242
TALL BUILDINGS IN HISTORIC CENTERS

Tall Building in Historic Centers

Embed Size (px)

DESCRIPTION

Though slim in volume, "Tall Buildings in Historic Centers" is rich with information specific to the disparate stratospheres of landmarks-organizations and tall buildings - because often the two collide. Unique to this study is: not just the finite practice of the collision – with its metrics, legislations, and countless built examples – but also the broader disciplinary problem (or promise) that the collision poses for architecture. The possibility that the surging capital motives of private real-estate development and the weight of social value can exist side-by-side – or bound – reassures the role of the architect in the future shaping of cities. More profoundly, this alludes to the responsibility an architect can hold in shaping history and capitalism.

Citation preview

  • TALL BUILDINGSIN

    HISTORIC CENTERS

    TALL B

    UILD

    ING

    S IN

    HIS

    TOR

    IC C

    EN

    TER

    S

  • TALL BUILDINGS IN HISTORIC CENTERSTALL BUILDINGS FOR HISTORIC CENTERSTALL BUILDINGS WITH HISTORIC CENTERS

    TALL BUILDINGS AROUND HISTORIC CENTERSTALL BUILDINGS AND HISTORIC CENTERSTALL BUILDINGS AT HISTORIC CENTERS

    TALL BUILDINGS BEFORE HISTORIC CENTERSTALL BUILDINGS AFTER HISTORIC CENTERSTALL BUILDINGS ABOVE HISTORIC CENTERS

    TALL BUILDINGS BEYOND HISTORIC CENTERSTALL BUILDINGS OVER HISTORIC CENTERSTALL BUILDINGS INTO HISTORIC CENTERS

    TALL BUILDINGS UNDER HISTORIC CENTERSTALL BUILDINGS BELOW HISTORIC CENTERSTALL BUILDINGS AMONG HISTORIC CENTERS

    TALL BUILDINGS AS HISTORIC CENTERSTALL BUILDINGS BEHIND HISTORIC CENTERSTALL BUILDINGS BESIDES HISTORIC CENTERS

    TALL BUILDINGS BETWEEN HISTORIC CENTERSTALL BUILDINGS BUT HISTORIC CENTERSTALL BUILDINGS AMID HISTORIC CENTERS

    TALL BUILDINGS DESPITE HISTORIC CENTERSTALL BUILDINGS FOLLOWING HISTORIC CENTERS

    TALL BUILDINGS FROM HISTORIC CENTERSTALL BUILDINGS INSIDE HISTORIC CENTERS

    TALL BUILDINGS OUTSIDE HISTORIC CENTERSTALL BUILDINGS LIKE HISTORIC CENTERSTALL BUILDINGS OFF HISTORIC CENTERS

    TALL BUILDINGS ONTO HISTORIC CENTERSTALL BUILDINGS OPPOSITE HISTORIC CENTERS

    TALL BUILDINGS PAST HISTORIC CENTERSTALL BUILDINGS NEAR HISTORIC CENTERSTALL BUILDINGS SINCE HISTORIC CENTERS

    TALL BUILDINGS REGARDING HISTORIC CENTERSTALL BUILDINGS PLUS HISTORIC CENTERS

    TALL BUILDINGS BY HISTORIC CENTERSTALL BUILDINGS EXCLUDING HISTORIC CENTERS

    TALL BUILDINGS CONSIDERING HISTORIC CENTERSTALL BUILDINGS TOWARDS HISTORIC CENTERSTALL BUILDINGS DURING HISTORIC CENTERS

    TALL BUILDINGS PER HISTORIC CENTERSTALL BUILDINGS VERSUS HISTORIC CENTERSTALL BUILDINGS ACROSS HISTORIC CENTERSTALL BUILDINGS UNLIKE HISTORIC CENTERS

    TALL BUILDINGS REGARDING HISTORIC CENTERSTALL BUILDINGS SINCE HISTORIC CENTERSTALL BUILDINGS UNTIL HISTORIC CENTERSTALL BUILDINGS UPON HISTORIC CENTERS

    TALL BUILDINGS THROUGH HISTORIC CENTERSTALL BUILDINGS VIA HISTORIC CENTERS

    TALL BUILDINGS WITHIN HISTORIC CENTERSTALL BUILDINGS WITHOUT HISTORIC CENTERS

  • TALL BUILDINGSIN

    HISTORIC CENTERS

  • This publication has been prepared as part of the thirteen week graduate thesis research program in the Northeastern University School of Architecture in the Fall 2012 as part of the ARCH7130 course. All research and content in this publication was produced by the Tall Buildings in Historic Centers studio research team.

    Published by Northeastern University School of Architecture360 Huntington AvenueBoston, Massachusetts 02115

    Copyright 2012 by Northeastern University School of ArchitectureAll rights reserved

    Thank You to Our Critics and Contributors:

    Garrett BrignoliAbraham AluicioIgor EktajnGeorge ThrushGreg RussellKevin BerryBruner/Cott & AssociatesBryan NorwoodDeborah BuelowJohn Martin

  • Tall Buildings in Historic Centers Research Team

    Paul DiMiceli Christine Greene Dan Joyce Reem Kanoo Hao Li Jeanette Lin Tim Loranger Melissa Murphy Evan Parkinson

    Led by

    David Turturo

  • Tall Building nounany realized building of at least 240 feet in height, determined as the necessary minimum for the accurate comparison of global urban centers

    Historic Center nounan historic urban moment that builds upon itself over time

    We define the following to be used throughout this book.

  • This book is the visual impulse of our shared search into the subject. Though slim in volume, the content is rich with information specific to the disparate stratospheres of landmarks-organizations and tall buildings - because often the two collide. What interests us about this study is not just the finite practice of the collision with its metrics, legislations, and countless built examples but also the broader disciplinary problem (or promise) that the collision poses for architecture. The possibility that the surging capital motives of private real-estate development and the weight of social value can exist side-by-side or bound reassures the role of the architect in the future shaping of cities. More profoundly, this alludes to the responsibility an architect can hold in shaping history and capitalism. For example, the extent to which our history remains in the public domain is not set in stone. Neither are the limitations that civic groups determine for our signature skylines. But we strive to determine what regulatory forces, if any, exist between historic centers and tall buildings.

    There are two traits that distinguish this volume amongst analyses in architecture today. The book pursues urbanity as opposed to context and axonometry rather than experience. This research strives to illustrate the conditions of collectivity: the intersections of memory, space, regulation, and ambition on the one hand; and articulates these in three measurable dimensions. It is in this vain that we study constraints and precedents. For example, civic groups like the Boston Redevelopment Authority play an important role in shaping Bostons skyline.

    Welcome to Tall Buildings in Historic Centers.

    PREFACE

  • Tall Buildings in Historic Centers8

    Par

    isN

    ew Y

    ork

    Mila

    nLo

    ndon

    Dub

    aiC

    hica

    goH

    ong

    Kon

    gB

    ejin

    gB

    osto

    n

    His

    toric

    Org

    aniz

    atio

    nsZo

    ning

    Cod

    eEc

    onom

    ic

    CITY

    CEN

    TERS

    01 CON

    STRA

    INTS

    25

  • Precedents

    Scra

    ping

    Nei

    ghbo

    rhoo

    dtJo

    hn H

    anco

    ck T

    ower

    One

    Bos

    ton

    Pla

    ceSe

    agra

    m B

    uild

    ing

    Seve

    n W

    orld

    Tra

    de C

    ente

    r

    TALL

    BU

    ILDI

    NGS

    133

    PROJ

    ECTI

    ONS

    173

    Scra

    ping

    Nei

    ghbo

    r50

    0 P

    ark

    Ave

    Atla

    ntic

    Wha

    rfB

    ank

    of A

    mer

    ica

    Tow

    erC

    itico

    rp C

    ente

    rC

    usto

    ms

    Hou

    se T

    ower

    Exch

    ange

    Plac

    eH

    ears

    t Tow

    erM

    assa

    chus

    etts

    Eye

    and

    Ear I

    nfirm

    ary

    Pen

    n M

    utua

    l Tow

    er

    Scra

    ping

    Infr

    astr

    uctu

    re33

    Arc

    h St

    reet

    Old

    Sta

    te H

    ouse

    One

    Pen

    n P

    laza

    Pan

    Am

    Bui

    ldin

    gP

    rude

    ntia

    l Tow

    erTh

    e St

    anda

    rd H

    otel

  • CITY CENTERS

    A variety of relationships exist between tall buildings and history in urban centers across the globe. In this section we studied the broad spatial

    relationships between tall buildings and historic districts in nine prominent cities. An analysis of the urban fabric within these cities reveals dimensional

    patterns that shape the footprint and form of tall buildings.

  • Tall Buildings in Historic Centers2

    Paris

    0 mi

    1

    5

    0 mi

    1

    5

  • City CentersNew York City

    0 mi

    1

    5

    0 mi

    1

    5

  • Tall Buildings in Historic Centers4

    Milan

    0 mi

    1

    5

    0 mi

    1

    5

  • City CentersLondon

    0 mi

    1

    5

    0 mi

    1

    5

  • Tall Buildings in Historic Centers6

    Dubai

    0 mi

    1

    5

    0 mi

    1

    5

  • City Centers

    Dubai(continued)

    0 mi

    1

    5

    0 mi

    1

    5

  • Tall Buildings in Historic Centers8

    Chicago

    0 mi

    1

    5

    0 mi

    1

    5

  • City CentersHong Kong

    0 mi

    1

    5

    0 mi

    1

    5

  • Tall Buildings in Historic Centers10

    Beijing

    0 mi

    1

    5

    0 mi

    1

    5

  • City CentersBoston

    0 mi

    1

    5

    0 mi

    1

    5

  • Tall Buildings in Historic Centers12

    One of the more significant factors that inform the design of tall buildings between different cities is the scale and patterning of the urban fabric they reside in. Many cities exhibit multiple scales and patterns of urban fabric as a result of the ways in which the programming of different areas of the city evolved overtime. Shown here are neighborhoods of urban fabric surrounding tall buildings, as well as examples of urban fabric in more historic districts for each city below.

