13
TAMU KALEWA Temple Mosque GPS Tree- T4, T3, T2,T1 Hand Pump Well Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone TRF Petrol Pump LP Well Church Overhead Water Tank HighTension Lines Low Tension Line Drain Line Bund Line Track Line Road Line Existing Carriageway Canal Line Retaining Wall Breast Wall Right of Way Railway Track North Symbol Electric Line Fence Line Proposed Centre Line Proposed Carriageway Edge Proposed Shoulder Proposed Toe Line Proposed Drain Proposed Culvert/Bridge/ HT Drain Bund Track Canal RT_Wall BR_Wall ROW EP Electric Pole LT PLAN R- Radius of Curve (m) c- Deviation Angle of Circular Curve (Degree) Lc- Length of Circular Curve (m) Ts- Tangent Length (m) Es- Apex Distance (m) LS- Length of Spiral Curve (m) s- Shift (m) - Deflection Angle (Degree) V- Design Speed (kmph) e- Superelevation (%) HIP- Horizontal Intersection Point TS- Point of change from Tangent to Spiral SC- Point of change from Spiral to Circular Curve PC- Point of Curvature PT- Point of Tangent SC- Point of change from Circular Curve to Spiral ST- Point of change from Spiral to Tangent LEGEND:- L-PROFILE G-Gradent % Lv - Length of Vertical Curve (m) L - Length of Grade (m) R - Radius (m) e - Superelevation (%) D - Straight Length of Horizontal Alignment (m) Lc - Length of Circuler Curve (m) VIP - Point of Vertical Intersection A3 MINISTRY OF EXTERNAL AFFAIRS NEW DELHI,INDIA PROJECT: CLIENT : Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches on Tamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO. Myanmar/TKK/P&P/ TITLE: Plan & Profile for Bridge no 21 (Ex.Str.No.34/2) At chainage : 54+150 21

TAMU KALEWA - Ministry of External Affairs...TAMU KALEWA Temple Mosque GPS Tree- T4, T3, T2,T1 Hand Pump Well Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE

  • Upload
    others

  • View
    12

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TAMU KALEWA - Ministry of External Affairs...TAMU KALEWA Temple Mosque GPS Tree- T4, T3, T2,T1 Hand Pump Well Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE:Plan & Profile for Bridge no 21

(Ex.Str.No.34/2) At chainage : 54+150

21

Page 2: TAMU KALEWA - Ministry of External Affairs...TAMU KALEWA Temple Mosque GPS Tree- T4, T3, T2,T1 Hand Pump Well Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE:Plan & Profile for Bridge no 21

(Ex.Str.No.34/2) At chainage : 54+150

21AM

ATCH

EXI

STIN

G

Proposed Road Level at Design CentrelineRoad/Ground Level below Design Centreline

Page 3: TAMU KALEWA - Ministry of External Affairs...TAMU KALEWA Temple Mosque GPS Tree- T4, T3, T2,T1 Hand Pump Well Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE: Plan & Profile for Bridge no 22

(Ex.Str.No.35/1)At chainage : 55+560

22

Proposed Road Level at Design CentrelineExisting Road/Ground Level below Design Centreline

MAT

CH E

XIST

ING

MAT

CH E

XIST

ING

Page 4: TAMU KALEWA - Ministry of External Affairs...TAMU KALEWA Temple Mosque GPS Tree- T4, T3, T2,T1 Hand Pump Well Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE: Plan & Profile for Bridge No. 23

(Ex.Str.No.38/1) At chainage : 60+075

23

Page 5: TAMU KALEWA - Ministry of External Affairs...TAMU KALEWA Temple Mosque GPS Tree- T4, T3, T2,T1 Hand Pump Well Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE:Plan & Profile for Bridge No. 23

(Ex.Str.No.38/1) At chainage : 60+075

23A

Proposed Road Level at Design CentrelineExisting Road/Ground Level below Design Centreline

MAT

CH E

XIST

ING

Page 6: TAMU KALEWA - Ministry of External Affairs...TAMU KALEWA Temple Mosque GPS Tree- T4, T3, T2,T1 Hand Pump Well Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE: Plan & Profile for Bridge no 24

(Ex.Str.No.38/2) At chainage : 60+275

24

Page 7: TAMU KALEWA - Ministry of External Affairs...TAMU KALEWA Temple Mosque GPS Tree- T4, T3, T2,T1 Hand Pump Well Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE:Plan & Profile for Bridge no 24

(Ex.Str.No.38/2) At chainage : 60+275

24A

Proposed Road Level at Design CentrelineExisting Road/Ground Level below Design Centreline

MAT

CH E

XIST

ING

Page 8: TAMU KALEWA - Ministry of External Affairs...TAMU KALEWA Temple Mosque GPS Tree- T4, T3, T2,T1 Hand Pump Well Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE:

