Tamworth Wireless: Affordable High Speed Broadband for All Citizens. Presentation to the Tamworth Foundation Annual Meeting August 23, 2010. Contents. History and Current Status Tamworth Wireless Mission How the Service Will Work Implementation Timelines - PowerPoint PPT Presentation
Citation preview
1 • Tamworth Wireless August 23, 2010 Presentation•
Tamworth Wireless:
Affordable High Speed Broadband for All Citizens
Presentation to the Tamworth Foundation Annual Meeting
August 23, 2010
2 • Tamworth Wireless August 23, 2010 Presentation•
Contents
1. History and Current Status
2. Tamworth Wireless Mission
3. How the Service Will Work
4. Implementation Timelines
5. What To Do If You Are Interested in Being a Customer
3 • Tamworth Wireless August 23, 2010 Presentation•
Tamworth Wireless – 4 Years in the Making
2007 • Gunnar Berg, Brian Forcier and Dennis Quinn develop the original design for Tamworth Wireless
2008 • Brian and Dennis share the idea with the Board of Selectmen
• Selectmen decide it is not an appropriate town investment; neither Dennis nor Brian have the free time to start a new enterprise
2009 • Pat Farley invites Dennis to be an “advisor” to the Tamworth Economic Development Committee (TEDC) on the future of Broadband in Tamworth, Dennis agrees to “explore” what it would actually take to create this network.
• NH’s federal broadband grant application is unsuccessful
2010 • With encouragement from Carol Miller, the NH Broadband Czar, Dennis decides to “just do it” and submits an application to the Tamworth Foundation
• Tamworth Foundation approves a $100,000 grant to Tamworth Wireless
4 • Tamworth Wireless August 23, 2010 Presentation•
Tamworth Wireless Mission and Vision
Mission:
To make affordable broadband Internet access and local IT support services available to all households, individuals and organizations in Tamworth.
Vision:
Tamworth citizens will use high speed broadband access to improve their livelihoods; create new opportunity; and connect with the world in ways that enhance their quality of life.
5 • Tamworth Wireless August 23, 2010 Presentation•
Current Status
• Founding Board established
• Non-Profit Articles of Incorporation in process
• Business plan developed
• Technical plan developed and approved by the Project Team
• Initial equipment arriving
• Deployment of first 25 “Beta Test” customers targeted for Fall 2010
Founding Board Members
•John Cleveland, Chair•Lianne Prentice•Jack Waldron•Betsy Loughran•Demirhan Yeningun•Dennis Quinn, President (Ex Officio)
Project Team(Meets monthly to review implementation progress)
•Tamworth Foundation Board Members
•Tamworth Wireless Board Chair and President
6 • Tamworth Wireless August 23, 2010 Presentation•
How the System Works
• Bandwidth is purchased from NHVT and travels through a phone line to a 10” dish on the back of the UCC Church
• A signal is broadcast from UCC to the Great Hill Fire Tower, and from there to Page Hill and Bunker Hill
• The signal is broadcast from those access points to a “internet radios” at individual residences, and to neighborhood nodes.
• A cable from the internet radio brings the signal to into the customer’s home.
Access Point
7 • Tamworth Wireless August 23, 2010 Presentation•
System Graphic
Fairpoint “Center of Operations”
UCC Church
Great Hill Fire Tower
Neighborhood Node
R
R
R
RRR
Page Hill
Neighborhood Node
R
R
R
RRR
Bunker Hill
Neighborhood Node
R
R
R
RRR
8 • Tamworth Wireless August 23, 2010 Presentation•
Projected System Performance Goals
• Each user will be guaranteed a minimum level of bandwidth
• Bandwidth will depend on the pricing plan (higher cost, more bandwidth)
• The “standard” bandwidth package is expected to be able to deliver:
• 3 megabits (3 million) of download speed• 1 megabit (1 million) of upload speed
• The Beta Test phase (first 25 customers) will determine verifiable system performance
9 • Tamworth Wireless August 23, 2010 Presentation•
Typical Broadband Speeds
TYPE OF SERVICE TYPICAL SPEEDS*
(Bits per second)
Download Upload
Cable 5 Mb 1 Mb
DSL 3 Mb 1 Mb
Satellite (WB & Hughes) .5 – 1Mb .1 - .2 Mb
Verizon Wireless 0.6 – 1.4 Mb 0.3 Mb
Dial Up 0.053 Mb 0.007 Mb
*Actual speeds may vary
Tamworth Wireless “Standard” Service
1.5 – 3 Mb 0.8 – 1.5 Mb
10 • Tamworth Wireless August 23, 2010 Presentation•
Preliminary Pricing Goals*
TYPE OF SERVICE
Bandwidth Cost Per Month
One Time Equipment FeeDownload Upload
Standard 3 Mb 1 Mb $40 $250
Budget 1 Mb 0.5 Mb $20 $250
Business 6+ Mb 3+ Mb $80 -- $200 $250
Part-Time** TBD TBD TBD $250*Final pricing may change slightly based on prototype experience and speeds that can be delivered.
**Pricing for part time residents has not yet been determined.
11 • Tamworth Wireless August 23, 2010 Presentation•
Other Services Tamworth Wireless Will Provide
• Customer IT support – computer repair; software troubleshooting, virus & malware removal.
• Website design
• Services will be provided on a fee basis – they are not included in the monthly Internet service fee
12 • Tamworth Wireless August 23, 2010 Presentation•
Implementation Timelines
Timeframe Implementation Steps
August – October Install backhaul and access points
September – November Install Beta Test customers (25)
October – December Verify system performance with Beta test
Winter, 2011 Formal marketing launch
January – June 2011 Add additional customers
13 • Tamworth Wireless August 23, 2010 Presentation•
Customer Sign Up Process – Beta Test
1. Fill out a form if you are interested.
2. Dennis will email everyone on the list to verify interest. (This will include those who expressed interest through the community survey, and online survey.)
3. Dennis will choose 25 representative customers, based on technical needs, and geographical location to effectively test the capabilities of the system.
4. Tamworth Wireless will provide and install customer equipment for free.
5. Customers will be connected for one month at no cost while system is being tested.
6. To continue, customers will sign a one-year contract.
14 • Tamworth Wireless August 23, 2010 Presentation•
Future Customer Additions
• Once the Beta Test is completed, additional customers will be added at the rate that the system can effectively absorb.
• The number of customers will need to be matched to broadband supply to assure guaranteed speeds.
• Depending on the Beta Test results, it may be feasible to offer a reduced cost for initial equipment and installation fees to “first wave” customers – but we will not know this until the Beta Test is complete.
15 • Tamworth Wireless August 23, 2010 Presentation•
Summary
• Tamworth Wireless will be an important new economic development asset for the town.
• In the future, our system will enable us to access even faster broadband speeds.
• The implementation process is technically complicated and needs to be done in a deliberate and careful manner.
• We will move as quickly as our quality standards allow us to!
16 • Tamworth Wireless August 23, 2010 Presentation•
Thank You to the Tamworth
Foundation for Supporting
Tamworth Wireless!
17 • Tamworth Wireless August 23, 2010 Presentation•
Q & A