Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
1 of 33
Tank Farm Plant Operating Procedure Effluent Treatment Facility
USQ Not Required – EFT is a < Hazard Category 3 Radiological Facility
CHANGE HISTORY ( LAST 5 REV-MODS )
Rev-Mod Release Date Justification: Summary of Changes
A-4 01/14/2019 DOE-0359 Update Implementing DOE-0359 changes in section 3.1, 4.1, and
addition of step 5.1.2.
A-3 10/02/2018 Incorporation of eDARF
changes
Note added to section 5.1 to run 65C-P-2 in MANUAL to
provide tank contents recirculation without the VOG in
operation.
A-2 02/15/2018 Formatting changes
Updated records section. Updated data sheets to include the
“Date” column. Removed signatures for NCO. Added signature
sheet. Removed 1st time use banner and added special
instruction to section 5.0.
A-1 06/16/2016 PER Response -
WRPS-PER-2015-1837
Remove unnecessary Independent Verification from the
following procedure datasheets; update datasheets and shading
to standard.
A-0 01/27/2016 Converting to WRPS Format New Procedure; Supersedes ETF-PRO-OP-51547
(POP-65C-001)
Table of Contents Page
1.0 PURPOSE AND SCOPE ................................................................................................................ 3
1.1 Purpose ................................................................................................................................ 3
1.2 Scope ................................................................................................................................... 3
2.0 INFORMATION............................................................................................................................. 3
2.1 Terms and Definitions......................................................................................................... 3
2.2 General Information ............................................................................................................ 3
3.0 PRECAUTIONS AND LIMITATIONS......................................................................................... 4
3.1 Personnel Safety.................................................................................................................. 4
3.2 Equipment Safety ................................................................................................................ 4
3.3 Radiation and Contamination Control ................................................................................ 5
3.4 Environmental Compliance ................................................................................................ 5
4.0 PREREQUISITES .......................................................................................................................... 6
4.1 Performance Documents ..................................................................................................... 6
4.2 Field Preparations ............................................................................................................... 6
5.0 PROCEDURE ................................................................................................................................. 7
5.1 System Startup .................................................................................................................... 7
5.2 Continued Operation Switching to Chem Feed Operation Permissive ............................. 11
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
2 of 33
5.3 Dilute Acid Adjustment .................................................................................................... 11
5.4 Dilute Caustic Adjustment ................................................................................................ 14
5.5 System Shutdown.............................................................................................................. 17
5.6 Charging Surge Tank Acid Line ....................................................................................... 18
5.7 Charging Surge Tank 50 % Sodium Hydroxide Line ....................................................... 20
5.8 Circulate 50% Caustic through Surge Tank Injection Pump ............................................ 22
5.9 Records ............................................................................................................................. 24
Data Sheet 1 – Initial Valve Lineup .......................................................................................................... 25
Data Sheet 2 – Initial Breaker Lineup ....................................................................................................... 32
Signature Sheet 1 ...................................................................................................................................... 33
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
3 of 33
1.0 PURPOSE AND SCOPE
1.1 Purpose
This procedure provides instructions for operating the Chemical Feed System, which
provides concentrated and dilute solutions of acid and caustic.
This procedure applies to ETF, LERF, and TEDF personnel working at ETF.
1.2 Scope
This procedure involves providing instructions for system startup and shutdown,
continued operation for switching to Chemfeed operation permissive; making dilute acid
and dilute caustic adjustments, charging surge tank acid line and surge tank 50% sodium
hydroxide line, and circulating 50% caustic through surge tank injection pump.
2.0 INFORMATION
2.1 Terms and Definitions
AOV – Air Operated Valve
MTT – Main Treatment Train
STT – Secondary Treatment Train
SWRT - Secondary Waste Receiving Tank.
2.2 General Information
None.
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
4 of 33
3.0 PRECAUTIONS AND LIMITATIONS
3.1 Personnel Safety
3.1.1 All work will be performed in accordance with DOE-0359, Hanford Site
Electrical Safety Program.
3.1.2 Operation of Circuit Breakers, Electrical disconnect Switches, and Similar
Switching Equipment shall be performed by a qualified person.
3.1.3 Component operation requires completion of an Electrical Risk Assessment
(ERA).
3.1.4 When the clean and inspects are current on the electrical equipment (breaker,
switchgear, disconnects, motor starters, etc.), the ERA for normal operating
condition is applicable, for those workers interacting with electrical
equipment.
3.1.4.1 Use safety glasses and leather gloves when manipulating
electrical components per the normal ERA.
3.1.5 When the clean and inspects are delinquent, the ERA for non-normal
operating condition is applicable, for those workers interacting with electrical
equipment.
3.2 Equipment Safety
3.2.1 With the system in AUTO operation, all of the following pumps run
constantly as follows:
92% Sulfuric Acid Tank Pump, P1 (65C-P-1)
50% Caustic (NaOH) Tank Pump, P2( 65C-P-2)
4% Acid Tank Pump, P3 (65C-P-3)
4% NaOH Tank Pump, P4 (65C-P-4)
With chemical feed permissive on, pumps and AOVs can be operated
in AUTO or MANUAL.
3.2.2 Valves 65C-083 and 65C-320 are not to be opened at the same time while
performing this procedure.
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
5 of 33
3.3 Radiation and Contamination Control
3.3.1 Work in radiological areas will be performed using a radiological work
permit following review by Radiological Control per ALARA Work Planning
Procedure, TFC-ESHQ-RP_RWP-C-03.
3.4 Environmental Compliance
3.4.1 In the event of a spill/leak/release, notify the SOM/FWS and respond per
ETF-ERP-85B-003, Emergency Spill or Release at ETF.
