Project Client Title Charnwood Borough Council Conversion Of The Old Magistrates Court - Phase 2 Loughborough, LE11 2TZ First Floor Plan Proposed (Option 1) T3355 - 930 D RW 1:100 @ A1 This drawing is copyright and may not be reproduced without our permission. No responsibility is accepted for any unauthorised alterations. Scaled dimensions should not be taken from this drawing unless authorised. Revisions Copyright By Turnkey Design Partnership Ltd T F E 01462 440569 01462 440589 [email protected] Client Drawing Status Project Drawing Title Date By Scale Drawing Number Revision Conversion Of The Old Magistrates Court - Phase 2 DESIGN Unit 1, 2 Elliott Road Cirencester Gloucestershire GL7 1YS WFF-06 WFF-07 WFF-08 WFF-09 WFF-10 WFF-11 WFF-12 WFF-13 WFF-14 WFF-15 WFF-16 WFF-21 WFF-22 WFF-23 WFF-26 WFF-27 WFF-28 WFF-29 WFF-30 WFF-31 WFF-32 WFF-33 FFD - 33 FFD -07 FFD -06 FFD-05 FFD -04 FFD-01 FFD -02 FFD -03 FFD-08 FFD -09 FFD-10 FFD-11 FFD-13 FFD-14 FFD-15 FFD-17 FFD-18 FFD-19 FFD-20 FFD-21 FFD-22 FFD-23 FFD-24 FFD-25 FFD - 26 FFD- 27 FFD-32 WFF -05 WFF -04 WFF -03 WFF -02 WFF -01 WFF-17 WFF-18 WFF-19 WFF-20 WFF-24 WFF-25 RE7 RE 8 Stair Lift New ramp down Stair Lift Smoke control door with mag lock Allow for reglazing windows WFF-24 to WFF-33 with polished georgian wired glass A: 68.0 sq ft A: 114.5 sq ft A: 221.0 sq ft Micro-Rib flat sheet self coloured composite panel fixed to light steel frame F1 Store F2 P.A. Office F3 Office F4 Corridor A F5 Office F6 Corridor B BU1 BU2 F11 Disabled WC F12 Corridor C BU3 F14 Unise x WC F15 Corridor D F21 Landing & Stairs Refuge F7 Kit. F8 Female WC BU6 BU4 WRA5 Refuge BU5 WRA4 WRA3 BU7 A: 67.9 m2 A: 29.3 m2 A: 13.3 m2 A: 9.0 m2 A: 9.4 m2 A: 9.0 m2 A: 6.3 m2 A: 10.6 m2 A: 20.5 m2 A: 315.5 sq ft A: 96.9 sq ft A: 100.9 sq ft A: 97.1 sq ft A: 143.0 sq ft A: 730.4 sq ft WCO-08 WCAB-07 WCAB - 11 WCAB-04 WCAB-05 WCAB-06 DCAB-19 1/2 hr WG -08 WG -07 WG -06 WG -05 WG -04 WG -03 WG-02 WCO-07 WCO-09 DG-11 DG -16 WCO-06 WCO-07 DCAB-22A 1/2 hr DCAB-22 Sash Lock WCAB-08 WCAB-20 WCAB-16 WCAB - 19 WCAB - 18 DCAB - 27 Dead Lock WCAB-17 DCAB -21 DCAB - 20 DCAB -18 1 / 2 hr Dead Lock DCAB - 17 1 / 2 hr Dead Lock WCAB-12 DCBC-03 Escape Sash Lock DCAB - 12 Fob DCAB -13 Fob DCAB - 14 Fob DCAB-03 Fob WCAB-13 WCAB-14 DCAB - 25 Emergency Push Bar DCAB-16 1/2 hr DCAB - 08 1 / 2 hr Smoke Seal Dead Lock DCAB - 09 WCAB-02 DCBC-01 1/2 hr Smoke Seal Dead Lock DCBC-02 1/2 hr Sash Lock WCAB-03 WCAB-09 WCAB-10 DCO-01 DCO-02 DCAB - 01 1 /2 hr Deadlock DCBC-04 1/2 hr Sash Lock DCAB-04 Fob DCAB-05 Fob WCAB-01 DCAB - 07 1/2 hr Fob DCAB-06 1/2 hr Fob DG-07 1/2 hr Fob DCBC-06 1/2 hr Sash Lock DG-06 1/2 hr Smoke Seal Panic Latch DCBC-05 Escape Sash Lock WG-12 WG-11 WG -10 WG -09 DG-05 1/2 hr Fob DG - 04 1/2 hr Fob DG -01 DG - 02 DG -03 DG -20 1/2 hr Fob DG-21 1/2 hr Fob DG-13 DG-14 DG-09 Fob DG-18 1/2 hr Smoke Seal Dead Lock DG-17 1/2 hr Fob DCO -07 1/2 hr Euro Lock DCO-03 1/2 hr Euro Lock DCO-09 Sash Lock DCO-10 1/2 hr DCAB -31 1 / 2 hr Sash Lock DCAB-23 Escape Lock DG-22 DCAB-10 1/2 hr Fob DCO -04 1/2 hr Sash Lock DCO-11 1/2 hr Sash Lock DCAB - 33 Escape Lock WCO -06 DCO-08 Dead Lock DCAB-34 1/2 hr FFD-29 FFD - 30 FFD-31 WCAB-02 DCAB-25A Escape Lock DCAB-15 1 / 2 hr Fob WG-14 WCAB-15 DCAB-11 1/2 hr Fob DG - 12 1 /2 hr WG-13 DG-10 1/2 hr Fob DCAB-30 1/2 hr Smoke Seal Mag Lock DCAB-24 1 / 2 hr Sash Lock DCAB-26 1/2 hr Sash Lock DG -08 Radar DCAB-02 1/2 hr Fob DCAB-28 1/2 hr Sash Lock DCAB-29 1/2 hr Sash Lock DCAB-32 1/2 hr DCO -07 1/2 hr Euro Lock DCO -05 1/2 hr Smoke Seal Euro Lock DCO-03 1/2 hr Euro Lock WCAB-18 WCAB-18 WCAB-19 WCAB-20 WCAB-21 WCAB-22 WCAB-23 WCAB-24 WCAB-25 WCAB-26 WCAB-28 WCAB-29 WCAB-26 WCAB-26 WCAB -29 WCAB -36 WCAB-34 WCAB-34 WCAB-34 WCAB-34 WCAB-34 WCAB-34 WCAB -29 WCAB -29 WCAB -29 WCAB -30 WCAB -31 WCAB -31 WCAB -31 WCAB -31 WCAB -31 WCAB -31 WCAB -31 WCAB -31 WCAB -31 WCAB -31 WCAB -31 WCAB -31 WCAB -31 WCAB -30 WCAB-33 WCAB-33 WCAB-33 WCAB-33 WCAB-33 WCAB-33 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -34 WCAB -31 WCAB -32 WCAB -33 WCAB -34 WCAB -35 WCAB -36 WCAB -33 WCAB -33 WCAB-36 WCAB-36 WCAB-36 WCAB-36 WCAB-36 WCAB-36 WCAB-36 WCAB-36 WCAB-36 WCAB-30 WCAB-31 +49,355 +49,465 +49,661 +49,530 +49,605 +49,859 +49,776 +49,904 +49,985 +50,000 +49,340 +49,481 +49,985 'B' 'A' 1/2 hr Fire Shutter on fusable link Waterproofing medium to be applied to face of wall, then slabs set on end up against wall Electronic cut-off switch to stair lift EVAC chair Evac chair Stair lift 1/2 hr Fire Shutter to hatch C18A C17 Corridor C11 Director's Office C21 Store C19 Kitchen C20 Staff Room C22 Store C15 WC C16 WC C14 Archive Store C13 Archive Store C12 Corridor C7 Interview Room 3 C8 Interview Room 2 C9 Interview Room 1 C4 Interview Room 4 C10 General Office C3 Initial Interview Room C25 Interview Room 5 G1 Finance Office G2 Office C11a Corridor C2 Reception C5a Corridor C5 Dis. WC C6 Corridor C1 Corridor CBC9 Existing Steps C24 Corridor C27 Interview Room 7 C26 Interview Room 6 C23 General Office C28 Corridor Stairs To Basement Stairs To Basement Stairs To Basement Skylight Skylight G3 General Office & Refuge Area G4 Entrance G5 Corridor G2a Corridor G9 Ebay Shop G8 Lobby G10 Community Opportunities Group G12 Unisex WC G14 Internet & Cafe Seating Area Skylight G6 Admin Office G7 Hot Desk Area Skylight G16 Fair Trade Shop Skylight Skylight G15 Cafe/Lounge Area CBC4 Cloakroom CBC2 Council Chamber Refuge CBC1 Dis WC CBC7 CBC8 G11 Dis WC CBC3 Mayor's Chamber G17 Kitchen G13 Lobby CBC5 Lobby CBC10 Corridor Computer Desk CBC11 C18 2110 2130 3055 3040 CBC Circulation & common Use WEA Business Units Glebe CBC RE7 RE 8 DG-23 1/2 hr WEA 2 WEA1 A: 15.6 m2 A: 31.3 m2 G18 Dishwash Area Projection Screen A: 168.3 sq ft A: 336.6 sq ft Citizen's Advice Bueaux Citizen's Advice Bueaux Glebe CBC CBC Council Public Area Council First Floor Plan Ground Floor Plan Arrangement of areas yet to be decided Arrangement of areas yet to be decided APR 2010 03.03.10 First Formal Issue RW NOTE: DRAWING PRODUCED FROM SURVEY INFORMATION PROVIDED BY BRUNEL SURVEYS LTD DRAWING REFERENCE 8186-100-01- RevA & 8186A-100-02 23.03.10 RW Door FFD-33 Added & Ramps Shaded 09.04.10 RW 1 no. Ramp Changed For Stair Lift, Lift Shaft Details & 1 no. Door Added 23.08.10 RW Proposal Amended To Comprise WEA & Business Units 25.08.10 RW Amended To Meeting Of 25/08/10 D C B A Existing step down

T3355 - 930 D

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Charnwood Borough Council
Conversion Of The Old Magistrates Court - Phase 2 Loughborough, LE11 2TZ
First Floor Plan Proposed (Option 1)
T3355 - 930 D
RW 1:100 @ A1
This drawing is copyright and may not be reproduced without our permission. No responsibility is accepted for any unauthorised alterations. Scaled dimensions should not be taken from this drawing unless authorised.
Revisions
Conversion Of The Old Magistrates Court - Phase 2 D E
S I G
Unit 1, 2 Elliott Road Cirencester Gloucestershire GL7 1YS
WFF-06 WFF-07 WFF-08 WFF-09 WFF-10 WFF-11 WFF-12 WFF-13 WFF-14 WFF-15 WFF-16
WFF-21 WFF-22
windows WFF-24 to WFF-33 with polished georgian wired glass
A: 68.0 sq ft
A: 114.5 sq ft A: 221.0 sq ft
Micro-Rib flat sheet self coloured composite panel fixed to light steel frame
F1 Store
F2 P.A.
F15 Corridor D
F21 Landing & Stairs
A: 13.3 m2 A: 9.0 m2A: 9.4 m2A: 9.0 m2
A: 6.3 m2
A: 10.6 m2 A: 20.5 m2
A: 315.5 sq ft A: 96.9 sq ftA: 100.9 sq ftA: 97.1 sq ft
A: 143.0 sq ft
C O
-0 8
WCAB-03 WCAB-09 WCAB-10
Panic Latch
Dead Lock
D C
A B
-2 4
1/ 2
hr S
as h
Lo ck
W CAB-30
Waterproofing medium to be applied to face of wall, then
slabs set on end up against wall
Electronic cut-off switch to stair lift
EVAC chair
Evac chair
Stair lift
C18A
G18 Dishwash
Citizen's Advice BueauxCitizen's Advice Bueaux
Glebe
CBCCBC
Council
be decided
be decided
APR 2010
NOTE: DRAWING PRODUCED
FROM SURVEY INFORMATION
RevA & 8186A-100-02
23.03.10 RWDoor FFD-33 Added & Ramps Shaded
09.04.10 RW1 no. Ramp Changed For Stair Lift, Lift Shaft Details & 1 no. Door Added
23.08.10 RWProposal Amended To Comprise WEA & Business Units
25.08.10 RWAmended To Meeting Of 25/08/10
D
C
B