6
0) Picosec timing: LBQ = L-bar Quartz Cherenkov radiator 40 mm bars, each 3mm x 3mm. light guide bars to Hamamatsu SiPMs MPPC S10943.(Sergey Los) p (120 GeV) SiPMs 2 boxes like this, so 4-in-line bars at at time

T979 (~10) Picosec timing: LBQ = L-bar Quartz Cherenkov radiator

  • Upload
    mandar

  • View
    51

  • Download
    0

Embed Size (px)

DESCRIPTION

T979 (~10) Picosec timing: LBQ = L-bar Quartz Cherenkov radiator 30mm and 40 mm bars, each 3mm x 3mm. Light up light guide bars to Hamamatsu SiPMs MPPC S10943.(Sergey Los). SiPMs. p (120 GeV ). 2 boxes like this, so 4-in-line bars at at time. 2mm x 2mm trigger counter. PMT240 - PowerPoint PPT Presentation

Citation preview

Page 1: T979 (~10)  Picosec  timing: LBQ = L-bar Quartz Cherenkov radiator

T979 (~10) Picosec timing: LBQ = L-bar Quartz Cherenkov radiator30mm and 40 mm bars, each 3mm x 3mm.Light up light guide bars to Hamamatsu SiPMs MPPC S10943.(Sergey Los)

p (120 GeV)

SiPMs

2 boxes like this, so 4-in-linebars at at time

Page 2: T979 (~10)  Picosec  timing: LBQ = L-bar Quartz Cherenkov radiator
Page 3: T979 (~10)  Picosec  timing: LBQ = L-bar Quartz Cherenkov radiator

2mm x 2mm trigger counter PMT240MCP, ref timeTwo L-Bar Quartic boxes

Beam, 120 GeV p

Page 4: T979 (~10)  Picosec  timing: LBQ = L-bar Quartz Cherenkov radiator

Beam deliberately through light guide bars

Page 5: T979 (~10)  Picosec  timing: LBQ = L-bar Quartz Cherenkov radiator

Scope traces (5 GHz, 200ps/pt)3 bars with PMT240 (bottom)2 ns/div & 20mV/div

Without clipping CapacitanceWith clipping CapacitanceRise times < 1 ns, good.

Page 6: T979 (~10)  Picosec  timing: LBQ = L-bar Quartz Cherenkov radiator

Successful runs, data being analysed. Await resolutions.