Technical Parameters of 70MN Hydraulic Press for Building
material
Tianjin Taipingyang Ultra-high pressure Equipment Co., Ltd
Add: Xumuyanjiusuo Road, Yixingbu Town, Beichen Dist. Tianjin,
China E-mail: [email protected] P.C. 300402 Tel: 0086-22-26999463
Website: www. pacific-machine.com Fax: 0086-22-26995099
mailto:[email protected]:[email protected]8/6/2019 Tai Lieu May Ep 70MN--~1
2/14
-70MN
Contents:
1.
Function and special feature2. Technical date
3. System components
3.1 Machinery system
3.2 Hydraulic system
3.3 Electrical control and safety system
4. Quality standard
5. Test method
6. Delivery
7. After sale services and relevant documents
7.1Quality assurance
7.2Service
7.3Providing documents
7.4List of spare parts
8/6/2019 Tai Lieu May Ep 70MN--~1
3/14
-70MN
50MN
The 50MN hydraulic press for pressing building material manufactured by Tianjin
Taipingyang Ultra-high Pressure Equipment Co., Ltd ranks first in quantity and takes
leading positions in designed efficiency and property in China. Details are as follows:
. Function and special feature:
1.1 15
The safety factor is high. Pressing life will be more than 15 years.
1.2 0.1mm
The working table has high rigid feature. The deformation under full working load is
0.1mm.
1.3
Pressure rising with double cylinders and the slides goes up placidly, no need to adjust
the working status.
1.4
The seals can be replaced without major cylinder being moved away from its installed
position.
1.5 4
Sliding blocks are respectively supported by 4 fast cylinders to go fleetly, greatly reducing
ineffective time consumption.
1.6 ,The hydraulic system adopts intensifier which can use lower system pressure, enhancing the
reliability of hydraulic system.
1.7
The adjustable high pressure pump and large flow low pressure pump will work together in
oil supplying, which can realize the pressing speed infinite variable control to save energy in
fast going up procedures.
1.8
The spherical connection between working cylinder and slide can lessen the wearing of seals,
and make the slide work accurately.
. Technical data
2.1
WorkingMN 50
2.2
Workingmm 13002600
2.3
Maximum opening mm 1200
8/6/2019 Tai Lieu May Ep 70MN--~1
4/14
-70MN
2.4
Maximum strokemm 400
2.5
Empty speed
mm/s 30
2.6
Workingmm/s 0.05-0.4
2.7
Return speedmm/s 30
2.8
Thickness of upper workingmm 600
2.9
Thickness of lower working
mm 600
2.10*
Operation windowmm 18001200
2.11
Diameter of mainmm 860
2.12
Number of main
2
2.13
Diameter of return cylinder
mm 160/110
2.14
Number of return cylinder
4
2.15
Pressure of the systemMPa 25
2.16
Pressure of mainMPa 60
2.17
Power of mainkW 37
2.18
Trailer bearing capacityt 20
2.19
Trailer power of
motor
kW 3.7
2.20
Speed of loading and
unloading trailer
mm/s 40
2.21
Total weight of the
e ui ment
t ~125
8/6/2019 Tai Lieu May Ep 70MN--~1
5/14
-70MN
2.22
Outside measurement of
the main equipment
mm 2570*2700*7000
2.23
Height above groundmm 3800
. Composition and assortment
3.1 Machinery system
4
The equipment has the structure of double frames and main cylinders. The lower slide is
driven to go up quickly by 4 fast cylinders. The oil tank (prefilling tank) is installed on the top
of main cylinder to make the connection.
Nos Name Material Quantity
Bearing frame2
Semi-cycle beam
Q235
4
Column Q235 4
winding steel wire65Mn 28t
Main oil cylinder
Body of the cylinder 45#
lid of the cylinder ZG270-500
Piston ZG270-500
Winding steel wire
65Mn 20t
3()
Movable workingQ235 1
4
Fixed working
Q235 1
5 Seat HT200 4
6
Fastening screw and bolt
45# 4
8/6/2019 Tai Lieu May Ep 70MN--~1
6/14
-70MN
7
Feeding trailer
Assembly
1
1set
3.2 Hydraulic system
The hydraulic system of the equipment is consisted of the major system, ultra high
pressure control system and the supplementary control system.
