230
shoulder width Required 2’-0" min. clear 35 ’- 0 " R t o b ac k f ace o f r a il PC 9 PT 25’-0" A (See Table CWGS-1) Guardrail transition W-beam guardrail W - b ea m gu a r d r a il 25’-0" minimum 2 ’- 0 "m i n . approach width Public road Bridge railing Type WGB Type TGB - width Req’d. shoulder AT BRIDGE END PUBLIC ROAD APPROACH INSTALLATION GUARDRAIL TRANSITION A TABLE CWGS-1 < 25’ > 25’ connector system Curved W-beam guardrail STATE OF No. A A D I N I N P R O F E S O I S N L A N E I G E N R E R G E I S T E R D E R I C H A R D L . V a n C L E A V E 9750 09/04/12 E 601-CWGS-01 09/04/12 09/04/12 DETAILS PLACED IN THIS FORMAT INDIANA DEPARTMENT OF TRANSPORTATION STANDARD DRAWING NO. /s/ Richard L. VanCleave /s/ Mark A. Miller DATE CHIEF ENGINEER DATE SUPERVISOR, ROADWAY STANDARDS See Standard Drawing E 601-CWGS-03 for General Notes. 1. NOTES: SEPTEMBER 2003 CONNECTOR SYSTEM CURVED W-BEAM GUARDRAIL

TABLE CWGS-1...1. 4 2 buffer details. See Standard Drawing E 601-CWGS-04 and 05 for terminal end See Standard Drawing E 601-CWGS-06 for CRT post details. type WBG details. See Standard

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • shoulder widthRequired

    2’-0" min. clear

    35’-0" R to back face of rail

    PC

    9

    PT

    25’-0"A

    (See Table CWGS-1)

    Guardrail transitionW-beam guardrail

    W-b

    ea

    m g

    uardrail

    25’-0" minimum

    2’-0"

    min.

    approach width

    Public road

    Bridge railing

    Type WGB

    Type TGB-

    width

    Req’d. shoulder

    AT BRIDGE END

    PUBLIC ROAD APPROACH INSTALLATION

    GUARDRAIL TRANSITIONA

    TABLE CWGS-1

    < 25’

    > 25’

    connector system

    Curved W-beam guardrail

    STATE OF

    No.

    AADIN I N

    PR

    OFE

    S

    OIS

    N LANE

    I

    G

    EN

    RE

    RGEISTER

    DE

    RIC

    HA

    RD L. VanCLE

    AVE

    9750

    09/04/12

    E 601-CWGS-01

    09/04/12

    09/04/12DETAILS PLACED IN THIS FORMAT

    INDIANA DEPARTMENT OF TRANSPORTATION

    STANDARD DRAWING NO.

    /s/ Richard L. VanCleave

    /s/ Mark A. Miller

    DATECHIEF ENGINEER

    DATESUPERVISOR, ROADWAY STANDARDS

    See Standard Drawing E 601-CWGS-03 for General Notes.1.

    NOTES:

    SEPTEMBER 2003

    CONNECTOR SYSTEM

    CURVED W-BEAM GUARDRAIL

  • STANDARD DRAWING NO.

    INDIANA DEPARTMENT OF TRANSPORTATION

    GUARDRAIL SYSTEM

    CURVED W-BEAM

    SEPTEMBER 2011

    E 601-CWGS-02

    NOTES:

    1.

    4

    2

    buffer details.

    See Standard Drawing E 601-CWGS-04 and 05 for terminal end

    See Standard Drawing E 601-CWGS-06 for CRT post details.

    type WBG details.

    See Standard Drawing E 601-TWGB-02 for guardrail transition

    See Standard Drawing E 601-CWGS-03 for General Notes.

    3

    STATE OF

    No.

    AADIN I N

    PR

    OFE

    S

    OIS

    N LANE

    I

    G

    EN

    RE

    RGEISTER

    DE

    RIC

    HA

    RD L. VanCLE

    AVE

    9750

    09/04/12DETAILS PLACED IN THIS FORMAT

    09/04/12

    09/04/12

    /s/ Richard L. VanCleave

    /s/ Mark A. Miller

    DATECHIEF ENGINEER

    DATESUPERVISOR, ROADWAY STANDARDS

    5-01-00

    5-01-00

    Anthony L. Uremovich

    /s/ Firooz Zandi

    E 706-TTBP-05

    TRANSITION, TPS-1

    CONCRETE BRIDGE RAILING

    MAY 2000

    CR

    T p

    os

    6’-

    ts @

    spaci

    Li

    mits

    of

    Cur

    ve

    d

    W-

    be

    am

    g

    Li

    mit

    s

    of

    Cu

    rv

    ed

    W-

    be

    am

    gu

    ar

    du

    ardr

    ra

    i

    ail

    l

    ter

    min

    alconnect

    or

    system

    system

    6’-3"

    3"

    or W-beam guardrail

    Guardrail transition type WGB

    B

    B

    A A

    Radius

    L

    W

    fixed objects (See Table CWGS-2)

    Hatched area shall remain free of

    6

    Terminal end buffer

    Edge of

    Tra

    velw

    ay

    4

    2

    8

    ng

    1’-3 1/4

    "2’-4"

    1"

    2’-3 3/4

    "

    or flatter

    Slope 15:1

    Face of rail

    2’-0"

    SECTION A-A

    and hex nut

    bolt with round washer

    CRT post3

    7

    1"

    2’-3 3/4

    "or flatter

    Slope 15:1

    Face of rail

    6" x 8" x 1’-2" wood block

    6" x 8" x 6’-0" wood post

    2’-0"

    SECTION B-B

    and hex nut

    bolt with round washer

    8"

    16d Nail

    CRT post

    7

    3

    TABLE CWGS-2

    5

    6

    RADIUS

    8

    11

    40’ x 20’

    50’ x 20’

    30’ x 15’

    L x W

    OF FIXED OBJECTS

    REQUIRED AREA FREE

    25’ x 15’

    POSTS

    NO. OF CRT

    8’-6"

    25’-6"

    17’-0"

    35’-0"

  • TABLE CWGS-3

    RADIUSTYPEPANELS REMOVED

    NUMBER OF 6’-3"

    8’-6"

    2

    3

    4

    5

    6

    7

    8

    9

    1

    8’-6"

    8’-6"

    17’-0"

    17’-0"

    17’-0"

    25’-0"

    25’-0"

    25’-0"

    1

    1

    1

    2

    2

    2

    0

    0

    0

    CONNECTOR SYSTEM

    2

    1 25’-0"

    35’-0"

    0

    0

    CURVED W-BEAM GUARDRAIL SYSTEMS

    TERMINAL SYSTEM

    connector system.

    This dimension shall be 5 ft for the 35 ft radius curved W-beam guardrail

    radius.

