5), I(20) P, E(5), I(20) P, E(5), I(20)

    Portable Containers

    P P P **

    Inspection Schedule/TableInspection Schedule/TablePPPeriodic Inspection by Owner Periodic Inspection by Owner EE--External Inspection by Certified Inspector External Inspection by Certified Inspector II--Internal Inspection Internal Inspection LL--Leak TestLeak Test

    Size, Gallons Category 1Category 1 Category 2 Category 3

    Shop built tank

    0 - 1100 P P P, E&L(10)

    1101 -5,000

    P P, E&L(10) [P, E&L(5), I(10)]or

    [P E(5) & L(2)][P, E(5) & L(2)]

    5,001 5,001 --30,00030,000

    P, E(20)P, E(20) [P, E(10)& I(20)]or

    [P, E(5) & L(10)]

    [P, E&L(5), I(10)]or

    [P, E(5) & L(1)]

    30,001 -50,000

    P, E(20) P, E&L(5), I(15) P, E&L(5), I(10)

    Field Erect Tank P, E(5), I(20) P, E(5), I(20) P, E(5), I(20)

    Portable Containers

    P P P **

    Inspection Schedule/TableInspection Schedule/TablePPPeriodic Inspection by Owner Periodic Inspection by Owner EE--External Inspection by Certified Inspector External Inspection by Certified Inspector II--Internal Inspection Internal Inspection LL--Leak TestLeak Test

    Size, Gallons Category 1 Category 2 Category 3Category 3

    Shop built tank

    0 - 1100 P P P, E&L(10)

    1101 -5,000

    P P, E&L(10) [P, E&L(5), I(10)]or

    [P E(5) & L(2)][P, E(5) & L(2)]

    5,001 -30,000

    P, E(20) [P, E(10)& I(20)]or

    [P, E(5) & L(10)]

    [P, E&L(5), I(10)]or

    [P, E(5) & L(1)]

    30,001 -50,000

    P, E(20) P, E&L(5), I(15) P, E&L(5), I(10)

    Field Erect Tank P, E(5), I(20) P, E(5), I(20) P, E(5), I(20)

    Portable Portable Containers Containers

    P P P **P **

    Category 3 Portable containersCategory 3 Portable containers** Owner shall either discontinue use of portable

    container or have DOT tested Plastic container - 7 years Steel container - 12 years

    S i l S l i 17 Stainless Steel container - 17 years

  • 9Inspection Schedule/TableInspection Schedule/TablePPPeriodic Inspection by Owner Periodic Inspection by Owner EE--External Inspection by Certified Inspector External Inspection by Certified Inspector II--Internal Inspection Internal Inspection LL--Leak TestLeak Test

    Size, Gallons Category 1 Category 2 Category 3Category 3

    Shop built tank

    0 - 1100 P P P, E&L(10)

    1101 -5,000

    P P, E&L(10) [P, E&L(5), I(10)]or

    [P E(5) & L(2)][P, E(5) & L(2)]

    5,001 -30,000

    P, E(20) [P, E(10)& I(20)]or

    [P, E(5) & L(10)]

    [P, E&L(5), I(10)]or

    [P, E(5) & L(1)]

    30,001 30,001 --50,00050,000

    P, E(20) P, E&L(5), I(15) P, E&L(5), I(10)P, E&L(5), I(10)

    Field Erect Tank P, E(5), I(20) P, E(5), I(20) P, E(5), I(20)

    Portable Containers

    P P P **

    Inspection Schedule/TableInspection Schedule/TablePPPeriodic Inspection by Owner Periodic Inspection by Owner EE--External Inspection by Certified Inspector External Inspection by Certified Inspector II--Internal Inspection Internal Inspection LL--Leak TestLeak Test

    Size, Gallons Category 1 Category 2Category 2 Category 3

    Shop built tank

    0 - 1100 P P P, E&L(10)

    1101 -5,000

    P P, E&L(10) [P, E&L(5), I(10)]or

    [P E(5) & L(2)][P, E(5) & L(2)]

    5,001 5,001 --30,00030,000

    P, E(20) [P, E(10)& I(20)][P, E(10)& I(20)]oror

    [P, E(5) & L(10)][P, E(5) & L(10)]

    [P, E&L(5), I(10)]or

    [P, E(5) & L(1)]

    30,001 -50,000

    P, E(20) P, E&L(5), I(15) P, E&L(5), I(10)

    Field Erect Tank P, E(5), I(20) P, E(5), I(20) P, E(5), I(20)