1.
The manual variable volume piston pump and low pressure hydraulic gear pump are used for
oil supplying.
2.
Reciprocating-type intensifiers are used in the ultra high pressure system to realize pressure
increase and release with the help of the ultra high pressure valve assembly..
:
Working principles of the hydraulic system:
Empty fast going up: The low pressure gear pump supply oil for 4 sets of fast cylinder,
which will bring the slide go up quickly. At the same time, the hydraulic oil in oil tank will go
through ultra-high pressure prefill valve to fill into main cylinder.
,
Pressurization: When the fast rising material contact with upper working table, the limit
switch will send signal (or by pressure sending signal) to change working status to
pressurization. The gear pump will unload, and the variable plunger pump will begin to work
by providing pressure directly to main cylinder with the help of controlling valve blocks. The
pressure will be set and originated by pressure sensor. If the procedure is too fast, it can be
changed to supply oil by booster.
Pressure increase: When the pressure of the pump is up to set value, the pump will provide
oil through reversing valve until the repeat working of intensifier, which will make the
pressure to final value by the way of outputting ultra-high pressure oil to main cylinder
Pressure keeping: Pressure keeping starts when the pressure reaches stipulated value and
the pump enters load release status. When the pressure is released to set value at which the
pressure will continue to raise, the pressure will keep a stable value in this way. The pressure keeping brings to an end the opening operation of the pressure release valve of both
sides to facilitate steady and fast pressure release of the liquid in the cylinder.
8/6/2019 Tai Lieu May Ep 70MN--~1
7/14
-70MN
Return travel: With the opening of liquid filing valve and fast cylinder oil releasing valve
at the bottom of the cylinder, the slide will realize quick stroke under the double action of
gravity and return cylinders.
3.2.1 power devices
Nos. Devices
Quantity
Model
Supplier
1
Motor 1
37Kw
1500 r.p.m
Double
extension moto
Beijing B.J
electric motor
2
Variable
piston
163SCY14-1B
Tianjin hydraulic
3
Gear pump1 CBG2080
4
Shaft coupling2
Tianjin
5
Seat 1
TPY
3.2.2 Oil tank assembly
1
body of oil tank1 ~3000L
TPY
2
Air filter2 QUQ3
Leemin hydraulic
3
Liquid level meter2 YWZ-250T
Leemin hydraulic
4
Temperature
1 0~100
Leemin hydraulic
5
Connecting valve2 DN65
Tang
3.2.3 () Cartridge valve block
1
Double pump pressure
adjustment valve
1 NG25
Taifeng
hydraulic
2
Directional valve block1 NG25
Taifeng
3
supporting speed
adjustment valve
1 NG25
Taifeng
hydraulic
3.2.4 Ultra pressure valve assembly
8/6/2019 Tai Lieu May Ep 70MN--~1
8/14
-70MN
1
Valve block1 Dg12
Taifeng
2
Double check valve 2 Dg12
TPY
3
Hydraulic control
pressure release
1 Dg12
TPY
4
Manual
pressure release
1 Dg12
TPY
5
Ultra pressure
liquid filling valve
1 Dg50
TPY
3.2.5 Double action intensifier
1
Body of ultra
pressure cylinder
1 42CrMo
TPY
2
Body of
medium
1 45#
TPY
3 piston 1 45#
TPY
4
Ultra pressure gasket1
Imported products
5High
pressure gasket1
Imported products
6Signal
giving1
TPY
7
Connection flange
and screw bolt
2
2 sets
TPY
3.2.6 Oil filter and supplementary hydraulic parts
1
Oil filter1
Leemin hydraulic
2
Joints and pipes
On
e
Leemin hydraulic
3.2.7 Hydraulic indicator, instrument and meter
1
Ultra pressure
touch point meter
1 0~160Mpa
Jinan Gauge
2Vibration
resistant pressure meter2 0~40
0~60Mpa
Tianjin
3 Pressure 1 0~100Mpa
8/6/2019 Tai Lieu May Ep 70MN--~1
9/14
-70MN
sensor SENEX
3.2.9 Oil cooling filtration device
1
Plate heat exchanger 1 12m2
TPY
2
Motor assembly
of oil pump
1 2.2kW,80/min
Tianjin
3
Water1 1.5 kW
Kaiquan
4
Filter1
Leemin Hydraulic
5 Thermometer 1 0~100
Leemin Hydraulic
6
Valv
e
3 DN65
Tianjin
Jintang valve
7
Seat1
TPY
3.3
Electric control and protection system
Q PLC
The electric system adopts Japanese Mitsubishi Q series PLC to realize control of every
working position of the press.