    A minimum 4 ft width shoulder shall be used with a 15 ft minimum drive

    be 2:1 or flatter.

    The embankment slope behind the curved W-beam guardrail system shall

    guardrail shall not be bolted to this post.

    For the 8’-6" radius curved W-beam guardrail terminal system,

    panels to be removed for each type of curved W-beam guardrail system.

    are to be omitted. See Table CWGS-03 for the number of guardrail

    outside of the clear zone and the plans specifically state that panels

    W-beam guardrail terminal system only where the bridge railing falls

    A maximum of two guardrail panels may be omitted from the curved

    W-beam guardrail connector system shall be used.

    run of guardrail only at a driveway. For a public road approach, a curved

    A curved W-beam guardrail terminal system shall be used to terminate a

    same as for the guardrail specified for the adjacent run.

    Except where otherwise shown, all hardware and installation shall be the

    shown on the plans in accordance with Table CWGS-3.

    The type of curved W-beam guardrail system to be used shall be as

    curved W-beam guardrail system is specified.

    E 601-CWGS-01 through -06, and E 601-CWGT-01 and -02 where a

    This drawing shall be used in conjunction with Standard Drawings

    4.

    3.

    5.

    2.

    1.

    6

    9

    GENERAL NOTES

    8

    7

    STATE OF

    No.

    AADIN I N

    PR

    OFE

    S

    OIS

    N LANE

    I

    G

    EN

    RE

    RGEISTER

    DE

    RIC

    HA

    RD L. VanCLE

    AVE

    9750

    E 601-CWGS-03

    INDIANA DEPARTMENT OF TRANSPORTATION

    STANDARD DRAWING NO.

    GUARDRAIL SYSTEM

    CURVED W-BEAM

    SEPTEMBER 1999

    09/04/12

    09/04/12

    09/04/12DETAILS PLACED IN THIS FORMAT

    /s/ Richard L. VanCleave

    /s/ Mark A. Miller

    DATECHIEF ENGINEER

    DATESUPERVISOR, ROADWAY STANDARDS

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • STANDARD DRAWING NO.

    INDIANA DEPARTMENT OF TRANSPORTATION

    GUARDRAIL SYSTEM

    CURVED W-BEAM

    SEPTEMBER 2011

    E 601-CWGS-06

    STATE OF

    No.

    AADIN I N

    PR

    OFE

    S

    OIS

    N LANE

    I

    G

    EN

    RE

    RGEISTER

    DE

    RIC

    HA

    RD L. VanCLE

    AVE

    9750

    1

    See Standard Drawing E 601-CWGS-04 for location of Post B.

    The TS 2 1/2" x 2 1/2" structural tube shall be welded to Post B only.

    NOTE:

    09/04/12

    09/04/12

    09/04/12DETAILS PLACED IN THIS FORMAT

    /s/ Richard L. VanCleave

    /s/ Mark A. Miller

    DATECHIEF ENGINEER

    DATESUPERVISOR, ROADWAY STANDARDS

    8"

    8"

    5/8" steel plate

    BEARING PLATE

    1"

    1"

    FRONT VIEW SIDE VIEW

    1" x 3/16" x 1"˜

    1" x 3/16" x 8"˜

    1/8 1/2"

    1/8

    1/8

    4"

    3"

    SIDE VIEW

    1’-3 1/2

    "8"

    1"

    6"

    holes

    3"3"

    5’-0"

    FRONT VIEW

    1/4

    1/4

    TS 8" x 6" x 3/16"

    TS 2 1/2" x 2 1/2" x 1/4" x 8"1

    POST B

    STEEL TUBE

    2"

    SIDE VIEW

    WOOD BREAKAWAY POST

    5 1/2" 7 1/2"

    FRONT VIEW

    7"

    1’-6"

    2 1/2

    "

    3’-6 1

    1/1

    6"

    1’-3 3/1

    6"

    sleeve (2 3/8" O.D.)

    std. 2" I.D. pipe

    timber post

    Treated

    5 1/2" x 7 1/2"

    alignment

    Centerline for

    alignment

    Centerline for

    6’-0"

    6" x 8" treated timber post

    8"

    CRT POST

    FRONT VIEW SIDE VIEW

    6"

    7"

    1’-3 1/4

    "2’-4"

    SOIL PLATE

    2’-0"

    2’-0"

    1/4" steel plate

    9"6"9"

    1’-0"

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • E.P.

    E.P.

    RCBA

    or

    BRIDGE

    transition

    Guardrail

    18’-9"

    Begin guardrail taper

    End guardrail taper

    parallel to E.P.

    Guardrail

    30

    1

    Railing Transittion

    End of Bridge-

    E.P.

    E.P.

    RCBA

    or

    BRIDGE

    shown on plans

    Guardrail required only if

    transition

    Guardrail

    Railing Transittion

    End of Bridge- WL3

    L 3

    End treatment

    MS 2

    4

    Double faced W-beam guardrail @ 6’-3" post spacing

    W

    Treatment

    OS End

    STANDARD DRAWING NO.

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    INDIANA DEPARTMENT OF TRANSPORTATION

    DESIGN STANDARDS ENGINEER DATE

    E 601-GRBA-02

    /s/ Richard L. VanCleave 09/01/11

    09/01/11/s/ Mark A. Miller

    STATE OF

    No.

    AADIN I N

    PR

    OFE

    S

    OIS

    N LANE

    I

    G

    EN

    RE

    RGEISTER

    DE

    RIC

    HA

    RD L. VanCLE

    AVE

    9750

    DIVIDED ROADWAY

    GUARDRAIL

    BRIDGE-APPROACH

    Transition rail as required for end treatment type MS.

    = length shown on plans of W-beam guardrail at 6’-3" post spacing, ft.W

    L

    See Standard Drawing E 601-GRET-07 for alternate placement detail.

    guardrail transition type TGB.

    the bridge-approach guardrail, and is connected to the bridge railing with

    1. This configuration shall be used where W-beam guardrail is specified as

    NOTES:

    2

    3

    4

    SEPTEMBER 2011

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • LEGEND:

    - W 14 x 22 Blockout

    2’-11 3/4

    "

    6’-3"6’-3"6’-3"6’-3"

    2’-3 3/4

    "

    2’-4 3/4

    "

    W-Beam Guardrail and Posts

    Transition Rail

    Thrie BeamThrie Beam Guardrail and Posts

    WGT - Transition Limits

    PLAN

    THRIE BEAM TO W-BEAM GUARDRAIL TRANSITION

    ELEVATION

    3’-0 3/4

    "

    1

    or End Treatment

    Begin W-Beam Guardrail

    Guardrail

    Thrie Beam

    Ground Line

    Guardrail

    W-Beam

    Backup Plate

    Thrie Beam

    See detail.

