T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
1 of 36
Tank Farm Plant Operating Procedure AP Tank Farm
USQ # TF-18-1416-S, Rev. 0 (GCX-1)
CHANGE HISTORY ( LAST 5 REV-MODS )
Rev-Mod Release Date Justification: Summary of Changes
G-5 10/09/2018 TF Automation / DSA changes
Removal of LCO 3.5
Added a box to ensure alternate power is supplied to DST Annulus
High level Alarm (Automation)
G-4 06/11/2018 Operations request
Added new step
"4.3.2 CONTACT Pacific Northwest Seismic Network (PNSN);
University of Washington before going into an outage at the
following:
Ray Clayton:
work: (509) 371-7251
cell: (509) 554-9959
Email: [email protected]. "
G-3 09/14/2017 Operations request
Page 31 DATA SHEET 2 Last row modified Equip ID number
from "CATHODIC PROTECTION RECTIFIERS CATH-REC-
100 & 101" to "DISTRIBUTION PANEL AP271-EDS-DP-107"
G-2 04/20/2017
Operations request to adjust for
recent ECNs and add
flexibility.
Updated White Label program statement to address change to
TFC-PLN-167. Added Contact Industrial Hygienist step. Modified
HFD/FSM notification step. Moved steps for shutting down
TFMCS. Additional minor changes to Section 4.3 to address
efficiencies and correct errors. Changes to Section 5.1 and 5.4 in
general include manipulation ventilation in a different manner,
adding steps for securing TFMCS. Modified to address new
electrical configuration. Deleted Step 5.2.2. Added new Section
5.3 to address alternate power to ventilation..
G-1 02/13/2017 AP Exhauster upgrade
In general: Modifications to change the electrical lineup for the
new AP Exhauster. Added to new wording replacing the risk
category 0 statement. Added Notes above Step 4.3.24 and added
new steps 4.3.24.2 and 3. Changed new exhauster operating
procedure references to TO-060-420.
Table of Contents Page
1.0 PURPOSE AND SCOPE ................................................................................................................ 3
1.1 Purpose ................................................................................................................................ 3
1.2 Scope ................................................................................................................................... 3
2.0 INFORMATION............................................................................................................................. 3
3.0 PRECAUTIONS AND LIMITATIONS......................................................................................... 4
3.1 Personnel Safety.................................................................................................................. 4
3.2 Radiation and Contamination Control ................................................................................ 5
3.3 Environmental Compliance ................................................................................................ 5
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
2 of 36
3.4 Limits .................................................................................................................................. 6
4.0 PREREQUISITES .......................................................................................................................... 7
4.1 Special Tools, Equipment, and Supplies............................................................................. 7
4.2 Performance Documents ..................................................................................................... 7
4.3 Field Preparation ................................................................................................................. 8
5.0 PROCEDURE ............................................................................................................................... 15
5.1 Shutdown of Electrical Power to AP-Farm ...................................................................... 15
5.2 Limits and Monitoring During Maintenance .................................................................... 19
5.3 Alternate Power Primary Exhauster Start-Up ................................................................... 20
5.4 Tank Farm Restoration ..................................................................................................... 22
5.5 Records ............................................................................................................................. 28
Data Sheet 1 241-AP SUBSTATION (AP241-EDS-ENCL-100) ............................................................ 30
Data Sheet 2 AP271-EDS-MCC-001........................................................................................................ 31
Data Sheet 3 AP241-EDS-MCC-002........................................................................................................ 33
Data Sheet 4 – Comments Sheet ............................................................................................................... 35
Signature Sheet 1 ...................................................................................................................................... 36
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
3 of 36
1.0 PURPOSE AND SCOPE
1.1 Purpose
This procedure supports a planned 241-AP Tank Farm power outage for maintenance,
inspection, cleaning or replacement of electrical equipment.
1.2 Scope
This procedure includes the Shutdown/ Re-Energizing of electrical power to the
AP-Farm substation (AP241-EDS-ENCL-100) and associated Motor Control Centers,
AP271-EDS-MCC-001 and AP241-EDS-MCC-002.
This procedure includes the actions Operators, Electricians and Shift Manager/OE are
expected to perform during a planned AP Farm power outage. Some of the steps are
performed by Operators or Shift Manager/OE. Other steps require the Operators or Shift
Manager/OE to ensure that actions are performed by supporting craft personnel or others.
This procedure may require both the Primary and Annulus Ventilation Systems to be
Shut Down.
These are considered total farm outages, but some circuits may remain energized from an
alternate source (i.e., evaporator) after shutting off the main power supply to AP Tank
Farm.
Activity specific work instructions are contained in other documents such as work
packages, radiation work permits, and maintenance procedures.
This procedure interfaces with other nuclear facilities, i.e., the interface between Tank
Farms and the 242-A Evaporator.
2.0 INFORMATION
Data Sheet 4 – Comments Sheet is provided to record comments, observations or additional
instructions.
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
4 of 36
3.0 PRECAUTIONS AND LIMITATIONS
3.1 Personnel Safety
WARNING - Failure to don proper PPE before energizing and de-energizing electrical
systems may result in personnel injury or death.
3.1.1 Personnel trained in the operation of breakers and disconnects will wear the
following PPE as a minimum:
Non-melting (untreated natural fiber) long-sleeved shirt
Safety glasses
Leather or insulating gloves
Hearing protection.
3.1.2 All known hazards will be addressed in the pre-job safety meeting.
3.1.3 Non-electrical worker accessing electrical enclosures must ensure the
following:
The enclosure must have a white label indicating that it has been
evaluated.
The work activity within the enclosure does not involve.
- Reaching around or moving electrical equipment
- Contacting electrical connectors/connections
- By-passing protective shielding/barriers.
