Background
� 30-45 minutes to take out tanks, take out 4-5 tanks
� Difficulty to find tanks
� Affects processing and packaging
Overflow
Inaccessible, different tank sizes Highly accessible, but effective space use?
Issues
� Limited Space
� Accessibility
� Safety
� Number of tanks , assume 17 tanks in use
Tank Size # of Tanks Foot Print
2000 33 72’’ x 72’’
1600 6 54’’ x 58’’
1200 7 48’’ x 48‘’
1000 30 56’’ x 56’’
550 12 46’’ x 46’’
250 19 32’’ x 34’’
Total 107
Additional Space
� Preweigh Walkway � Finished Goods
Move to store 16 additional tanks
Gain six tank spots and increase accessibility
Costs
Category Cost Description
Labor XXXX Move barriers and netting.
Materials XXXX Anchors, extension posts, sealant,
labeling, tape/paint, etc
Labor and materials to move
rack outside of pre-weigh to
expand isle
XXXX If necessary
TOTAL XXXX
Time Required to implement ~12-24 hrs Dependent on number of people
Action Plan
Action Item Responsible
Days
Needed Date Status
Railings Mike G./Elaine M. 4 10/23/2009 Ready to put in order
Communication of
finish goods staging Joshua Miller/Elaine M. 110/23/2009
Powerpoint presentation made
Flexnet Locations
An Tran/Kevin Stewart/ Elaine
M. 2
10/30/2009Determined cannot use put-away
function, Meeting with Kevin to
finalize zones
Tags Brian Wagner/ Elaine M. 1 11/06/2009 Testing needed for hanging tags
Grinding and
Coating Tom Zollo/ Elaine M. 5/Area11/13/2009
Three areas: Rails, 2000's, 1000's
Tape Walter Rhodes/ Elaine M. 1/Area 11/13/2009 No tape trial necessary
Training Mike G./Elaine M. 2 TBD
Gains
� Four to five tanks
� Check through whole tank farm
� Up to 40 minutes a tank
� At most two
� Find by location (lane or rack space)
� Up to an estimated 10 minutes to find a tank
Current Proposed