    (from top, left to right): China World Trade Center, Beijing; Hancock Tower, Boston; Willis Tower,Chicago; Burj Khalifa, Dubai; Central Plaza, Hong Kong

  • City Centers

  • Tall Buildings in Historic Centers14

    (from top, left to right): One Canada Square, London; Pirelli Tower, Milan; Empire State Building, New York; One Place des Saisons, Paris

  • City Centers

  • Tall Buildings in Historic Centers16

    725 ft

    375 ft

    250 ft

    1125 ft

    875 ft

    250 ft

    315 ft

    625 ft230 ft 375 ft

    190 ft

    875 ft

    750 ft625 ft

    875 ft

    250 ft

    500 ft

    1625 ft

    1125 ft

    1000 ft

    150 ft

    150 ft440 ft

    180 ft

    180 ft125 ft

    270 ft 180 ft 250 ft

    300 ft 650 ft510 ft 430 ft

    140 f

    t

    560 ft

    250 ft

    375 ft125 ft

    15

    0 f

    t

    150 ft

    The dimensions of city blocks and parcels in large part determine both the footprint and the height of the tall buildings located there. Here, a prototypical tower plan is compared to the dimensioned blocks in which prominent towers are located in these cities.

  • City Centers

    725 ft

    375 ft

    250 ft

    1125 ft

    875 ft

    250 ft

    315 ft

    625 ft230 ft 375 ft

    190 ft

    875 ft

    750 ft625 ft

    875 ft

    250 ft

    500 ft

    1625 ft

    1125 ft

    1000 ft

    150 ft

    150 ft440 ft

    180 ft

    180 ft125 ft

    270 ft 180 ft 250 ft

    300 ft 650 ft510 ft 430 ft

    140 f

    t

    560 ft

    250 ft375 ft

    125 ft

    15

    0 f

    t

    150 ft

  • Tall Buildings in Historic Centers18

    !

    !

    !

    !

    !

    45

    25

    140

    560

    52

    20

    30

    100

    30

    20

    60

    140

    avg153

    50

    90

    There are several measurements pertaining to historic and tall buildings that are dictated by the urban fabrics they reside in. Here, prototypical dimensions relating to a Boston rowhouse and a residential tower are compared.

  • City Centers

    !

    !

    !

    !

    !

    45

    25

    140

    560

    52

    20

    30

    100

    30

    20

    60

    140

    avg153

    50

    90

  • Tall Buildings in Historic Centers20

    The urban fabric of city districts typically determines the form of its buildings at the street scale. Because of their significant height, tall buildings have the ability to both conform to the street grid at the ground level as well as make a more expressionistic statement above. An analysis of Noli maps taken at various heights for these prominent tall buildings exposes the freedoms possible with tall building form above street level.

    (from left to right): China World Trade Center, Beijing; Hancock Tower, Boston; Willis Tower, Chicago;Burj Khalifa, Dubai; Central Plaza, Hong Kong

  • City Centers

  • Tall Buildings in Historic Centers22

    (from left to right): One Canada Square, London; Pirelli Tower, Milan; Empire State Building, New York; One Place des Saisons, Paris

  • City Centers

  • 90 (street wall)115

    235350 (max H)

    35

    15

    15

    35

    35

    Maximum height

    and setbacks as

    determined in

    design review

    Maximum height

    and setbacks as

    determined in

    design review

    400 (max H)300

    125 (street wall)

    40

    35

    50

    400 (max H)

    40

    125 (street wall)

    465 (max H)

    125 (street wall)155

    295

    10

    20

    20

    400 (max H)

    70 (street wall)

    295155

    5

    15

    15

    1,000

    100 100 = lease value

    $100 / SF yr = $1,000 ft

    $ / SF yr

    >2.5W

    44

    250 MAX.44 MIN.50 MAX.

  • 90 (street wall)115

    235350 (max H)

    35

    15

    15

    35

    35

    Maximum height

    and setbacks as

    determined in

    design review

    Maximum height

    and setbacks as

    determined in

    design review

    400 (max H)300

    125 (street wall)

    40

    35

    50

    400 (max H)

    40

    125 (street wall)

    465 (max H)

    125 (street wall)155

    295

    10

    20

    20

    400 (max H)

    70 (street wall)

    295155

    5

    15

    15

    1,000

    100 100 = lease value

    $100 / SF yr = $1,000 ft

    $ / SF yr

    >2.5W

    44

    250 MAX.44 MIN.50 MAX.

  • Tall Buildings in Historic Centers26

    modern texture/facade

    historic facade

    historical elements preserved

    historical street presence remains

    sensitivity to landmark

    facade reacts to landmark

    modern column grid

    PUBLIC PRIVATE

    TESTIMONIAL HEARING VOTE MOTION PASSED

    REGISTRATION

    PUBLIC PRIVATE

    REPORT VOTE MOTION PASSED

    PROCESS TO BECOME A BOSTON LANDMARK

    PROCESS TO BECOME A NATIONAL LANDMARK

    CITY HALL HEARING

    Initial meeting opento the public

    Report led after hearing

    STRUCTURE NOW A LANDMARK

    Signed into lawby the mayor of Boston

    VOTE BY THE COMMISSION

    Proposal must be approvedby 2/3 of the Commission

    WRITTEN PETITION SUBMITTED

    Testimonial submitted toBoston Landmarks

    Commission

    Building must be 50 years oldStructure is then placed on the Federal Register

    BUILDING IS EVALUATED

    Advisory board makes commentson report in preparation for

    the testimony

    REPORT PREPARED BY CONGRESS ADVISORY BOARD VOTES

    Board has 30 days to approveor deny landmark request

    LANDMARK IS ESTABLISHED

    Property is placed on the National Register 6-8 weeks after

    Advisory Board Vote

    Historic Commissions

    In history-laden Boston there are many sites protected by the Boston Landmarks Commission (BLC) and the National Trust of Historic Places (NTHP). The BLC controls the process in which a Boston building can become a landmark. Buildings are nominated for landmark designation by individuals or groups that feel they merit such recognition. Elements including fenestration, building texture, and street presence are primarily responsible for determining those buildings considered for landmark designation. Despite the existence of several organizations to protect and preserve Bostons historic buildings, there are no regulations set in place that prevent the realization of tall buildings in close proximity to landmarks.

  • Constraints

    modern texture/facade

    historic facade

    historical elements preserved

    historical street presence remains

    sensitivity to landmark

    facade reacts to landmark

    modern column grid

    PUBLIC PRIVATE

    TESTIMONIAL HEARING VOTE MOTION PASSED

    REGISTRATION

    PUBLIC PRIVATE

    REPORT VOTE MOTION PASSED

    PROCESS TO BECOME A BOSTON LANDMARK

    PROCESS TO BECOME A NATIONAL LANDMARK

    CITY HALL HEARING

    Initial meeting opento the public

    Report led after hearing

    STRUCTURE NOW A LANDMARK

    Signed into lawby the mayor of Boston

    VOTE BY THE COMMISSION

    Proposal must be approvedby 2/3 of the Commission

    WRITTEN PETITION SUBMITTED

    Testimonial submitted toBoston Landmarks

    Commission

    Building must be 50 years oldStructure is then placed on the Federal Register

    BUILDING IS EVALUATED

    Advisory board makes commentson report in preparation for

    the testimony

    REPORT PREPARED BY CONGRESS ADVISORY BOARD VOTES

    Board has 30 days to approveor deny landmark request

    LANDMARK IS ESTABLISHED

    Property is placed on the National Register 6-8 weeks after

    Advisory Board Vote

  • Tall Buildings in Historic Centers28

    APPLICATION REVIEW VOTE MOTION PASSED

    PUBLIC PRIVATE

    PROCESS TO CHANGE A BOSTON LANDMARK

    LANDMARKS HEARING

    Building characteristics suchas texture, facade work,

    and architectural elements are

    WORK MAY BEGIN

    Building permit granted

    and work may begin

    VOTE BY THE COMMISSION

    Proposal must be approvedby 2/3 of the Commission

    APPLY BUILDING PERMIT

    Application for buildingpermit submitted to

    Landmarks Commissionconsidered

    Landmarks in Boston are mainly dictated by the regulations of the BRA and the Landmarks Commission.

    (from left): Individual buildings can be designated as landmarks also districts can be declared landmarks. Zones of preservation are also another common way to control development around a protected site. Building heights adjacent to, or on top of landmarks are controlled by groups such as the BRA and the BCDC.

  • APPLICATION REVIEW VOTE MOTION PASSED

    PUBLIC PRIVATE

    PROCESS TO CHANGE A BOSTON LANDMARK

    LANDMARKS HEARING

    Building characteristics suchas texture, facade work,

    and architectural elements are

    WORK MAY BEGIN

    Building permit granted

    and work may begin

    VOTE BY THE COMMISSION

    Proposal must be approvedby 2/3 of the Commission

    APPLY BUILDING PERMIT

    Application for buildingpermit submitted to

    Landmarks Commissionconsidered

  • Tall Buildings in Historic Centers30 Tall Buildings in Historic Centers30

    context in scale

    align to street wall

    humanely-scaledstreet wall

    height restriction(refer to zoning)

    setback(refer to zoning)

    through-blockpedestrian way

    easily maintainedpublic space

    small-scale block

    context in scaleorganization of mass

    ground level treatmenttype of materials

    ...contemporary architectural expression would make a more progressive statement regarding Bostons entry into the twenty-

    rst century, while still reinforcing the citys more traditional

    attributes.

    ...how a project allows important open spaces to be connected...

    ...transitions to or extentions from an existing open space.

    ...how the physical design of open spaces - particularly the edge condition and location -

    affect the usability of a proposed space.

    ...continues to encourage buildings that dene the

    streetwall and offer through-block pedestrian passageways.

    ...the negative impacts that removing inter-building pedetrian

    trafc has on the street life.

