    Technical Parameters of 70MN Hydraulic Press for Building

    material

    Tianjin Taipingyang Ultra-high pressure Equipment Co., Ltd

    Add: Xumuyanjiusuo Road, Yixingbu Town, Beichen Dist. Tianjin,

    China E-mail: [email protected] P.C. 300402 Tel: 0086-22-26999463

    Website: www. pacific-machine.com Fax: 0086-22-26995099

    mailto:[email protected]:[email protected]
  • 8/6/2019 Tai Lieu May Ep 70MN--~1

    2/14

    -70MN

    Contents:

    1.

    Function and special feature2. Technical date

    3. System components

    3.1 Machinery system

    3.2 Hydraulic system

    3.3 Electrical control and safety system

    4. Quality standard

    5. Test method

    6. Delivery

    7. After sale services and relevant documents

    7.1Quality assurance

    7.2Service

    7.3Providing documents

    7.4List of spare parts

  • 8/6/2019 Tai Lieu May Ep 70MN--~1

    3/14

    -70MN

    50MN

    The 50MN hydraulic press for pressing building material manufactured by Tianjin

    Taipingyang Ultra-high Pressure Equipment Co., Ltd ranks first in quantity and takes

    leading positions in designed efficiency and property in China. Details are as follows:

    . Function and special feature:

    1.1 15

    The safety factor is high. Pressing life will be more than 15 years.

    1.2 0.1mm

    The working table has high rigid feature. The deformation under full working load is

    0.1mm.

    1.3

    Pressure rising with double cylinders and the slides goes up placidly, no need to adjust

    the working status.

    1.4

    The seals can be replaced without major cylinder being moved away from its installed

    position.

    1.5 4

    Sliding blocks are respectively supported by 4 fast cylinders to go fleetly, greatly reducing

    ineffective time consumption.

    1.6 ,The hydraulic system adopts intensifier which can use lower system pressure, enhancing the

    reliability of hydraulic system.

    1.7

    The adjustable high pressure pump and large flow low pressure pump will work together in

    oil supplying, which can realize the pressing speed infinite variable control to save energy in

    fast going up procedures.

    1.8

    The spherical connection between working cylinder and slide can lessen the wearing of seals,

    and make the slide work accurately.

    . Technical data

    2.1

    WorkingMN 50

    2.2

    Workingmm 13002600

    2.3

    Maximum opening mm 1200

  • 8/6/2019 Tai Lieu May Ep 70MN--~1

    4/14

    -70MN

    2.4

    Maximum strokemm 400

    2.5

    Empty speed

    mm/s 30

    2.6

    Workingmm/s 0.05-0.4

    2.7

    Return speedmm/s 30

    2.8

    Thickness of upper workingmm 600

    2.9

    Thickness of lower working

    mm 600

    2.10*

    Operation windowmm 18001200

    2.11

    Diameter of mainmm 860

    2.12

    Number of main

    2

    2.13

    Diameter of return cylinder

    mm 160/110

    2.14

    Number of return cylinder

    4

    2.15

    Pressure of the systemMPa 25

    2.16

    Pressure of mainMPa 60

    2.17

    Power of mainkW 37

    2.18

    Trailer bearing capacityt 20

    2.19

    Trailer power of

    motor

    kW 3.7

    2.20

    Speed of loading and

    unloading trailer

    mm/s 40

    2.21

    Total weight of the

    e ui ment

    t ~125

  • 8/6/2019 Tai Lieu May Ep 70MN--~1

    5/14

    -70MN

    2.22

    Outside measurement of

    the main equipment

    mm 2570*2700*7000

    2.23

    Height above groundmm 3800

    . Composition and assortment

    3.1 Machinery system

    4

    The equipment has the structure of double frames and main cylinders. The lower slide is

    driven to go up quickly by 4 fast cylinders. The oil tank (prefilling tank) is installed on the top

    of main cylinder to make the connection.

    Nos Name Material Quantity

    Bearing frame2

    Semi-cycle beam

    Q235

    4

    Column Q235 4

    winding steel wire65Mn 28t

    Main oil cylinder

    Body of the cylinder 45#

    lid of the cylinder ZG270-500

    Piston ZG270-500

    Winding steel wire

    65Mn 20t

    3()

    Movable workingQ235 1

    4

    Fixed working

    Q235 1

    5 Seat HT200 4

    6

    Fastening screw and bolt

    45# 4

  • 8/6/2019 Tai Lieu May Ep 70MN--~1

    6/14

    -70MN

    7

    Feeding trailer

    Assembly

    1

    1set

    3.2 Hydraulic system

    The hydraulic system of the equipment is consisted of the major system, ultra high

    pressure control system and the supplementary control system.