3.1.3.1 Stop and notify management if these conditions cannot be met, or
if discrepancies exist (e.g. conflicting or missing labels, missing
or damaged protective barriers).
3.1.4 Compliance with DOE-0336, Hanford Site Lockout/Tagout procedure is
required when working with this procedure.
3.1.5 Ensure Arc Flash/Shock Hazard analysis has been performed for operation of
any switch gear 300-600 volt utility supplied electrical equipment.
3.1.6 Contact Industrial Hygienist for appropriate sample plan.
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
5 of 36
3.2 Radiation and Contamination Control
3.2.1 Work in radiological areas will be performed using a radiation work permit
following review by Radiological Control per the ALARA Work Planning
procedure TFC-ESHQ-RP_RWP-C-03.
3.3 Environmental Compliance
NOTE: Notification of the Environmental Field representative is required seven (7)
days prior to a planned facility power shutdown that will render the leak
detection system, leak detection device, cathodic protection system, air
emission equipment or other environmental equipment inoperable for a period
of greater than 24 hours.
3.3.1 The Environmental representative shall verify that the following are
completed per OSD-T-151-00031:
3.3.1.1 Washington State Department of Ecology is notified of the
outage and/or use of any alternate leak detection systems.
3.3.1.2 Alternate leak detection requirements during the outage are
documented in a letter/internal memo from the Environmental
Compliance manager to the Senior Level 1 manager of
Production Operations.
3.3.1.3 Ecology is notified of Out-of-Service (OOS) conditions, with a
schedule from 3.3.2.2a, extending beyond 90 days.
3.3.2 Operations shall:
3.3.2.1 For outages greater than 24 hours and requiring alternative leak
detection, implement monitoring requirements per internal memo
generated in 3.3.1.2.
NOTE - OSD-T-151-00031 required leak detection systems shall
be restored to service as soon as possible.
3.3.2.2 Track the leak detection system or device outage on the
TSR/Environmental Equipment OOS section of the TOC Daily
Report with an initial “Required By Date” not to exceed 90 days.
a. Prepare a recovery plan representing returning the leak
detection system, or device, back to service as soon as
possible should the OOS condition reach 90 days..
Provide the recovery plan schedule to the Environmental
Representative for completion of 3.3.1.3.
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
6 of 36
3.3 Environmental Compliance (Cont.)
3.3.3 If annulus or primary tank ventilation will not be maintained during the
outage; exchange the stack sample filter papers as long as the samples have
sufficient runtime.
3.3.4 Waste disturbing activities are not allowed during the outage.
3.3.5 To the extent possible; ensure the performance of environmentally required
preventative maintenance activities are completed prior to the scheduled
outage if the duration of the outage will span the preventative maintenance
activities "late due date,"
OR
Track any missed environmentally required preventative maintenance
activities due to the scheduled outage for completion after the restoration of
electrical power (e.g. cathodic protection).
3.3.6 Per WAC 173-303-640 and TFC-ESHQ-ENV-FS-C-01, Environmental
Notification, Environmental must be notified if Cathodic Protection System
will be de energized.
3.4 Limits
TECHNICAL SAFETY REQUIREMENTS
HNF-SD-WM-TSR-006, Tank Farms Technical Safety Requirements
LCO 3.1 DST Primary Tank Ventilation Systems
LCO 3.4 DST Induced Gas Release Event Flammable Gas Control
OPERATING SPECIFICATIONS DOCUMENTS
OSD-T-151-00007 Operating Specifications for the Double-Shell Storage Tanks
OSD-T-151-00031 Operating Specifications for Tank Farm Leak Detection and Single
Shell Tank Intrusion Detection
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
7 of 36
4.0 PREREQUISITES
4.1 Special Tools, Equipment, and Supplies
Portable light plants (Min. 3)
Portable 20 KW Generators (2)
Signs and Barricades
Other tools, equipment, and supplies as identified by FWS/User.
4.2 Performance Documents
The following procedures, drawings and permits may be needed to perform this
procedure:
TF-OPS-005, DST Daily CAM and Record Sampler Inspections
TF-OR-DR-AN, AN Daily Rounds
TO-060-420, Operate the 241-AP Primary Ventilation System (VTP)
TO-060-341, Operate 241-AP Tank Farm Annulus Exhauster System
TO-100-052, Perform Waste Generation, Segregation, Accumulation and Clean-
up
H-2-2126, 200 East Area Electrical Switching Diagram
H-14-030003, AP Tank Farm Electrical One Line Diagrams.
DOE-0336, Hanford Site Lockout/Tagout Procedure
2-GENI-810, Maintain ABB System AC800M Controller and S800 IO Hardware
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
8 of 36
4.3 Field Preparation
NOTE - Signature Sheet 1 requirement is ongoing as new individuals become involved
in the procedure.
- Steps 4.3.1 through 4.3.24 may be performed in any logical order,
concurrently, or in parallel during field preparations.
4.3.1 AT least four weeks prior to the planned start date of the outage, ENSURE
the Hanford Fire Department/Fire System Maintenance (HFD/FSM) and
WRPS Fire Protection has been notified to generate planned impairment
work package.
4.3.2 CONTACT Pacific Northwest Seismic Network (PNSN); University of
Washington before going into an outage at the following:
Ray Clayton:
work: (509) 371-7251
cell: (509) 554-9959
Email: [email protected]
4.3.3 EVALUATE LCO 3.4 for waste disturbing activities and time durations. (LCO
3.4)
/ /
Signature Printed Name (first and last) Date
Shift Manager/OE
4.3.4 IF ventilation will be operable during electrical outage, ENSURE
“TEMPORARY POWER” or “ALTERNATE POWER” to Primary
ventilation system has been identified to provide alternate temporary power
as required.