    Transition Rail

    Thrie Beam

    - W 6 x 9 Post

    W-Beam Blockout

    - Timber or Composite

    2"

    4 1/4"

    8 1/2"

    3 1/4"

    4 1/4"4 1/4" 4 1/4"

    Approx. 1’-6"

    Cut to fit.

    Approx. 3’-6 1/2"

    B-B

    SECTION

    A-A

    SECTION

    1’-8" (– 3/ 16")

    (Typ.)

    3/4" x 2 1/2"

    Post Bolt Slot

    1’-1 3/4"1’-1 3/4"

    THRIE BEAM TRANSITION RAIL

    ELEVATION

    CAP PLATE PLAN

    A

    A

    B

    B

    5

    2

    Single groove weld and grind flush.

    2"

    7’-3 1/2"

    6’-3"

    typical section.

    match W-beam

    dimensions

    Cross section

    typical section.

    match thrie beam

    dimensions

    Cross section

    E 601-TWGT-01

    INDIANA DEPARTMENT OF TRANSPORTATION

    STANDARD DRAWING NO.

    DATECHIEF ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    SEPTEMBER 2014

    TRANSITION, WGT

    THRIE BEAM GUARDRAIL

    W-BEAM GUARDRAIL TO

    See Standard Drawing E 601-TBGC-01 for Thrie Beam Rail Section.5

    hereon.

    W-beam guardrail relative orientation is opposite to that shown

    Slope on thrie beam transition shall be reversed where thrie beam to 4.

    Guardrail Assembly details.

    See Standard Drawings E 601-WBGA-01 through -03 for W-Beam 3.

    Components.

    See Standard Drawing E 601-WBGC-01 for W-Beam Guardrail 2

    thrie-beam splice and at other locations as shown.

    details. Thrie beam backup plate required at posts where there is no

    See Standard Drawing E 601-MTGR-01 for Thrie Beam Guardrail 1

    NOTES:

    IR

    C

    R

    AH

    ESIET

    DRE

    D

    AEL

    V

    9750

    E

    C.L naV

    G

    RP

    N

    O

    S

    EF

    I A

    No.

    STATE OF

    ANI

    D

    O

    E

    G

    IN

    R

    ER

    ENSI N

    AL

    /s/ Richard L. VanCleave 02/20/14

    /s/ Mark A. Miller 03/03/14

    3 1/4"

    3 5/1

    6"

    5’-0"

    10 Gauge Plate

    8"

    1’-0" (– 1/4

    ")

    (Typ.)

    29/32" x 1 1/8"

    Splice Bolt Slots

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • 2'-0"Required Width Varies (8'-0" Min.)2'-0"

    Limits of Subgrade Treatment

    1

    3

    ~~

    2

    5

    ~

    1

    ~

    4

    LEGEND

    6" Compacted Aggregate No. 53, Base

    Earth Shoulder

    Width and Cross Slope as Required

    2

    1

    3

    4

    5

    220 lb/yd² HMA Intermediate, Type B

    140 lb/yd² HMA Surface, Type B, on

    HMA for Sidewalk Consisting of

    Compacted to the Density and Moisture Requirement

    Subgrade Treatment Type III, 6" of Soil

    E 604-NVUF-01

    INDIANA DEPARTMENT OF TRANSPORTATION

    STANDARD DRAWING NO.

    DATECHIEF ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    SEPTEMBER 2017

    HMA PAVEMENT SECTION

    NON-MOTORIZED VEHICLE USE FACILITY

    EISGER

    DTE

    PR

    I N

    E

    S

    OF

    No.

    A

    STATE OF

    IN AD G

    E

    E

    I

    E

    R

    NR

    SNO

    IA

    NL

    ELIZ

    AB

    ETH W

    . PHIL

    LIPS

    10200124

    at edge of pavement.

    Construct safety edge as required for Surface and Intermediate layers 1

    NOTE:

    1

    /s/ John Leckie

    /s/ Elizabeth W. Phillips 04/27/17

    04/28/17

  • Existing Ballast

    2'-0"Required Width Varies (8'-0" Min.)2'-0"

    1

    ~

    7

    5

    2

    ~~

    1

    6

    ~

    Limits of Subgrade Treatment

    LEGEND

    6" Compacted Aggregate No. 53, Base

    Width and Cross Slope as Required

    1

    5

    7

    6

    Variable-Depth Compacted Aggregate No. 53 or No. 73

    2

    220 lb/yd² HMA Intermediate, Type B

    140 lb/yd² HMA Surface, Type B, on

    HMA for Sidewalk Consisting of

    and Replaced with 3" Coarse Aggregate No. 53

    Subgrade Treatment Type V, 3" Subgrade Excavated

    E 604-NVUF-02

    INDIANA DEPARTMENT OF TRANSPORTATION

    STANDARD DRAWING NO.

    DATECHIEF ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    SEPTEMBER 2017

    ON ABANDONED RAILROAD CORRIDOR

    HMA PAVEMENT SECTION

    NON-MOTORIZED VEHICLE USE FACILITY

    EISGER

    DTE

    PR

    I N

    E

    S

    OF

    No.

    A

    STATE OF

    IN AD G

    E

    E

    I

    E

    R

    NR

    SNO

    IA

    NL

    ELIZ

    AB

    ETH W

    . PHIL

    LIPS

    10200124

    at edge of pavement.

    Construct safety edge as required for Surface and Intermediate layers 1

    NOTE:

    1

    04/28/17/s/ John Leckie

    04/27/17/s/ Elizabeth W. Phillips

  • 5'-0" Min.Median

    SECTION A-A

    SECTION B-B

    Median

    Raised Median

    TS

    A A

    Media

    n Width

    4

    Media

    n Width

    4 TS TS

    MEDIAN PERPENDICULAR CURB RAMPS

    Raised Median

    5'-0"

    Min.

    5'-0"

    Min.

    Min.

    5'-0"

    WITH CURB

    MEDIAN CUT-THROUGH

    3

    Min.

    5'-0"

    4'-0"

    4'-0"

    4'-0"

    Min.

    Min.

    Min.

    5

    5

    5

    5

    5

    5

    Raised Median

    Crosswalk Markings

    Crosswalk Markings

    Side

    Flared

    Side

    Flared

    Side

    Flared

    Side

    Flared

    Sidewalk Expansion Joint

    Curb

    Curb

    6

    Sidewalk Expansion Joint

    5'-0" Min.

    Sidewalk Expansion Joint

    Raised Median

    WITH TAPERED CURB

    MEDIAN CUT-THROUGH

    B

    Media

    n Width

    4

    2'-0"

    Min.

    3

    Min.

