Redeveloped by: Belveron RE Partners & Low Income Housing Corp (LIHC) Summit Plaza Jersey City, NJ 483 Units Project Based Section 8 Site Taking Summit Plaza from Acquisition to Recapitalization: Leveraging Operations, Utility, and Environmental Costs

Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Redeveloped by: Belveron RE Partners &

Low Income Housing Corp (LIHC)

Summit Plaza Jersey City, NJ

483 UnitsProject Based Section 8 Site

Taking Summit Plaza from Acquisition to

Recapitalization: Leveraging Operations, Utility, and Environmental Costs

Page 2: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Original Site and Current Site,

etc.

Page 3: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

5 minute walk to Journal Square PATH 11 minute train to World Trade Center22 minute train to Penn Station (34th Street)

Location, Location, Location

Summit Plaza

Transit Station

Page 4: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

HUD Operation Breakthrough: Innovative Construction and Systems

Page 5: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Innovative Systems: 1970s Off Grid Living for 1,150 Residents

Page 6: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Innovative Systems: Labor Saving Pneumatic Trash Collector

Page 7: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Modular Construction 1.0 and Transit Oriented Development vs. Today

18 story construction with “concrete box” prefabricated slide-in-place modules

Page 8: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Deep Dive on Mechanical Due Diligence: Legacy Issues

Page 9: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

HVAC: Operating and Maintenance Cost

Creative Thinking: Challenge Replace in Kind Mentality

Holistic: Multiple Benefits from each Expenditure With Underwriting of Savings

The Sum is Greater Than the Addition of the Parts

Due Diligence Leads To Two Key Contractors and No GC

Finding Root Cause: The First Day of the Next 40 years

Page 10: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

ISSUES

• Active NJ DEP case

• Annual Permitting and Testing

• Title V Air Permit

• Tanks, Tanks, Tanks

RESULTS:

• Clean Site

• $65,000/yr Savings

Environmental Clean Up Reduces Cost and Allows HUD Approval

Page 11: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

This:

The Legacy Amenity: Pool $666/day

OR:

Page 12: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

2018 Summit Plaza Resident Experience

All This AND Net Savings $20,000/year

Resident Services Coordinator

Infill New Community Room

New Lobby

Security Office with Window onto Site

Page 13: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

• Rockport guidance during due diligence helped team quantify savings

• Rockport Mortgage translated our vision to HUD • Quantifiable data provided to HUD resulted in no pushback from National

Loan Committee• Two independent sources of documentation with such large amounts of

energy and operational savings underwritten was very critical (Sparhawk Group and PSE&G)

• Leveraged the energy and operation savings at 75% of expected savings

• Emphasized prior track record of reducing operational expense

Rockport Mortgage Translated Vision to HUD

Page 14: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

$14,000

$11,700$10,300

-

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

Annual Operating Cost: Dollars Per Unit

Base Underwriting

Loan

New Loan

2015 2017 2018

RESULTS

2015 2017 2018

Base Year $0

$1.100

$1.775

-

0.5

1.0

1.5

2.0

Annual Operating Expense Savings, $ Millions

2017 Actuals2018 Estimated

Page 15: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Rough Waters: New Approaches, New Tools & New Crew

Page 16: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Think Outside “Replace In Kind”

Expanded PSE&G

Cost $3.6 million

Incentive $2.3 million

Savings/yr $382,000

Payback After Incentive

3.5 years

Owner Infrastructure

Expanded Utility

Incentive Project

Original PSE&G

Cost $1.5 million

Incentive $774,000

Savings/yr $129,000

Payback After Incentive

5.6 years

Original Utility

Incentive Project

Step 1: Starting Point

Step 2: Owner Advocate + Due Diligence

Page 17: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Think Whole Site AND Total Cost of Operation

PSE&G + Owner

Cost $11.2 million

Incentive $2.9 million

Savings/yr $1.6 million

Payback after Incentive

5.0 years

Expanded Utility Incentive

Project

Entire Owner Project: Utility Infrastructure,

Windows, Water Conservation,

Combined Heat and Power, Solar PV, Controls

Original PSE&G

Cost $1.5 million

Incentive $774,000

Savings/yr $129,000

Payback after Incentive

5.6 years

Original PSE&G Project

Step 1: Starting Point

Step 3: Total Cost of Operation$3.6 + $1.6 + $6 - $2.9 Incentive - $0.2 ITC = $8.1 Million NET Cost

Page 18: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Identifying Root Needs and Causes

Page 19: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Identifying Root Needs and Causes

Page 20: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Root Causes: Right Sizing For Savings

Page 21: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Creative Solutions Reduce Capital Cost and Operation Cost

Page 22: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Documented Operations Savings: $481,000 per year, $1,000 per unit

