29

Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture
Page 2: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | i

Table of Contents

1 Overview .......................................................................................1

2 Preparation ...................................................................................22.1 Installation Tools ..........................................................................................22.2 Installation Environment Requirements ......................................................3

2.2.1 AC Version .........................................................................................32.2.2 DC Version .........................................................................................4

2.3 Preparation Task Checklist ...........................................................................5

3 Package Contents ..........................................................................6

4 IdentifyingYourSystem .................................................................74.1 S9700-53DX Overview .................................................................................74.2 PSU FRU Overview .......................................................................................7

4.2.1 AC Version .........................................................................................74.2.2 DC Version .........................................................................................8

4.3 Fan FRU Overview .......................................................................................84.4 Port Overview ..............................................................................................9

5 MountingtheSwitchinaRack .................................................... 10

6 InstallingtheFanModules ........................................................... 11

7 InstallingthePowerSupplyUnits ................................................ 12

8 GroundingtheSwitch .................................................................. 13

9 ConnectingPower ....................................................................... 159.1 System Power Consumption ......................................................................159.2 Connecting the AC Version PSU .................................................................15

9.2.1 Attaching the AC Power Cord ..........................................................159.2.2 Feeding AC Power ...........................................................................15

9.3 Connecting the DC Version PSU .................................................................159.3.1 Before Attaching the DC Power Cable .............................................159.3.2 Attaching the DC Power Cable .........................................................179.3.3 Tightening the Screws .....................................................................179.3.4 Feeding DC Power ..........................................................................17

10 VerifyingSwitchOperation .......................................................... 1810.1 Front Panel LED .........................................................................................1810.2 PSU FRU LED ..............................................................................................1910.3 Fan FRU LED ...............................................................................................19

11 InitialSystemSetup ..................................................................... 2011.1 Connecting Console Cables .......................................................................2011.2 Checking Serial Control Availability ...........................................................2011.3 Launching a Terminal Emulator ................................................................21

Page 3: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | ii

11.4 Accessing CLI .............................................................................................21

12 InstallingtheTransceiver ............................................................. 22

13 CautionsandRegulatoryComplianceStatements ........................ 2313.1 Cautions and Warnings ..............................................................................2313.2 Installation Location Statement .................................................................2413.3 Compliance Statements .............................................................................24

Page 4: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 1

1 OverviewProviding 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture required to fulfill the high traffic loading in a 5G mobile Ethernet network. As part of UfiSpace’s S9700 Series, the S9700-53DX is a robust, flexible and carrier-grade router that can be standalone or coupled with fabric routers (S9705-48D) in small/medium or large clusters. Suitable for aggregation, edge and core networking, S9700-53DX adopts service and fabric routers building blocks to provide carriers with a better solution in place of the traditional chassis.

With 1+1 redundancy hot-swappable PSU FRU, 3+1 redundancy hot-swappable Fan FRU, and a high port density design, the S9700-53DX delivers high system reliability, Ethernet switching performance and intelligence to the network that helps reduce infrastructure and administrative costs.

This document describes the hardware installation process for S9700-53DX.

S9700-53DX PSU, FAN &IO ports configurations are shown as below:

Managementport IO ports FAN PSU1 x 10/100/1000BASE-T RJ45 40 x QSFP28 Ethernet 3+1 Redundant 1+1 Redundant2 x 10G SFP+ 13 x QSFP-DD Fabric 8038 FAN Module 2000W PSU1 x RJ45/Micro USB Serial Console

*Note: Serial Console works either one in the same time and RJ45 has higher priority

Page 5: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 2

2 Preparation

2.1 InstallationTools

Screwdriver (Phillips head #2)

Insula�on Wire Lead

Ground Wire(size #6 AWG)

0.5 +/- 0.02”(12.7 +/- 0.5 mm)

Philips screwdriver 6-AWG wire for grounding

Crimping Tool

Grounding Lug

Wire Stripping Tool Stripping Tool

• Desktop or laptop with terminal emulation software. Refer to section 11, for details.• Baud rate: 115200 bps• Data bits: 8• Parity: None• Stop bits: 1• Flow control: None

Page 6: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 3

2.2 InstallationEnvironmentRequirements

2.2.1 ACVersion

• Power Reserve: The S9700-53DX uses two 1+1 redundant, active/active 200 to 240 voltage AC power supply field replaceable units. To ensure the active/active feed power design functions properly, it is recommended that the field has dual power circuits and has a reserve of at least 1800 watt on each circuit.