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
6 of 33
4.0 PREREQUISITES
4.1 Performance Documents
The following documents may be needed to perform this procedure:
ETF-01B-001, Compressed Air System Operations
ETF-05-002, ETF Sample Processing
ETF-25B-001, Electrical Distribution System Startup and Operation
ETF-25E-001, Trace Heat System Operations
ETF-45D-001, Vessel Off-Gas System Operation
ETF-60-002, Integrated MTT Operation
ETF-60H-001, Verification System Operations
A-6007-595, Hanford Site Electrical Risk Assessment.
4.2 Field Preparations
4.2.1 ENSURE electrical power available per ETF-25B-001.
4.2.2 ENSURE compressed air system in operation per ETF-01B-001.
4.2.3 ENSURE heat trace system in service per ETF-25E-001.
4.2.4 ENSURE vessel ventilation system in operation per ETF-45D-001.
4.2.5 ENSURE verification water available per ETF-60H-001.
4.2.6 ENSURE concentrated acid storage tank 65C-TK-1 contains greater than 5%
of operational volume.
4.2.7 ENSURE sodium hydroxide storage tank 65C-TK-2 contains greater than
6% of operational volume.
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
7 of 33
5.0 PROCEDURE
Special Instructions
SOM determines component lineup requirements.
Sections 5.1 through 5.8 of this procedure may be performed in any logical order, including
concurrently, repeated, or out of sequence.
5.1 System Startup
5.1.1 ENSURE valve lineup per Data Sheet 1 – Initial Valve Lineup.
5.1.2 DON PPE per appropriate ERA listed in Section 3.1.
5.1.3 ENSURE breaker lineup per Data Sheet 2 – Initial Breaker Lineup.
5.1.4 ON graphic Chemfeed Setpoints, CONFIRM the following setpoints for the
tank pump temperature alarms and pump cutoffs:
Description VA Tag Setpoint
92% Acid Tank Pump HIHI Temp Alarm Setpoint VA51208 150°F
92% Acid Tank Pump HI Temp Alarm Setpoint VA51207 140°F
4% Acid Tank Pump HIHI Temp Alarm Setpoint VA51210 135°F
4% Acid Tank Pump HI Temp Alarm Setpoint VA51209 130°F
50% NaOH Tank Pump HIHI Temp Alarm Setpoint VA51306 140°F
50% NaOH Tank Pump HI Temp Alarm Setpoint VA51305 130°F
4% NaOH Tank Pump HIHI Temp Alarm Setpoint VA51308 135°F
4% NaOH Tank Pump HI Temp Alarm Setpoint VA51307 130°F
50% NaOH Tank Heater “ON” Setpoint VA51309 75°F
50% NaOH Tank Heater “OFF” Setpoint VA51310 76.5°F
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
8 of 33
5.1 System Startup (Cont.)
Special Instructions
The Chemical Feed System may be operated in two different modes:
Full automatic, where all four chemical systems must be in Automatic operation
as a prerequisite to MTT or STT OPERATION mode.
Chemfeed operation permissive, where the operational status of the four chemical
systems does not affect the MTT or STT OPERATION mode; each of the four
chemical systems may be in AUTOMATIC, MANUAL, or SHUTDOWN status.
If independent operation of the Chemical Feed System pumps is chosen, then it may be
advisable to place the AOVs feeding verification water to the 4% tanks in manual. This
will prevent addition of water to the 4% tanks for makeup while the bulk (50% NaOH or
92% acid) feed tank pump is not in operation. Selection of MANUAL or AUTO for the
AOVs is left to the discretion of the SOM and CRO.
The Chemfeed operation permissive is automatically reset by the following:
Normal chemical feed operation buttons (for fully AUTO operation)
Chemical feed shutdown buttons
Emergency stop plant systems button
Chemical berm level high alarm activation.
NOTE - P1 (65C-P-1) and P2 (65C-P-2) may run in MANUAL to provide tank contents
recirculation without the VOG in Operation.
5.1.5 IF independent operation of Chemical Feed System pumps is required with
MTT in SHUTDOWN, PERFORM the following:
5.1.5.1 ENSURE the following pumps are in MANUAL/OFF:
P1 (65C-P-1)
P2 (65C-P-2)
P3 (65C-P-3)
P4 (65C-P-4).
5.1.5.2 ON graphic Chemical, SELECT OPERATION for Chemfeed
operation permissive (VD535182).
5.1.5.3 ON graphic Chemfeed Temperature Setpoints, ENSURE high
temperature cutoff for all desired pumps is reset.
5.1.5.4 ON graphic Chemical, ENSURE LAH-20B016 reset is reset
(VD535186).
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
9 of 33
5.1 System Startup (Cont.)
5.1.5.5 ON graphic Chemical, PLACE desired pumps to desired status:
Pump Description Status
P1 (65C-P-1) 92% H2SO4 Pump Auto or Manual/ON
P2 (65C-P-2) 50% NaOH Pump Auto or Manual/ON
P3 (65C-P-3) 4% H2SO4 Pump Auto or Manual/ON
P4 (65C-P-4) 4% NaOH Pump Auto or Manual/ON
5.1.6 IF Automatic operation of all Chemical Feed System pumps is required as a
prerequisite to MTT and STT operation, PERFORM the following:
5.1.6.1 ON graphic Chemfeed Temperature Setpoints, ENSURE high
temperature cutoff for all Chemical Feed System pumps is reset.
5.1.6.2 ON graphic Chemical, ENSURE LAH-20B016 reset is reset
(VD535186).