4.3.5 ENSURE all personnel involved in the performance of this procedure enter
their printed name, signature and initials on Signature Sheet 1.
4.3.6 ENSURE this outage is scheduled not to prevent the timely completion of
the bi-monthly and/or annual cathodic protection preventative maintenance
activities associated with AP-Farm.
4.3.6.1 IF this outage will affect the performance of the cathodic
protection preventative maintenance activities, ENSURE the
preventative maintenance activities for the cathodic protection
system are performed prior to entering the electrical outage.
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
9 of 36
4.3 Field Preparation (Cont.)
4.3.7 ENSURE this electrical outage evolution does not prevent daily leak
detection and liquid level monitoring in 241-AP Tank Farm.
OR
IF either liquid level readings or leak detection monitoring cannot be taken,
ENSURE that Environmental has issued a letter which documents alternate
leak detection requirements per OSD-T-151-00031. (Refer to Section 3.3 for
DST leak detection specifications)
4.3.8 DETERMINE if alternate power for HMI, TFLAN, Cathodic, and ENRAF
is available for the electrical outage.
Check () if power is Available
HMI.
TFLAN.
Cathodic Protection.
ENRAF.
DST Annulus high-level alarm (automation).
/ /
Signature Printed Name (first and last) Date
Shift Manager/OE
4.3.9 IF alternate power to the annulus leak detection CANNOT be provided
during the duration of the electrical outage, ENSURE Environmental has
been informed per Environmental On Call List, of the intended planned
outage of AP-Farm AND
VERIFY the alternate leak detection requirement letter has been issued, as
applicable per Step 4.3.7.
/ /
Signature Print (first and last) Date
FWS/OE
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
10 of 36
4.3 Field Preparation (Cont.)
NOTE - Some electrical circuits in the 241-AP Tank Farm may receive power from
outside sources (e.g., evaporator). These circuits may remain ENERGIZED
even though the 241-AP Tank Farm main power supply has been disconnected.
- During maintenance and repair of electrical equipment, the main power supply
to 241-AP Tank Farm will be DE-ENERGIZED unless otherwise noted.
- Additional information of systems that will be lost during this power outage
may be found on Data Sheet 1, Data Sheet 2, and Data Sheet 3 in the back of
this procedure.
- Substation 241-AP (AP241-EDS-ENCL-100) power supplies, fed from
C8X167 and associated loads are as follows:
AP 241-EDS-ENCL-100
AP FARM LOADCENTER UNIT SUBSTATION
Reference Drawing : H-14-030003 Sheet 1
COMPT. DESCRIPTION
A1 TRANSITION SECTION
B1 METERING COMPARTMENT
B2 AP241-EDS-MTS-001 VTP EXHAUSTER NORMAL POWER
B3 AP241-EDS-BKR-101 AP TANK FARM PRIMARY BREAKER
C1 AP241-EDS-DP-100 SUBSTATION DISTRIBUTION PANEL
C2 AP241-EDS-XFMR-100
- Alternate power sources for primary ventilation is supplied through the
following:
Alternate Generator
Reference H-14-030003, Sheet 31
EIN DESCRIPTION
AP241-EDS-RCPT-101 Reverse Type Plug
AP241-EDS-DS-001 Generator Disconnect Switch
AP241-EDS-MTS-002 Alternate Power Manual Transfer Switch
AP241-EDS-MTS-001 Main Power Manual Transfer Switch
Alternate Electrical Utilities (Transformer)
Reference H-14-030003, Sheet 31
EIN DESCRIPTION
AP241-EDS-DS-002 Alternate Electrical Utilities Disconnect Switch
AP241-EDS-MTS-002 Alternate Power Manual Transfer Switch
AP241-EDS-MTS-001 Main Power Manual Transfer Switch
NOTE - A common activity during power outages is to clean and inspect Motor Control
Center cubicles. Transfer pumps are normally locked out at the breakers on the
Motor Control Center cubicles. These locks need to be removed if cubicles
will be opened for cleaning and inspection.
4.3.10 CONFIRM the LOCK & TAG LOGBOOK, and ADMINISTRATIVE
LOCK LOGBOOK in Area Dayshift Managers or Central Shift Office are
reviewed to determine whether currently installed locks and tags, and
administrative locks will interfere with this work scope.
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
11 of 36
4.3 Field Preparation (Cont.)
4.3.11 CONFIRM UTILITIES has been notified prior to outage to support outage
activities.
NOTE - Water Utilities will need to be provided with a CACN for work scope.
4.3.12 CONFIRM Water Utilities has been notified and arrangements have been
made to pump the 2607-E12 (4th & Canton) sanitary sewer system.
NOTE - There is only one Radio Fire Alarm Repeater (RFAR) box located in 241AP-
271. This RFAR box is number 2320. It is attached to the fire alarm system
protecting both 241AP-271 and 241AP-273. The Hanford Fire Department
will need to reset alarms at the Radio Fire Alarm Reporter (RFAR) Control
Panel located in 241AP-271 Instrument building, as they occur or notification
will be made to the Fire Department to disregard alarms during the electrical
outage. Fire department will need to be on site to reset Radio Fire Alarm
Reporter (RFAR) Control Panel at the end of the electrical outage.
4.3.13 ENSURE Hanford Fire Department (phone 373-2845) has been notified prior
to outage at 241-AP Tank Farm.
4.3.13.1 FWS/OE/Shift Manager PROVIDE MSA
work package number: .
4.3.13.2 REQUEST Fire Systems Maintenance appropriately configure
RFAR and/or FACP per MSA work package provided in Step
4.3.13.1 to support facility outage.
NOTE - Washington Administrative Code requires a level reading be taken in each tank
each calendar day.
