1DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

TAC Meeting #3: 24 March 2014

Preliminary Alternatives

Page 2: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

2DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Overview

Schedule

Data Collection and Review of Existing Conditions

Summary of Traffic Projections

Preliminary Alternatives

Congestion Summary

Pros and Cons

Streetscape Themes

Next Steps

Agenda

Page 3: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

3DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Growth Projections

From the Cecil/Gibbs growth

analysis traffic volume increases

were estimated based on the # of

residential units and the square

footage of commercial/retail

space

Page 4: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

4DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Projected Increase in Traffic Volume

PM Peak Hour (2014 – 2034)

Page 5: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

5DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

2014 2034

PM Peak Level of Service

Page 6: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

6DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Dismissed Improvement Strategies

One/two-way hybrid alternatives

Upper Square Circulator

Lower Square Roundabout

2 lane roundabout

footprint

Truck U-movement in

Upper Square

Page 7: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

7DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Overall Improvements – Common to All Alternatives

Lower Square

Additional northbound

approach lane

Tighten intersection geometry

Upper Square Plaza

Road Diets: Chestnut Street

and Central Ave north of Upper

Square

Washington/Main traffic

calming

2 travel lanes on Washington,

with on-street parking

Page 8: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

8DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Currently provides bypass to downtown

Potential road-diet north of Orchard Street

Road Diet: Chestnut Street

Page 9: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

9DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Washington Street/Main Street Traffic Calming

Covert from yield

to stop controlled

Page 10: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

10DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Alt A: Enhanced One-way Loop

Summary of Alternatives

Alt B: Two-way Loop Alt C: Enhanced Two way loop

Page 11: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

11DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Lower Square

Close Henry Law Ave access

Additional northbound right lane

Upper Square

Plaza on western side of square

Alternative A: Enhanced One-way Loop

Page 12: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

12DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Alternative A: Lower Square

Reduce from four

approach lanes to

threeHenry Law Ave

Closure reclaimed

space (3,800 SF)

Install additional

northbound approach

lane

Narrowed

intersection

Page 13: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

13DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Alternative A: Upper Square

Reduce from

four approach

lanes to three

Reclaimed space

(11,000 SF)

Remove NBL lane

One through

lane in either

direction

(currently

two)

Page 14: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

14DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Chestnut Street

Page 15: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

15DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Lower Square

Henry Law Ave access remains

open

Additional northbound right lane

Upper Square

Plaza on eastern side of square

Main St/Portland Ave aligned with

Young St at four-way stop

intersection

Alternative B: Two-way Loop

Page 16: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

16DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Alternative B: Lower Square

Install northbound

approach lane

Narrowed

intersection

Remains one-

way southbound

Page 17: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

17DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Alternative B: Upper Square

Reduce to one

through lane in

either direction

(currently two)

Regained space

(13,000 SF)

Reverse flow

along Chapel St

Page 18: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

18DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

“Square up” intersection

Install four-way stop

control

Alternative B: Main St/Portland Ave

Page 19: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

19DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Chestnut Street

Page 20: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

20DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Lower Square

Close Henry Law Ave access

Additional northbound lane

Upper Square

Plaza on eastern side of square

Main St/Portland Ave mini

roundabout

Alternative C: Enhanced Two-way Loop

Page 21: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

21DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Alternative C: Lower Square

Install additional

northbound

approach lane

Henry Law Ave

Closure

reclaimed space

(3,800 SF)

Narrowed

intersection

Page 22: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

22DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Alternative C: Upper Square

Reduce to one

through lane in

either direction

(currently two)

Regained space

(13,000 SF)

Reverse flow

along Chapel St

Page 23: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

23DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Install mini roundabout

Traversable center

median

Alternative C: Main St/Portland Ave

Narrowed

intersection and

crosswalks

Page 24: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

24DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Chestnut Street

Page 25: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

25DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Improved traffic flow at Lower Square

Improved mobility and safety at Upper Square

Congestion Summary

No Build Alt A Alt B Alt C

Upper Square D D D D

Lower Square E D D D

Main St/Portland Ave C C C C

Main St/Washington St C C C C

No Build Alt A Alt B Alt C

Upper Square D D D D

Lower Square F D E D

Main St/Portland Ave D D D D

Main St/Washington St E F D D

2014 PM Peak Hour

2034 PM Peak Hour

Page 26: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

26DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Alternatives Evaluation Matrix