5.1.6.3 ON graphic Chemical, ENSURE OFF for Chemfeed operation
permissive (VD535182).
5.1.6.4 ON graphic Chemical, PLACE pumps to AUTO:
Pump Description
P1 (65C-P-1) 92% H2SO4 Pump
P2 (65C-P-2) 50% NaOH Pump
P3 (65C-P-3) 4% H2SO4 Pump
P4 (65C-P-4) 4% NaOH Pump
5.1.7 ON graphic Chemical, INITIATE Chemical Feed System operation.
NOTE - Recirculation flow for P3 (65C-P-3) is adjusted to achieve a flow that meets
the minimum required flow for the pump and the maximum recommended
flow for the fiberglass recirculation line to the tank.
5.1.8 ADJUST 65C-015 to obtain 7.5 gpm to 8.5 gpm as indicated on
FIT-65C110.
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
10 of 33
5.1 System Startup (Cont.)
NOTE - Recirculation flow for P4 (65C-P-4) is adjusted to achieve a flow that meets
the minimum required flow for the pump and the maximum recommended
flow for the fiberglass recirculation line to the tank.
5.1.9 ADJUST 65C-035 to obtain 7.5 gpm to 8.5 gpm as indicated on
FIT-65C210.
5.1.10 CHECK the following system operating parameters:
Pump/Heater Indicator Normal Operating
Rang
Group Display
Number
65C-E-2 TT-65C221 80 to 125°F 49
65C-P-1
(92% Acid)
IT-65C155 3.5 (2.5 to 6) amps 50
PIT-65C102 38 (35 to 65) psig 48
65C-P-2
(50% Caustic)
IT-65C255 8.0 (6 to 9) amps 50
PIT-65C202 42 (40 to 55) psig 49
65C-P-3
(4% Acid)
IT-65C156 3.3 (2.5 to 6) amps 50
PIT-65C112 80 (65 to 85) psig 48
65C-P-4
(4% Caustic)
IT-65C256 3.5 (2.5 to 6) amps 50
PIT-65C212 80 (65 to 85) psig 49
5.1.11 IF current indication (IT-65C156) [IT-65C256] is outside normal operating
range per Step 5.1.10, RE-PERFORM Steps 5.1.8 and 5.1.9.
5.1.12 IF current range remains outside normal operating range, NOTIFY SOM.
5.1.13 IF current indication IT-65C155 or IT-65C255 is outside normal operating
range per Step 5.1.10, NOTIFY SOM.
5.1.14 IF any pump discharge pressure indication (PIT-65C### per Step 5.1.10) is
out of normal operating range, NOTIFY SOM.
5.1.15 IF shutdown of one or more Chemical Feed System pumps is required,
SELECT “MANUAL/STOP” on desired pump.
Pump Description
P1 (65C-P-1) 92% H2SO4 Pump
P2 (65C-P-2) 50% NaOH Pump
P3 (65C-P-3) 4% H2SO4 Pump
P4 (65C-P-4) 4% NaOH Pump
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
11 of 33
5.2 Continued Operation Switching to Chem Feed Operation Permissive
5.2.1 IF independent operation of Chemical Feed System pumps is required with
MTT in READY or OPERATION, PERFORM the following:
5.2.1.1 ON graphic Chemical, SELECT OPERATION for Chemfeed
operation permissive (VD535182).
5.2.1.2 ON graphic Chemical, PLACE desired pumps to desired status:
Pump Description Status
P1 (65C-P-1) 92% H2SO4 Pump Auto or Manual/ON
P2 (65C-P-2) 50% NaOH Pump Auto or Manual/ON
P3 (65C-P-3) 4% H2SO4 Pump Auto or Manual/ON
P4 (65C-P-4) 4% NaOH Pump Auto or Manual/ON
5.3 Dilute Acid Adjustment
NOTE - SOM or DA will determine volume of water or acid to be added.
5.3.1 ON graphic Chemical, DETERMINE actual H2SO4 concentration in tank
65C-TK-3 from C (AIT-65C197).
5.3.2 IF AIT-65C197 is not available or out of service, DETERMINE actual
H2SO4 concentration in tank 65C-TK-3, per ETF-05-002.
5.3.2.1 RECORD H2SO4 concentration in ETF Control Room Logbook.
5.3.3 CONFIRM 65C-TK-3 has sufficient volume available for concentration
adjustment.
5.3.4 IF space must be made available for concentration in 65C-TK-3,
TRANSFER an amount to either a SWRT or concentrate tank, as directed by
SOM.
5.3.4.1 RECORD SOM direction in ETF Control Room Logbook.
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
12 of 33
5.3 Dilute Acid Adjustment (Cont.)
Transfer to SWRT
5.3.5 ON graphic SWRT, SELECT H2SO4.
5.3.6 ON group display 35,
OR
ON graphic SWRT, SET FQ-65C144SP setpoint to reagent gallons required.
5.3.7 ON graphic SWRT, SELECT (pH Control Tk A) [pH Control Tk B].
5.3.8 ON group display 34,
OR
ON graphic SWRT, MONITOR FT-65C144, H2SO4 flow.
Transfer to Concentrate Tank
5.3.9 ON graphic Conc, SELECT H2SO4.
5.3.10 ON group display 41,
OR
ON graphic Conc, SET FQ-65C145SP setpoint to reagent gallons required.
5.3.11 ON graphic Conc, SELECT (pH control Tk A) [pH Control Tk B].
5.3.12 ON group display 41,
OR
ON graphic Conc, MONITOR FT-65C145, H2SO4 flow.