    Portable Containers

    P P P **

  • 10

    Inspection Schedule/TableInspection Schedule/TablePPPeriodic Inspection by Owner Periodic Inspection by Owner EE--External Inspection by Certified Inspector External Inspection by Certified Inspector II--Internal Inspection Internal Inspection LL--Leak TestLeak Test

    Size, Gallons Category 1 Category 2 Category 3Category 3

    Shop built tank

    0 - 1100 P P P, E&L(10)

    1101 1101 --5,0005,000

    P P, E&L(10) [P, E&L(5), I(10)][P, E&L(5), I(10)]oror

    [P E(5) & L(2)][P E(5) & L(2)][P, E(5) & L(2)][P, E(5) & L(2)]

    5,001 -30,000

    P, E(20) [P, E(10)& I(20)]or

    [P, E(5) & L(10)]

    [P, E&L(5), I(10)]or

    [P, E(5) & L(1)]

    30,001 -50,000

    P, E(20) P, E&L(5), I(15) P, E&L(5), I(10)

    Field Erect Tank P, E(5), I(20) P, E(5), I(20) P, E(5), I(20)

    Portable Containers

    P P P **

    Insulated ASTInsulated AST

    y Remove insulation where moisture or product collectsy If vapor barrier damaged, remove sections

    of insulationo su at o

    Inspection Schedule/TableInspection Schedule/TablePPPeriodic Inspection by Owner Periodic Inspection by Owner EE--External Inspection by Certified Inspector External Inspection by Certified Inspector II--Internal Inspection Internal Inspection LL--Leak TestLeak Test

    Size, Gallons Category 1Category 1 Category 2 Category 3Category 3

    Shop built tank

    0 - 1100 P P P, E&L(10)

    1101 1101 --5,0005,000

    PP P, E&L(10) [P, E&L(5), I(10)][P, E&L(5), I(10)]oror

    [P E(5) & L(2)][P E(5) & L(2)][P, E(5) & L(2)][P, E(5) & L(2)]

    5,001 -30,000

    P, E(20) [P, E(10)& I(20)]or

    [P, E(5) & L(10)]

    [P, E&L(5), I(10)]or

    [P, E(5) & L(1)]

    30,001 -50,000

    P, E(20) P, E&L(5), I(15) P, E&L(5), I(10)

    Field Erect Tank P, E(5), I(20) P, E(5), I(20) P, E(5), I(20)

    Portable Containers

    P P P **

    UST as AST

  • 11

    RepairsRepairs

    y Per STI Standard SP031 covers shop-fabricated tanks onlyy Qualified personnel for repairs

    Facility that manufactures STI, UL, etc. tanksFacility that manufactures STI, UL, etc. tanks ASME Section IX welders AWS D1.1 welders

    Shop-Fabricated Typical Bottom or Head

    Field-FabricatedTypical Bottom

    Special Consideration in Special Consideration in ShopShop--Fabricated TanksFabricated Tanks

    Standard OrganizationStandard Organization

    y 1.0 Scopey 2.0 Definitionsy 3.0 Safety

    Considerations

    y 5.0 Materials and Weldingy 6.0 Modificationsy 7.0 Repairs

    y 4.0 Personnel Qualifications Repair & Inspection

    y 8.0 Testing

    ScopeScope

    y Aboveground Tanks Flammable & Combustible Atmospheric Built to national standardsyWhat is not included?

    Underground Tanks API tanks Bolted and Riveted Tanks

    Personnel QualificationsPersonnel Qualifications

    y Repair/Modify Manufacturer of Labeled/Listed Tanks ASME Section IX AWS

    Tester Final Inspection

    STI SP001 API 653 Manufacturer of labeled/listed tanks

  • 12

    Modifications SectionModifications Section

    y Items New pipe connectionsx Reinforcing plate when

    pipe >2

    ManwaysManwaysx Reinforcing plate when

    below liquid level

    New second bottomx Knuckle at bottom

    Repairs at knuckleRepairs at knuckle

    y Limited repairs in knuckle areay Otherwise, replace

    the bottom or head.

    Shell RepairShell Repair

    y Lap Weld Patch plates Shape Over existing welds

    y Weld Spacingy Plate Inserts

    Bottom RepairsBottom Repairs

    T Joints and KnucklesT Joints and Knuckles TestingTesting

    y Testing of all repairs and modifications requiredy Significant repair examples (requires tank

    pressure test)p essu e test) Complete replacement of bottom Patch plate greater than 12 square feet Openings greater than 12 inches diametery Final inspection by SP001 inspector or

    tank manufacturer