    ...how a project recognizes traits distinctive to the city, such as an accomodation for the view of a distant landmark or the use the the citys historic street pattern

    and scale.

    physical denitionvisability

    accessibilitysunlight

    special features

    well-dened streets shaped by continuous, humanely scaled

    street wallssmall-scaled blocks

    active ground oor uses

    unique shorelinetopgraphic features

    USE MASSING HEIGHT SITE DESIGN

    BUILDINGS PUBLIC SPACE STREETS AND WALKWAYS CITY CHARACTER

    BR

    AR

    EVI

    EW

    BC

    DC

    RE

    VIE

    W (

    60

    -90

    DAY

    PE

    RIO

    D)

    BC

    DC

    CO

    NC

    LUS

    ION

    :AP

    PROV

    AL, R

    EJEC

    TION

    , OR

    MOD

    IFIC

    A-TI

    ON

    RE

    QU

    IRE

    D

    Boston Civic Design Commission

    Article 28 of the Boston Zoning Code defi nes the Boston Civic Design Commission as a forum for the public and professional design communities to participate in shaping the citys physical form. BCDC approval is required for tall building proposals over 100,000 square feet. The BCDC reviews tall building proposals to ensure that new projects have a positive effect on the city. Because every project is subject to its unique context, however, there are no prescribed tall building design requirements that will grant BCDC approval.

  • Constraints

    context in scale

    align to street wall

    humanely-scaledstreet wall

    height restriction(refer to zoning)

    setback(refer to zoning)

    through-blockpedestrian way

    easily maintainedpublic space

    small-scale block

    context in scaleorganization of mass

    ground level treatmenttype of materials

    ...contemporary architectural expression would make a more progressive statement regarding Bostons entry into the twenty-

    rst century, while still reinforcing the citys more traditional

    attributes.

    ...how a project allows important open spaces to be connected...

    ...transitions to or extentions from an existing open space.

    ...how the physical design of open spaces - particularly the edge condition and location -

    affect the usability of a proposed space.

    ...continues to encourage buildings that dene the

    streetwall and offer through-block pedestrian passageways.

    ...the negative impacts that removing inter-building pedetrian

    trafc has on the street life.

    ...how a project recognizes traits distinctive to the city, such as an accomodation for the view of a distant landmark or the use the the citys historic street pattern

    and scale.

    physical denitionvisability

    accessibilitysunlight

    special features

    well-dened streets shaped by continuous, humanely scaled

    street wallssmall-scaled blocks

    active ground oor uses

    unique shorelinetopgraphic features

    USE MASSING HEIGHT SITE DESIGN

    BUILDINGS PUBLIC SPACE STREETS AND WALKWAYS CITY CHARACTER

    BR

    AR

    EVI

    EW

    BC

    DC

    RE

    VIE

    W (

    60

    -90

    DAY

    PE

    RIO

    D)

    BC

    DC

    CO

    NC

    LUS

    ION

    :AP

    PROV

    AL, R

    EJEC

    TION

    , OR

    MOD

    IFIC

    A-TI

    ON

    RE

    QU

    IRE

    D

  • Tall Buildings in Historic Centers32

    (from top left): The BCDC seeks to maintain a lively street presence, maintain the urban wall of the city, as well as keeping the streetscapes character. The Commission also seeks to keep the historic street presence of the neighborhood, while providing views through the buildings to pedestrians. By doing so, the BCDC perpetuates active storefronts, the visibility of the project, and ensures that history is mirrored within said projects.

  • Constraints

  • Tall Buildings in Historic Centers34

    (clockwise from top left): Tall buildings employ several gestures to create public space at the ground level, including setbacks, canopies, winter gardens, deviations from the urban fabric, stilts and atriums.

  • Constraints

  • Tall Buildings in Historic Centers36

    2012

    1826

    1775

    1,000 ft

  • Constraints

    2012

    1826

    1775

    1,000 ft

  • Tall Buildings in Historic Centers38

  • Constraints

  • Tall Buildings in Historic Centers40

    Old

    Stat

    e Ho

    use

    Old

    Sout

    h M

    eetin

    g Ho

    use

    Fane

    uil H

    all

    Old

    North

    Chu

    rch

    Park

    Stre

    et C

    hurc

    h

    Bunk

    er H

    ill M

    onum

    ent

    Chur

    ch o

    f the

    Cov

    enan

    t

    Trin

    ity C

    hurc

    h

    Ames

    Bui

    ldin

    g

    Stoc

    k Ex

    chan

    ge B

    uild

    ing

    Custo

    m H

    ouse

    Tow

    er

    Unite

    d Sh

    oe M

    achi

    nery

    Com

    pany

    Bui

    ldin

    g

    New

    Engla

    nd M

    utua

    l Life

    Insu

    ranc

    e Bu

    ildin

    g

    John

    Han

    cock

    Ber

    keley

    Bui

    ldin

    g

    John

    Han

    cock

    Tow

    er

    Chris

    tian

    Scien

    ce C

    ente

    r Tow

    er

    Prud

    entia

    l Tow

    er

    One

    Bosto

    n Pl

    ace

    Exch

    ange

    Plac

    e

    One

    Hund

    red

    Elev

    en H

    untin

    gton

    1700

    1800

    1900

    1900

    2000

    500

    100

    200

    400

    700

    1000

    Old

    Sout

    h Ch

    urch

    Flou

    r and

    Gra

    in E

    xcha

    nge

    Build

    ing

    Citc

    o Si

    gn

    New

    Engla

    nd T

    eleph

    one

    Build

    ing

    Fede

    ral R

    eser

    ve B

    ank

    Build

    ing

    Inte

    rnat

    ional

    Plac

    e

  • Constraints

    Old

    Stat

    e Ho

    use

    Old

    Sout

    h M

    eetin

    g Ho

    use

    Fane

    uil H

    all

    Old

    North

    Chu

    rch

    Park

    Stre

    et C

    hurc

    h

    Bunk

    er H

    ill M

    onum

    ent

    Chur

    ch o

    f the

    Cov

    enan

    t

    Trin

    ity C

    hurc

    h

    Ames

    Bui

    ldin

    g

    Stoc

    k Ex

    chan

    ge B

    uild

    ing

    Custo

    m H

    ouse

    Tow

    er

    Unite

    d Sh

    oe M

    achi

    nery

    Com

    pany

    Bui

    ldin

    g

    New

    Engla

    nd M

    utua

    l Life

    Insu

    ranc

    e Bu

    ildin

    g

    John

    Han

    cock

    Ber

    keley

    Bui

    ldin

    g

    John

    Han

    cock

    Tow

    er

    Chris

    tian

    Scien

    ce C

    ente

    r Tow

    er

    Prud

    entia

    l Tow

    er

    One

    Bosto

    n Pl

    ace

    Exch

    ange

    Plac

    e

    One

    Hund

    red

    Elev

    en H

    untin

    gton

    1700

    1800

    1900

    1900

    2000

    500

    100

    200

    400

    700

    1000

    Old

    Sout

    h Ch

    urch

    Flou

    r and

    Gra

    in E

    xcha

    nge

    Build

    ing

    Citc

    o Si

    gn

    New

    Engla

    nd T

    eleph

    one

    Build

    ing

    Fede

    ral R

    eser

    ve B

    ank

    Build

    ing

    Inte

    rnat

    ional

    Plac

    e

  • Tall Buildings in Historic Centers46

    Growing MediumFilter Membrane

    Drainage

    WaterproongSupport Panel

    ThermalInsulationVapor ControlStructure

    Different Environmental Aspects can be taken advantage of to create a more environmentally conscious building. Some of these aspects are: Rain, sun and Wind. Rain can be collected through green roofs, (right) sun and wind energy can be collected through solar panels and wind turbines.

  • Constraints

    Growing MediumFilter Membrane

    Drainage

    WaterproongSupport Panel

    ThermalInsulationVapor ControlStructure

  • Tall Buildings in Historic Centers48

    Different Shading strategies can be used to avoid solar gain. Horizontal strategies are best for the southern exposure, and vertical strategies can be used for east and west.

  • Constraints

  • Tall Buildings in Historic Centers50

    Growing MediumFilter Membrane

    Drainage

    WaterproongSupport Panel

    ThermalInsulationVapor ControlStructure

    spandrel panel(can insert PV panels)

    green roof

    wind turbine

    grey water collection tank

    SUN

    Solar PV panels and Passive shading techiniques

    RAIN

    Grey water collection and Green Roofs

    WIND

    Horizontal vs vertical wind turbines

    Different environmental aspects can be taken advantage of to create a more environmentally conscious building. Some of these aspects are: rain, sun and wind. Rain can be collected through green roofs. Sun and wind energy can be collected through solar panels and wind turbines. Different Shading strategies can be used to avoid solar gain. Horizontal strategies are best for the southern exposure, and vertical strategies can be used for east and west.

  • Constraints

    Growing MediumFilter Membrane

    Drainage

    WaterproongSupport Panel

    ThermalInsulationVapor ControlStructure

    spandrel panel(can insert PV panels)

    green roof

    wind turbine

    grey water collection tank

    SUN

    Solar PV panels and Passive shading techiniques

    RAIN

    Grey water collection and Green Roofs

    WIND

    Horizontal vs vertical wind turbines

  • Tall Buildings in Historic Centers52

    Wind turbines, courtyards, dense neighborhoods, and rammed earth are all strategies implemented throughout history as ways to make the living environment more manageable without the use of technology.

  • Constraints

  • Tall Buildings in Historic Centers54

    Exceptions

    IMS 121A URD PDA / EDA

    Pre-review Planning Meeting

    Applicant Initiating the Reivew

    Putblic Notice (within 45 days)

    BRA Review and Approval (within 60 days)

    Certificate of Consistency

    Zoning Commision Approval

    Issurance of Permit

    General District Zoning Laws

    $$

    IMS 121A URD PDA

    121A DESIGNATION

    Gives BRA power to create zoning for specic sites

    Allows re-negotiation of pre-established property tax

    (15 years max.)

    URBAN RENEWAL DESIGNATION

    Clear parcels for development

    Parcels owned by BRA

    Requires approval by zoning commission

    PLANNED DEVELOPMENT AREA

    Public Process

    Have to prove how it ts into context of environment

    INSTITUTIONAL MASTER PLAN

    Zoning exceptions for institutions over 100,000 sf

    Needs to relate to institutions overall plan

    PRIVATE PUBLIC

    INSTITUTION ECONOMIC GOVERNMENT COMMUNITY

    Zoning

    The Boston Redevelopment Authority (BRA) dictates zoning restrictions in Boston. Zoning tells developers where they can build, how tall they can build, and how some qualities of shared spaces can be preserved. While general district codes apply to most of the city, there are exceptions in some districts that grant developers the opportunity to build taller. This section will focus on the potentials of these Planned Development Areas (PDAs) and latent opportunities to reinvent Bostons historic skyline.