25

MAT

CH E

XIST

ING

Plan&Profile for Bridge no 25(Ex.Str.No.41/1) At chainage : 64+135

Proposed Road Level at Design CentrelineExisting Road/Ground Level below Design Centreline

MAT

CH E

XIST

ING

MAT

CH E

XIST

ING

Page 9: TAMU KALEWA - Ministry of External Affairs...TAMU KALEWA Temple Mosque GPS Tree- T4, T3, T2,T1 Hand Pump Well Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE:Plan & Profile for Bridge no 26

(Ex.Str.No.42/1) At chainage : 66+405

26

MAT

CH E

XIST

ING

MAT

CH E

XIST

ING

Page 10: TAMU KALEWA - Ministry of External Affairs...TAMU KALEWA Temple Mosque GPS Tree- T4, T3, T2,T1 Hand Pump Well Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE: Plan & Profile for Bridge no 27

(Ex.Str.No.44/1) At chainage : 68+995

27

Proposed Road Level at Design CentrelineExisting Road/Ground Level below Design Centreline

MAT

CH E

XIST

ING

MAT

CH E

XIST

ING

Page 11: TAMU KALEWA - Ministry of External Affairs...TAMU KALEWA Temple Mosque GPS Tree- T4, T3, T2,T1 Hand Pump Well Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE: Plan & Profile for Bridge no 28

(Ex.Str.No.46/1) At chainage : 72+200

28

Proposed Road Level at Design CentrelineExisting Road/Ground Level below Design Centreline

MAT

CH E

XIST

ING

MAT

CH E

XIST

ING

Page 12: TAMU KALEWA - Ministry of External Affairs...TAMU KALEWA Temple Mosque GPS Tree- T4, T3, T2,T1 Hand Pump Well Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE: Plan & Profile for Bridge no 29

(Ex.Str.No.47/3) At chainage : 74+905

29

MAT

CH E

XIST

ING

Proposed Road Level at Design CentrelineExisting Road/Ground Level below Design Centreline

Page 13: TAMU KALEWA - Ministry of External Affairs...TAMU KALEWA Temple Mosque GPS Tree- T4, T3, T2,T1 Hand Pump Well Lamp Post Transformer Points Telephone Box OFC Pillar Mile Stone MILE

TAMU KALEWA

Temple

Mosque

GPS

Tree- T4, T3, T2,T1

Hand Pump

Well

Lamp Post

Transformer Points

Telephone Box

OFC Pillar

Mile Stone

MILE

STONE

TRF

Petrol Pump

LP

Well

Church

Overhead Water Tank

HighTension Lines

Low Tension Line

Drain Line

Bund Line

Track Line

Road Line

Existing Carriageway

Canal Line

Retaining Wall

Breast Wall

Right of Way

Railway Track

North Symbol

Electric Line

Fence Line

Proposed Centre Line

Proposed Carriageway Edge

Proposed Shoulder

Proposed Toe Line

Proposed Drain

Proposed Culvert/Bridge/

HT

Drain

Bund

Track

Canal

RT_Wall

BR_Wall

ROW

EP

Electric Pole

LT

PLAN

R- Radius of Curve (m)

c- Deviation Angle of Circular Curve (Degree)

Lc- Length of Circular Curve (m)

Ts- Tangent Length (m)

Es- Apex Distance (m)

LS- Length of Spiral Curve (m)

s- Shift (m)

- Deflection Angle (Degree)

V- Design Speed (kmph)

e- Superelevation (%)

HIP- Horizontal Intersection Point

TS- Point of change from Tangent to Spiral

SC- Point of change from Spiral to Circular Curve

PC- Point of Curvature

PT- Point of Tangent

SC- Point of change from Circular Curve to Spiral

ST- Point of change from Spiral to Tangent

LEGEND:-

L-PROFILE

G-Gradent %

Lv - Length of Vertical Curve (m)

L - Length of Grade (m)

R - Radius (m)

e - Superelevation (%)

D - Straight Length of

Horizontal Alignment (m)

Lc - Length of Circuler Curve (m)

VIP - Point of Vertical Intersection

A3

MINISTRY OF EXTERNAL AFFAIRSNEW DELHI,INDIA

PROJECT:CLIENT :

Consultancy Services For Preparation of Feasibility Report For Construction of Bridges including Approaches onTamu- Kyigone-Kalewa Road Section From Km 0.000 to Km 149.700 in Myanmar. DRAWING NO.

Myanmar/TKK/P&P/

TITLE: Plan & Profile for Bridge no 30

(Ex.Str.No.48/1) At chainage : 75+325

30M

ATCH

EXI

STIN

G

Proposed Road Level at Design CentrelineExisting Road/Ground Level below Design Centreline