• Space Clearance: The S9700-53DX chassis width is 17.16 inches (43.6cm) and shipped with rail rack kit and adjustable mounting rails suit for 19 inch (48.3cm) wide racks. The depth of the S9700-53DX chassis is 30 inches (76.2cm) without the field replaceable units (FRUs). The handle of fan FRU is 1 inch (2.5cm) and the handle of the PSU FRU is 1.5 inches (3.8cm). A minimum space clearance of 6 inches (15.2cm) is required on the side with the fan FRUs and PSU FRUs. A total minimum reserve depth for the cabinet is 36 inches (94.4cm).

• Cooling: The S9700-53DX airflow direction is from front-to-back. Make sure the air flow is in the same direction with other equipment in the same rack.

Page 7: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 4

2.2.2 DC Version

• Power Reserve: The S9700-53DX uses two 1+1 redundant, active/active -48 voltage DC power supply field replaceable units. To ensure the active/active feed power design functions properly, it is recommended that the field has dual power circuits and has a reserve of at least 1800 watt on each circuit.

• Space Clearance: The S9700-53DX chassis width is 17.16 inches (43.6cm) and shipped with rail rack kit and adjustable mounting rails suit for 19 inch (48.3cm) wide racks. The depth of the S9700-53DX chassis is 30 inches (76.2cm) without the field replaceable units (FRUs). The handle of the fan FRU is 1 inch (2.5cm) and the handle of the PSU FRU is 1.5 inches (3.8cm). A minimum space clearance of 6 inches (15.2cm) is required for the side with the fan FRUs and PSU FRUs. A total minimum reserve depth for the cabinet is 36 inches (94.4cm).

• Cooling: The S9700-53DX airflow direction is front-to-back. Make sure the air flow is in the same direction with other equipment in the same rack.

Page 8: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 5

2.3 PreparationTaskChecklist

Task Check DatePowervoltageandelectriccurrentrequirement:(AC Version: 200 to 240V AC, 12.5 x 2 ampere maximum

DC Version: -40 to -72V DC, 60 to 33 x 2 ampere maximum)

Installingspaceandweightloadrequirement:(S9700-53DX chassis has a height of 2RU (3.45”/8.8cm), a width of 19” (48.3cm), and a depth of 30” (76.2cm) without considering cable routing).

Thermalrequirement(S9700-53DX working temperature is 32 to 113°F (0 to 45°C), airflow direction is front-to-back)

Installingtoolsrequirement(Screwdriver Philips head #2, Wire-stripping tools for stripping 6-AWG, crimping tool for ground lug)

Accessoryrequirement(Desktop or laptop with terminal emulation software and USB port)

Page 9: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 6

3 Package ContentsAccessoryList:Item Description Sepc.&Dimensions Q’ty Weight

1

1-1 Grounding Lug

DC Version: 1.54” x 1.47” x 0.49” (# 6 AWG) (39 x 37.5 x 12.5mm)

5 pcs 0.14lbs (63.6g)/1 pcs

AC Version: 1.54” x 1.47” x 0.49” (# 6 AWG)

1 pcs 0.14lbs (63.6g)/1 pcs

1-2 Screw Kit (for Ground Lug) (39 x 37.5 x 12.5mm) 2 sets 0.01lbs (2.6g)/1 set

1-3 Micro USB Cable 3.28’ (1m) 1 pcs 0.5lbs (24.4g)/1 pcs

1-4 RJ45 to DB9 Female Cable 8’ (2.4m) 1 pcs 0.27lbs (123.9g)/1 pcs

2

2-1 Adjustable Mounting Rail (for 4 post)

30.4” x 1.7” x 0.9” (771 x 44 x 22mm) (22”~33” rack depth)

2 pcs7.01lbs (3.2kg)/2 pcs3.5lbs (1.6kg)/1 pcs

2-2Screw Kit(for Rack Mount Bracket)

2 x Screw M4.0*L5.5mm 2 sets 0.004lbs (1.9g)/1 set

Physicalinformation:Componentphysicalinformation

Weight

Chassis without FRUs 49.2lbs (22.3kg)

S9700-53DX full set 58.9lbs (26.7kg)

PSUDC PSU: 2.6lbs (1.2kg)

AC PSU: 2.6lbs (1.2kg)