    (clockwise starting top left):Institutional Master PlanUrban Renewal Development121A DesignationPlanned Development Area

  • Constraints

    Exceptions

    IMS 121A URD PDA / EDA

    Pre-review Planning Meeting

    Applicant Initiating the Reivew

    Putblic Notice (within 45 days)

    BRA Review and Approval (within 60 days)

    Certificate of Consistency

    Zoning Commision Approval

    Issurance of Permit

    General District Zoning Laws

    $$

    IMS 121A URD PDA

    121A DESIGNATION

    Gives BRA power to create zoning for specic sites

    Allows re-negotiation of pre-established property tax

    (15 years max.)

    URBAN RENEWAL DESIGNATION

    Clear parcels for development

    Parcels owned by BRA

    Requires approval by zoning commission

    PLANNED DEVELOPMENT AREA

    Public Process

    Have to prove how it ts into context of environment

    INSTITUTIONAL MASTER PLAN

    Zoning exceptions for institutions over 100,000 sf

    Needs to relate to institutions overall plan

    PRIVATE PUBLIC

    INSTITUTION ECONOMIC GOVERNMENT COMMUNITY

  • Tall Buildings in Historic Centers56

    Boylston St

    15 ft min

    less than 90 ft

    Boylston St

    15 ft min

    less than 65 ft

    L

    L1

    A

    B

    C

    D

    SB1

    SB2

    SB3

    H

    25

    (opposite):A: Street WallB: Height 1C: Height 2D: Maximum HeightSB: Setbacks

    (top):L: Length of wall parallel (or within 45o of parallel) to lot line, measured parallel to lot line.

    L1: Length of wall parallel (or within 45o of parallel) to lot line, measured parallel to lot line at greatest length above the height below which no setback is required.

    H: Height of building above the height below which no setback is required.

  • Constraints

    Boylston St

    15 ft min

    less than 90 ft

    Boylston St

    15 ft min

    less than 65 ft

    L

    L1

    A

    B

    C

    D

    SB1

    SB2

    SB3

    H

    25

  • Tall Buildings in Historic Centers58

    FAR =total building area (TBA)

    total lot area (TLA)

    FAR is the measurement that determines the volumetric coverage of the built area within its plot. The higher the allowable FAR of a district, the more dense it becomes with built fabric.

    (left): The city is scaled in height according to each districts maximum allowable FAR.

    (right): The zoning of the city allows opportunities to add density through Planned Development Areas (rendered in blue).

  • Constraints

    FAR =total building area (TBA)

    total lot area (TLA)

  • Tall Buildings in Historic Centers60

    North End Local Business

    North End Waterfront

    North End Business

    Government Center

    Fort Point Bulnch Triangle

    Cambridge St.North

    Charlestown Chinatown Leather District / South Station

    DorchesterBay

    Neponset River Midtown Cultural Huntington Ave /Prudential

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    40%60 ft520,000 sf10,000 sf2

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    40%60 ft520,000 sf10,000 sf2

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    77%156 ft13100,000 sf10,000 sf10

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    70%120 ft570,000 sf10,000 sf7

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    23%156 ft1330,000 sf10,000 sf3

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    88%96 ft870,000 sf10,000 sf7

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    50%120 ft1050,000 sf10,000 sf5

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    40%60 ft520,000 sf10,000 sf2

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    86%84 ft760,000 sf10,000 sf6

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    86%84 ft760,000 sf10,000 sf6

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    40%60 ft520,000 sf10,000 sf2

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    40%60 ft520,000 sf10,000 sf2

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    70%156 ft1390,000 sf10,000 sf9

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    77%156 ft13100,000 sf10,000 sf10

    distri

    ct zo

    ning

    heigh

    t lim

    it

    100 ft

    PDA

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    24%396 ft3380,000 sf10,000 sf8

    PDA

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    23%156 ft1330,000 sf10,000 sf3

    PDA

    lot coverage:height:stories:

    total area:lot area:

    district FAR:

    40%300 ft25100,000 sf10,000 sf10

    PDA

    lot coverage:height:stories:

    total area:lot area:

    district FAR:

    36%468 ft39140,000 sf10,000 sf14

    PDA

    lot coverage:height:stories:

    total area:lot area:

    district FAR:

    48%504 ft42200,000 sf10,000 sf20

    PDA

    lot coverage:height:stories:

    total area:lot area:

    district FAR:

    48%504 ft42200,000 sf10,000 sf20

    40 40 77 70 23

    88 5

    0 40 86 8640 40

    70 77

    100

    100

    100

    100

    100

    100

    100

    100

    100

    100

    100

    100

    100

    100

    100

    48 48

    36

    40

    24

    23

    5 stor

    ies

    5 stor

    ies

    13 sto

    ries

    10 sto

    ries

    33 sto

    ries

    13 sto

    ries21

    stories

    8 stor

    ies 10 sto

    ries

    5 stor

    ies 7 sto

    ries

    25 sto

    ries

    7 stor

    ies

    39 sto

    ries

    5 stor

    ies

    5 stor

    ies

    13 sto

    ries

    42 sto

    ries

    13 sto

    ries

    42 sto

    ries

    12

    Fixed Site: 10,000 sf Fixed Story Height: 12 ft

  • North End Local Business

    North End Waterfront

    North End Business

    Government Center

    Fort Point Bulnch Triangle

    Cambridge St.North

    Charlestown Chinatown Leather District / South Station

    DorchesterBay

    Neponset River Midtown Cultural Huntington Ave /Prudential

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    40%60 ft520,000 sf10,000 sf2

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    40%60 ft520,000 sf10,000 sf2

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    77%156 ft13100,000 sf10,000 sf10

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    70%120 ft570,000 sf10,000 sf7

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    23%156 ft1330,000 sf10,000 sf3

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    88%96 ft870,000 sf10,000 sf7

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    50%120 ft1050,000 sf10,000 sf5

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    40%60 ft520,000 sf10,000 sf2

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    86%84 ft760,000 sf10,000 sf6

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    86%84 ft760,000 sf10,000 sf6

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    40%60 ft520,000 sf10,000 sf2

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    40%60 ft520,000 sf10,000 sf2

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    70%156 ft1390,000 sf10,000 sf9

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    77%156 ft13100,000 sf10,000 sf10

    distri

    ct zo

    ning

    heigh

    t lim

    it

    100 ft

    PDA

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    24%396 ft3380,000 sf10,000 sf8

    PDA

    lot coverage:height:stories:

    TBA:TLA:

    district FAR:

    23%156 ft1330,000 sf10,000 sf3

    PDA

    lot coverage:height:stories:

    total area:lot area:

    district FAR:

    40%300 ft25100,000 sf10,000 sf10

    PDA

    lot coverage:height:stories:

    total area:lot area:

    district FAR:

    36%468 ft39140,000 sf10,000 sf14

    PDA

    lot coverage:height:stories:

    total area:lot area:

    district FAR:

    48%504 ft42200,000 sf10,000 sf20

    PDA

    lot coverage:height:stories:

    total area:lot area:

    district FAR:

    48%504 ft42200,000 sf10,000 sf20

    40 40 77 70 23

    88 5

    0 40 86 8640 40

    70 77

    100

    100

    100

    100

    100

    100

    100

    100

    100

    100

    100

    100

    100

    100

    100

    48 48

    36

    40

    24

    23

    5 stor

    ies

    5 stor

    ies

    13 sto

    ries

    10 sto

    ries

    33 sto

    ries

    13 sto

    ries21

    stories

    8 stor

    ies 10 sto

    ries

    5 stor

    ies 7 sto

    ries

    25 sto

    ries

    7 stor

    ies

    39 sto

    ries

    5 stor

    ies

    5 stor

    ies

    13 sto

    ries

    42 sto

    ries

    13 sto

    ries

    42 sto

    ries

    12

    Fixed Site: 10,000 sf Fixed Story Height: 12 ft

  • Tall Buildings in Historic Centers62

    1

    5

    2

    2

    4

    3

    90 (street wall)115

    235

    350 (max H)

    35

    15

    15

    35

    35

    35

    Franklin St.

    Wash

    ington

    St.

    Hawl

    ey S

    t. Hawley Pl

    Milk St.

    Wash

    ington

    St.

    Franklin St.

    Hawle

    y St.

    Washi

    ngton

    St.

    Washi

    ngton

    St.

    Washi

    ngton

    St.

    Washi

    ngton

    St.

    Tremo

    nt St.

    Essex St.

    Stuart St.

    Tremo

    nt St.

    Washi

    ngton

    St.

    Boston Common

    1

    2

    3

    4

    51

    2 4 3

    1010

    1515 90 (street wall)155

    625 (max. H)

    15

    15 90 (street wall)155

    400 (max. H)

    90 (street wall)155

    275 (max. H)10

    15

    15

    15

    25

    90 (street wall)155

    235300 (max. H)

    80 (street wall)

    32

    125 (entry facade)

    155465 (max. H)

    80 (street wall)155

    311 (max. H)

    80155

    242 (max. H)

    1 1

    1 4

    80

    10

    Midtown District Huntington Ave. District

    setbacks as

    determined in

    design review

    setbacks as

    determined in

    design review

    setbacks as

    determined in

    design review

    setbacks as

    determined in

    design review

    Maximum height

    and setbacks as

    determined in

    design review

  • Constraints

    1

    5

    2

    2

    4

    3

    90 (street wall)115

    235

    350 (max H)

    35

    15

    15

    35

    35

    35

    1

    2

    3

    4

    Huntin

    gton A

    ve.

    Belvidere St.

    Bolyston St

    .

    Huntin

    gton A

    ve.

    Belvidere St.

    Bolyston St

    .

    Huntin

    gton A

    ve.

    Belvidere St.

    Bolyston St

    .

    Hunti

    ngton

    Ave.

    Public Allley 402Bolys

    ton St.

    Stuart St.

    Dartmouth St.