    5'-0"

    5

    5

    Raised Median

    Crosswalk Markings

    Joint

    Sidewalk Expansion

    Curb

    4:1 Max

    Detectable Warning Surface

    :LEGEND

    Ramp

    TS Turning Space

    E 604-SWCR-11

    INDIANA DEPARTMENT OF TRANSPORTATION

    STANDARD DRAWING NO.

    DATECHIEF ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    SEPTEMBER 2016

    TYPICAL PLACEMENT

    MEDIAN PERPENDICULAR CURB RAMP

    MEDIAN CUT-THROUGH AND

    EISGER

    DTE

    PR

    I N

    E

    S

    OF

    No.

    A

    STATE OF

    IN AD G

    E

    E

    I

    E

    R

    NR

    SNO

    IA

    NL

    ELIZ

    AB

    ETH W

    . PHIL

    LIPS

    10200124

    /s/ Elizabeth W. Phillips 03/15/16

    03/18/16/s/ Mark A. Miller

    details.

    See Standard Drawing E 604-CCSJ-01 for sidewalk expansion joint 9.

    Warning Surface placement, configuration, and details.

    See Standard Drawing E 604-SWCR-12, -13, and -14 for Detectable 8.

    See Standard Drawing E 604-SWCR-01 for cross slope exceptions.7.

    Walkable Surface. The cross slope shall be 2.00% maximum.6

    adjacent pavement gutter line.

    curb ramp and the top of curb shall be flush with the edge of

    The bottom edge of the median cut-through or median perpendicular 5

    shall not be placed.

    Where median width is less than 6 ft, detectable warning surfaces 4

    2.00% maximum.

    Where a median cut through is used the running slope shall be 3

    4 ft x 5 ft.

    median, the turning space shall have a minimum clear dimension of

    2. Where in-line or offset perpendicular curb ramps are used within a

    perpendicular curb ramp shall be 5 ft.

    1. The minimum width of a median cut-through and median

    NOTES:

    Curb

    Curb 4:1 Max SlopeB

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • Approach

    R.C. Bridge

    Bridge Deck

    Concrete

    or Greater

    Backer Rod 3/8" Ø

    Final Saw Cut

    1/4" – 1/16"

    1/4

    " – 1/1

    6"

    1 1/4

    "

    3"

    Initial Saw Cut

    1/8"

    E 609-BRJT-01

    09/04/12DETAILS PLACED IN THIS FORMAT

    INDIANA DEPARTMENT OF TRANSPORTATION

    STANDARD DRAWING NO.

    DATECHIEF ENGINEER

    DATESUPERVISOR, ROADWAY STANDARDS

    See Standard Drawing E-609-RCBA-01 for joint location.1.

    NOTES:

    TYPE I-A JOINT

    SEPTEMBER 2012

    STATE OF

    No.

    AADIN I N

    PR

    OFE

    S

    OIS

    N LANE

    I

    G

    EN

    RE

    RGEISTER

    DE

    RIC

    HA

    RD L. VanCLE

    AVE

    9750

    /s/ Richard L. VanCleave 09/04/12

    /s/ Mark A. Miller 09/04/12

    1/4

    "

    Sealant

    Silicone Joint

  • 3

    2

    Bridge Deck

    Pavement Ledge

    3"

    RC

    BA Width to b

    e S

    ho

    wn o

    n Pla

    ns

    20’-6"

    3

    2

    Bridge Deck

    Pavement Ledge

    3"

    RC

    BA Width to b

    e S

    ho

    wn o

    n Pla

    ns

    20’-6"

    PLAN SHOWING TOP REINFORCING

    PLAN SHOWING BOTTOM REINFORCING

    30 Spa. @ 8" = 20’-0"

    10 Spa. @ 2’-0" = 20’-0"

    Structure

    Structure

    3"

    3"

    3"

    #5 B

    ars S

    pa.

    @ 8"

    Max.

    3"

    3"

    3"

    591 B

    ars S

    pa.

    @ 6"

    Max.

    31 - #5 Bars

    #5 x 20’-2"

    11 - #5 Bars

    591

    E 609-RCBA-01

    INDIANA DEPARTMENT OF TRANSPORTATION

    STANDARD DRAWING NO.

    DATECHIEF ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    SEPTEMBER 2014

    SQUARE

    REINFORCED CONCRETE BRIDGE APPROACH

    PCCP = Portland Cement Concrete Pavement

    RCBA = Reinforced Concrete Bridge Approach

    :KEY

    RCBA shall be surface sealed.5.

    extensions used with bridge railing transitions.

    See Standard Drawings E 609-TBAE-01 through -04 for RCBA 4.

    slab details.

    See Standard Drawing E 503-BATJ-01 for terminal joint and sleeper 3

    detail, and reinforcing bar bending diagram.

    See Standard Drawing E 609-RCBA-03 for section, pavement ledge 2

    All reinforcing bars shall be epoxy-coated.1.

    NOTES:

    EISGER

    DTE

    PR

    I N

    E

    S

    OF

    No.

    A

    STATE OF

    IN AD G

    E

    E

    I

    E

    R

    NR

    SNO

    IA

    NL

    ELIZ

    AB

    ETH W

    . PHIL

    LIPS

    10200124

    /s/ Elizabeth W. Phillips 03/04/14

    /s/ Mark A. Miller 03/04/14

    Approach Roadway

    Sleeper Slab with PCCP

    Approach Roadway

    Sleeper Slab with PCCP

  • 3

    2

    Bridge Deck

    Pavement Ledge

    3"

    RC

    BA Width to b

    e S

    ho

    wn o

    n Pla

    ns

    Lap

    2’-0"

    20’-6"

    3

    2

    Bridge Deck

    Pavement Ledge

    3"

    RC

    BA Width to b

    e S

    ho

    wn o

    n Pla

    ns

    20’-6"

    PLAN SHOWING TOP REINFORCING

    PLAN SHOWING BOTTOM REINFORCING

    Structure

    Structure

    6

    Lap

    2’-0"

    6

    30 Spa. @ 8" = 20’-0"

    10 Spa. @ 2’-0" = 20’-0"

    #5

    3"

    #5 & 5

    91 B

    ars S

    pa.

    @ 6"

    Max.

    3"

    #5

    #5 B

    ars S

    pa.

    @ 8"

    Max.

    3"

    3"

    3"

    3"

    Lengths

    #5, Variable

    Variable Lengths

    #5 @ 8",

    31 - #5

    #5 x 20’-2"

    Variable Lengths

    #5 @ 2’-0", 11 - #5

    Lengths

    #5, Variable

    591

    E 609-RCBA-02

    INDIANA DEPARTMENT OF TRANSPORTATION

    STANDARD DRAWING NO.

