    INTRODUCTION

    &

    WORK FLOW ABOUT

    THE GARMENT EXPORT INDUSTRY

  • 8/2/2019 T&a Critical Planner

    3/23

    Buyer

    Development samples

    as per recv design spec

    Range selection &

    Order confirmation

    Costing &Negotiation

    Booking planner& Order planner

    Developments &

    Approvals

    Range & OwnSample

    development

    Program requirement

    Develop patterns

    Sample Finishing

    SAMPLE QC

  • 8/2/2019 T&a Critical Planner

    4/23

    Trims &

    Accessoriesrequirement withapproved details

    Better sourcing

    Better quality withcheaper price and

    affordable Leadtime

    READY FOR PRODUCTION

    TESTING

    Fabric Requirementwith approved details

    Arrive consumptionThru CAD or manually

    Offer technical details forPurchasing & Planning

    Programming

    Fabric Inspector

    Fit Requirement

    ApprovedMeasurement

    Spec

    Amend pattern & Refit the sample to

    achieve Req. spec

  • 8/2/2019 T&a Critical Planner

    5/23

    P/R Testing

    Material

    Purchase

    Cutting

    Line layout &Time Study (

    SAM Calc )

    VAP

    Sewing

    Trimming &Checking

    Finishing &

    Packaging

    Final Inspection

    GOODS READY TO SHIP

    CMT Ratecalculation

    LineQC

    Inspection QC

    CuttingQC

    Work orderdetails to Factory

    Pre Productionsample approval

    Documentation& Endorsement

    Booking

    Receive LC

  • 8/2/2019 T&a Critical Planner

    6/23

    WHAT

    IS

    PLANNING

  • 8/2/2019 T&a Critical Planner

    7/23

    PLANNING

    Its a psychological process ofthinking aboutthe activities required to create a desiredgoal on some scale.

    Forecasting can be described as predictingwhat the future will look like, whereasplanning predicts what the future should look

    like. A plan should be a realistic view of the

    expectations.

    http://en.wikipedia.org/wiki/Thinkinghttp://en.wikipedia.org/wiki/Forecastinghttp://en.wikipedia.org/wiki/Forecastinghttp://en.wikipedia.org/wiki/Thinking
  • 8/2/2019 T&a Critical Planner

    8/23

    OBJECTIVE

    Production line should not be idle.

    There is no frequent change over.

    There should not be over feeding.

    Offers a benchmark against which actualperformance can be measured and reviewed.

    As the end we are committed to manufacture &

    supply garment that meet our customersspecification, in time.

  • 8/2/2019 T&a Critical Planner

    9/23

    TYPES OF PLANNING

    Forward planning

    Backward planning

  • 8/2/2019 T&a Critical Planner

    10/23

    MANIPULATE THE T&A PLAN BASED ON

    Material & Production Capacity

    Man power

    Inventory

  • 8/2/2019 T&a Critical Planner

    11/23

    PLANNER ROLES

    Planner roll starts from booking form receipt toshipping the goods.

    Need to circulate the T&A planner to the concern

    dept in daily basis with yesterday update. If any event lapsed from the target plan, make the

    revised plan and update the same in fast tracksystem.

    Need to submit the weekly progress to planningteam manager.

  • 8/2/2019 T&a Critical Planner

    12/23

    BASIC KNOWLEDGE

    Basic knowledge about fabric, trims & sewingand there processing lead times.

    Basic skills of handling details & being clarityin presentation

    Practical knowledge on things to makedecision, which will be earned by experience.

  • 8/2/2019 T&a Critical Planner

    13/23

    CRITICAL EVENT

    IN

    T&A

    PLANNER

  • 8/2/2019 T&a Critical Planner

    14/23

  • 8/2/2019 T&a Critical Planner

    15/23

  • 8/2/2019 T&a Critical Planner

    16/23

  • 8/2/2019 T&a Critical Planner

    17/23

    EVENTS IN PLANNING

    Booking Form Is the first doc we received from ourcustomer, it comprise the order quantity details withsizewise ratio break-ups and ship date.

    PO sheets Purchase order is a major customer doc for

    doing business it comprise,

    1. Agreed price details with order qty & ship date

    2. Care label instruction with ident no & supplier ref.

    3. Barcode tag instructions with retail price

    4. Box end label information's.

    5. Packing & presentation methods.

  • 8/2/2019 T&a Critical Planner

    18/23

    LC form After signing the po doc, buyer will open a LCthrough their banker, Buyers banker will send the LC to

    sellers bank by telex or swift.

    White sealIts a initial sample developed by the supplier

    based on the received buyers design spec

    Black seal If there any measurement amendments orcorrections in the submitted the white seal sample, we needto submit the revised sample in the sample fabric quality

    without VAP called black seal. Lap-dip Before proceeding to bulk dyeing, the lab-dips

    are made in lab. 2 to 4 lab-dips are made similar to requiredshade.

  • 8/2/2019 T&a Critical Planner

    19/23

    VAP Value added process like print, embroidery

    AOP All over print

    Trims Accessories items like buttons, zippers etc.,

    Bulk fabric As per the customer appd lab-dip we needthe process the whole bulk, which is also appd by customerbefore bulk cutting start date.

    FPT & GPT Fabric pass test & garment pass test.

    MCD Final cut off date to in-house the bulk materials iscalled Material Cut off Date.

    Pilot-run Before proceeding to bulk production we need tosew 6 samples in each sizes using the in-housed bulkmaterials, to ensure the right measurements as per appdspec.

  • 8/2/2019 T&a Critical Planner

    20/23

    Bulk cutting Cutting the bulk fabric as per the appd specmeasurements with the best efficiency.

    Bulk sewing Garment production (joining the cutted partsas per specification)

    Quality Inspection

    I. This dept works independently with freedom of finding &pointing out mistakes.

    II. These will not worry too much about the cost, profit, loss,delay in shipment.

    III. Their only aim is to control the quality of garments and tomake sure that they are up to acceptable level.

  • 8/2/2019 T&a Critical Planner

    21/23

    Ironing & packing Need to Iron & pack thegarments as per the customer specifications.

    Shipping Means transportation of goods, it

    includes road transport, rail transport, seatransport, air transport.

  • 8/2/2019 T&a Critical Planner

    22/23

    IMPORTANT DATES IN CRITICAL PLANNER

    Mcd

    Cutting start date

    Sewing start dateQAC date

  • 8/2/2019 T&a Critical Planner

    23/23

    QUERIES