4.3.14 VERIFY Operator Rounds TF-OR-DR-AN for AP Farm is complete. (OSD-T-151-00007)
/ /
Signature Print (first and last) Date
Shift Manager /OE
NOTE - If ventilation outage will exceed 24 hours, ORP permission is required prior to
commencing outage.
4.3.15 IF primary ventilation system outage is to exceed 24 hours, ENSURE ORP
permission has been obtained before commencing outage.
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
12 of 36
4.3 Field Preparation (Cont.)
4.3.16 ASSIST cleanup of rodent contaminated areas per TO-100-052, when such
areas are encountered.
4.3.17 CONFIRM the Present status of System(s) or equipment is as follows:
All Waste transfer pumps physically connected to AP-Farm are under
administrative lock
NO transfers associated with the AP Farm may be performed during
this outage
NOTE - Hanford Fire Department requires fire alarm system and RFAR
batteries to be disconnected for electrical outages lasting more than
10 hours. This requires WRPS Fire Protection to issue a fire
permit and Operations to implement a fire watch.
4.3.17.1 IF directed by Shift Manager/OE, PERFORM the following:
a. REQUEST a fire permit be issued from WRPS Fire
Protection.
b. ESTABLISH a Fire Watch.
4.3.17.2 DOCUMENT current alarms in alarm status log.
4.3.18 ENSURE TMACS operator, 242-A Evaporator, and Surveillance Operator
have been notified that the Primary and Annulus ventilation systems will be
shut down.
4.3.19 IF directed by Shift Manager/OE, SHUT DOWN AP Farm Annulus
Ventilation System, per TO-060-341.
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
13 of 36
4.3 Field Preparation (Cont.)
4.3.20 ENSURE PCM (AP-farm change trailer) has been shut down.
4.3.21 IF alternate power is available per Step 4.3.8, PERFORM the following to
place ENRAF’s on line:
4.3.21.1 ENSURE alternate power is connected to AP271-EDS-RCPT-
101.
4.3.21.2 IF alternate power supply is required, START the portable
generator.
4.3.21.3 PLACE AP271-EDS-MTS-101 in position 2.
4.3.22 IF alternate power is not available per Step 4.3.8, ENSURE the following
displacers for AP-Farm Primary Tank Waste Storage ENRAF’s have been
raised to approximately 12" above waste, freeze and turn ENRAF tree hand
switches (AP101-WST-HS-101 through AP108-WST-HS-101) to “OFF”
position.
AP101-WST-LIT-101
AP102-WST-LIT-101
AP103-WST-LIT-101
AP104-WST-LIT-101
AP105-WST-LIT-101
AP106-WST-LIT-101
AP107-WST-LIT-101
AP108-WST-LIT-101.
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
14 of 36
4.3 Field Preparation (Cont.)
4.3.23 IF AP Farm primary ventilation will not be maintained operable during this
outage, VERIFY current Survey Task Description is in effect.
/
Survey Task Description Number Rev
/ /
Signature Print (first and last) Date
Radiological Control/First Line Supervisor
NOTE - Minimum required respiratory protection and voluntary upgrade is identified
on the AP-001 TVIS.
- Industrial Hygiene Monitoring requirements will be specified in the Industrial
Hygiene Sample Plan (IHSP).
4.3.24 IF AP-Farm Primary Ventilation will not be maintained operable during this
outage, PERFORM the following:
4.3.24.1 CONTACT the Facility Industrial Hygienist for the appropriate
IHSP.
4.3.24.2 ENSURE respiratory protection is used in conjunction with IHT
Monitoring.
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
15 of 36
5.0 PROCEDURE
5.1 Shutdown of Electrical Power to AP-Farm
5.1.1 ENSURE Environmental has been informed per Environmental On Call List,
of the intended planned outage of the Cathodic Protection System.
/ /
Signature Print (first and last) Date
OE/Field Work Supervisor
5.1.2 IF this procedure is to be performed with a scheduled outage completion time
of less than 12 hours, REQUEST Shift Manager/OE review any steps
pertaining to monitoring of Annulus Leak Detection AND
Shift Manager/OE: DETERMINE if the steps can be marked N/A.
5.1.3 CONTACT Area Dayshift or Central Shift Manager, to NOTIFY of
commencement of electrical power outage.
/ /
Signature Print (first and last) Date
OE/Field Work Supervisor
5.1.4 IF AP Farm Primary Ventilation System is operating on normal power,
SHUT DOWN Primary Ventilation per TO-060-420.
5.1.4.1 WHEN AP Farm Primary Ventilation system is shutdown,
NOTIFY Shift Manager to initiate time monitoring per
LCO 3.1.A. (LCO 3.1)
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
16 of 36
5.1 Shutdown of Electrical Power to AP-Farm (Cont.)
5.1.5 IF directed by Survey Task Description, PERFORM radiological surveys
during performance of electrical power outage.
WARNING
Failure to don proper PPE before energizing and de-energizing
electrical systems may result in personnel injury or death.
5.1.6 ENSURE personnel trained in the operation of breakers and disconnects
dons PPE (See Section 3.1)
NOTE - During performance of Step 5.1.7, loads may be shed in parallel,
independently, or sequentially, as directed by OE/FWS.
5.1.7 IF directed by Shift Manager/OE/FWS, OPEN (OFF Position) breakers
AND
ENTER “AS FOUND” position on Data Sheet 1 through Data Sheet 3.
5.1.8 IF directed by Shift Manager/OE/FWS. OPEN AP241-EDS-BKR-101.
5.1.9 IF directed by Shift Manager/OE/FWS, INSTALL Lock Out Tag Out on
AP241-EDS-BKR-101.