Add Verification Water
5.3.13 ON graphic Chemical, MANUALLY OPEN V052 (AOV-65C052) to add
desired amount of verification water to tank 65C-TK-3 (as shown by FQI-
65C104 on group 50 or graphic Chemical).
5.3.14 AFTER desired amount of verification water has been added to tank
65C-TK-3, CLOSE valve V052 (AOV-65C052).
5.3.15 ON graphic Chemical, ACTIVATE 4% acid totalizer reset (VD535234).
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
13 of 33
5.3 Dilute Acid Adjustment (Cont.)
Special Instructions
Pump P1 (65C-P-1) shuts down when LIT-65C111 is at 96%.
Adding 92% acid to 65C-TK-3 will cause temperature in tank to increase.
Operating P3 (65C-P-3) for extended time will cause temperature in 65C-TK-3 to
increase.
Acid flow rate to 65C-TK-3 is set to about 0.7 gpm. Acid addition time duration is
calculated per following equation:
Gallons of acid needed = Acid addition duration in minutes acid flow rate in gpm.
Add 92% Acid
5.3.16 ON graphic Chemical, ENSURE LIT-65C111 is less than 96%.
5.3.17 ON graphic Chemical, ENSURE TT-65C122 is less than 125 F.
5.3.18 IF MTT or STT is in OPERATION, ON graphic Chemical, CONFIRM
Chemfeed operation permissive (VD535182) is placed in OPERATION.
5.3.19 DETERMINE time duration of acid addition.
5.3.20 PLACE V010 (AOV-65C010) and V052 (AOV-65C052) in
MAN/CLOSED.
5.3.21 ENSURE the following are in operation per Section 5.1:
P1 (65C-P-1)
P3 (65C-P-3).
5.3.22 OPEN V010 (AOV-65C010).
5.3.23 ON graphic Chemical, MONITOR FT-65C103 volume added.
5.3.24 IF flow rate is different from about 0.7 gpm, ADJUST 65C-006 to obtain
correct flow.
5.3.25 MONITOR TT-65C-122 for 4% acid tank temperature.
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
14 of 33
5.3 Dilute Acid Adjustment (Cont.)
5.3.26 IF tank temperature increases to 130F, PERFORM the following:
5.3.26.1 CLOSE V010 (AOV-65C010).
5.3.26.2 SHUT DOWN P3 (65C-P-3).
5.3.26.3 ALLOW tank temperature to drop below 125°F.
5.3.26.4 RETURN to Step 5.3.13 to resume acid addition.
5.3.27 WHEN desired time duration of acid addition is obtained, CLOSE V010
(AOV-65C010).
5.3.28 ON graphic Chemical, ACTIVATE 4% acid totalizer reset (VD535234)
5.4 Dilute Caustic Adjustment
NOTE - SOM or DA will determine volume of water or caustic to be added.
5.4.1 ON graphic Chemical, DETERMINE actual NaOH concentration in tank
65C-TK-4 from C (AIT-65C201).
5.4.2 IF C (AIT-65C201) is not available or out of service, DETERMINE actual
NaOH concentration in tank 65C-TK-4 per ETF-05-002.
5.4.2.1 RECORD actual NaOH concentration in ETF Control Room
Logbook.
5.4.3 CONFIRM 65C-TK-4 has sufficient volume available for concentration
adjustment.
5.4.4 IF space must be made available for concentration in 65C-TK-4,
TRANSFER an amount to either a SWRT or concentrate tank, as directed by
SOM.
5.4.4.1 RECORD SOM direction in ETF Control Room Logbook.
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
15 of 33
5.4 Dilute Caustic Adjustment (Cont.)
Transfer to SWRT Tank
5.4.5 ON graphic SWRT, SELECT NaOH.
5.4.6 ON group display 35,
OR
ON graphic SWRT, SET FQ-65C244SP setpoint to reagent gallons required.
5.4.7 ON graphic SWRT, SELECT (pH Control Tk A) [pH Control Tk B].
5.4.8 ON group display 34,
OR
ON graphic SWRT, MONITOR FT-65C244, NaOH flow.
Transfer to Concentrate Tank
5.4.9 ENSURE 65C-320 is CLOSED.
5.4.10 ENSURE 65C-083 is 21 to 2 turns OPEN.
5.4.11 ON group display 41,
OR
ON graphic Conc, SET FQ-65C245SP to reagent gallons required.
5.4.12 ON graphic Conc, SELECT NaOH.
5.4.13 ON graphic Conc, SELECT (pH Control Tk A) [pH Control Tk B].
5.4.14 ON group display 41,
OR
ON graphic Conc, MONITOR FT-65C-245, NaOH flow.
5.4.15 CLOSE 65C-083.
5.4.16 ON graphic Chemical, ACTIVATE 4% NaOH Totalizer Reset (VD535235).
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
16 of 33
5.4 Dilute Caustic Adjustment (Cont.)
Add Verification Water
5.4.17 ON graphic Chemical, MANUALLY OPEN V051 (AOV-65C051) to add
desired amount of verification water to tank 65C-TK-4 (as shown by
FT-65C104 on group 50 or graphic Chemical).
5.4.18 AFTER desired amount of verification water has been added to tank
65C-TK-4, CLOSE valve V051 (AOV-65C051).
Special Instructions
Pump P2 (65C-P-2) shuts down when LT-65C211 is at 98%.
Operating 65C-P-4 for extended time will cause temperature in 65C-TK-4 to increase.
Caustic flow rate to 65C-TK-4 is set to about 1.4 gpm. Caustic addition time duration is
calculated per following equation:
Gallons of caustic needed = Caustic addition duration in minutes
caustic flow rate in gpm.