    51

    2 4 3

    1010

    1515 90 (street wall)155

    625 (max. H)

    15

    15 90 (street wall)155

    400 (max. H)

    90 (street wall)155

    275 (max. H)10

    15

    15

    15

    25

    90 (street wall)155

    235300 (max. H)

    80 (street wall)

    32

    125 (entry facade)

    155465 (max. H)

    80 (street wall)155

    311 (max. H)

    80155

    242 (max. H)

    1 1

    1 4

    80

    10

    Midtown District Huntington Ave. District

    setbacks as

    determined in

    design review

    setbacks as

    determined in

    design review

    setbacks as

    determined in

    design review

    setbacks as

    determined in

    design review

    Maximum height

    and setbacks as

    determined in

    design review

  • Tall Buildings in Historic Centers64

    Lincoln St.

    Kneelan

    d St.

    Boston Proper District_Backbay

    12

    3

    1

    2

    Downtown District

    North Station EDA

    400 (max H)300

    125 (street wall)

    40

    35

    50

    Cause

    way S

    t.

    Nash

    ua S

    t.

    Cause

    way S

    t.

    Nash

    ua S

    t.Na

    shua

    St.

    Nash

    ua S

    t.Na

    shua

    St.

    Nash

    ua S

    t.Na

    shua

    St.

    Nash

    ua S

    t.Na

    shua

    St.

    Nash

    ua S

    t.Na

    shua

    St.

    Atlantic Ave.

    South Station EDA

    1

    1

    400 (max H)

    70 (street wall)

    295

    155

    5

    15

    15

    465 (max H)

    125 (street wall)

    155

    295

    10

    20

    20

    400 (max H)

    40

    125 (street wall)

    Maximum height

    and setbacks as

    determined in

    design review

    Maximum height

    and setbacks as

    determined in

    design review

    1 2

    1 2

    1

    1

  • ConstraintsBoston Proper District_Backbay

    12

    3

    1

    2

    Downtown District

    North Station EDA

    400 (max H)300

    125 (street wall)

    40

    35

    50

    South Station EDA

    1

    1

    400 (max H)

    70 (street wall)

    295

    155

    5

    15

    15

    465 (max H)

    125 (street wall)

    155

    295

    10

    20

    20

    400 (max H)

    40

    125 (street wall)

    Maximum height

    and setbacks as

    determined in

    design review

    Maximum height

    and setbacks as

    determined in

    design review

    1 2

    1 2

    1

    1

  • Tall Buildings in Historic Centers66

    South Station District North Station District

  • South Station District North Station District

  • Tall Buildings in Historic Centers68

    Downtown District Boston Proper District

  • Downtown District Boston Proper District

  • Tall Buildings in Historic Centers70

    Chinatown District

    Kneeland St.

    Marginal Rd.Marginal Rd.Marginal Rd.Marginal Rd.Marginal Rd.

    Knee

    land S

    t.

    Kneela

    nd St.

    Kneela

    nd St.

    1 2

    1 2Fort Point Harbor Water Front District

    12

    1

    2

    90 (street wall)

    5

    300 (max. H)

    90 (street wall)125 (max. H)

    12 (from the side of the dock)

    50 (from the end dock)

    250 (max. H)

    250 (max. H)

  • Chinatown District 1 2

    1 2Fort Point Harbor Water Front District

    12

    1

    2

    90 (street wall)

    5

    300 (max. H)

    90 (street wall)125 (max. H)

    12 (from the side of the dock)

    50 (from the end dock)

    250 (max. H)

    250 (max. H)

  • Midtown District Huntington Avenue District

  • Midtown District Huntington Avenue District

  • Tall Buildings in Historic Centers74

    Chinatown District Fort Point Harbor Water Front District

  • ConstraintsChinatown District Fort Point Harbor Water Front District

  • Tall Buildings in Historic Centers80

    50

    14 - 18

    2.5 SF/LF

    15

    SIGNS

    (top) Typically, tall buildings touch in the ground in three different ways. There is either a standard lobby(left), a base one story element with commercial activity (middle), or a larger plinth that contains moreretail and commercial space (right).(opposite) For the ground fl oor space to be successful, the space typically needs to meet the guidelines diagramed. There are guidelines for bay size (top, middle), sidewalk width (top, right), signage size (bottom, right), and height (bottom, middle).

  • Constraints

    50

    14 - 18

    2.5 SF/LF

    15

    SIGNS

  • Tall Buildings in Historic Centers82

    BENEFITS PRESERVATION AGREEMENT POTENTIAL

    SHORELINE MUST BE ACCESSIBLE TO THE PUBLIC

    HARBOR WALKWAY MUST BEPRIVILEGED

    PUBLIC LAND USED BY PRIVATEDEVELOPER

    REQUIRED TO PROVIDE PUBLICSPACE

    MORE PUBLIC SPACE ELIMINATESEYE-SORES

    ECONOMIC BENEFIT TO PUBLICSPACE

    PROVIDE AMENTITIES TO TALLBUILDINGS

    EASE NEIGHBORHOODCONCERNS

    PRIVATELY OWNED PUBLIC SPACES IN BOSTON

    PDA CH. 91 PUBLIC INTEREST PRIVATE INVESTMENT

    0 mi

    1

    5

    0 mi

    1

    5

    Privately Owned Public Spaces in Boston

  • Constraints

    BENEFITS PRESERVATION AGREEMENT POTENTIAL

    SHORELINE MUST BE ACCESSIBLE TO THE PUBLIC

    HARBOR WALKWAY MUST BEPRIVILEGED

    PUBLIC LAND USED BY PRIVATEDEVELOPER

    REQUIRED TO PROVIDE PUBLICSPACE

    MORE PUBLIC SPACE ELIMINATESEYE-SORES

    ECONOMIC BENEFIT TO PUBLICSPACE

    PROVIDE AMENTITIES TO TALLBUILDINGS

    EASE NEIGHBORHOODCONCERNS

    PRIVATELY OWNED PUBLIC SPACES IN BOSTON

    PDA CH. 91 PUBLIC INTEREST PRIVATE INVESTMENT

    0 mi

    1

    5

    0 mi

    1

    5

    Privately Owned Public Spaces in Boston

  • Tall Buildings in Historic Centers84

    175

    75%

    25%

    w

    w

    w + d2

    40

    d

    d

    w + d2

    15

    8

    2

    17

    4 - 6

    In a 1961 zoning resolution, the City of New York established incentive zoning. The city made concessions to developers to increase the amount of public space in tall buildings. If developers included plazas, arcades, atriums, and other outdoor and indoor spaces in their designs, more floor space could be built beyond the standard allowances as a bonus. Later a resolution was passed to that specified these spaces must include certain amenities. These amenities are then governed by design standards articulated by the administration. On the opposite page, the specific dimensions for outdoor plazas are included. A similar set of guidelines could increase the public space in Boston. The following pages then articulate the types of amenities incorporated in plazas and the other spaces included in the zoning resolution.

  • Constraints

    175

    75%

    25%

    w

    w

    w + d2

    40

    d

    d

    w + d2

    15

    8

    2

    17

    4 - 6

  • Tall Buildings in Historic Centers86

    water featureartwork (optional)

    landscapingseatinglighting

    Besides conforming to the larger metrics established on the previous pages, certain amenities must be included in these privately owned plazas in New York. These include items such as seating, lighting, water features, and landscaping. For plazas between five and ten thousand square feet, additional amenities must be provided such as artwork. These plazas can be placed in any number of positions within a site, as seen on the this page.

  • Constraints

    water featureartwork (optional)

    landscapingseatinglighting

  • Tall Buildings in Historic Centers88

    Interior amenities range from large scale programs such as recreation (top, left), retail (top, right), residential (bottom, right), or office space (bottom, left) to lobby features (opposite top, left) (also important in the classification of leasable office space as seen in a later economics spread), food services (top, right) winter gardens (bottom, right) and loading options (bottom, left).

  • Constraints

  • Tall Buildings in Historic Centers90

    include the historic renovation of an existing structure complying

    with historic preservation regulations

    must be located in a historic district or listed on a Historic lists

    capture a volume of rainwater on the lot equivalent to no less than one inch across that portion of

    the surface area of the lot

    or provide measures that otherwise result in on-site

    inltration of rainwater

    areas subject to Article 32, provide (50%) greater recharge than required under Article 32-6

    useful congestion relief

    on-site combined electrical power and heat generation

    system

    shuttle service to public transit stations

    parking cash out program for employees using publuc transit

    fty percent transit pass subsidy for all on-site employees

    garage occupancy information monitors

    Pre-tax payroll deduction and distribution for T passes for all on-site employees.

    covered secure bicycle storage with shower facilities

    on-site ATM and direct deposit of paychecks.

    preferential parking spaces for carpools and vanpools

    preferential parking for alternative fuel or high efciency vehicles

    On-site electric charging plug-in stations

    BOSTON GREEN BUILDING CREDITS

    MODERN GRID HSITORIC PRESERVATION GROUNDWATER RECHARGE MODER MOBILITY

    MODERN MOBIBILTY: TRANSPORTATION DEMAND MANAGEMENT (TDM) REQUIREMENTS FOR OFFICE AND RETAIL PROJECTS

    HIGH-VALUE (MEET AT LEAST ONE) BASIC (MEET AT LEAST 4)

    In addition to TDM, Prerequisites:

    On-Site Transportation Coordinator

    Post information about public transportation & car-sharing, transit, bike and pedestrian access informa-

    tion on building website;

    on-site bicycle racks and storage

    Comply with Boston Transportation Department district parking ratios;

    join a Transportation Management

    Association

    US GREEN COUNCIL CATEGORIES

    ENERGY AND

    ATMOSPHERE

    MATERIALS AND

    RESOURCES

    INDOOR ENVIRONMENT

    QUALITY

    INNOVATIVATION& DESIGNPROCESS

    WATER EFFICIENCT

    SUSTAINABLE SITE

    Erosion & Sedimenta-tion Control

    Development Density

    Browneld Redevelop-ment

    Alternative Transpor-tation

    Light Pollution Reduction

    Landscape & Exterior Design to Reduce

    Heat Islands

    Reduced Site Disturbance, Protect

    or Restore Open Space

    Stormwater Manage-ment

    Water Efcient Landscaping

    Innovative Wastewater Technologies

    Water Use Reduction

    Storage & Collection of Recyclables

    Building Reuse

    Construction Waste Management

    Resource Reuse

    Recycled Content

    Local/Regional Materials

    Rapidly Renewable Materials

    Certied Wood

    Minimum IAQ Perfor-mance

    Environmental Tobacco Smoke (ETS) Control

    Carbon Dioxide (CO2 ) Monitoring

    Ventilation Effectiveness

    Construction IAQ Management Plan

    Low-Emitting Material

    Indoor Chemical & Pollutant Source Control

    Controllability of Systems

    Thermal Comfort

    Daylight & Views

    Innovation in Design

    LEED Accredited Professional

    Fundamental Building Systems Commission-

    ing

    Minimum Energy Performance

    CFC Reduction in HVAC&R Equipment

    Optimize Energy Performance

    Renewable Energy

    Additional Commis-sioning

    Ozone Depletion

    Green Power

  • Constraints

    include the historic renovation of an existing structure complying

    with historic preservation regulations

    must be located in a historic district or listed on a Historic lists

    capture a volume of rainwater on the lot equivalent to no less than one inch across that portion of

    the surface area of the lot

    or provide measures that otherwise result in on-site

    inltration of rainwater

    areas subject to Article 32, provide (50%) greater recharge than required under Article 32-6

    useful congestion relief

    on-site combined electrical power and heat generation

    system

    shuttle service to public transit stations

    parking cash out program for employees using publuc transit

    fty percent transit pass subsidy for all on-site employees

    garage occupancy information monitors

    Pre-tax payroll deduction and distribution for T passes for all on-site employees.

    covered secure bicycle storage with shower facilities

    on-site ATM and direct deposit of paychecks.

    preferential parking spaces for carpools and vanpools

    preferential parking for alternative fuel or high efciency vehicles

    On-site electric charging plug-in stations

    BOSTON GREEN BUILDING CREDITS

    MODERN GRID HSITORIC PRESERVATION GROUNDWATER RECHARGE MODER MOBILITY

    MODERN MOBIBILTY: TRANSPORTATION DEMAND MANAGEMENT (TDM) REQUIREMENTS FOR OFFICE AND RETAIL PROJECTS

    HIGH-VALUE (MEET AT LEAST ONE) BASIC (MEET AT LEAST 4)

    In addition to TDM, Prerequisites:

    On-Site Transportation Coordinator

    Post information about public transportation & car-sharing, transit, bike and pedestrian access informa-

    tion on building website;

    on-site bicycle racks and storage

    Comply with Boston Transportation Department district parking ratios;

    join a Transportation Management

    Association

    US GREEN COUNCIL CATEGORIES

    ENERGY AND

    ATMOSPHERE

    MATERIALS AND

    RESOURCES

    INDOOR ENVIRONMENT

    QUALITY

    INNOVATIVATION& DESIGNPROCESS

    WATER EFFICIENCT

    SUSTAINABLE SITE

    Erosion & Sedimenta-tion Control

    Development Density

    Browneld Redevelop-ment

    Alternative Transpor-tation

    Light Pollution Reduction

    Landscape & Exterior Design to Reduce

    Heat Islands

    Reduced Site Disturbance, Protect

    or Restore Open Space

    Stormwater Manage-ment

    Water Efcient Landscaping

    Innovative Wastewater Technologies

    Water Use Reduction

    Storage & Collection of Recyclables

    Building Reuse

    Construction Waste Management

    Resource Reuse

    Recycled Content

    Local/Regional Materials

    Rapidly Renewable Materials

    Certied Wood

    Minimum IAQ Perfor-mance

    Environmental Tobacco Smoke (ETS) Control

    Carbon Dioxide (CO2 ) Monitoring

    Ventilation Effectiveness

    Construction IAQ Management Plan

    Low-Emitting Material

    Indoor Chemical & Pollutant Source Control

    Controllability of Systems

    Thermal Comfort

    Daylight & Views

    Innovation in Design

    LEED Accredited Professional

    Fundamental Building Systems Commission-

    ing

    Minimum Energy Performance

    CFC Reduction in HVAC&R Equipment

    Optimize Energy Performance

    Renewable Energy

    Additional Commis-sioning

    Ozone Depletion

    Green Power

  • Tall Buildings in Historic Centers92

    spandrel panel

    building height

    core

    oor to oor height

    diagonal distance

    (dashed, top)

    building width

    building length

    LOW RISE HIGH RISE HIGH RISE SUPER HIGH RISE

    HIGH RISE CODE CHANGES APPLIES

    Must be constructed of noncombustible material

    Shafts and vertical penetrations must be enclosed to prevent the

    spread of smoke and re

    Stair enclosures are to be seperated by at least 30 feet or not less than 1/4 the length of the max. diagonal dimension,

    whichever is less

    UNDER 75 FEET OVER 75 FEET OVER 120 FEET OVER 420 FEET

    ADDITIONAL FIRE SERVICE ACCESS ELEVATOR

    No fewer than two re service elevators required

    ADDITIONAL EGRESS & HIGHER RATING

    Additional exit stairway or re elevator required

    Hardened exit and elevator shafts, concrete or masonry

    accepted (risk categories III and IV also)

    Min. bond strength for sprayed re-resistant materials increases

    IBC & LOCAL CODE APPLIES

    Code

    Code dictates a number of dimensions that affect the design of tall buildings. These include building height and width, corridor dimensions, elevator cab sizes, and the distances that govern core and egress stair locations. Life safety guidelines prevent the spread of fl ames and other potential dangers for tall building occupants; standards for light sharing and air access are also set to address quality of space issues. This section outlines the code requirements that inform tall building design, with a focus on standard practice of core placement in tall buildings.

  • Constraints

    spandrel panel

    building height

    core

    oor to oor height

    diagonal distance

    (dashed, top)

    building width

    building length

    LOW RISE HIGH RISE HIGH RISE SUPER HIGH RISE

    HIGH RISE CODE CHANGES APPLIES

    Must be constructed of noncombustible material

    Shafts and vertical penetrations must be enclosed to prevent the

    spread of smoke and re

    Stair enclosures are to be seperated by at least 30 feet or not less than 1/4 the length of the max. diagonal dimension,

    whichever is less

    UNDER 75 FEET OVER 75 FEET OVER 120 FEET OVER 420 FEET

    ADDITIONAL FIRE SERVICE ACCESS ELEVATOR

    No fewer than two re service elevators required

    ADDITIONAL EGRESS & HIGHER RATING

    Additional exit stairway or re elevator required

    Hardened exit and elevator shafts, concrete or masonry

    accepted (risk categories III and IV also)

    Min. bond strength for sprayed re-resistant materials increases

    IBC & LOCAL CODE APPLIES

  • Tall Buildings in Historic Centers94

    (top): These two plans illustrate the constraints of exit access (IBC 1016.1), corridor width (1018.2), dead ends (1018.4), and stair enclosures (403.5.1).

    (opposite, top left): To prevent the spread of fire, exterior openings that are within 5 feet horizontally must be separated with the below story by at least 3 feet. This is typically done with a spandrel panel.

    (opposite, top right): Minimum ceiling height is typically 7-6, but it may be reduced to 6-8 in some instances.

    (opposite, right): As building height increases from 75 (left) to 120 (middle) an additional fire-service access elevator is required. At 420 (right) egress requirements change as well as fire resistance ratings.

    Egress Stair

    Janitorial Closet

    Electrical Room

    Elevator Lobby

    Service Elevator

    Restrooms

    Supply Air

    Exhaust Air

    Egress Stair

    Mechanical Room

    Storage

    >2.5W

    44

    44 min.

    250 max.

    50 m

    ax.

  • Egress Stair

    Janitorial Closet

    Electrical Room

    Elevator Lobby

    Service Elevator

    Restrooms

    Supply Air

    Exhaust Air

    Egress Stair

    Mechanical Room

    Storage

    >2.5W

    44

    44 min.

    250 max.

    50 m

    ax.

  • Tall Buildings in Historic Centers96

    10% of 25sf

    6

    10

    2

    3 1

    15

    34

    6 - 8no more than 50% of egress path may be reduced to

    7 - 6 min.ceiling height.

    (left): Minimum ceiling height is 7-6, but it may be reduced to 6-8 in some instances.

    (right): Exterior openings are to open to the outdoors to yards and court. Yard and court sizes are set to provide minimum dimensions for light wells and backyards of multistory buildings so that these areas provide real light and air to the spaces they serve.

    (opposite, right): If an interior room is shared with the main room it must have the minimum of 10% of the interior square footage opening in order to allow natural light from the main room.

  • Constraints

    10% of 25sf

    6

    10

    2

    3 1

    15

    34

    6 - 8no more than 50% of egress path may be reduced to

    7 - 6 min.ceiling height.

  • Tall Buildings in Historic Centers98

    ZONE

    1ZO

    NE 2

    ZONE

    3

    median wait time = range of wait time = total trip time per elevatornumber of elevators per bank

    2 Car Layout 3 Car Layout 4 Car Layout 6 Car Layout 8 Car Layout

    Angled Layout

    Alcove Layout

    Circular Layout

    7AM

    Outgoing Interoor Incoming

    5%

    10%

    11%

    8AM 9AM 10AM 11AM 12PM 1PM 2PM 3PM 4PM 5PM 6PM 7PM 8PM

    POPU

    LATI

    ON O

    F BU

    ILDI

    NG IN

    HABI

    TANT

    S

    (middle): A transfer slab is needed at every floor where there is a transfer between elevator banks.(right): In super tall buildings, those taller than 1,000 feet, banking of elevators is needed to maximize the shafts in the core. At every 15 floors a shift of elevators and at every 36 floors a skylobby is used. In addition to the banking of elevators there are shuttles which lead directly to the upper floors.(opposite, top left): A buildings elevator capacity is typically designed to meet the peak demand that occurs within the 5 minutes prior to the start of day. Additional peaks correspond with mid and end of day traffic.(opposite, bottom): Elevator cars are grouped to minimize the distance from the call button to each door and reduce the time a car must wait at each floor.(opposite, top right): While most groupings are linear or parallel, there are a few notable exceptions.