Fan module 1.1lbs (498g)

Ground lug kit 0.6lbs (66.2g)

Adjustable rail slide 7lbs (3.2kg)

Micro USB cable 0.1lbs (24.4g)RJ45 to DB9 Female cable 0.27lbs (123.9g)

AC power cord (AC version only) 0.7lbs (318g)

Dimension

S9700-53DX (W x H x D) 17.16” x 30” x 3.45” (436 x 762 x 87.6mm)

PSU FRU (W x L x H) 1.99” x 14.17” x 1.58” (50.5 x 360 x 40mm)

Fan module (W x H x D) 3.15” x 3.15” x 4.8” (80 x 80 x 122mm)

Page 10: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 7

4 IdentifyingYourSystem

4.1 S9700-53DX Overview

4.2 PSUFRUOverview

3+1 Redundant, hot swappable fan field replaceable unit (FRU).

4.2.1 ACVersion

Page 11: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 8

4.2.2 DC Version

4.3 FanFRUOverview

3+1 Redundant, hot swappable fan field replaceable unit (FRU).

Page 12: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 9

4.4 Port Overview

Port ID FormFactor MaximumSupportDistance SupportSpeed0-19 QSFP28 Up to 6.2mi (10km) 1 x 100GE/1 x 40GE/4 x 25GE/4 x 10GE20-39 QSFP28 Up to 6.2mi (10km) 1 x 100GE/1 x 40GE0-12 QSFP-DD 328ft (100m) 400GE

Page 13: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 10

5 MountingtheSwitchinaRack

Caution

It is recommended that switch installation be done by two individuals. One individual should hold the switch in position on the rack, while the other secures it in place using the rail slide screws

Page 14: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 11

6 InstallingtheFanModulesThe fan module is a hot swappable field replaceable unit, which can be replaced while the switch is operating as long as the remaining three modules are installed and in operation. The fans come pre-installed and the following steps are instructions on how to install a new fan module:

1. Press and hold the release tab located on the fan module inward to unlock the old fan module from the fan bay.

2. While holding down the red tab, grip the handle located on the fan module and gently pull the old fan module out of the fan bay.

3. Align the new fan module with the fan bay, ensuring that the fan module’s power connector is in the correct position.

4. Carefully slide the new fan module into the fan bay and gently push until it is flush with the switch case.

5. An audible click will be heard when the fan module is installed correctly. The fan module will not go in all the way if it is installed in the wrong direction.

Fan Module:

Page 15: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 12

7 InstallingthePowerSupplyUnitsThe power supply unit (PSU) is a hot swappable field replaceable unit and can be replaced while the switch is operating as long as the remaining (second) PSU is installed and in operation (with 220V power input). The AC and DC PSU follow the same steps for installation. The PSU comes pre-installed and the following are instructions on how to install a new PSU:

Warning

If power input for AC power supply is only 110V, there will only be 1000 watts per power supply and will not be enough power for the power supply to be changed while the switch is in operation. In order for AC power supply to be changed while the switch is in operation, ensure that 220V power is supplied.

Caution

Shock hazard!

Disconnect all power inputs before servicing.

ACVersion: DCVersion:

1. Press and hold down the release tab located on the PSU inward to unlock the old PSU from the power bay.

2. While holding down the tab, grip the handle located on the PSU and gently pull the old PSU out of the power bay.

ACVersion: DCVersion:

3. Align the new PSU with the power bay, ensuring the PSU’s power connector is in the correct position.

4. Carefully slide the new PSU into the power bay and gently push until it is flush with the switch case.

5. An audible click will be heard when the PSU is installed correctly. The PSU will not go in all the way if it is in the wrong direction.

Page 16: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 13

8 GroundingtheSwitchIt is recommended that the switch changes be installed on a ground compliant rack system. This will reduce or prevent the risk of shock hazards, equipment damage, and potential of data corruption.

The switch can be grounded from the switch chassis and/or the DC power supply units (PSUs). When grounding the DC PSUs, ensure that both PSUs are grounded at the same time in case one of them is removed. The grounding wire is not provided with the switch package contents. M4 screws and washers are provided with the switch package contents.

Warning

This equipment must be grounded. Do not defeat the ground conductor or operate the equipment without a suitably installed ground conductor. Contact the appropriate electrical inspection authority or an electrician if you are uncertain about whether your equipment has been correctly grounded.