Add 50% Caustic
5.4.19 ON graphic Chemical, ENSURE LT-65C211 is less than 98%.
5.4.20 IF MTT or STT is in operation, ON graphic Chemical, CONFIRM
Chemfeed operation permissive (VD535182) is placed in OPERATION.
5.4.21 DETERMINE time duration of caustic addition.
5.4.22 PLACE V030 (AOV-65C030) and V051 (AOV-65C051) in
MAN/CLOSED.
5.4.23 ENSURE the following is in operation per Section 5.1:
P2 (65C-P-2)
P4 (65C-P-4).
5.4.24 OPEN V030 (AOV-65C030).
5.4.25 ON graphic Chemical, MONITOR FT-65C203 volume added.
5.4.26 IF flow rate is different from about 1.4 gpm, ADJUST 65C-029 to obtain
correct flow.
5.4.27 WHEN desired time duration of caustic addition is obtained, CLOSE V030
(AOV-65C030).
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
17 of 33
5.4 Dilute Caustic Adjustment (Cont.)
5.4.28 ON graphic Chemical, ACTIVATE 4% NaOH totalizer reset (VD535235).
5.4.29 IF directed by SOM, SHUT DOWN the following pumps:
P2 (65C-P-2)
P4 (65C-P-4).
5.4.29.1 RECORD SOM direction in ETF Control Room Logbook.
5.5 System Shutdown
5.5.1 IF Chemfeed operation permissive has not been selected, ON graphic
Chemical, INITIATE Chemical Feed System shutdown.
5.5.2 IF Chemfeed operation permissive has been selected, PERFORM the
following:
5.5.2.1 ON graphic Chemical, PLACE desired pumps to AUTO:
Pump Description
P1 (65C-P-1) 92% H2SO4 Pump
P2 (65C-P-2) 50% NaOH Pump
P3 (65C-P-3) 4% H2SO4 Pump
P4 (65C-P-4) 4% NaOH Pump
5.5.2.2 ON graphic Chemical, SELECT OPERATION for Chemfeed
system.
5.5.2.3 ON graphic Chemical, SELECT OFF for Chemfeed operation
permissive (VD535182).
5.5.2.4 ON graphic Chemical, SELECT SHUTDOWN.
5.5.2.5 ON graphic Chemical, CONFIRM pumps have stopped:
Pump Description
P1 (65C-P-1) 92% H2SO4 Pump
P2 (65C-P-2) 50% NaOH Pump
P3 (65C-P-3) 4%H2SO4 Pump
P4 (65C-P-4) 4% NaOH Pump
5.5.3 ON graphic Chemical, CONFIRM Chemical Feed System shutdown light is
STEADY ON.
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
18 of 33
5.6 Charging Surge Tank Acid Line
5.6.1 For the acid injection pumps, 65C-P-5 and 65C-P-6, to run, ENSURE the
surge system is in READY or OPERATION per ETF-60-002.
5.6.2 ON graphic Surge, CONFIRM surge tank level LT-60A012, is
≥ 7%.
5.6.3 ON graphic Surge, CONFIRM surge system is in READY or OPERATION.
5.6.4 PERFORM the following valving:
Valve Location Position
65C-004 NORTH SIDE OF
65C-TK-3 CLOSED
65C-121 NORTH SIDE OF
65C-TK-3 CLOSED
65C-007 92% ACID TANK
65C-TK-1 CLOSED
65C-060 92% ACID TANK
65C-TK-1 OPEN
65C-159 ON TOP OF SURGE
TANK CLOSED
65C-173 NORTH SIDE OF
65C-TK-3 CLOSED
65C-300 WEST SIDE OF
65C-TK-3 OPEN
65C-301 WEST SIDE OF
65C-TK-3 CLOSED
65C-302 WEST SIDE OF
65C-TK-3 CLOSED
65C-303 WEST SIDE OF
65C-TK-3 CLOSED
65C-305 WEST SIDE OF
65C-TK-3 OPEN
65C-306 WEST SIDE OF
65C-TK-3 OPEN
65C-307 WEST SIDE OF
65C-TK-3 CLOSED
65C-308 WEST SIDE OF
65C-TK-3 CLOSED
65C-311 WEST SIDE OF
65C-TK-3 CLOSED
65C-312 WEST SIDE OF
65C-TK-3 OPEN
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
19 of 33
5.6 Charging Surge Tank Acid Line (Cont.)
5.6.5 ON graphic Surge, PLACE pump speed controller to 100% output.
Controller Pump
65CP5 65C-P-5
65CP6 65C-P-6
5.6.6 ON graphic Surge, PLACE pumps to MANUAL/START.
Pump
65C-P-5
65C-P-6
5.6.7 WHEN fifteen minutes has elapsed,
OR
WHEN surge tank pH falls on the following:
AIT-60A-022
AIT-60A-023
ON graphic Surge, PLACE pumps to MANUAL/STOP.
5.6.8 PLACE speed controller P65CP5 and P65CP6 to 0% output.
Pump
65C-P-5
65C-P-6
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
20 of 33
5.7 Charging Surge Tank 50 % Sodium Hydroxide Line
5.7.1 For the caustic injection pump, 65C-P-7, to run, ENSURE the surge system
is in READY or OPERATION per ETF-60-002.
5.7.2 IF directed by SOM or process memo, ON graphic Surge, CONFIRM surge
tank level LT-60A012, is ≥ 7%.