5.1.10 IF lock Out Tag Out is installed on AP241-EDS-BKR-101,
GO TO Step 5.1.20.
5.1.11 IF directed by Shift Manager/OE, SHUT DOWN each controller cabinet for
the TFMCS system as follows:
NOTE - Technician access level is required to shut down ABB software
program on any HMI.
5.1.11.1 CONTACT maintenance to shut down ABB program on each
HMI in control room.
5.1.11.2 From the Taskbar, SELECT “SHUT DOWN” for each computer
HMI.
5.1.12 ENSURE AP241-EDS-DP-348 MAIN BKR is O/OFF (primary exhauster
load).
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
17 of 36
5.1 Shutdown of Electrical Power to AP-Farm (Cont.)
5.1.13 ENSURE AP241-EDS-DP-003 MAIN is O/OFF (mini power zone for HMI,
TFLAN).
5.1.14 NOTIFY Electrical Utilities LEAD that loads have been shed and MAINS
are OPEN.
5.1.15 IF directed by Shift Manager/OE, ENSURE Safe Condition checks are ready
to be performed.
5.1.16 ALLOW electrical utilities to install hold-off tag on utility pole for the
following fused disconnects:
C8X167
C8X680.
5.1.17 NOTIFY electrical utilities dispatcher that you are ready to apply the lock
out tag out to utility pole for the following fused disconnects:
C8X167
C8X680.
5.1.18 ONCE electrical utilities dispatcher gives permission, APPLY lock out tag
out over hold-off tag on utility pole for the following fused disconnects:
C8X167
C8X680.
5.1.19 APPLY lock out tag out to AP241-EDS-RCPT-101 and any additional tags
as identified per the outage LOCKOUT/TAGOUT AUTHORIZATION
FORM, in accordance with DOE-0336, Hanford Site Lockout/Tagout
Procedure.
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
18 of 36
5.1 Shutdown of Electrical Power to AP-Farm (Cont.)
NOTE - With normal power secured, the normal tank pressure monitoring and alarm
system are not operable, then tank pressure will be monitored when personnel
are in the farm.
5.1.20 IF primary ventilation is operating, CONFIRM twice each shift, that
vacuum is greater than zero on each of the eight tank magnahelic gauges
identified below. (LCO 3.1)
241-AP-102 & 104 gauges AP901-VTP-PI-102 and
AP901-VTP-PI-104. Located in Annulus Tank CAM Instrument
Enclosure 241-AP-901
241-AP-101 & 103 gauges AP902-VTP-PI-101 and
AP902-VTP-PI-103. Located in Annulus Tank CAM Instrument
Enclosure 241-AP-902
241-AP-105 & 107 gauges AP903-VTP-PI-105 and
AP903-VTP-PI-107. Located in Annulus Tank CAM Instrument
Enclosure 241-AP-903
241-AP-106 & 108 gauges AP904-VTP-PI-106 and
AP904-VTP-PI-108. Located in Annulus Tank CAM Instrument
Enclosure 241-AP-904.
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
19 of 36
5.2 Limits and Monitoring During Maintenance
5.2.1 IF administrative locks are to be removed to support maintenance activities,
PERFORM the following:
5.2.1.1 NOTIFY Shift Manager/OE to specify and implement correct
administrative lock controls per TFC-OPS-OPER-C-22.
5.2.1.2 REMOVE any existing Administrative locks needed to complete
maintenance activities.
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
20 of 36
5.3 Alternate Power Primary Exhauster Start-Up
5.3.1 ENSURE Alternate power source Line-up;
Component Position Check
Complete
AP241-EDS-DS-002 ON
AP241-EDS-MTS-002 ALTERNATE ELECTRICAL
UTILITIES or ALTERNATE
GENERATOR
AP241-EDS-MTS-001 ALTERNATE
5.3.2 REMOVE DDNO over-tag on POLE C8X680 per DOE-0336, Hanford Site
Lockout/Tagout Procedure.
5.3.3 ALLOW Electrical Utilities to remove hold-off tag on utiltity pole C8X680,
and restore power.
5.3.4 ENSURE AP241-EDS-DP-348 MAIN BKR is 1/ON (primary exhauster
load).
5.3.5 ENSURE AP241-EDS-DP-003 MAIN is 1/ON (mini power zone for HMI,
TFLAN).
5.3.6 IF ABB controller is not responding correctly, RE-LOAD ABB controller
per 2-GENI-810.
5.3.7 IF directed by Shift Manager/OE per 2-GENI-810, ENSURE Primary tank
pressure indicators are inhibited prior to exhauster start;
Nomenclature/
Equipment ID
Inhibited
()
AP101-WST-PDIT-111
AP102-WST-PDIT-111
AP103-WST-PDIT-111
AP104-WST-PDIT-111
AP105-WST-PDIT-111
AP106-WST-PDIT-111
AP107-WST-PDIT-111
AP108-WST-PDIT-111
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
21 of 36
5.3 Alternate Power Primary Exhauster Start-Up (Cont.)
5.3.8 IF directed by Shift Manager/OE, START AP primary exhauster per
TO-060-420.
5.3.8.1 IF ABB controller is not responding correctly, RE-LOAD ABB
controller per 2-GENI-810 AND
GO TO Step 5.3.8.
NOTE - AP primary exhauster is now in Alternate power source operation.
5.3.9 ENSURE any maintenance activities associated with the AP primary
exhauster system is completed in accordance per DOE-0336, Hanford Site
Lockout/Tagout Procedure.
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
22 of 36
5.4 Tank Farm Restoration
5.4.1 AFTER electrical maintenance activities are complete, CHECK all
administrative locks removed during maintenance are “re-installed” before
restoring power to AP-Farm.