The following instructions are for grounding the switch chassis:1. Before grounding the switch chassis, ensure that the rack is properly grounded and in

compliance with local regulatory guidelines, ensure that a good electrical connection to the grounding point exists, and remove any paint or materials that may prevent good grounding contact.

2. Strip the insulation from a size #6 AWG ground wire (not provided), leaving 0.5” +/-0.02” (12.7mm +/-0.5mm) of exposed grounding wire.

3. nsert the exposed grounding wire all the way into the hole of the ground lug (provided with switch package contents).

4. Using a crimping tool, firmly secure the grounding wire to the ground lug.

Page 17: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 14

5. Remove yellow tape located on the switch chassis that is covering the holes for securing the ground lug.

6. Using 2 M4 screws and 4 washers (provided with switch package contents), firmly lock the ground lug to the switch chassis

Page 18: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 15

9 ConnectingPower

9.1 SystemPowerConsumption

The maximum power consumption of the S9700-53DX is 1565 watts. It is recommended that enough power be reserved from the power distribution system in order to support the proper function of the S9700-53DX. Ensure that both PSUs have been properly installed before powering up the switch, as the S9700-53DX is designed to support 1 + 1 power redundancy.

9.2 ConnectingtheACVersionPSU

9.2.1 AttachingtheACPowerCord

Locate the AC inlet connector on the PSU and plug the AC power cable (250Vac 15A, IEC60320 C19) into the AC inlet connector.

9.2.2 FeedingACPower

The PSU will immediately output 12V & 5VSB to the system with a 220V, AC power source. The PSU has a built-in 15 amperes, fast acting fuse based on the PSU maximum capacity, which will act as a second tier system protection in case the power distribution unit’s fuse is not functioning.

Note

If only a 110V AC power source is available, the S9700-53DX can still be powered with both PSUs providing 1000 watts each for a total output of 2000 watts. However, in this case, if one PSU stops functioning, the power output would be inefficient to sustain the switch’s operation.

9.3 ConnectingtheDCVersionPSU

9.3.1 BeforeAttachingtheDCPowerCable

The UL 1015, 6 AWG DC power cable (not provided) must be attached to a two-hole lug before connecting to the PSU. The following instructions are for connecting the DC Power Cable to the lug:1. Strip the insulation from a DC Power Cable, leaving 0.5” +/-0.02” (12.7mm +/-0.5mm) of

exposed cable.2. Insert the exposed DC power cable into the heat shrink tubing, the length of heat shrink

tubing should not less than 38.5mm. 3. Insert the exposed DC power cable all the way into the hollow tube of the lug (provided

with switch package contents).4. Using a crimping tool, firmly secure the DC power cable to the lug. It is recommended to not

crimp exceeding the lines indicated on the lug, which is also depicted as the cross-section area in the picture on the below.

Page 19: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 16

5. Move the heat shrink tubing to cover any exposed metal on the DC power cable and lug.

6. Use a heat source to secure the heat shrink tubing in place. Allow the heat shrink tubing to cool before attaching the DC power cable. An example of the installed DC version with insulation material as below

Page 20: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 17

9.3.2 AttachingtheDCPowerCable

Locate the DC power screw-type terminal block located on the PSU. Remove the plastic cover that is protecting the terminal block by pushing from the top or bottom of the cover and flipping open the cover outwards (Top picture). Secure the two-hole lug (with the DC power cable attached) to the terminal block (Middle picture). Put plastic cover back on terminal block to guard against contact with terminals (Bottom picture).

9.3.3 TighteningtheScrews

Tighten the screws to a torque value of 14.0+/-0.5kgf.cm. If the torque is not enough, the lug will not be secure and may cause malfunctions. If the torque is too much, the terminal block or lug may be damaged. The previous picture depicts how it should look once the lug is attached and the protective plastic cover reinstalled.

9.3.4 FeedingDCPower

The PSU will immediately output 12V and 5VSB to the system with a -48V DC power source. The PSU has a built in 80 amperes, fast acting fuse based on the PSU maximum capacity, which will act as a second tier system protection in case the power distribution unit’s fuse is not functioning.

Page 21: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 18

10 VerifyingSwitchOperation

10.1 FrontPanelLED

Verify basic switch operations by checking the system LEDs located on the switch. Under normal operating conditions, the SYS, FAN, PS0 and PS1 LEDs should all display green.