    DATECHIEF ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    SEPTEMBER 2014

    PCCP = Portland Cement Concrete Pavement

    RCBA = Reinforced Concrete Bridge Approach

    :KEY

    SKEWED

    REINFORCED CONCRETE BRIDGE APPROACH

    RCBA shall be surface sealed.7.

    reinforcing bars shall be provided.

    shorter than 2’-0", a fanned configuration of three #5 x 5’-0"

    For skew > 15° where variable-length transverse bars would be 6

    extensions used with bridge railing transitions.

    See Standard Drawings E 609-TBAE-01 through -04 for RCBA 5.

    on the plans.

    Variable-length #5 bars shall be detailed by means of cutting diagrams 4.

    slab details.

    See Standard Drawing E 503-BATJ-01 for terminal joint and sleeper 3

    detail, and reinforcing bar bending diagram.

    See Standard Drawing E 609-RCBA-03 for section, pavement ledge 2

    All reinforcing bars shall be epoxy-coated.1.

    NOTES:

    EISGER

    DTE

    PR

    I N

    E

    S

    OF

    No.

    A

    STATE OF

    IN AD G

    E

    E

    I

    E

    R

    NR

    SNO

    IA

    NL

    ELIZ

    AB

    ETH W

    . PHIL

    LIPS

    10200124

    /s/ Elizabeth W. Phillips 03/04/14

    /s/ Mark A. Miller 03/04/14

    3 - #5 x 5’-0"

    3 - #5 x 5’-0"

    Approach Roadway

    Sleeper Slab with PCCP

    Approach Roadway

    Sleeper Slab with PCCP

  • Subbase

    6" Dense Graded

    #5 (Typ.)

    Bridge Deck

    RC

    BA T

    hickness

    (Typ.)

    8"

    Pv

    mt. T

    hickness

    7Joint with PCCP Only

    Sleeper Slab and Terminal

    SECTION THROUGH APPROACH

    See Detail.

    Pavement Ledge

    Tie-Bar Assy.

    #5 Threaded

    (Typ.)

    2’-0"

    #5 @ 8" Max.

    591 @ 6" Max.#5 @ 6" Max.

    20’-2"

    591 x 20’-9"

    PAVEMENT LEDGE DETAIL

    Min. Thickness 6 Mils

    2 Layers of Polyethylene,

    1"

    2 1/2

    "

    2"

    Polystyrene

    1/2" x 2" Expanded

    Polystyrene

    1/2" x 4" Expanded

    2"

    2"

    6"

    1’-6"

    45°

    Thickness

    Approach

    Min.

    6"

    2" Cl.

    Bridge Deck

    (Billed With Superstructure)

    Tie-Bar Assy. Spa. @ 2’-0"

    #5 x 6’-0" Epoxy-Coated Threaded

    RCBA

    E 609-RCBA-03

    INDIANA DEPARTMENT OF TRANSPORTATION

    STANDARD DRAWING NO.

    DATECHIEF ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    SEPTEMBER 2014

    SECTION AND PAVEMENT LEDGE DETAIL

    REINFORCED CONCRETE BRIDGE APPROACH

    slab details.

    See Standard Drawing E 503-BATJ-01 for terminal joint and sleeper 7

    details and notes.

    See Standard Drawing E 703-BRST-01 for reinforcing-bar bending 6.

    Joint type I-A. See Standard Drawing E 609-BRJT-01 for details.5

    Same as pavement thickness, if pavement thickness = 12 in.

    12 in. if pavement thickness < 12 in.

    For PCCP:4

    12 in. if design year AADT = 1000

    10 in. if design year AADT < 1000

    For HMA pavement:3

    See plans for approach thickness.2

    All reinforcing bars shall be epoxy-coated.1.

    NOTES:

    PCCP = Portland Cement Concrete Pavement

    RCBA = Reinforced Concrete Bridge Approach

    :KEY

    EISGER

    DTE

    PR

    I N

    E

    S

    OF

    No.

    A

    STATE OF

    IN AD G

    E

    E

    I

    E

    R

    NR

    SNO

    IA

    NL

    ELIZ

    AB

    ETH W

    . PHIL

    LIPS

    10200124

    /s/ Elizabeth W. Phillips 02/21/14

    /s/ Mark A. Miller 03/03/14

    23

    4

    Dense Graded Subbase

    2

    5

    3 4

  • 5901

    5

    42

    5904

    EPOXY-COATED REINFORCING BARS

    269 LBS

    2.7 SYS

    BILL OF MATERIALS

    MISCELLANEOUS

    SIZE

    MARK OR

    BARS

    NO. OFLENGTH WEIGHT

    4’-2"

    16’-7"

    Reinforcing BarsTotal Epoxy-Coated

    RCBA Extension Area

    RCBA extension

    Quantities are for one

    SECTION B-B

    PLAN

    A

    A

    B B

    1’-6"

    2"

    2"

    3"

    3" 2"

    16’-5"

    2’-0"

    2"

    16’-5"

    Concrete Bridge Railing Transition Type TFC, TPF-1, TPF-2, TPS-1, or TPS-2 Limits

    (Bottom)

    3 - 5904

    (Top)

    2 - 5904

    59045901 (Typ.)

    5901 (Typ.)

    6"

    6"

    3"

    3"

    Railing LimitsConcrete Bridge

    R.C.

    Bridge A

    ppro

    ach

    33-5901 (Top), Lap with #4 Bars in R.C. Bridge Approach

    32 Spa. @ 6" = 16’-0" (Top)

    9-5901 (Bottom), Lap with #5 Bars in R.C. Bridge Approach

    8 Spa. @ 2’-0" = 16’-0 (Bottom)

    SECTION A-A

    1’-6"

    5901

    R.C. Bridge Approach

    5904 (Typ.)

    2" Clr. 2"

    Clr.

    2"

    Clr.

    5901 x 4’-2"

    5904 x 16’-7"

    16’-0"

    3’-7"

    E 609-TBAE-01

    5 6

    1

    1

    65

    TFC, TPF-1, TPF-2, TPS-1, OR TPS-2

    BRIDGE RAILING TRANSITION

    RCBA EXTENSION FOR

    3

    See Standard Drawing E 609-TBAE-04 for General Notes .3.

    railing transition type TPS-2 details.

    See Standard Drawings E 706-TTPP-07 and -08 for concrete bridge

    railing transition type TPS-1 details.

    See Standard Drawings E 706-TTPP-05 and -06 for concrete bridge

    railing transition type TPF-2 details.

    See Standard Drawings E 706-TTPP-03 and -04 for concrete bridge

    railing transition type TPF-1 details.

    See Standard Drawings E 706-TTPP-01 and -02 for concrete bridge 2

    bridge railing transition type TFC details.

    See Standard Drawings E 706-TTFC-01 through -03 for concrete 1

    NOTES

    2

    2

    12

    SEPTEMBER 2013

    DATECHIEF ENGINEER

    EISGER

    DTE

    PR

    I N

    E

    S

    OF

    No.