/ /
Signature Print (first and last) Date
Shift Manager/OE
WARNING
Failure to don proper PPE before energizing and de-energizing
electrical systems may result in personnel injury or death.
5.4.2 ENSURE personnel trained in the operation of breakers and disconnects
dons PPE (See Section 3.1)
5.4.3 CHECK ALL work is complete and tools/test equipment are removed from
work areas.
/ /
Signature Print (first and last) Date
Field Work Supervisor
5.4.4 CLEAR locks and tags from isolation point(s) of completed work packages
per DOE-336, Hanford Site Lockout/Tagout procedure.
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
23 of 36
5.4 Tank Farm Restoration (Cont.)
5.4.5 ENSURE prior to the restoration of power that all breakers are positioned as
directed by Shift Manager/OE and identified on Data Sheet 1 through
Data Sheet 3.
5.4.6 REQUEST Fire Systems Maintenance restore FACP and/or RAFR per MSA
work package provided in Step 4.3.13.1.
5.4.7 NOTIFY Shift Manager of commencement of re-start of AP-Farm.
/ /
Signature Print (first and last) Date
Field Work Supervisor/OE
5.4.8 IMMEDIATELY before startup, NOTIFY Tank Monitor and Control
System (TMACS) Operator and 242 A Evaporator Control Room Operator.
WARNING
Failure to don proper PPE before energizing and de-energizing
electrical systems may result in personnel injury or death.
5.4.9 ENSURE personnel trained in the operation of breakers and disconnects
dons PPE (See Section 3.1)
5.4.10 IF Lock Out Tag Out is installed on AP241-EDS-BKR-101, REMOVE Lock
Out Tag Out on AP241-EDS-BKR-101.
5.4.11 IF directed by Shift Manager/OE/FWS, POSITION (ON POSITION) to
“As-Found” position on Data Sheet 1 AND
GO TO Step 5.4.18.
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
24 of 36
5.4 Tank Farm Restoration (Cont.)
5.4.12 NOTIFY Electrical Utilities LEAD that loads are shed and MAINS are
OPEN and the electrical outage is completed and facility is ready for power
restoration.
5.4.13 NOTIFY Electrical Utilities Dispatcher lock out tagout is ready for removal.
5.4.14 REMOVE lock out tag out from utility pole.
5.4.15 NOTIFY electrical utilities LEAD that the lock out tag out is removed.
5.4.16 NOTIFY electrical utilities LEAD to re-establish power to AP Farm by
installing fuses on fused disconnect C8X167.
5.4.17 RESTORE main power supply to AP Farm.
NOTE - Some “As Found” final positions may be changed as directed by FWS/OE
assigned to fieldwork as field conditions dictate.
5.4.18 CLOSE (turn on) breakers to energize loads as follows:
5.4.18.1 IF not performed in Step 5.4.11, CLOSE (ON Position) breakers
to “As Found” positions on Data Sheet 1 AND
RECORD AND INITIAL “As Left” position.
5.4.18.2 RESTORE main power supply to AP-Farm.
5.4.18.3 CLOSE (ON Position) breakers to “As Found” positions on
Data Sheet 2 AND
RECORD AND INITIAL “As Left” position.
NOTE - During performance of Step 5.4.18.4, loads may be energized in
parallel, independently, or sequentially, as directed by Field Work
Supervisor.
5.4.18.4 CLOSE (ON Position) breakers to “As Found” positions on
Data Sheet 3 AND
RECORD AND INITIAL “As Left” position per Data Sheet 3 .
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
25 of 36
5.4 Tank Farm Restoration (Cont.)
5.4.19 IF AP Farm Primary Ventilation is connected to, and running on alternate
power, SHUTDOWN Primary Ventilation per TO-060-420.
5.4.19.1 IF directed by Shift Manager/OE, SHUT DOWN each controller
cabinet for the TFMCS system as follows:
NOTE - Technician access level is required to shut down
ABB software program on any HMI.
a. CONTACT maintenance to shut down ABB program on
each HMI in control room.
b. From the Taskbar, SELECT “SHUT DOWN” for each
computer HMI.
c. WHEN AP Farm Primary Ventilation system is
shutdown, NOTIFY Shift Manager to initiate time
monitoring per LCO 3.1.A. (LCO 3.1)
5.4.20 ENSURE AP241-EDS-DP-348 MAIN BKR is O/OFF (primary exhauster
load).
5.4.21 ENSURE AP241-EDS-DP-003 MAIN is O/OFF (mini power zone for HMI,
TFLAN).
5.4.22 ENSURE NORMAL power source Line-up as follows;
Component Position Check
Complete
AP241-EDS-DS-002 OFF
AP241-EDS-MTS-002 ALTERNATE ELECTRICAL UTILITIES or
ALTERNATE GENERATOR
AP241-EDS-MTS-001 NORMAL
5.4.23 ENSURE AP241-EDS-DP-348 MAIN BKR is 1/ON (primary exhauster
load).
5.4.24 ENSURE AP241-EDS-DP-003 MAIN is 1/ON (mini power zone for HMI,
TFLAN).
5.4.25 IF ABB controller is not responding correctly, RE-LOAD ABB controller
per 2-GENI-810.
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
26 of 36
5.4 Tank Farm Restoration (Cont.)
5.4.26 IF directed by Shift Manager/OE per 2-GENI-810, ENSURE Primary tank
pressure indicators are returned to NORMAL uninhibited state prior to
exhauster start;
Nomenclature/
Equipment ID
Un-Inhibited
()
AP101-WST-PDIT-111
AP102-WST-PDIT-111
AP103-WST-PDIT-111
AP104-WST-PDIT-111
AP105-WST-PDIT-111
AP106-WST-PDIT-111
AP107-WST-PDIT-111
AP108-WST-PDIT-111
5.4.27 VERIFY PDITs are communicating before commencement of re-start of AP-
Farm.