    1.

    The manual variable volume piston pump and low pressure hydraulic gear pump are used for

    oil supplying.

    2.

    Reciprocating-type intensifiers are used in the ultra high pressure system to realize pressure

    increase and release with the help of the ultra high pressure valve assembly..

    :

    Working principles of the hydraulic system:

    Empty fast going up: The low pressure gear pump supply oil for 4 sets of fast cylinder,

    which will bring the slide go up quickly. At the same time, the hydraulic oil in oil tank will go

    through ultra-high pressure prefill valve to fill into main cylinder.

    ,

    Pressurization: When the fast rising material contact with upper working table, the limit

    switch will send signal (or by pressure sending signal) to change working status to

    pressurization. The gear pump will unload, and the variable plunger pump will begin to work

    by providing pressure directly to main cylinder with the help of controlling valve blocks. The

    pressure will be set and originated by pressure sensor. If the procedure is too fast, it can be

    changed to supply oil by booster.

    Pressure increase: When the pressure of the pump is up to set value, the pump will provide

    oil through reversing valve until the repeat working of intensifier, which will make the

    pressure to final value by the way of outputting ultra-high pressure oil to main cylinder

    Pressure keeping: Pressure keeping starts when the pressure reaches stipulated value and

    the pump enters load release status. When the pressure is released to set value at which the

    pressure will continue to raise, the pressure will keep a stable value in this way. The pressure keeping brings to an end the opening operation of the pressure release valve of both

    sides to facilitate steady and fast pressure release of the liquid in the cylinder.

  • 8/6/2019 Tai Lieu May Ep 70MN--~1

    7/14

    -70MN

    Return travel: With the opening of liquid filing valve and fast cylinder oil releasing valve

    at the bottom of the cylinder, the slide will realize quick stroke under the double action of

    gravity and return cylinders.