    A

    STATE OF

    IN AD G

    E

    E

    I

    E

    R

    NR

    SNO

    IA

    NL

    ELIZ

    AB

    ETH W

    . PHIL

    LIPS

    10200124DATEDESIGN STANDARDS ENGINEER

    STANDARD DRAWING NO.

    INDIANA DEPARTMENT OF TRANSPORTATION

    /s/ Elizabeth W. Phillips 02/28/13

    /s/ Mark A. Miller 03/27/13

  • E 609-TBAE-02

    5 6

    1

    1

    TFT, TTF-2, OR TTX

    BRIDGE RAILING TRANSITION

    RCBA EXTENSION FOR

    See Standard Drawing E 609-TBAE-04 for General Notes .4.

    railing transition type TTX details.

    See Standard Drawing E 706-TTTX-01 and -02 for concrete bridge 3

    bridge railing transition type TTF-2 details.

    See Standard Drawing E 706-TTTF-01 through -04 for concrete 2

    bridge railing transition type TFT details.

    See Standard Drawing E 706-TTFT-01 through -03 for concrete 1

    NOTES

    2 3

    SEPTEMBER 2013

    DATECHIEF ENGINEER

    EISGER

    DTE

    PR

    I N

    E

    S

    OF

    No.

    A

    STATE OF

    IN AD G

    E

    E

    I

    E

    R

    NR

    SNO

    IA

    NL

    ELIZ

    AB

    ETH W

    . PHIL

    LIPS

    10200124DATEDESIGN STANDARDS ENGINEER

    3

    STANDARD DRAWING NO.

    INDIANA DEPARTMENT OF TRANSPORTATION

    /s/ Elizabeth W. Phillips 02/28/13

    /s/ Mark A. Miller 03/27/13

    20’-6"

    PLAN

    SECTION D-D

    C

    C

    D

    2" 2"

    3"3"

    3" 3"

    20’-6"

    1’-6"

    R.C.

    Bridge A

    ppro

    ach

    (Bottom)

    3-5902

    (Top)

    2-5902

    5902

    5901 (Typ.)

    5901 (Typ.)6"

    2"

    6"

    6"

    3"

    3"

    D

    41 - 5901 (Top), Lap with #4 Bars in R.C. Bridge Approach

    40 Spa. @ 6" = 20’-0" (Top)

    11 - 5901 (Bottom), Lap with #5 Bars in R.C. Bridge Approach

    10 Spa. @ 2’-0" = 20’-0" (Bottom)

    Concrete Bridge Railing Transition Type TFT, TTF-2, or TTX Limits

    Railing Limits

    Concrete Bridge

    5901

    5

    52

    5902

    MISCELLANEOUS

    EPOXY-COATED REINFORCING BARS

    333 LBS

    3.4 SYS

    BILL OF MATERIALS

    SIZE

    MARK OR

    BARS

    NO. OFLENGTH WEIGHT

    4’-2"

    20’-7"

    Reinforcing BarsTotal Epoxy-Coated

    RCBA Extension Area

    RCBA extension

    Quantities are for one

    5901 x 4’-2"

    5902 x 20’-7"

    20’-0"

    3’-7"

    SECTION C-C

    1’-6"

    5902 (Typ.)

    5901

    R.C. Bridge Approach2" Clr.

    2 1/2

    " Clr.

    2"

    Clr.

    3 2

    1

    2

    65

  • 5900

    35

    11

    5901

    EPOXY-COATED REINFORCING BARS

    312 LBS

    3.4 SYS

    BILL OF MATERIALS

    5903 5

    2

    MISCELLANEOUS

    SIZE

    MARK OR

    BARS

    NO. OFLENGTH WEIGHT

    5’-0"

    4’-2"

    18’-1"

    3’-6"#5

    Reinforcing BarsTotal Epoxy-Coated

    RCBA Extension Area

    RCBA extension

    Quantities are for one

    5901 x 4’-2"5900 x 5’-0"

    5903 x 18’-1"

    3’-7"4’-5"

    17’-6"

    SECTION E-E

    5903 (Typ.)

    1’-6"

    5901

    SECTION F-F

    5903 (Typ.)

    2’-4"

    5900

    #5

    Approach

    R.C. Bridge

    Approach

    R.C. Bridge

    4" Clr.2" Clr. 2"

    Clr.

    2"

    Clr.

    3"

    Clr.

    3"

    Clr.

    E

    E

    G

    PLAN

    SECTION G-G

    F

    F

    (1 Top & 1 Bottom)

    2 - #5 X 3’-6"

    1’-6"

    10"

    4’-0"14’-0"

    18’-0"

    2’-4"

    1’-6"

    18’-0"

    5903

    (Bottom)

    3 - 5903

    (Top)

    2 - 5903

    Railing LimitsConcrete Bridge

    28 - 5901 (Top), Lap with #4 Bars in R.C. Bridge Approach R.C. Bridge Approach

    Lap with #4 Bars in

    8 - 5900 (Top),

    Bridge Approach

    with #4 Bars in R.C.

    3 - 5900 (Bottom), Lap

    7 - 5901 (Bottom), Lap with #5 Bars in R.C. Bridge Approach

    6"

    G

    R.C.

    Bridge A

    ppro

    ach

    Concrete Bridge Railing Transition Type WFC Limits

    35 Spa. @ 6" = 17’-6" (Top)

    8 Spa. @ 2’-0" = 16’-0" (Bottom) 2" Clr.

    2" Clr.4" Clr.

    4" Clr.

    3"

    Clr.

    2" Clr.4" Clr.4"

    Clr.

    4" Clr.

    E 609-TBAE-03

    SEPTEMBER 2013

    1

    3

    2

    5 6

    1

    1

    WFC

    BRIDGE RAILING TRANSITION

    RCBA EXTENSION FOR

    See Standard Drawing E 609-TBAE-04 for General Notes .2.

    bridge railing transition WFC details.

    See Standard Drawings E 706-TWFC-01 through -03 for concrete 1

    NOTES

    2

    5 6 5 6

    DATECHIEF ENGINEER

    EISGER

    DTE

    PR

    I N

    E

    S

    OF

    No.

    A

    STATE OF

    IN AD G

    E

    E

    I

    E

    R

    NR

    SNO

    IA

    NL

    ELIZ

    AB

    ETH W

    . PHIL

    LIPS

    10200124DATEDESIGN STANDARDS ENGINEER

    STANDARD DRAWING NO.

    INDIANA DEPARTMENT OF TRANSPORTATION

    /s/ Elizabeth W. Phillips 02/28/13

    /s/ Mark A. Miller 03/27/13

    6"

  • STANDARD DRAWING NO.