2015 Purchase Order for Operations and MaintenanceMECHANICAL 483 Units

Contractor Building Service Description2015 Sum of

Purchase Orders

Eliminated Heating Repairs *1

Remaining Plmb & Heat Repairs

Estimated MaterialsEstimated

invoice labor *2

Labor Savings $110 vs $225/hr

*3New Budget Budget per unit

Prestige 625 plmb/heat repairs $42,014 $21,175 $20,838 $4,168 $16,671 $8,669 $12,170Prestige 627 plmb/heat repairs $53,810 $16,762 $37,049 $7,410 $29,639 $15,412 $21,636Prestige 700 plmb/heat repairs $159,286 $90,624 $68,662 $13,732 $54,930 $28,563 $40,099Prestige 730 Bldg 730, all 2015 $318,815Prestige 730 Sprinkler Engineering $55,000Prestige 730 Sprinkler Permits $44,000Prestige 730 New DHW $123,519Prestige 730 only plmb/heat repairs $96,296 $26,894 $69,402 $55,521 $28,871 $26,650Prestige other $5,404 $1,980 $3,424 $1,712 $890 $822Prestige central plant mixed capital & operating $73,436 $23,406 $50,030 $25,015 $13,008 $12,007

Mechanical Total without capital projects $356,809 $180,840 $249,404 $183,487 $95,413 $80,555 $167ELECTRICAL

Contractor Building Service Description2015 Sum of

Purchase Orders

Eliminated Heating Repairs *1

Lighting Fixture/Lamp

Savings *4

One Time Install GFI Cost *5

New Budget

Statsi All work $234,785Statsi 700 new sprinkler panel 700 $111,344Statsi 730 new sprinkler panel 730 $13,696Statsi All work Non-capital projects $109,745 $4,593 $31,986 $31,986 $41,180 $85

Universal All buildings Non-capital projects $97,858 $23,258 $74,601 $154Electrical Total without capital projects $207,603 $27,850 $31,986 $31,986 $115,781 $240

SUPPLIES

Contractor BuildingAll supplies for consumables,

repairs and unit turns

2015 Sum of Purchase

Orders

Eliminated Toilets As All Will Be Replaced

*6New Budget

HD Supply All $121,053 $8,878 $112,176 $232Total of 2015 Purchase Orders/Invoices, no capital projects $905,334 $424,292 $878Projected Annual Savings $481,041

Page 23: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Monthly Power Cost: 291 Units, 2 Buildings, plus Central Plant 2015/2016/2017

-

10,000

20,000

30,000

40,000

50,000

60,000

70,000

February March April May June July August September October November December January

Co

st (

$/m

on

th)

Page 24: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

0

100

200

300

400

500

600

700

800

900 M

ay

Jun

e

July

Au

gust

Sep

tem

ber

Oct

ob

er

No

vem

ber

Dec

emb

er

De

man

d(k

W)

2015 Demand 2017 Demand 2015 Demand Trendline 2017 Demand Trendline

Electric Power Demand: 291 Units, 2 Buildings, plus Central Plant 2015/2017

Page 25: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Site Wide Water and Sewer Savings 2015/2017

$-

$10

$20

$30

$40

$50

$60

$70

$80

January February March April May June July August September October November December

Co

st (

$/u

nit

-mo

nth

)

April 1 to December 31, 34% Savings, $325/unit annualized savings

Percent Savings

4% 24% 41% 42% 46% 30% 42% 45% 40% 50% 39% 39%

Page 26: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Cooling Tower Water Savings: 6.4 gpm/24/7 for four summer months! 2015/2017

Percent Savings

49% 53% 64% 79%

$-

$2.00

$4.00

$6.00

$8.00

$10.00

$12.00

June July August September

Co

st (

$/u

nit

-mo

nth

)

Month

Page 27: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Gas and Electric Savings: Not Weather Normalized, 2015/2017/2018

Percent Savings

40% 33% 29% 36% 36% 52% 48% 40% 40%

2017/2015 HDD %

49% 145% 197% 93%

$-

$50

$100

$150

$200

$250

$300

May June July August September October November December January

Co

st (

$/u

nit

-mo

nth

)

Page 28: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

More Savings to Come: February 2018

0

50

100

150

200

250

300

350

0:00 4:00 8:00 12:00 16:00 20:00 0:00

Usa

ge (

kW)

Time

Daily Electric Power Usage (Feb 5, 2018)

Building…Cogen Power

Page 29: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Holistic Approach is Greater Than The Sum of Parts

PSE&G + Owner

Cost $11.2million

Incentive $2.9 million

Savings/yr $1.6 million

Payback 5.0 years

Expanded Utility Project

Entire Owner Project: Utility Infrastructure,

Windows, Combined Heat and Power,

Solar PV, Controls

$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost

YearPortfolio

Manger Energy Benchmark

HUD Water Benchmark

2015 2 10

2017 30 33

2018* 87 63

* - Projected Use Based on 2017 Savings

Page 30: Taking Summit Plaza from Acquisition to Recapitalization...$3.6 + $1.6 + $6 - $2.9 MM Incentive - $0.2 ITC = $8.1 million NET Cost Year Portfolio Manger Energy Benchmark HUD Water

Amy Johnson

Portfolio Management

Belveron RE Partners

[email protected]

303 888 4350

Matthew Holden, P.E.

President

Sparhawk Group

[email protected]

207 650 1172

Thank You!