SYSLEDCondition SwitchStatus

OFF No powerSolid Green Host CPU/BMC is upBlinking Green ReservedSolid Amber Power is up but Host CPU/BMC is not upBlinking Amber Reserved

FANLEDCondition FanFRUStatus

OFF No FAN modules present or FAN modules are not initializedSolid Green All FAN modules are working wellBlinking Green ReservedSolid Amber One or more FAN module(s) need serviceBlinking Amber Reserved

PS0LEDCondition PSUFRUStatus

OFF No PowerSolid Green PSU 0 is working wellBlinking Green ReservedSolid Amber PSU 0 fail (PSU0 need service)Blinking Amber Reserved

Page 22: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 19

PS1LEDCondition PSUFRUStatus

OFF No PowerSolid Green PSU 1 is working wellBlinking Green ReservedSolid Amber PSU 1 fail (PSU1 need service)Blinking Amber Reserved

10.2 PSUFRULED

Additional information about PSU status can be obtained by the LEDs located on the PSUs itself.

LEDFunction/State MeaningGreen Output ON and OK.Off No input power to all power supplies.Blinking Green (1/sec) PSU standby state input power present / Only +5VSB on.

Blinking Red (1/sec) Input power cord unplugged or input power lost with a second power supply in parallel still with AC input power.

RedPower supply critical event causing a shutdown, failure, over current, short circuit, over voltage, fan failure, and/or over temperature.

Blinking between Green and Red

Power supply warning events where the power supply continues to operate; high temp, high power, high current, and/or slow fan.

Blinking Green (2/sec) Power supply firmware updating (Boot-loader mode).

10.3 FanFRULED

Additional information about Fan status can be obtained by the LEDs located on the Fans itself.

LEDCondition FanStatusGreen Fan FRU function normalOff No input power to all power suppliesYellow Fan FRU abnormal, service is required

Page 23: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 20

11 InitialSystemSetupEstablishing a first-time serial connection

To assign an IP address, you must have access to the command line interface (CLI). The CLI is a text-based interface that can be accessed through a direct serial connection to the switch.

Access the CLI by connecting to the console port located on the switch. After you assign an IP address, you can access the system through terminal emulators such as Putty, TeraTerm or HyperTerminal.

Perform the following steps to access the switch through a serial connection:

11.1 ConnectingConsoleCables

• The console can be connected either with the IOIO port or the USB port. If connecting with USB, drivers will need to be installed.

• To connect the console using the IOIO port, locate the console port labelled IOIO, then plug in the serial cable into the console port and connect the other end to the appropriate port of the computer. Cable types may vary depending on the switch model.

• To connect the console using USB, locate the USB port on the switch, then connect your

computer to the switch using the USB port located on the switch. Download the suitable driver for your operating system (OS) using the URL below:• https://www.silabs.com/products/development-tools/software/usb-to-uart-bridge-

vcp-drivers • https://www.silabs.com/ and search for CP210X

11.2 CheckingSerialControlAvailability

Disable any serial communication programs running on the computer such as synchronization programs to prevent interference

Page 24: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 21

11.3 LaunchingaTerminalEmulator

Open a terminal emulator application such as HyperTerminal (Windows PC), Putty or TeraTerm and configure the application. The following settings are for a Windows environment (other operating systems will vary):

• Baud rate: 115200 bps• Data bits: 8• Parity: None• Stop bits: 1• Flow control: None

11.4 AccessingCLI

After the connection is established, a prompt for the username and password displays. En-ter the username and password provided to you by your software vendor in order to access the CLI.

Page 25: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 22

12 InstallingtheTransceiver

Note

It is not recommended to use tie wraps or cable ties with optical cables. Over tightening will damage the optic fibers.

Read the following guidelines before proceeding with the installation:

Read the following guidelines before proceeding with the installation:

• Before installing a switch, take into consideration rack space requirements for cable management and plan accordingly.

• It is recommended to use hook and loop style straps to secure and organize the cables.• For easier management, label each fiber-optic cable and record its respective connection.• Maintain a clear line of sight to the LEDs by routing the cables away from the LEDs.

Caution

Prior to connecting any cables, discharge the static charge on the cable. Before you begin any installation procedures, ensure that proper grounding procedures are followed, such as using an ESD wrist strap.