    3.2.1 power devices

    Nos. Devices

    Quantity

    Model

    Supplier

    1

    Motor 1

    37Kw

    1500 r.p.m

    Double

    extension moto

    Beijing B.J

    electric motor

    2

    Variable

    piston

    163SCY14-1B

    Tianjin hydraulic

    3

    Gear pump1 CBG2080

    4

    Shaft coupling2

    Tianjin

    5

    Seat 1

    TPY

    3.2.2 Oil tank assembly

    1

    body of oil tank1 ~3000L

    TPY

    2

    Air filter2 QUQ3

    Leemin hydraulic

    3

    Liquid level meter2 YWZ-250T

    Leemin hydraulic

    4

    Temperature

    1 0~100

    Leemin hydraulic

    5

    Connecting valve2 DN65

    Tang

    3.2.3 () Cartridge valve block

    1

    Double pump pressure

    adjustment valve

    1 NG25

    Taifeng

    hydraulic

    2

    Directional valve block1 NG25

    Taifeng

    3

    supporting speed

    adjustment valve

    1 NG25

    Taifeng

    hydraulic

    3.2.4 Ultra pressure valve assembly

  • 8/6/2019 Tai Lieu May Ep 70MN--~1

    8/14

    -70MN

    1

    Valve block1 Dg12

    Taifeng

    2

    Double check valve 2 Dg12

    TPY

    3

    Hydraulic control

    pressure release

    1 Dg12

    TPY

    4

    Manual

    pressure release

    1 Dg12

    TPY

    5

    Ultra pressure

    liquid filling valve

    1 Dg50

    TPY

    3.2.5 Double action intensifier

    1

    Body of ultra

    pressure cylinder

    1 42CrMo

    TPY

    2

    Body of

    medium

    1 45#

    TPY

    3 piston 1 45#

    TPY

    4

    Ultra pressure gasket1

    Imported products

    5High

    pressure gasket1

    Imported products

    6Signal

    giving1

    TPY

    7

    Connection flange

    and screw bolt

    2

    2 sets

    TPY

    3.2.6 Oil filter and supplementary hydraulic parts

    1

    Oil filter1

    Leemin hydraulic

    2

    Joints and pipes

    On

    e

    Leemin hydraulic

    3.2.7 Hydraulic indicator, instrument and meter

    1

    Ultra pressure

    touch point meter

    1 0~160Mpa

    Jinan Gauge

    2Vibration

    resistant pressure meter2 0~40

    0~60Mpa

    Tianjin

    3 Pressure 1 0~100Mpa

  • 8/6/2019 Tai Lieu May Ep 70MN--~1

    9/14

    -70MN

    sensor SENEX

    3.2.9 Oil cooling filtration device

    1

    Plate heat exchanger 1 12m2

    TPY

    2

    Motor assembly

    of oil pump

    1 2.2kW,80/min

    Tianjin

    3

    Water1 1.5 kW

    Kaiquan

    4

    Filter1

    Leemin Hydraulic

    5 Thermometer 1 0~100

    Leemin Hydraulic

    6

    Valv

    e

    3 DN65

    Tianjin

    Jintang valve

    7

    Seat1

    TPY

    3.3

    Electric control and protection system

    Q PLC

    The electric system adopts Japanese Mitsubishi Q series PLC to realize control of every

    working position of the press.

    a. Operation system:

    Two-hand operation is maintained by two hands, safe and

    reliable. b. Safety protection system:

    The press is accompanied with safety relay, making the equipment reliable andsafe.

    0.1 Mpa

    For safety and reliability, the connection contact pressure meter, signal giving for

    ultra pressure alert and immediate pressure release are installed with the press in addition to

    pressure sensor. The precision is 0.1M pa.

    Emergency buttons accompanied with recovery functions are available with two sides of

    press, facilitating easy maintenance, repairing and operation.

    c.

    System for self inspection of operation status:

    The touch screen shows its position and the working status of the electromagnetic valve of the

  • 8/6/2019 Tai Lieu May Ep 70MN--~1

    10/14

    -70MN

    hydraulic system. The working pressure is shown on the touch screen as well as on the digital

    status indicator.

    The alarming device in the electric control system shows category of the alarm, giving an

    order the repairman for repairing and indicating the statistics of the number of

    maintenance and repairing.

    Temperature sensor is mounted in the oil tank gauge to check temperature of oil and start

    the plate heat exchanger automatically according to setting temperature. When the

    temperature excesses the setting value, press will shut down immediately.

    Oil flitting device are mounted in the oil inlet of pump, which have the check device for

    oil cleansing. When there is impurity, indicator will alarm and press shut down.

    Two hand operation button control box is installed beside the press which can be easily

    manipulated.

    3.3.1. Electric motor starting box

    Nos.