    INDIANA DEPARTMENT OF TRANSPORTATION

    E 609-TBAE-04

    SEPTEMBER 2012

    GENERAL NOTES

    BRIDGE RAILING TRANSITION

    RCBA EXTENSION FOR

    DATECHIEF ENGINEER

    /s/ Mark A. Miller

    DATESUPERVISOR, ROADWAY STANDARDS

    09/04/12

    09/04/12STATE OF

    No.

    AADIN I N

    PR

    OFE

    S

    OIS

    N LANE

    I

    G

    EN

    RE

    RGEISTER

    DE

    RIC

    HA

    RD L. VanCLE

    AVE

    9750

    /s/ Richard L. Van Cleave

    GENERAL NOTES

    cement concrete pavement.

    See the plans for thickness of RCBA and its extension to be used with a terminal joint and portland 6

    See the plans for thickness of RCBA and its extension to be used with asphalt pavement.5

    See Standard Drawing E 703-BRST-01 for reinforcing-bar bending details and notes.4.

    bridge end as shown on the plans.

    This end of the reinforced concrete bridge approach extension shall match the construction at the 3

    Construction joint type A. See Standard Drawing E 702-CJTA-01 for details.2

    See Standard Drawing E 609-RCBA-01 and the plans for reinforced concrete bridge approach details.1

  • .

  • .

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • E 610-MBAP-01

    INDIANA DEPARTMENT OF TRANSPORTATION

    STANDARD DRAWING NO.

    DATECHIEF ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    SEPTEMBER 2014

    (V = 50 MPH)

    HIGH SPEED ROADWAY

    MAILBOX APPROACHES

    pavement section.

    Mailbox approach pavement section shall be the same as the shoulder 3.

    See plans for W.2

    S = Normal width of paved shoulder as shown on plans.1

    NOTES:

    IR

    C

    R

    AH

    ESIET

    DRE

    D

    AEL

    V

    9750

    E

    C.L naV

    G

    RP

    N

    O

    S

    EF

    I A

    No.

    STATE OF

    ANI

    D

    O

    E

    G

    IN

    R

    ER

    ENSI N

    AL

    /s/ Richard L. VanCleave 02/20/14

    /s/ Mark A. Miller 03/03/14

    TYPICAL MAILBOX APPROACH

    R = 25’-0"

    Direction of Traffic

    Direction of Traffic

    Direction of Traffic

    Edge of Travelway

    Edge of Paved Shoulder

    6’-8" Min.

    22’-0"

    6’-8" Min.

    SS W

    16’-6"22’-0"

    Shoulder 20:1

    Taper Paved

    SWS

    Shoulder 20:1

    Taper Paved

    Shoulder 20:1

    Taper Paved

    Mailbox Assemblies

    16’-6"

    Shoulder 20:1

    Taper Paved

    SW 1

    2(Mailbox Located Beyond Drive)

    COMBINATION MAILBOX APPROACH & DRIVE

    (Mailbox Located in Advance of Drive)

    COMBINATION MAILBOX APPROACH & DRIVE

    Shoulder Break

    S 1

    Shoulder Break(Typ.)

    2’-6" Min.

    R = 15’-0"

    Shoulder Break

    (Typ.)

    2’-6" Min.Break

    Shoulder

    (Typ.)

    2’-6" Min.

    R = 15’-0"

    Shoulder Break

    Edge of Travelway

    Edge of Paved Shoulder

    Edge of Travelway

    Edge of Paved Shoulder

    Drive

    Drive

    R = 25’-0"

    1

    2

    11

    2

    1

    AssemblyMailbox

    AssemblyMailbox

  • E 610-MBAP-02

    INDIANA DEPARTMENT OF TRANSPORTATION

    STANDARD DRAWING NO.

    DATECHIEF ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    SEPTEMBER 2014

    pavement section.

    Mailbox approach pavement section shall be the same as the shoulder 3.

    See plans for W.2

    S = Normal width of paved shoulder as shown on plans.1

    NOTES:

    (V = 45 MPH)

    LOW SPEED ROADWAY

    MAILBOX APPROACHES

    IR

    C

    R

    AH

    ESIET

    DRE

    D

    AEL

    V

    9750

    E

    C.L naV

    G

    RP

    N

    O

    S

    EF

    I A

    No.

    STATE OF

    ANI

    D

    O

    E

    G

    IN

    R

    ER

    ENSI N

    AL

    /s/ Richard L. VanCleave 02/20/14

    /s/ Mark A. Miller 03/03/14

    12:1 Taper

    Direction of Traffic

    12:1 Taper

    12:1 Taper

    12:1 Taper

    Direction Of Traffic

    Direction of Traffic

    TYPICAL MAILBOX APPROACH

    (Mailbox Located Beyond Drive)

    COMBINATION MAILBOX APPROACH & DRIVE

    (Mailbox Located in Advance of Drive)

    COMBINATION MAILBOX APPROACH & DRIVE

    S

    16’-6"

    W

    S

    R=25’-0"

    22’-0"

    S

    W

    SS

    R=15’-0"

    22’-0" 16’-6"

    R=25’-0"

    W

    S

    6’-8" Min. Mailbox Assemblies

    6’-8" Min.

    1

    2

    11

    2

    1

    1

    2

    1

    Drive

    Drive

    Edge of Travelway

    Edge of Travelway

    R=15’-0"

    Edge of Paved ShoulderEdge of Paved Shoulder (Typ.)

    2’-6" Min.(Typ.)

    2’-6" Min.Shoulder Break

    Shoulder Break

    Edge of Paved ShoulderEdge of Paved Shoulder

    Shoulder Break Shoulder Break

    (Typ.)

    2’-6" Min.

    Edge of Paved Shoulder

    Shoulder Break

    Edge of Paved Shoulder

    Shoulder Break

    (Typ.)

    2’-6" Min.

    Mailbox Assembly

    Mailbox Assembly

    Edge of Travelway

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • V.C. = 20'-0"

    Vertical Scale Exaggerated for Clarity

    GRADE OF U-TURN MEDIAN OPENING

    4'-0"4'-0"

    R=

    W/2

    R=W/2

    A A

    30'-0"

    4'-0"

    4'-0"

    Traffic

    Traffic

    PLAN

    10'-0"

    10'-0"10'-0"

    Vertical Scale Exaggerated for Clarity

    SECTION A-A

    3"

    Cro

    wn

    30'-0"

    10'-0"

    (typ.)

    No Corrugations in This Area (Typ.)

    Variable

    Variable

    Survey

    Survey

    HMA or PCCP Shoulder

    W

    HMA or PCCP Shoulder

    HMA or PCCP Shoulder

    HMA or PCCP Shoulder

    E 610-UTMO-01

    INDIANA DEPARTMENT OF TRANSPORTATION

    STANDARD DRAWING NO.