  • Constraints

    ZONE

    1ZO

    NE 2

    ZONE

    3

    median wait time = range of wait time = total trip time per elevatornumber of elevators per bank

    2 Car Layout 3 Car Layout 4 Car Layout 6 Car Layout 8 Car Layout

    Angled Layout

    Alcove Layout

    Circular Layout

    7AM

    Outgoing Interoor Incoming

    5%

    10%

    11%

    8AM 9AM 10AM 11AM 12PM 1PM 2PM 3PM 4PM 5PM 6PM 7PM 8PM

    POPU

    LATI

    ON O

    F BU

    ILDI

    NG IN

    HABI

    TANT

    S

  • Tall Buildings in Historic Centers100

    Center Core Split Core End Core Atrium Core

    (bottom): Typical core orientations include center, split, end and atrium.(top): The orientation of the core and the number of tenants per fl oor determine access and the placement of circulation paths. Lease span is the distance from core to exterior wall and determines the usable fl oor area.(opposite): The shape and orientation of a core is often determined by building form and program; each confi guration is unique.

  • Constraints

    Center Core Split Core End Core Atrium Core

  • Tall Buildings in Historic Centers102

    20121826

    1775

  • Constraints

    20121826

    1775

  • Tall Buildings in Historic Centers104

  • Constraints

  • Tall Buildings in Historic Centers106

    building height

    plan size

    building facade

    building proportion

    building structure

    site constraints

    building uses

    building articulation

    lift strategy

    UTILITY WATER

    TABLES

    UNION CRANES

    LANDMARKS BCDC

    EROSION

    INFRASTRUCTURE

    CONCRETE CONSTRUCTION STEEL CONSTRUCTION ADDITIONAL PROCESSES & COSTS

    SIT

    E W

    OR

    KS

    TRU

    CTU

    RE

    FAC

    AD

    EC

    ON

    TRA

    CTO

    RS

    P

    RE

    LIM

    INA

    RIE

    S

    $ $ $ $

    $$

    $$

    $$

    $$

    $$

    $$

    $$

    $$$

    $$$$ $$$$

    PERMIT DESIGNSOILS ENGINEER SOILS ENGINEER

    Economic

    While tall buildings do not necessarily correspond to historic centers, the two possess an amount of physical interaction. Design components, construction methods, and lease and land values are the primary fi nancial factors that determine the viability of tall buildings. The clustering of landmarks indicates the center of historic cities, often the focus of economic activity. Tall buildings are built in these areas to leverage high lease rates and rationalize the economies inherent in building tall in expensive areas, causing tall buildings and landmarks to exist in close proximity.

  • Constraints

    building height

    plan size

    building facade

    building proportion

    building structure

    site constraints

    building uses

    building articulation

    lift strategy

    UTILITY WATER

    TABLES

    UNION CRANES

    LANDMARKS BCDC

    EROSION

    INFRASTRUCTURE

    CONCRETE CONSTRUCTION STEEL CONSTRUCTION ADDITIONAL PROCESSES & COSTSS

    ITE

    WO

    RK

    STR

    UC

    TUR

    EFA

    CA

    DE

    CO

    NTR

    AC

    TOR

    S

    PR

    ELI

    MIN

    AR

    IES

    $ $ $ $

    $$

    $$

    $$

    $$

    $$

    $$

    $$

    $$$

    $$$$ $$$$

    PERMIT DESIGNSOILS ENGINEER SOILS ENGINEER

  • Tall Buildings in Historic Centers108

    Different methods of construction affect the cost of tall buildings. Here, typical processes for poured-in-place concrete and steel construction are shown, common construction methods for tall buildings in Boston.

  • Tall Buildings in Historic Centers110

    (above): Class A buildings represent the highest quality of leasable commercial space and are often commercial buildings constructed after 1970. They provide leased spaces by suite and consequently house many different tenants. Typical vacancy is 5.5%. (center): Class B buildings are the second highest quality of commercial building leases available. These buildings were commonly built from 1800-1925 and have undergone significant renovations to incorporate features such as elevators, lobbies, heating systems, and replacement windows. They also offer property leased by suite. Typical vacancy rate is 18.9%. (right): Class C buildings are characterized as suboptimal commercial property for leasing conditions, and represent the lowest rating for commercial space. They typically are buildings built from 1800-1925 that have not undertaken appropriate levels of renovation.

  • Tall Buildings in Historic Centers112

    Desired features and amenities may raise the consumer value of a tall building and enable higher lease rates to offset the buildings initial construction costs. These amenities include street frontage, retail, parking, proximity to services and public transit; corner offices, security, elevators, and an inviting lobby.

  • Tall Buildings in Historic Centers114

    A comparison of the heights of current and potential future tall buildings with the relative lease values of these buildings presents a more dense Boston skyline. Historic landmarks provide scale andlogic for tall building clustering.

    1,000

    100 100 = lease value

    $100 / SF

    yr= $1,000 ft

    $ / SF

    yr

  • Constraints

    1,000

    100 100 = lease value

    $100 / SF

    yr= $1,000 ft

    $ / SF

    yr

  • Tall Buildings in Historic Centers116

  • Constraints

  • Tall Buildings in Historic Centers118

    $380/sf

    $0/sf

    $95/sf

    The land values of Bostons many districts are determined by a number of factors, such as availability of unoccupied parcels. A mapping of historical landmarks across the citys individual districts reveals correlations between the presence of history, tall buildings, and high land value.

    (clockwise starting top left): Central Boston, $380/sf; Back Bay, $302/sf; South End, $174/sf; Charleston, $118/sf; Fenway/Kenmore, $109/sf; South Boston, $44/sf; East Boston, $40/sf; Jamaica Plain, $32/sf; Allston/Brighton, $30/sf; West Roxbury, $27/sf; Mattapan, $23/sf; Hyde Park/Roslindale, $22/sf; Dorchester, $18/sf; Roxbury, $16/sf.

  • Constraints

    $380/sf

    $0/sf

    $95/sf

  • Tall Buildings in Historic Centers120

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    $380/sf

    $95/sf

    $0/sf

    Among Bostons fourteen districts, two of them contain several prominent historic neighborhoods. These districts, the Back Bay and the South End, have the second and third highest land values in the city. The areas exhibit many qualities characteristic of historic neighborhoods, including small parcel and block sizes, narrow streets and alleys, and restricted building height.

  • Constraints

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    $380/sf

    $95/sf

    $0/sf

  • Tall Buildings in Historic Centers124

    oor to oor height:stories in 240ft:

    gross sf:net to gross:

    net sf:

    9 feet26585,0000.84491,400

    20 stories 17 stories

    35 stories41 stories55 stories

    26 stories240 ft

    500 ft

    oor to oor height:stories in 240ft:

    gross sf:net to gross:

    net sf:

    12 feet20450,0000.84378,000

    oor to oor height:stories in 240ft:

    gross sf:net to gross:

    net sf:

    14 feet17382,5000.84321,000

    GROSS AREA =

    GROSS AREA NET AREA

    (total length) ft X (total width) ft

    NET TO GROSS = (gross area) sf

    (area of core) sf

    GROSS AREA = 150 ft x 150 ft = 22,500 sf

    NET TO GROSS RATIO = 22,500 sf

    (60 ft x 60 ft)= 0.84

    150

    ft

    150 ft

    60 ft 45 ft

    9 ft 12

    ft

    14 ft

    60 ft

    Shown here are the typical dimensions of high-rise towers. Planning of the typical core drastically affects the buildings floor plan. When considering the design of a tall building, overall footprint defines the buildings gross area. The net to gross ratio defines how much usable space is left after the core has been factored into the buildings plan. The closer the net to gross ratio is to one, the more efficient a tall building is. This allows for the building to have as much rentable space as possible. Shown to the right are the effects of the floor-to-floor height has on the amount of rentable space in a tall building.

  • Constraints

    oor to oor height:stories in 240ft:

    gross sf:net to gross:

    net sf:

    9 feet26585,0000.84491,400

    20 stories 17 stories

    35 stories41 stories55 stories

    26 stories240 ft

    500 ft

    oor to oor height:stories in 240ft:

    gross sf:net to gross:

    net sf:

    12 feet20450,0000.84378,000

    oor to oor height:stories in 240ft:

    gross sf:net to gross:

    net sf:

    14 feet17382,5000.84321,000

    GROSS AREA =

    GROSS AREA NET AREA

    (total length) ft X (total width) ft

    NET TO GROSS = (gross area) sf

    (area of core) sf

    GROSS AREA = 150 ft x 150 ft = 22,500 sf

    NET TO GROSS RATIO = 22,500 sf

    (60 ft x 60 ft)= 0.84

    150

    ft

    150 ft

    60 ft 45 ft

    9 ft 12

    ft

    14 ft

    60 ft

  • Tall Buildings in Historic Centers126

    Within urbanized areas contaminated sites, or brownfi elds, have developed around former industrial sites. These plots, usually located near central business districts, are underutilized as well as underdeveloped. In order to increase density within cities, and create greener sites, brownfi elds can be developed by utilizing the typology of the high rise. By using tall buildings, the developments would prove to be more economically feasible, as well as be more successful in bringing large amounts of people back into urban cores.

