Taiwan Grid Development Plan and Challenges on Grid Integration Global offshore Wind Summit TAIWAN Peter Yuinhong Liu Taiwan Power Company April 25, 2019 1

Taiwan Grid Development Plan and Challenges on Grid ......II.2 Challenges on grid integration for Renewable Energy Connection •Requirement for Wind Generator Voltage Ride Through

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Taiwan Grid Development Plan and Challenges on Grid ......II.2 Challenges on grid integration for Renewable Energy Connection •Requirement for Wind Generator Voltage Ride Through

Taiwan Grid Development Plan and

Challenges on Grid Integration

Global offshore Wind Summit – TAIWAN

Peter Yuinhong Liu

Taiwan Power Company

April 25, 2019

1

Page 2: Taiwan Grid Development Plan and Challenges on Grid ......II.2 Challenges on grid integration for Renewable Energy Connection •Requirement for Wind Generator Voltage Ride Through

Challenges

Smart Grid

Conclusion

Grid Development

Outline

I

II

III

IV

2

Page 3: Taiwan Grid Development Plan and Challenges on Grid ......II.2 Challenges on grid integration for Renewable Energy Connection •Requirement for Wind Generator Voltage Ride Through

3

I.1 Offshore Wind Farm Connection in Taiwan

◆Taiwan Power Company (TPC) Power Grid ConstructionPlan for Offshore Wind Connection

➢Existing Capacity: 3.51GW

➢Capacity Under construction:7.14GW• investment amount: 2 billion USD• construction period: 8 years (January 2018 ~ December 2025)

➢Total Grid connection capacity:10.65 GW in 2025.

Page 4: Taiwan Grid Development Plan and Challenges on Grid ......II.2 Challenges on grid integration for Renewable Energy Connection •Requirement for Wind Generator Voltage Ride Through

I.2 Offshore Wind Farm Connection in Taiwan

➢Provides additional grid-connected capacity as:• Changhua 6.5GW

The Changhua area is expected to add 1GW, ChangoneA, in 20211.5GW,ChangoneB, in 2024 2GW,Changgong, in 20252GW, Youngxing, in 2025

• Taoyuan 0.64GW, in 2025• 161kV New Lines• 345kV Lines upgrade

TPC Power Grid Construction Plan for

Offshore Wind Connection On Changhua Area

◆Taiwan Power Company (TPC) Power Grid ConstructionPlan for Offshore Wind Connection

(乙)

(甲)

T

T

東鋼

(丙)

鐵富

T

觀威WPP

大潭風力w

楊梅

梅湖

大潭

白玉

保生

榮成塘尾

觀音

富岡

楊高

鴻友

富綢

T

大潭新#8(GT2+ST)#9#10

(丁)

往六家~龍潭(南)分歧線

龍潭(南)

往宋屋 往中大

往長發

築能WPP

麗威WPP

麗威WPP

WPP

台強

TPC Power Grid Construction Plan for

Offshore Wind Connection On Taoyuan Area

4

Page 5: Taiwan Grid Development Plan and Challenges on Grid ......II.2 Challenges on grid integration for Renewable Energy Connection •Requirement for Wind Generator Voltage Ride Through

大彰化西南#14

337.1MW

海龍三號#18

512MW

海龍二號#19

232MW

大彰化西北#12

582.9MW

Location of Offshore wind Farm

大彰化西南#14

337.1MW

◆Offshore Wind Installed Capacityin Taiwan from 2020 to 2025

0.738

1.698

0

0.452

0.948

1.664

0.738

2.436 2.436

2.888

3.836

5.5

2020 2021 2022 2023 2024 2025

Offshore Wind Installed Capacity in Taiwan from 2020 to 2025

Installed Capacity(GW) Accumulation Installed Capacity(GW)

5

I.3 Offshore Wind Installed Capacity

Page 6: Taiwan Grid Development Plan and Challenges on Grid ......II.2 Challenges on grid integration for Renewable Energy Connection •Requirement for Wind Generator Voltage Ride Through

________________________________________________________________________________________________

• Due to a large amount of renewable energy is expected to be connectedto the grid, the impact of climate/ temperature is greatly increased.

II.1 Challenges on grid integration for Renewable Energy Connection

Duck curve - winter of 2025

System LoadPV generation

PV generation Wing generation Net generation PV installed Capacity

Comparison of Renewable-energy Generation in 2018

Affected by the climate of Taiwan, wind power has a higher power generation output in autumn and winter .

6

Page 7: Taiwan Grid Development Plan and Challenges on Grid ......II.2 Challenges on grid integration for Renewable Energy Connection •Requirement for Wind Generator Voltage Ride Through

________________________________________________________________________________________________

II.2 Challenges on grid integration for Renewable Energy Connection

•Requirement for Wind Generator✓ Voltage Ride Through

✓ Frequency Ride Through

✓ Power ramping rate

✓ Voltage Support

✓ Frequency Support

✓ Forecast

LVRT

HVRT

0.25s

0.75s

0.15s

Wind Turbine Required to

Stay Online Wind Turbine Not Required to

Stay Online

Wind Turbine Not Required to

Stay Online

PO

I V

olt

age

(p.u

.)Time(s)

7

Page 8: Taiwan Grid Development Plan and Challenges on Grid ......II.2 Challenges on grid integration for Renewable Energy Connection •Requirement for Wind Generator Voltage Ride Through

________________________________________________________________________________________________

II.3 Ancillary Service(Operating/Spinning Reserve)

• Government’s Renewable Energy installed capacity target 26.7GW on 2025

✓ PV 20GW

✓ Onshore Wind 1.2GW

✓ Offshore Wind 5.5GW

• Estimation of Operating/Spinning Reserve

✓ Need additional Operating Reserve/Spinning Capacity 5.87GW

8

Page 9: Taiwan Grid Development Plan and Challenges on Grid ......II.2 Challenges on grid integration for Renewable Energy Connection •Requirement for Wind Generator Voltage Ride Through

________________________________________________________________________________________________

installations of combined cycle(CC) generator 24.14GW

Change operating mode of Pumped-storage hydroelectricity(PSH) 2.5GW

Other Hydroelectric Generator

Automated Demand Response(ADR)

Installations of Energy Storage(ES) 0.59GW

◼Total 5.87GW

II.4 Diversified Strategy for Operating Reserve

9

Page 10: Taiwan Grid Development Plan and Challenges on Grid ......II.2 Challenges on grid integration for Renewable Energy Connection •Requirement for Wind Generator Voltage Ride Through

________________________________________________________________________________________________

1

0

Six major subjects of grid system integration

1) Smart Generation and Dispatch

AMI

Energy Storage Equipment

dispatching Center

E/S and electric vehicle

User Energy managementCharging

Station2) Power Grids Management

Time of Use Rates

Demand Response

Transmission DistributionBig data Analysis

Generation(including IPPs)

3) Energy Storage System4) Demand side management

5) Information and communication infrastructure

6) Regulations and human resources

T&DAutomation

III.1 Smart Grid in Taiwan

Page 11: Taiwan Grid Development Plan and Challenges on Grid ......II.2 Challenges on grid integration for Renewable Energy Connection •Requirement for Wind Generator Voltage Ride Through

IV. Conclusion

◆Grid connection capacity of 10.65 GW will be provided for offshore wind power from 2020 to 2025.

◆Revise related Grid connection code of Renewable-energy.

◆Operating/Spinning Reserve Capacity 5.87GW will be provided in 2025.

◆Smart Grid sustainable development.