5.7.3 ON graphic Surge, CONFIRM surge system is in READY or OPERATION.
5.7.4 IF directed by SOM, PERFORM the following valving:
Valve Location Position
65C-024 50% CAUSTIC
TANK 65C-TK-2 CLOSED
65C-026 50% CAUSTIC
TANK 65C-TK-2 CLOSED
65C-070 50% CAUSTIC
TANK 65C-TK-2 OPEN
65C-124 NORTH SIDE OF
65C-TK-4 CLOSED
65C-161 ON TOP OF SURGE
TANK CLOSED
65C-174 WEST SIDE OF
65C-TK-4 CLOSED
65C-330 WEST SIDE OF
65C-TK-4 OPEN
65C-331 WEST SIDE OF
65C-TK-4 CLOSED
65C-332 WEST SIDE OF
65C-TK-4 CLOSED
65C-333 WEST SIDE OF
65C-TK-4 CLOSED
65C-335 WEST SIDE OF
65C-TK-4 OPEN
65C-336 WEST SIDE OF
65C-TK-4 CLOSED
65C-338 WEST SIDE OF
65C-TK-4 CLOSED
65C-339 WEST SIDE OF
65C-TK-4 CLOSED
5.7.4.1 RECORD SOM direction in ETF Control Room Logbook.
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
21 of 33
5.7 Charging Surge Tank 50 % Sodium Hydroxide Line (Cont.)
5.7.5 ON graphic Surge, PLACE pump speed controller P65C-P-7 to 100%
output.
5.7.6 ON graphic Surge, PLACE pump 65C-P-7 to MANUAL/START.
5.7.7 WHEN fifteen minutes has elapsed,
OR
WHEN surge tank pH begins to rise on the following:
AIT-60A-022
AIT-60A-023.
ON graphic Surge, PLACE pump 65C-P-7 to MANUAL/STOP.
5.7.8 PLACE pump speed controller P65CP7to 0% output.
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
22 of 33
5.8 Circulate 50% Caustic through Surge Tank Injection Pump
5.8.1 ON graphic Surge, ENSURE one of the following:
Surge system is in READY/OPERATION per ETF-60-002
At least one surge pump is in MANUAL/ON.
5.8.2 IF directed by SOM, ENSURE the following valve positions:
Valve Location Position
65C-070 50% CAUSTIC
TANK 65C-TK-2 OPEN
65C-024 50% CAUSTIC
TANK 65C-TK-2 CLOSED
65C-026 WEST SIDE OF
65C-TK-4 CLOSED
65C-174 WEST SIDE OF
65C-TK-4 CLOSED
65C-124 NORTH SIDE OF
65C-TK-4 CLOSED
65C-330 WEST SIDE OF
65-C-TK-3 OPEN
65C-331 WEST SIDE OF
65-C-TK-3 CLOSED
65C-332 WEST SIDE OF
65-C-TK-3 CLOSED
65C-333 WEST SIDE OF
65-C-TK-3 CLOSED
65C-338 WEST SIDE OF
65-C-TK-3 OPEN
65C-339 WEST SIDE OF
65-C-TK-3 CLOSED
65C-335 WEST SIDE OF
65-C-TK-3 CLOSED
5.8.2.1 RECORD SOM direction in ETF Control Room Logbook.
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
23 of 33
5.8 Circulate 50% Caustic through Surge Tank Injection Pump (Cont.)
5.8.3 IF directed by SOM, PERFORM the following:
5.8.3.1 ON graphic Surge, PLACE pump speed controller
P65C-P-7 to 100% output.
5.8.3.2 ON graphic Surge, PLACE pump 65C-P-7 to
MANUAL/START.
5.8.3.3 RECORD SOM direction in ETF Control Room Logbook.
5.8.4 WHEN one hour has elapsed, ON graphic Surge, PLACE pump 65C-P-7
to MANUAL/STOP.
5.8.5 PLACE pump speed controller P65CP7 to 0% output.
5.8.6 CLOSE 65C-338.
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
24 of 33
5.9 Records
5.9.1 PERFORM the following for records identified within this procedure.
5.9.1.1 RECORD the number of times the record was generated in
applicable column
OR
PLACE a check mark () in the N/A column.
5.9.1.2 SUBMIT the package for verification of completed records.
Records Submittal Checklist
Number
of times
completed
N/A
()
Data Sheets
Data Sheet 1 – Initial Valve Lineup
Data Sheet 2 – Initial Breaker Lineup
Signature Sheets
Signature Sheet 1
FWS/OE/Shift Manager SEND the completed records to the Central Shift Office for
records retention.
/ /
Signature Print (First & Last) Date
FWS/OE/Shift Manager
The record custodian identified in the company-level Records Inventory and Disposition
Schedule (RIDS) is responsible for record retention in accordance with TFC-BSM-
IRM_DC-C-02.
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
25 of 33
Data Sheet 1 – Initial Valve Lineup
Sheet 1 of 7
Valve
Number Valve Name Location
Required
Position Initials(3) Date
SOUTH SIDE OF 65C-TK-4
65C-092 Loop Seal Fill CLOSED
65C-093 Loop Seal Drain CLOSED
EAST SIDE OF 65C-TK-4
65C-127 65C-TK-4 Tank Outlet OPEN
65C-050 65C-TK-4 Drain CLOSED
65C-031 4% NaOH to 65C-P-4 (65C-P-4 Inlet) OPEN
65C-055 Isolation LIT 65C211 OPEN
V-LIT65C211-A LIT 65C211 Drain CLOSED
65C-176 Pump Casing Drain Valve (P-4) CLOSED
65C-033 4% Recirc Line Drn (65C-P-4 Discharge) CLOSED
65C-128 4% NaOH Sample Valve CLOSED
65C-057 Isolation PIT 65C212 OPEN
65C-034 4% NaOH to ETF (65C-P-4 Discharge) OPEN
65C-035 4% NaOH Recirc THROTTLE
65C-036 4% NaOH to ETF OPEN
65C-202 4% NaOH Recirculation Line Drain CLOSED
NORTH SIDE OF 65C-TK-4
V-PIT65C212-A PIT-65C212 Drain CLOSED
65C-124 PIT-65C202 Drain CLOSED
65C-125 50% NaOH Sample CLOSED
Special Instructions (3) Component known to be in the Required Position per SOM.