/ /
Signature Print (First and Last) Date
FWS /OE
5.4.28 IF directed by Shift Manager/OE, START AP Farm Primary Ventilation
System, on NORMAL power per TO-060-420.
5.4.28.1 NOTIFY Shift Manager to stop time monitoring per LCO 3.1.A.
(LCO 3.1).
5.4.29 CONFIRM all farm readings are as expected.
5.4.30 IF directed by IH&S monitoring plan, PERFORM toxic vapor checks
(i.e., Pit covers, etc.) during performance of electrical power outage.
NOTE - Steps 5.4.31 through 5.4.36 may be performed in any logical order,
concurrently, or in parallel, during the restoration of systems.
5.4.31 IF directed by Survey Task Description, PERFORM radiological surveys
during performance of electrical power outage.
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
27 of 36
5.4 Tank Farm Restoration (Cont.)
5.4.32 IF directed by Shift Manager/OE, START-UP Annulus Ventilation System
per TO-060-341.
5.4.33 PLACE PCM back in service.
5.4.34 PLACE AP271-EDS-MTS-101 to Position 1.
5.4.35 CHECK ENRAFs are reading correctly.
5.4.35.1 IF ENRAFs are not reading correctly, NOTIFY Shift
Manager/OE.
5.4.36 REMOVE portable generator/temporary power from
AP271-EDS-RCPT-101.
5.4.37 IF directed by Shift Manager/OE, PERFORM CAM operability per TF-
OPS-005.
5.4.38 CHECK alarms are reset or cleared AND
COMPARE with the alarm status log.
5.4.39 IMMEDIATELY after outage is complete, PERFORM AP-Farm Daily
Rounds TF-OR-DR-AN.
5.4.40 COMPLETE Inspection of Cathodic Protection System Rectifiers per 5-
CATH-221 to verify all rectifiers are operational.
5.4.41 CONFIRM all fieldwork is complete, and all documentation in this
procedure is filled out and signed.
5.4.42 NOTIFY Environmental Field Representative of Date and Time power
outage is complete, and environmental systems, such as CATHODIC, Record
Sampler, have been restored.
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
28 of 36
5.5 Records
5.5.1 PERFORM the following for records identified within this procedure.
5.5.1.1 RECORD the number of times the record was generated in
applicable column
OR
PLACE a check mark () in the N/A column.
5.5.1.2 SUBMIT the package for verification of completed records.
Records Submittal Checklist
Number of
times
completed
N/A
()
4.3 Field Preparation
Step 4.3.3 Step 4.3.8 Step 4.3.9
Step 4.3.14
Step 4.3.23 5.1 Shutdown of Electrical Power to AP-Farm
Step 5.1.1
Step 5.1.3 5.4 Tank Farm Restoration
Step 5.4.1 Step 5.4.3 Step 5.4.7
Step 5.4.27 Data Sheets
Data Sheet 1 241-AP SUBSTATION (AP241-EDS-ENCL-100)
Data Sheet 2 AP271-EDS-MCC-001
Data Sheet 3 AP241-EDS-MCC-002
Data Sheet 3 AP241-EDS-MCC-002
Data Sheet 4 – Comments Sheet
Signature Sheet
Signature Sheet 1 FWS/OE/Shift Manager SEND the completed records to the Central Shift Office for records retention.
/ /
Signature Print (First and Last) Date
FWS/OE/Shift Manager
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
29 of 36
5.5 Records (Cont.)
The record custodian identified in the company-level Records Inventory and
Disposition Schedule (RIDS) is responsible for record retention in
accordance with TFC-BSM-IRM_DC-C-02.
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
30 of 36
Data Sheet 1 241-AP SUBSTATION (AP241-EDS-ENCL-100)
AP241-EDS-ENCL-100
LOADCENTER UNIT SUBSTATION
Reference Drawing : H-14-030003 Sheet 1
COMPT. DESCRIPTION
*AS FOUND BKR.
POS. ON/OFF
(A, D, C,) []
POSITION
FOR
OUTAGE**
()
*OUTAGE
COMPLETE
(AS LEFT) ON/OFF
(A, D, C,) []
INITIALS
OUTAGE
COMPLETE
(AS LEFT) ON OFF
A1 TRANSITION SECTION N/A N/A N/A N/A
B1 METERING COMPARTMENT N/A N/A N/A N/A
B2 AP241-EDS-BKR-100 VTP
EXHAUSTER NORMAL POWER
A D C A D C
B3
AP241-EDS-BKR-101
AP TANK FARM PRIMARY
BREAKER
A D C A D C
C1
241AP-EDS-DP-100
SUBSTATION DISTRIBUTION
PANEL
A D C A D C
C2 AP241-EDS-XFMR-100 N/A N/A N/A N/A
* The “AS FOUND” and “AS LEFT” columns are BEGINNING and ENDING visual verifications,
initials (A, D, C,) are for craft “INFORMATION ONLY” and may be identified by means of a [].
This DOES NOT AUTHORIZE removal or reinstallation of lock and tags.
** Shift Manager/OE to check required position of breaker for outage.
A= Administrative, D = Danger, C= Caution
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
31 of 36
Data Sheet 2 AP271-EDS-MCC-001
AP271-EDS-MCC-001
MOTOR CONTROL CENTER
( FED FROM: 241-A SUBSTATION COMPARTMENT A1 ) ( Reference: H-14-030003 Sheet # 1 and #2 )
COMPT. EQUIPMENT I.D. NUMBER
*AS FOUND BKR.