    Soil Removal

    Contamination Cover

    Site Injection

  • Constraints

    Soil Removal

    Contamination Cover

    Site Injection

  • Tall Buildings in Historic Centers128

    PRIVATEINDUSTRIAL SITE

    VOTECost Estimate: 500,000 per acre

    LIGHT REMEDIATION

    BROWNFIELD GROUNDWATER CONTAMINATION

    INDUSTRIAL SITE REMEDIATION

    Time Estimate: 0.5 -1 yearsCost Estimate:1,000,000 per acre

    MILD REMEDIATION

    Time Estimate: 1 yearCost Estimate: 3,000,000 per acre

    HEAVY REMEDIATION

    Time Estimate: 2 yearsTax Benets: ~$135,000 Tax Benets: ~$300,000 Tax Benets: ~ $990,000

    seaport:max height:

    price per sq. ft:

    groundwater/industrialFAA$492.00

    240 ft

    somerville:max height:

    price per sq. ft:

    industrial/browneldBRA Code$288.00

    everett:max height:

    price per sq. ft:

    industrial/browneldBRA Code$148.00

    4 stor

    ies

    36 + sto

    ries

    24sto

    ries

    3 stor

    ies

    36 + sto

    ries

    PRIVATEINDUSTRIAL SITE

    VOTECost Estimate: 500,000 per acre

    LIGHT REMEDIATION

    BROWNFIELD GROUNDWATER CONTAMINATION

    INDUSTRIAL SITE REMEDIATION

    Time Estimate: 0.5 -1 yearsCost Estimate:1,000,000 per acre

    MILD REMEDIATION

    Time Estimate: 1 yearCost Estimate: 3,000,000 per acre

    HEAVY REMEDIATION

    Time Estimate: 2 yearsTax Benets: ~$135,000 Tax Benets: ~$300,000 Tax Benets: ~ $990,000

    seaport:max height:

    price per sq. ft:

    groundwater/industrialFAA$492.00

    240 ft

    somerville:max height:

    price per sq. ft:

    industrial/browneldBRA Code$288.00

    everett:max height:

    price per sq. ft:

    industrial/browneldBRA Code$148.00

    4 stor

    ies

    36 + sto

    ries

    24sto

    ries

    3 stor

    ies

    36 + sto

    ries

  • Constraints

    PRIVATEINDUSTRIAL SITE

    VOTECost Estimate: 500,000 per acre

    LIGHT REMEDIATION

    BROWNFIELD GROUNDWATER CONTAMINATION

    INDUSTRIAL SITE REMEDIATION

    Time Estimate: 0.5 -1 yearsCost Estimate:1,000,000 per acre

    MILD REMEDIATION

    Time Estimate: 1 yearCost Estimate: 3,000,000 per acre

    HEAVY REMEDIATION

    Time Estimate: 2 yearsTax Benets: ~$135,000 Tax Benets: ~$300,000 Tax Benets: ~ $990,000

    seaport:max height:

    price per sq. ft:

    groundwater/industrialFAA$492.00

    240 ft

    somerville:max height:

    price per sq. ft:

    industrial/browneldBRA Code$288.00

    everett:max height:

    price per sq. ft:

    industrial/browneldBRA Code$148.00

    4 stor

    ies

    36 + sto

    ries

    24sto

    ries

    3 stor

    ies

    36 + sto

    ries

  • Tall Buildings in Historic Centers130

    An issue with building near the water, as well as remediating this site, is that many are alluvial shores. Alluvial shores are areas of heavy soil and silt content which separates the top soil from the bedrock beneath. Due to their tendency to hold much water, these areas are prone to water contamination, and are thus much more expensive to clean than that of an interior site.

    contaminated topsoilexisting sandalluvial materials

    bedrock

    contaminated topsoil

    dense clay

    bedrock

    $

    $

  • Constraints

    contaminated topsoilexisting sandalluvial materials

    bedrock

    contaminated topsoil

    dense clay

    bedrock

    $

    $

  • TALL BUILDINGS

    Each of the precedents shown exhibits a particular interaction with history. We have grouped precedentsinto three categories in order to better examine these relationships. The Scraping Neighborhood category encompasses tall buildings that address their larger surrounding context in some way, including proximity to history as well as fenestration and structural expression. Scraping Neighbor

    includes tall buildings that exhibit a direct relationship with their context and may physically interact with an existing building. Tall buildings categorized as

    Scraping Infrastructure interact with transportation systems or other historic urban infrastructural conditions. These precedents exemplify built examples of diverse reactions to historical conditions while still addressing the realities of modernity.

  • Tall Buildings in Historic Centers134

    The John Hancock Tower is obliquely placed at the southeast corner of Copley Square in Bostons Back Bay, adjacent to H.H. Richardsons Trinity Church and the John Hancock Berkeley Building. Its singular, monolithic form and trapezoidal fl oor plan accentuated the sharpness of this angle and minimize its presence within the square. A highly refl ective glass faade mirrors the historic architecture surrounding a triangular entry plaza at the towers base. At upper levels, the tower disappears into the afternoon sky refl ected in the facade. The placement, shape and refl ectivity of the tower combine to honor the historic architecture and reduce the impact of a sixty-story building on the neighborhood.

    Scraping Neighborhoods

  • Constraints

  • Tall Buildings in Historic Centers136

    200

    ft

    600 f

    t

    One Boston Place

    One Boston Place is situated at the intersection of State and Washington Streets in Bostons historic fi nancial district. The corner is home to the Old State House and the citys fi rst skyscraper, the thirteen-story, masonry structure Ames Building. The dark and structurally expressive 600 foot tower is among the tallest in the city and commands a sense of permanence amid the skyline while diminishing its presence at the ground level, meeting it at only the core and each corner. The sides of the base are open and do not compete with the historic architecture opposite each street.

  • Constraints

    200

    ft

    600 f

    t

    One Boston Place

  • Tall Buildings in Historic Centers138

    The Seagram Building steps back from Park Avenue in midtown Manhattan and surrenders space to an urban plaza in response to the neo-classical Racquet Club of McKim, Mead and White directly opposite. The plaza creates habitable public space in the dense urban environment and refl ects the architecture of the historic club through materiality, symmetry and the classical proportioning of the towers structural bays. An abstract representation of a neo-classical column can further be found in the composition of the tower and expressed in the vertical fl uting of the mullion applique.

  • Constraints

  • Tall Buildings in Historic Centers140

    250

    ft 75 f

    t668 f

    t

    Seven World Trade Center is located within the dense urban fabric of lower Manhattan in close proximityto the World Trade Center Memorial. The oblique plan and refl ective faade of the building clouds its profi le so that is seamlessly vanishes into the sky. This effect respects the adjacency of the memorial and produces a minimal impact on the sensitive site. It also creates an airiness not found in the surrounding buildings and a welcome contrast to the neighborhoods density.

  • Constraints

    250

    ft 75 f

    t668 f

    t

  • Tall Buildings in Historic Centers142

    500 Park Avenue shares a narrow site in midtown Manhattan with the former Pepsi Cola building, originally designed by SOM. The towers faade is a combination of masonry, which maintains the character of the historic avenue, and curtain wall, which absorbs the horizontal banding of the existing building to create a cohesive block. A glass volume on the side of the tower cantilevers the existing building to maximize space on the limited site.

    Scraping Neighbor

  • ConstraintsConstraintsConstraints

  • Tall Buildings in Historic Centers144

    Atlantic Wharf is located along Bostons historic Fort Point Channel and incorporates three existing mercantile buildings. The Russia Building which fronts Atlantic Avenue is preserved in its entirety while the brick facades of the other two buildings are renovated and form the base of the thirty-two-story tower. The restorations of the old warehouses preserve the texture of the historic site and recall its once maritime industrial function, a theme that is expressed throughout the buildings details. The primary entry is located between the Russia Building and the base of the tower, creating a ninety-foot atrium that highlights the brick faade at the rear of the Russia Building.

  • ConstraintsConstraintsConstraints

  • Tall Buildings in Historic Centers146

    25-0The Bank of America Tower is sited at the northwest corner of historic Bryant Park in midtown Manhattan and preserves the existing faade of the Henry Miller Theater on Forty-Third Street. Landmark policy allows the theater interior to be reconstructed while restoring the exterior as an element in the towers faade and retaining an important piece of Broadway history. The canopy height in the park and the massing of the surrounding buildings infl uence the form of the tower at its base near the park.

  • Constraints

    25-0

  • Tall Buildings in Historic Centers148

    9 stories

    Citicorp Center is located on Lexington Avenue in midtown Manhattan on the site of St. Peters church, originally built in 1905. To accommodate the historic structure, the building is set on four nine-story stilts positioned at the center of each faade that allow its corners to cantilever seventy two feet above the church and a public plaza below. This cantilevering is possible because of a structural system consisting of six eight-story inverted chevron trusses that transfer their load onto the four centered piers.

  • ConstraintsConstraintsConstraints

    9 stories

  • Tall Buildings in Historic Centers150

    140 75

    The Custom House Tower that features prominently amid Bostons waterfront skyline was an early twentieth century addition to the original, mid-nineteenth century Greek revival building which forms the towers base. At the time of its construction, the tower was allowed to exceed the citys 125 foot height limit because it was federally owned, making it the tallest building in the city for half a century. Thestructure of the tower uses the original building as a foundation, preserving the historic dome at the center of the old building and creates an expansive public space within it.

  • Constraints

    140 75

  • Tall Buildings in Historic Centers152

    Boston Exchange Place is located at the intersection of State and Congress Streets in Bostons historic fi nancial district, steps from the Boston Massacre site. The 500 foot glass tower steps back from its State Street front and retains the twelve-story, rusticated stone faade on the nineteenth century Boston Stock Exchange. The primary entrance, on Congress Street, is placed between the rear of old building and the base of the tower, creating a six-story atrium that highlights the connection to the historic building and contrasts the architectural styles.

  • Constraints

  • Tall Buildings in Historic Centers154

    40 ft modulespans 4 floors

    The Hearst Tower utilizes the cast stone faade of the original, 1928 headquarters building as the sixstorybase of a 600 foot glass tower. The initial plan of the old building proposed the future construction of a skyscraper; it was delayed by the great depression and realized nearly seventy years later. The new tower projects upwards from the original building envelope, highlighting the contrast between the historic faade and the towers steel structure is displayed in the open atrium space a level above the public entry. This structure forms a diagonal grid on the towers faade and stands out amid its surroundings near Columbus Circle in midtown Manhattan.

  • Constraints

    40 ft modulespans 4 floors

  • Tall Buildings in Historic Centers156

    3 stories

    The Massachusetts Eye and Ear Infi rmary consists of the original 1824 building and an addition that expands the space within the boundaries of the existing site while maintaining as much of the old building as possible. The tower accommodates both constraints by adding vertical space that stays within the tight limits and slipping over the shell of the original building. It utilizes three large piers to receive the forces of the tower above without obstructing the faade of the historic building.

  • Constraints

    3 stories

    ConstraintsConstraints

  • Tall Buildings in Historic Centers158

    The Penn Mutual Tower is delicately placed among its historic neighbors in downtown Philadelphia. Onthe site of the old Pennsylvania Fire Insurance Company, the tower fronts Independence Park, adjacent to one of the most historic buildings in the country, Independence Hall. The four-story, Egyptian revival faade of the old insurance building is preserved to create a free standing screen at the towers entry which visitors must pass around. The historic faade provides not only a contrast to the glass tower but a scale that respects Independence Hall. The fenestration structure of the tower mimics the proportions of the preserved facade.

  • ConstraintsConstraintsConstraints