    Device

    Model

    Quantity

    Brand

    1

    Body of box

    TS8/800*800*2000+100 2 Rittal

    2

    Automatic air switch

    NSX250HM1C2.2+exte

    ntion handle

    1 Schneider

    3

    Automatic air switch

    NSX250H/MA220 1 Schneider

    4

    Thermal relay

    LR9-F5367/60-100A 1 Schneider

    5

    A C contactor

    LC1/F185M7/220V 3 Schneider

    6

    DC voltage

    stabilized

    SITOP 6EP1336-2 2 Siemens

    7

    Thermal relay

    LR97D25B/DC24V 3 Schneider

    8

    AC contactor

    LC1-D1810M7/220V 3 Schneider

    9

    AC ammeter

    BE-72/200/5 3 Mack

    10

    Current transformer

    RCT-15-1/200/5 3 Mack

    11

    AC voltage meter

    BE-72/600V 3 Mack

    12 MY2NJ/DC24V 30 OMROM

  • 8/6/2019 Tai Lieu May Ep 70MN--~1

    11/14

    -70MN

    Intermediate relay

    13

    Autoconnecte

    d transformer

    380/220-75KVA 1 Shanghai

    Leipu

    14

    Control transformer

    380/220/JBK5-4KVA 1 Shanghai

    15

    Circuit breaker

    OSMC32ND6/1P 18 Schnerder

    16

    Circuit breaker

    GV2-ME16 3 Schneider

    17

    Circuit breaker

    OSMC32ND2/2P 2 Schneider

    18 Circuit breaker

    OSMC32ND10/2P 4 Schneider

    19

    Circuit breaker

    OSMC32ND20/2P 4 Schnieder

    3.3.2. Electric box for operation control

    Nos.Device

    Model

    Quanti

    t y

    Brand

    1

    Body of boxTP/600*400*875 1 Rittal

    2

    Programmable controller

    Q03UDCPU/QX80/QY10

    series1 set Mitsubishi

    3

    Touch screenGT1575-XTBA 1 Mitrubishi

    4

    Programming softwareGX DEVRLOPER 1 Mitsubishi

    5

    Configuration softwareGT Designer 1 Mitsubishi

    6

    Indicator of

    pressure

    RKC/RD900/4-2-mA 1Japanes

    e make

    7

    ThermometerRKC/CD701 1

    Japanese

    make

    8

    Button with lightXB4BW33B1C/24V 16+2 Schneider

    9

    Button with light

    ZB4BW34C+ZB4BWB42

    C/24V10 Schneider

    10 .Locking button with light

    XB4BW36B1C=ZB4BZ21C/24V

    4 Schneider

    11

    Selection switch

    ZB4DD2C+ZB4

    BZ105C

    4 Schneider

  • 8/6/2019 Tai Lieu May Ep 70MN--~1

    12/14

    -70MN

    12

    Approach switch

    E2E-X5MEI 2 Omron

    13

    Emergency stop

    XB4-BS542 3 Schneider

    14

    Thermocouple

    E52-IC6D 1 OMROM

    15

    Photoelectric

    displacement

    1000mm 2 OMROM

    16

    Opto electronic swithcE3JK-5M1 1 OMROM

    17

    Approach switchE2E-X10E1 1 OMROM

    18

    Trailer motorFRN7.5G1S 1 FUJI

    3.3.3. Safety protection system

    1

    Stroke control switch

    HL5030 4 OMROM

    2

    Signal giving device

    XVB+XVS series 1 Schneider

    3

    Safety relay

    G7SA-4A2B/DC24V 5 OMROM

    3.3.4. Supplementary electric parts

    1

    Electric wire

    BVR25/BVR1 100/800 General Factory of

    Electric wire

    2

    Terminal

    280-901/80 4 Wanke

    . Test and inspection method:

    4.1

    Inspect the press according to the parameters stipulated in t he contract.4.2 5

    Keep the pressure under full work capacity for 5 minutes and check the interior pressure of

    the major cylinder 3 times repeatedly and take the average value of the three as the standard.

    4.3 100

    Feasibility test report under full work capacity may result in 100 continuous pressing on

    bearer block without any problem.

    . Delivery

    5.1 150

    The buyer is supposed to come to the manufacturers factory site to conduct inspection

    for acceptance and delivery within 150 days after signing of contract and receipt of prepayment.

  • 8/6/2019 Tai Lieu May Ep 70MN--~1

    13/14

    -70MN

    .

    After sale services and relevant documents:

    6.1 Quality Guarantee

    6.1.1 15 Frame and main cylinders shall have a guarantee to be free from cracks in 15 years.

    6.1.2

    The whole press is guaranteed for 1 year

    6.2 Services

    6.2.1 24

    The supplier will propose problem solution for user within 24 hours upon

    notice whether it is within or after expiration of the quality guarantee period.

    6.2.2

    Provide free repairmen and spare parts if the equipment has the quality problem inthe guarantee period

    6.3 providing documents

    6.3.1

    General drawing

    6.3.2

    Hydraulic principle drawing

    6.3.3

    Electronic system drawing

    6.3.4

    Wearing parts drawing

    6.3.5

    Detail list of bought-in components

    6.3.6

    Instruction book of operation

    a.

    Operation main point

    b.

    Content and time requirement of regular check and maintenance

    c.

    Replacement method of main seals

    d.

    Wearing parts list

    e.

    Problem judgment, maintenance and repairing

    6.3.7

    Instruction book for brought-in electronic control devices

    6.3.8

    Main spare parts material report and detection test report

    6.3.9 Machine test report

  • 8/6/2019 Tai Lieu May Ep 70MN--~1

    14/14

    -70MN

    6.3.10

    Quality certificate

    6.3.11

    Packing list

    6.4 List of spare parts

    No.s

    Name

    Unit

    Quantity

    Supplier

    1

    Pipeline seals

    set2

    China

    2

    Double check valve seat and spool

    Set2

    TPY

    3

    Relief valve seat and spool

    set2

    TPY

    . ,

    Price and terms of payment:

    7.1 Price of equipmentIncluding spare parts:

    Equipment --Ex work

    RMB (Unit: 10,000

    70MN

    70MN Hydraulic press for pressing building270Ex-work

    8.2 Cost for installation and test operation

    Equipment

    RMB (Unit: 10,000

    70MN

    70MN Hydraulic press for pressing building8

    Except the fee for food accommodation of technical

    8.4 Terms of payment:

    8.4.1 30%

    Pay up 30% of the price of the equipment after signing of contract.

    8.4.2 30%

    Pay up 30% of the price of the equipment in the winding period.

    8.4.3 35%

    Pay up 35% of the price of the equipment after the FAT approved

    8.4.4

    Pay up all the freight cost after the equipment get to the factory site of buyer.

    8.4.4 5%

    Pay all installation cost of the equipment within two weeks after test approved in buyers site,and the remaining 5% of the equipment within one year since approval.