(Continued on Next Sheet)
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
26 of 33
Data Sheet 1 – Initial Valve Lineup (Cont.)
Sheet 2 of 7
Valve
Number Valve Name Location
Required
Position Initials(3) Date
WEST SIDE OF 65C-TK-4
65C-071 50% NaOH to Conc. TKs OPEN
65C-054 50% NaOH to 4% TK OPEN
65C-029 50% NaOH to 4% TK (65C-P-2 Discharge) THROTTLED
65C-028 50% Recirc (50% Recirc Line) OPEN
65C-027 50% NaOH to ETF (65C-P-2 Discharge) OPEN
65C-026 50% Recirc Line Drn (65C-P-2 Discharge) CLOSED
65C-048 Isolation PIT 65C202 OPEN
65C-038 50% NaOH to 65C-P-2 OPEN
65C-174 Pump Casing Drain Valve (P-2) CLOSED
65C-087 Verif to 4% NaOH Tk THROTTLED
SOUTH SIDE OF 65C-TK-3
65C-090 Loop Seal Fill CLOSED
65C-091 Loop Seal Drain CLOSED
EAST SIDE OF 65C-TK-3
65C-101 65C-TK-3 Tank Outlet OPEN
65C-102 65C-TK-3 Drain CLOSED
65C-049 65C-TK-3 Drain CLOSED
65C-012 4% Acid to 65C-P-3 OPEN
65C-115 Level Transmitter Isolation OPEN
V-LIT65C111-A LIT 65C111 Drain CLOSED
65C-175 Pump Casing Drain Valve (P-3) CLOSED
65C-056 Isolation PIT 65C112 OPEN
Special Instructions (3) Component known to be in the Required Position per SOM.
(Continued on Next Sheet)
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
27 of 33
Data Sheet 1 – Initial Valve Lineup (Cont.)
Sheet 3 of 7
Valve
Number Valve Name Location
Required
Position Initials(3) Date
EAST SIDE OF 65C-TK-3 (Cont.)
65C-126 PIT-65C-112 Drain CLOSED
65C-016 4% Sample Port Isolation (65C-P-3 Discharge) CLOSED
65C-112 4% Acid Sample Valve CLOSED
65C-014 4% Acid to ETF (65C-P-3 Discharge) OPEN
65C-017 4% Acid to ETF (65C-P-3 Discharge) OPEN
65C-015 4% Recirc (on 4% Recirc Line) THROTTLED
NORTH SIDE OF 65C-TK-3
65C-006 92% Acid to 4% Tk THROTTLED
65C-053 92% Acid to 4% Tk OPEN
65C-003 92% Acid to ETF (65C-P-1 Discharge) OPEN
65C-004 92% Recirc Line Drn (65C-P-1 Discharge) CLOSED
65C-047 Isolation PIT 65C102 OPEN
65C-121 Sample Isolation CLOSED
65C-122 92% Acid Sample Valve CLOSED
65C-005 92% Recirc OPEN
65C-173 Pump Casing Drain Valve (P-1) CLOSED
65C-001 92% Acid to 65C-P-1 OPEN
WEST SIDE OF 65C-TK-3
65C-169 Verification H2O Drain CLOSED
65C-011 Verification Tanks to 4% Tanks OPEN
65C-009 Verification Tanks to 4% Tanks OPEN
65C-086 Verif to 4% Acid Tk THROTTLED
65C-300 Acid Inlet Isolation to 65C-P-6 OPEN
Special Instructions (3) Component known to be in the Required Position per SOM.
(Continued on Next Sheet)
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
28 of 33
Data Sheet 1 – Initial Valve Lineup (Cont.)
Sheet 4 of 7
Valve
Number Valve Name Location
Required
Position Initials(3) Date
WEST SIDE OF 65C-TK-3
65C-301 Acid Drain on 65C-P-6 Inlet CLOSED
65C-302 Acid Drain on 65C-P-6 Outlet CLOSED
65C-303 Acid Vent on 65C-P-6Outlet CLOSED
65C-305 Acid Outlet Isolation to 65C-P-6 OPEN
65C-306 Acid Inlet Isolation to 65C-P-5 OPEN
65C-307 Acid Drain on 65C-P-5 Inlet CLOSED
65C-308 Acid Vent on 65C-P-5 Outlet CLOSED
65C-311 Acid Drain on 65C-P-5 Outlet CLOSED
65C-312 Acid Outlet Isolation to 65C-P-5 OPEN
65C-330 Caustic Inlet Isolation to 65C-P-7 OPEN
65C-331 Caustic Drain on 65C-P-7 Inlet CLOSED
65C-332 Caustic Drain on 65C-P-7 Outlet CLOSED
65C-333 Caustic Vent on 65C-P-7 Outlet CLOSED
65C-335 Caustic Outlet Isolation to 65C-P-7 CLOSED
65C-336 Caustic Vent CLOSED
65C-338 Caustic Isolation for 65C-P-7 Recycle CLOSED
65C-339 Caustic Drain for 65C-P-7 Recycle CLOSED
Special Instructions (3) Component known to be in the Required Position per SOM.
(Continued on Next Sheet)
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
29 of 33
Data Sheet 1 – Initial Valve Lineup (Cont.)