    DATECHIEF ENGINEER

    U-TURN MEDIAN OPENING

    SEPTEMBER 2017

    DATEDESIGN STANDARDS ENGINEER

    EISGER

    DTE

    PR

    I N

    E

    S

    OF

    No.

    A

    STATE OF

    IN AD G

    E

    E

    I

    E

    R

    NR

    SNO

    IA

    NL

    ELIZ

    AB

    ETH W

    . PHIL

    LIPS

    10200124

    04/28/17/s/ John Leckie

    04/27/17/s/ Elizabeth W. Phillips

    2.0%2.0%

    HMA or PCCP ShoulderHMA or PCCP Shoulder

    W

    165 lb/syd HMA Surface Type B

    495 lb/syd HMA Intermediate Type B

    4" Compacted Aggregate, No.53, Base

    Subgrade Treatment, Type II

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

  • DESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATEDESIGN STANDARDS ENGINEER

    CHIEF HIGHWAY ENGINEER DATE

    DESIGN STANDARDS ENGINEER

    DATE

    E601-CWGSE601-CWGS-01E601-CWGS-02E601-CWGS-03E601-CWGS-04E601-CWGS-05E601-CWGS-06

    E601-CWGTE601-CWGT-01E601-CWGT-02

    E601-GAIAE601-GAIA-01E601-GAIA-01aE601-GAIA-02E601-GAIA-03

    E601-GCTAE601-GCTA-01E601-GCTA-02E601-GCTA-03E601-GCTA-04E601-GCTA-05E601-GCTA-06

    E601-GRBAE601-GRBSE601-GRBS-01E601-GRBS-02E601-GRBS-03E601-GRBS-04E601-GRBS-05E601-GRBS-06E601-GRBS-07E601-GRBS-08

    E601-GRETE601-GRET-04E601-GRET-05E601-GRET-06E601-GRET-07E601-GRET-08E601-GRET-09E601-GRET-10E601-GRET-11E601-GRET-12

    E601-MTGRE601-NWGAE601-NWGA-01E601-NWGA-02E601-NWGA-03E601-NWGA-04

    E601-RHPGE601-RHPG-01E601-RHPG-02E601-RHPG-03E601-RHPG-04

    E601-TBGCE601-TBGC-01E601-TBGC-02

    E601-TMTTE601-TPGPE601-TPGP-01E601-TPGP-02

    E601-TTGBE601-TTGB-01E601-TTGB-02E601-TTGB-03E601-TTGB-04E601-TTGB-05

    E601-TTGPE601-TTGP-01E601-TTGP-02E601-TTGP-03

    E601-TTGTE601-TTGT-01E601-TTGT-02

    E601-TTMSE601-TTVHE601-TTVH-01E601-TTVH-02

    E601-TWGBE601-TWGB-01E601-TWGB-02E601-TWGB-03

    E601-TWGTE601-WBGAE601-WBGA-01E601-WBGA-02E601-WBGA-03E601-WBGA-06

    E601-WBGCE601-WBGC-01E601-WBGC-02E601-WBGC-03

    E602-CCMBE602-CCMB-01E602-CCMB-02E602-CCMB-03E602-CCMB-04

    E603-CLTFE603-CLTF-01E603-CLTF-02E603-CLTF-03

    E603-FFTFE603-FFTF-01E603-FFTF-02E603-FFTF-03E603-FFTF-04

    E604-CCSJE604-NVUF604-NVUF-01604-NVUF-02

    E604-SDWK604-SDWK-01604-SDWK-02604-SDWK-03

    E604-SWCR604-SWCR-01604-SWCR-02604-SWCR-03604-SWCR-04604-SWCR-05604-SWCR-06604-SWCR-07604-SWCR-08604-SWCR-09604-SWCR-10604-SWCR-11604-SWCR-12604-SWCR-13604-SWCR-14

    E605-CCCGE605-CNCBE605-CNCB-01E605-CNCB-02

    E605-CNCCE605-CNCC-01E605-CNCC-02E605-CNCC-03

    E605-CTCGE605-CTCG-01E605-CTCG-02

    E605-ERCNE605-ERCN-01E605-ERCN-02

    E605-GTRCE605-GTRC-01E605-GTRC-02E605-GTRC-03

    E606-SHCGE606-SHCG-01E606-SHCG-02E606-SHCG-03E606-SHCG-04E606-SHCG-05

    E607-PSDTE607-PSDT-01E607-PSDT-02E607-PSDT-03E607-PSDT-04E607-PSDT-05E607-PSDT-06

    E609-BRJT609-BRJT-01

    E609-RCBAE609-TBAEE609-TBAE-01E609-TBAE-02E609-TBAE-03E609-TBAE-04

    E610-DRIVE610-DRIV-01E610-DRIV-02E610-DRIV-03E610-DRIV-04E610-DRIV-05E610-DRIV-06E610-DRIV-07E610-DRIV-08E610-DRIV-09E610-DRIV-10E610-DRIV-11E610-DRIV-12E610-DRIV-13E610-DRIV-14E610-DRIV-16E610-DRIV-17E610-DRIV-18E610-DRIV-19E610-DRIV-20E610-DRIV-21

    E610-MBAPE610-MBAP-01E610-MBAP-02

    E610-PRAPE610-PRAP-01E610-PRAP-02E610-PRAP-03E610-PRAP-04E610-PRAP-05E610-PRAP-06E610-PRAP-07E610-PRAP-08E610-PRAP-09E610-PRAP-10E610-PRAP-11E610-PRAP-12E610-PRAP-13E610-PRAP-14

    E610-PRCOE610-PRCO-01E610-PRCO-01aE610-PRCO-02E610-PRCO-03E610-PRCO-04E610-PRCO-05E610-PRCO-06E610-PRCO-07

    E611-MBASE611-MBAS-01E611-MBAS-02E611-MBAS-03E611-MBAS-04

    E616-SWCOE616-SWCO-01E616-SWCO-02E616-SWCO-03E616-SWCO-04E616-SWCO-05E616-SWCO-06E616-SWCO-07

    E616-SWRRE616-SWRR-01E616-SWRR-02

    E617-CDINE617-CDIN-01E617-CDIN-02E617-CDIN-03E617-CDIN-04

    E619-PRWSE622-LSPLE622-LSPL-01E622-LSPL-02E622-LSPL-03E622-LSPL-04E622-LSPL-05E622-LSPL-06E622-LSPL-07E622-LSPL-08E622-LSPL-09E622-LSPL-10E622-LSPL-11

    E622-LSPRE622-LSPR-01E622-LSPR-02E622-LSPR-03E622-LSPR-04E622-LSPR-05E622-LSPR-06E622-LSPR-07