a. Operation system:
Two-hand operation is maintained by two hands, safe and
reliable. b. Safety protection system:
The press is accompanied with safety relay, making the equipment reliable andsafe.
0.1 Mpa
For safety and reliability, the connection contact pressure meter, signal giving for
ultra pressure alert and immediate pressure release are installed with the press in addition to
pressure sensor. The precision is 0.1M pa.
Emergency buttons accompanied with recovery functions are available with two sides of
press, facilitating easy maintenance, repairing and operation.
c.
System for self inspection of operation status:
The touch screen shows its position and the working status of the electromagnetic valve of the
8/6/2019 Tai Lieu May Ep 70MN--~1
10/14
-70MN
hydraulic system. The working pressure is shown on the touch screen as well as on the digital
status indicator.
The alarming device in the electric control system shows category of the alarm, giving an
order the repairman for repairing and indicating the statistics of the number of
maintenance and repairing.
Temperature sensor is mounted in the oil tank gauge to check temperature of oil and start
the plate heat exchanger automatically according to setting temperature. When the
temperature excesses the setting value, press will shut down immediately.
Oil flitting device are mounted in the oil inlet of pump, which have the check device for
oil cleansing. When there is impurity, indicator will alarm and press shut down.
Two hand operation button control box is installed beside the press which can be easily
manipulated.
3.3.1. Electric motor starting box
Nos.
Device
Model
Quantity
Brand
1
Body of box
TS8/800*800*2000+100 2 Rittal
2
Automatic air switch
NSX250HM1C2.2+exte
ntion handle
1 Schneider
3
Automatic air switch
NSX250H/MA220 1 Schneider
4
Thermal relay
LR9-F5367/60-100A 1 Schneider
5
A C contactor
LC1/F185M7/220V 3 Schneider
6
DC voltage
stabilized
SITOP 6EP1336-2 2 Siemens
7
Thermal relay
LR97D25B/DC24V 3 Schneider
8
AC contactor
LC1-D1810M7/220V 3 Schneider
9
AC ammeter
BE-72/200/5 3 Mack
10
Current transformer
RCT-15-1/200/5 3 Mack
11
AC voltage meter
BE-72/600V 3 Mack
12 MY2NJ/DC24V 30 OMROM
8/6/2019 Tai Lieu May Ep 70MN--~1
11/14
-70MN
Intermediate relay
13
Autoconnecte
d transformer
380/220-75KVA 1 Shanghai
Leipu
14
Control transformer
380/220/JBK5-4KVA 1 Shanghai
15
Circuit breaker
OSMC32ND6/1P 18 Schnerder
16
Circuit breaker
GV2-ME16 3 Schneider
17
Circuit breaker
OSMC32ND2/2P 2 Schneider
18 Circuit breaker
OSMC32ND10/2P 4 Schneider
19
Circuit breaker
OSMC32ND20/2P 4 Schnieder
3.3.2. Electric box for operation control
Nos.Device
Model
Quanti
t y
Brand
1
Body of boxTP/600*400*875 1 Rittal
2
Programmable controller
Q03UDCPU/QX80/QY10
series1 set Mitsubishi
3
Touch screenGT1575-XTBA 1 Mitrubishi
4
Programming softwareGX DEVRLOPER 1 Mitsubishi
5
Configuration softwareGT Designer 1 Mitsubishi
6
Indicator of
pressure
RKC/RD900/4-2-mA 1Japanes
e make
7
ThermometerRKC/CD701 1
Japanese
make
8
Button with lightXB4BW33B1C/24V 16+2 Schneider
9
Button with light
ZB4BW34C+ZB4BWB42
C/24V10 Schneider
10 .Locking button with light
XB4BW36B1C=ZB4BZ21C/24V
4 Schneider
11
Selection switch
ZB4DD2C+ZB4
BZ105C
4 Schneider
8/6/2019 Tai Lieu May Ep 70MN--~1
12/14
-70MN
12
Approach switch
E2E-X5MEI 2 Omron
13
Emergency stop
XB4-BS542 3 Schneider