Sheet 5 of 7
Valve
Number Valve Name Location
Required
Position Initials(3) Date
5 FT SOUTHWEST OF 60A-P-1C
65C-061 4% Acid to Surge Tk pH Meters CLOSED
65C-077 4% NaOH to Surge Tk pH Meters CLOSED
NEAR SUMP TANK 1
65C-321 50% NaOH Line Drain CLOSED
ON TOP OF pH ADJUSTMENT TANK 60C-TK-1
65C-151 4% Acid to pH Adjust OPEN
65C-152 4% Acid Drain CLOSED
65C-153 4% NaOH to pH Adjust OPEN
65C-154 4% NaOH Drain CLOSED
65C-106 4% Acid Drain CLOSED
65C-107 4% Acid to pH Adjust Tank OPEN
65C-108 4% NaOH Drain CLOSED
65C-109 4% NaOH to pH Adjust Tank OPEN
65C-110 PI-65C-097 Isolation CLOSED
65C-111 PI-65C-099 Isolation CLOSED
65C-113 4% Acid Vent CLOSED
65C-114 4% NaOH Vent CLOSED
ON TOP OF SWRT A (60I-TK-1A)
65C-062 4% Acid to SWRT TK-A OPEN
65C-063 4% NaOH to SWRT TK-A OPEN
Special Instructions (3) Component known to be in the Required Position per SOM.
(Continued on Next Sheet)
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
30 of 33
Data Sheet 1 – Initial Valve Lineup (Cont.)
Sheet 6 of 7
Valve
Number Valve Name Location
Required
Position Initials(3) Date
ON TOP OF SWRT B (60I-TK-1B)
65C-064 4% Acid to SWRT TK-B OPEN
65C-065 4% NaOH to SWRT TK-B OPEN
ON MEZZANINE NORTH OF FINE FILTER
65C-021 4% Acid to SWRT Tks OPEN
65C-074 4% Acid Vent CLOSED
65C-040 4% NaOH to SWRT Tks OPEN
65C-076 4% NaOH Vent CLOSED
65C-089 4% NaOH-Filter Clean CLOSED
65C-088 4% Acid-Filter Clean CLOSED
65C-082 4% Acid to Conc Tanks OPEN
65C-083 4% Caustic to Conc Tank CLOSED
65C-177 4% Acid FT-65C-145 Drain CLOSED
65C-320 50% Caustic to Conc Tank CLOSED
65C-329 4% NaOH FT-65C-245 Drain CLOSED
ON TOP OF CONCENTRATE TANK A (60J-TK-1A)
65C-020 4% Acid to Conc Tk-A OPEN
65C-039 NaOH to Conc Tk-A OPEN
ON TOP OF CONCENTRATE TANK B (60J-TK-1B)
65C-043 4% Acid to Conc Tk-B OPEN
65C-019 NaOH to Conc Tk-B OPEN
ON TOP OF EFFLUENT pH TANK 60C-TK-2
65C-171 4% Acid to Eff pH CLOSED
65C-172 4% NaOH to Eff pH CLOSED
Special Instructions (3) Component known to be in the Required Position per SOM.
(Continued on Next Sheet)
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
31 of 33
Data Sheet 1 – Initial Valve Lineup (Cont.)
Sheet 7 of 7
Valve
Number Valve Name Location
Required
Position Initials(3) Date
N TOP OF RO CIP TANK 60F-TK-3
65C-310 4% NaOH to CIP CLOSED
92% ACID TANK 65C-TK-1
65C-060 65C-TK-1 Discharge OPEN
65C-007 65C-TK-1 Drain CLOSED
65C-085 92% Acid Load-In CLOSED
50% CAUSTIC TANK 65C-TK-2
65C-067 50% NaOH Load-In CLOSED
65C-070 65C-TK-2 Discharge OPEN
65C-024 65C-TK-2 Drain CLOSED
ON TOP OF SURGE TANK
65C-159 Acid Drain (Pipe Hdr. Between Surge and
Bldg) CLOSED
65C-161 Caustic Header Drain (Near 65C-159) CLOSED
ABOVE POLISHERS
65C-103 H2SO4 to Polishers OPEN
65C-104 NaOH to Polishers OPEN
AOVs
65C010 Graphic CHEMICAL AUTO
65C030 Graphic CHEMICAL AUTO
65C051 Graphic CHEMICAL AUTO
65C052 Graphic CHEMICAL AUTO
Special Instructions (3) Component known to be in the Required Position per SOM.
/ /
Signature Print (First & Last) Date
SOM Completion Review
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
32 of 33
Data Sheet 2 – Initial Breaker Lineup
Breaker
Number Breaker Name and Location
Required
Position Initials(3) Date
MOTOR CONTROL CENTER 3 (MCC-3)
65C-P-1 92% H2SO4 Storage Tank Pump ON
65C-P-2 50% NaOH Storage Tank Pump ON
MOTOR CONTROL CENTER 1 (MCC-1)
65C-P-3 4% H2SO4 Solution Feed Pump ON
65C-P-4 4% NaOH Solution Feed Pump ON
MAIN DISTRIBUTION PANEL 2 (MDP-2)
15 NaOH Tank Heater ON
Special Instructions (3) Component known to be in the Required Position per SOM.
/ /
Signature Print (First & Last) Date
SOM Completion Review
Chemical Feed System Operation
Type
CONTINUOUS Document No.
ETF-65C-001 Rev/Mod
A-4 Release Date
01/14/2019 Page
33 of 33
Signature Sheet 1
Participating personnel enter their signature, printed name (first & last), and initials below.
Signature Print Name (First & Last) Initials