Alternative A: Alternative B: Alternative C:

Enhanced One way Loop Two way Loop Enhanced Two way Loop

Traffic Capacity

Traffic Mobility

Safety Enhancement

Vehicle Emissions

Ped/bike Mobility

Reclaimed Space

Page 27: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

27DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Streetscape Themes

Formal and Traditional Urban Orientation

Pedestrian Orientation

Place Specific

Page 28: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

28DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Streetscape Themes: Formal and Traditional Urban Orientation

Sidewalk treatments

Page 29: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

29DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Streetscape Themes: Formal and Traditional Urban Orientation

Lighting Furniture Bollards

Page 30: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

30DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Street trees and buffers

Streetscape Themes: Formal and Traditional Urban Orientation

Bicycle racks

Page 31: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

31DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Streetscape Themes: Formal and Traditional Urban Orientation

Alternative A

Upper Square Lower Square

Page 32: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

32DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Streetscape Themes: Formal and Traditional Urban Orientation

Alternative B

Upper Square Lower Square

Page 33: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

33DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Streetscape Themes: Formal and Traditional Urban Orientation

Alternative C

Upper Square Lower Square

Page 34: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

34DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Streetscape Themes: Pedestrian Orientation

Sidewalks treatments Crosswalks and intersectionsPedestrian refuge

Page 35: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

35DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Streetscape Themes: Pedestrian Orientation

Upper Square Lower Square

Alternative A

Page 36: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

36DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Upper Square Lower Square

Alternative B

Streetscape Themes: Pedestrian Orientation

Page 37: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

37DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Upper Square Lower Square

Alternative C

Streetscape Themes: Pedestrian Orientation

Page 38: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

38DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Streetscape Themes: Place Specific

Sidewalk treatments Patterns and Art

Page 39: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

39DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Streetscape Themes: Place Specific

Furniture Wayfinding signage Recycling

receptacles

Page 40: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

40DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Streetscape Themes: Place Specific

Urban spaces Defining vegetation

Page 41: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

41DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Streetscape Themes: Place Specific

Pedestrian and visual links to amenities

From the Dover Master Plan

Bridge treatments

Page 42: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

42DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Upper Square Lower Square

Alternative A

Streetscape Themes: Place Specific

Page 43: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

43DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Upper Square Lower Square

Alternative B

Streetscape Themes: Place Specific

Page 44: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

44DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Upper Square Lower Square

Alternative C

Streetscape Themes: Place Specific

Page 45: TAC Meeting #3: 24 March 2014 - Dover, New Hampshire · 2021. 3. 3. · DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14 1 TAC Meeting #3: 24 March

45DOVER | Downtown Pedestrian and Vehicular Access Streetscape Study | TAC 03/24/14

Dover Downtown Pedestrian and Vehicular Access and

Streetscape Study

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Schedule Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov

Project Initiation and Communication

a. Kick-off Meeting

b. Project Coordination Meetings (8)

c. Transportation Advisory Committee Meetings (5)

d. Special stakeholder outreach and workshop meetings (3)

e. Communication support and surveys

Interim Reports R1 R2 R3 R4

Task 1. Data Collection and Review of Existing

Conditions

1. a. Analysis of Previously Completed Planning Documents

1. b. Assessment of Existing Infrastructure/Environment

1.c. Traffic Counts

1.d. Transit Service

1.e. Identification of Existing Activity Center and

Development Nodes

1.f. Analysis of Land Use Patterns/Parking and Circulation

Implications

1.g. Technical Memorandum on Existing Conditions

Task 2. Community Workshop #1 – Data and Analysis

Presentation

Task 3. Development of Alternatives

3.a Preliminary Alternatives

3.b Review of Preliminary Concepts

3.c Alternatives

Task 4. Community Workshop #2 – Alternatives

Task 5 Preferred Design

5.a. Layout and circulation concept for all modes

5.b. Streetscape and urban design

5c.Parking strategy

5.d.Cost evaluations

Task 6: Community Workshop #3 Preferred Design

and Draft Final Report

Task 7: Final Report

7.a. Report

7.b. Design Plans (25%)

Task 8: Construction and Bid Documents

8.a. Survey

8.b. Design Development (75%)

8.c. Final Construction Documents (100%)

8.d. Bidding Documents

Task 9: Construction Phase Services (Begin Spring,

2015)

2014

x x x

x x x

21 16 24 26x27

Gibbs to

facilitate

Next Steps: