Upload
thermaltechnologies
View
218
Download
0
Embed Size (px)
Citation preview
8/2/2019 T3 Utility Panel Datasheet
1/1
T3 HEATED UTILITY PANEL
T3 HEATED UTILITY PANELThe ulity panel system is designed to be installed anywhere extra coverage is neede
such as valleys, chimneys, skylights and other areas prone to ice buildup. With an am
6 of coverage the ulity panel melts any snow or ice that may have formed on the e
re length of the panel. Thermal Technologies innovave roof snow and ice elimina
systems are aracve and cost eecve. They ensure that the buildings owner will have the frustraon, property damage, and costs associated with water damage cau
by the inability of roofs to drain water during winter months.
SPECIFICATIONS
Material Selecon Recycled Aluminum Alloy 6063 Temper - T5
Color Spray Powder Coang Colors
Panel Size 6 x 6Designed to help eliminate snow and ice buildup on roof
valleys.
Heang Systems Commercial Grade-Self Regulang Heat Cable (5, 8 or 10 Wa per
in 100-130 VAC or 208-277 VAC) or 3/8 PEX Hydronic Radiant Tub
Product Finish High Grade Powder Coang or Architectural Decorave Cover
Components Includes 6 Aluminum Alloy Snap Loc Top, 6 Aluminum Alloy Ulity
Base Panel and Aluminum Expansion Joint Cap (EJC). System is provi
with either 2 electric heat cable or 2 of hydronic PEX tubing per foo
Oponal Items System controller, Self regulang heat trace for guers and down
spouts
Electrical Requirements N.E.C. 426-28 requires 30 mA Ground Fault circuit
protecon for snow and ice melng applicaons
revent Ice Dams with T-PanelsHeat from the sun and warmth from the ac
arally melt roof snow, creang a trickle of
water which freezes at the roofs edge. If le
ntreated, ice dams and icicles can form.
he T-Panel System melts and prevents
roperty-damaging ice dams, the formaon of
angerous icicles and heavy snow load. Theres
o longer a need to shovel and scrape away
now and ice.
(866) 635-8123
www.thermaltechusa.com