14
Thermocouple
E52-IC6D 1 OMROM
15
Photoelectric
displacement
1000mm 2 OMROM
16
Opto electronic swithcE3JK-5M1 1 OMROM
17
Approach switchE2E-X10E1 1 OMROM
18
Trailer motorFRN7.5G1S 1 FUJI
3.3.3. Safety protection system
1
Stroke control switch
HL5030 4 OMROM
2
Signal giving device
XVB+XVS series 1 Schneider
3
Safety relay
G7SA-4A2B/DC24V 5 OMROM
3.3.4. Supplementary electric parts
1
Electric wire
BVR25/BVR1 100/800 General Factory of
Electric wire
2
Terminal
280-901/80 4 Wanke
. Test and inspection method:
4.1
Inspect the press according to the parameters stipulated in t he contract.4.2 5
Keep the pressure under full work capacity for 5 minutes and check the interior pressure of
the major cylinder 3 times repeatedly and take the average value of the three as the standard.
4.3 100
Feasibility test report under full work capacity may result in 100 continuous pressing on
bearer block without any problem.
. Delivery
5.1 150
The buyer is supposed to come to the manufacturers factory site to conduct inspection
for acceptance and delivery within 150 days after signing of contract and receipt of prepayment.
8/6/2019 Tai Lieu May Ep 70MN--~1
13/14
-70MN
.
After sale services and relevant documents:
6.1 Quality Guarantee
6.1.1 15 Frame and main cylinders shall have a guarantee to be free from cracks in 15 years.
6.1.2
The whole press is guaranteed for 1 year
6.2 Services
6.2.1 24
The supplier will propose problem solution for user within 24 hours upon
notice whether it is within or after expiration of the quality guarantee period.
6.2.2
Provide free repairmen and spare parts if the equipment has the quality problem inthe guarantee period
6.3 providing documents
6.3.1
General drawing
6.3.2
Hydraulic principle drawing
6.3.3
Electronic system drawing
6.3.4
Wearing parts drawing
6.3.5
Detail list of bought-in components
6.3.6
Instruction book of operation
a.
Operation main point
b.
Content and time requirement of regular check and maintenance
c.
Replacement method of main seals
d.
Wearing parts list
e.
Problem judgment, maintenance and repairing
6.3.7
Instruction book for brought-in electronic control devices
6.3.8
Main spare parts material report and detection test report
6.3.9 Machine test report
8/6/2019 Tai Lieu May Ep 70MN--~1
14/14
-70MN
6.3.10
Quality certificate
6.3.11
Packing list
6.4 List of spare parts
No.s
Name
Unit
Quantity
Supplier
1
Pipeline seals
set2
China
2
Double check valve seat and spool
Set2
TPY
3
Relief valve seat and spool
set2
TPY
. ,
Price and terms of payment:
7.1 Price of equipmentIncluding spare parts:
Equipment --Ex work
RMB (Unit: 10,000
70MN
70MN Hydraulic press for pressing building270Ex-work
8.2 Cost for installation and test operation
Equipment
RMB (Unit: 10,000
70MN
70MN Hydraulic press for pressing building8
Except the fee for food accommodation of technical
8.4 Terms of payment:
8.4.1 30%
Pay up 30% of the price of the equipment after signing of contract.
8.4.2 30%
Pay up 30% of the price of the equipment in the winding period.
8.4.3 35%
Pay up 35% of the price of the equipment after the FAT approved
8.4.4
Pay up all the freight cost after the equipment get to the factory site of buyer.
8.4.4 5%
Pay all installation cost of the equipment within two weeks after test approved in buyers site,and the remaining 5% of the equipment within one year since approval.