The following steps are instructions for installing a transceiver onto the switch:

1. Remove the new transceiver from its protective packaging.2. Remove the protective plug from the transceiver port located on the transceiver.3. Place the bail/bale handle (wire handle) into the unlocked position and align the

transceiver with the port.4. Slide the transceiver into the port and apply gentle pressure to seat it in place. An audible

click sound should be heard when the transceiver is correctly installed into the port.

Page 26: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 23

13 CautionsandRegulatoryComplianceStatements

13.1 CautionsandWarnings

Caution

Shockhazard!

Disconnect all power inputs before servicing.

Warning

ElectricalHazard: Only qualified personnel should perform installation procedures.

Risquesd’électrocution:Seul un personnel qualifié doit effectuer les procédures d’installation.

Warning

Warning: Network Switch power supplies do not have switches for turning the unit on and off. Before servicing, disconnect all power cords to remove power from the device. Make sure that these connections are easily accessible.

Avertissement:Network Switch alimentations ne sont pas des interrupteurs pour allumer l’appareil et en dehors. Avant l’entretien, débranchez tous les cordons d’alimentation pour couper l’alimentation de l’appareil. Assurez-vous que ces connexions sont facilement accessibles.

Caution

Before mounting the device, ensure that the rack can support it without compromising stability. Otherwise, personal injury and/or equipment damage may result.

Caution

Follow appropriate ESD procedures when unpacking and handling the switch. These include unpacking the switch in an ESD-safe environment and wearing appropriate ESD protective gear, such as ESD-safe footwear and ESD wrist straps where appropriate.

Caution

This unit must be installed indoors. The unit, AC power supplies, DC power supplies, and its cables are not designed for outdoor use.

Caution

Use of controls or adjustments or performance of procedures other than those specified herein may result in hazardous radiation exposure.

Warning

Warning: Do not use optical instruments to view the laser output. The use of optical instruments to view laser output increases eye hazard. Use only UL/CSA, IEC/EN60825-1/-2 recognized pluggable modules.

Avertissement:Ne pas utiliser d’instruments optiques pour voir la sortie du laser. L’utilisation de instruments optiques pour afficher la sortie laser augmente les risques oculaires. Utilisez uniquement UL/CSA, IEC/EN60825-1 /-2 reconnu modules enfichables.

Page 27: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 24

13.2 InstallationLocationStatement

It is recommended that the device be installed only in a server room or computer room where access is:• Restricted to qualified service personnel or users familiar with restrictions applied to the

location, reasons therefore, and any precautions required.• Only afforded by the use of a tool or lock and key, or other means of security, and controlled

by the authority responsible for the location.Suitable for installation in Information Technology Rooms in accordance with Article 645 of the National Electrical Code and NFPA 75.

13.3 ComplianceStatements

FederalCommunicationsCommission(FCC)Notice

This device complies with Part 15 of the FCC rules. Operation is subject to the following two conditions: (1) this device may not cause harmful

interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.

Caution

This equipment has been tested and found to comply with the limits for a class A digital device, pursuant to Part 15 of the FCC rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment uses, generates, and can radiate radio frequency energy and if not installed in accordance with the operator’s manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause interference in which case the user will be required to correct the interference at his own expense.

Warning

Changes or modifications made to this device which are not expressly approved by the party responsible for compliance could void the user’s authority to operate the equipment.

IndustryCanadaNotice

CANICES-3(A)/NMB-3(A)

This digital apparatus does not exceed the class A limits for radio noise emissions from digital apparatus set out in the Radio Interference

Regulations of the Canadian Department of Communications.

Le présent appareil numérique n’émet pas de bruits radioélectriques dépassant les limites applicables aux appareils numériques de la class A

prescrites dans le Règlement sur le brouillage radioélectrique édicté par le ministère des Communications du Canada.

Page 28: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture

S9700-53DX Hardware Installation Guide | 25

ClassAITENotice

Warning

CThis equipment is compliant with Class A of CISPR 32. In a residential environment this equipment may cause radio interference.

ClassAVCCINotice

This is a Class A product based on the standard of the Voluntary Control Council for Interference by Information Technology Equipment (VCCI). If this equipment is used in a domestic environment, radio disturbance may arise. When such trouble occurs, the user may be required to take corrective actions.

Page 29: Table of Contents - UfiSpace · S9700-53DX Hardware Installation Guide | 1 1 Overview Providing 100GbE service and 400GbE fabric ports, the S9700-53DX enables the disaggregated architecture