POS. ON/OFF (A, D, C ) []
POSITION
FOR
OUTAGE**
()
*OUTAGE
COMPLETE (AS
LEFT) ON/OFF
(A, D, C ) []
INITIALS
OUTAGE
COMPLETE
(AS LEFT) ON OFF
B1
AP241-EDS-BKR-103
MOTOR CONTROL CENTER 001
MAIN BREAKER
A D C A D C
B2
AP271-EDS-BKR-104
MOTOR CONTROL CENTER 002
PRIMARY BREAKER
A D C A D C
C1
AP271-EDS-BKR-105
TK-101 SUPERNATANT PUMP
WT-P-001
A D C A D C
C2
AP271-EDS-BKR-106
TK-102 SUPERNATANT PUMP
WT-P-002 AND PIT 02D
A D C A D C
C3
AP271-EDS-BKR-107
TK-103 SUPERNATANT PUMP
WT-P-003
A D C A D C
D1
AP271-EDS-BKR-108
TK-104 SUPERNATANT PUMP
WT-P-004
A D C A D C
D2
AP271-EDS-BKR-109
TK-105 SUPERNATANT PUMP
WT-P-005
A D C A D C
D3
AP271-EDS-BKR-110
TK-106 SUPERNATANT PUMP
WT-P-006
A D C A D C
E1
AP271-EDS-BKR-111
TK-107 SUPERNATANT PUMP
WT-P-007
A D C A D C
E2
AP271-EDS-BKR-112
TK-108 SUPERNATANT PUMP
WT-P-008
A D C A D C
E3A AP271-EDS-BKR-113
DISTRIBUTION PANEL
AP271-EDS-DP-107
A D C A D C
* The “AS FOUND” and “AS LEFT” columns are BEGINNING and ENDING visual verifications, initials (A, D, C,) are
for craft “INFORMATION ONLY” and may be identified by means of a []. This DOES NOT AUTHORIZE removal
or reinstallation of lock and tags.
** Shift Manager/OE to check required position of breaker for outage.
A= Administrative, D = Danger, C= Caution
Continued Next Page
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
32 of 36
Data Sheet 2 AP271-EDS-MCC-001 (Cont.)
AP271-EDS-MCC-001
MOTOR CONTROL CENTER
( FED FROM: 241-AP SUBSTATION COMPARTMENT A1 ) ( Reference: H-14-030003 Sheet # 2 )
COMPT. EQUIPMENT I.D. NUMBER
AS FOUND BKR.
POS. ON/OFF
(A, D, C ) []
POSITION
FOR
OUTAGE**
()
OUTAGE
COMPLETE (AS
LEFT) ON/OFF
(A, D, C ) []
INITIALS
OUTAGE
COMPLETE
(AS LEFT) ON OFF
E3B AP271-EDS-BKR-114
DIST PANEL, AP271-EDS-DP-101,
POWER AP801-EDS-DP-102 AND
AP271-EDS-DP-103 PWR VIA AP271-
EDS-DP-101
A D C A D C
E4
AP271-EDS-BKR-119
POR475-WT-DP-001
A D C A D C
F1 AP271-EDS-BKR-115
POR388-WT-HPU-001
A D C A D C
F2 AP271-EDS-BKR-116
MOTOR CONTROL CENTER AP271-
EDS-MCC-003
MAIN BREAKER
A D C A D C
F3 AP271-EDS-BKR-117 DIST PANEL
AP271-EDS-DP-104 POWER
AP271-EDS-DP-105 POWER VIA
AP271-EDS-DP-104
A D C A D C
G1 AP271-EDS-BKR-118
DISTRIBUTION PANEL
AP271-EDS-DP-106 POWER
A D C A D C
G3A G3A-PNLBD
AP271A-EDS-DP-127
A D C A D C
G3B AP241-EDS-DP-131 VIA G3B-AP241-
EDS-XFMR-131
A D C A D C
* The “AS FOUND” and “AS LEFT” columns are BEGINNING and ENDING visual verifications,
initials (A, D, C,) are for craft “INFORMATION ONLY” and may be identified by means of a [].
This DOES NOT AUTHORIZE removal or reinstallation of lock and tags.
** Shift Manager/OE to check required position of breaker for outage.
A= Administrative, D = Danger, C= Caution
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
33 of 36
Data Sheet 3 AP241-EDS-MCC-002
AP241-EDS-MCC-002
MOTOR CONTROL CENTER
FED FROM: AP271-EDS-MCC-001 ( AP271-EDS-BKR-104 )
( Reference H-14-030003 Sheet #3 )
COMPT. EQUIPMENT I.D. NUMBER
AS FOUND BKR.
POS. ON/OFF (A, D, C ) []
POSITION
FOR
OUTAGE**
OUTAGE
COMPLETE (AS
LEFT) ON/OFF (A, D, C ) []
INITIALS
OUTAGE
COMPLETE
(AS LEFT) ON OFF
A1 SPACE N/A N/A N/A N/A
A3
AP241-EDS-BKR-127
MOTOR CONTROL CENTER 002
MAIN BREAKER
A D C A D C
B1A
AP241-EDS-BKR-128
AIR INTAKE STATION “A”
HEATER AND MINI POWER
STATION
A D C A D C
B1B
AP241-EDS-BKR-129
AIR INTAKE STATION “B”
HEATER AND MINI POWER
STATION
A D C A D C
B2A
AP241-EDS-BKR-130
AIR INTAKE STATION “C”
HEATER AND MINI POWER
STATION
A D C A D C
B2B
AP241-EDS-BKR-131
AIR INTAKE STATION “D”
HEATER AND MINI POWER
STATION
A D C A D C
B3A
AP241-EDS-BKR-132
A TRAIN ANNULUS EXHAUST
HEATER
A D C A D C
B3B
AP241-EDS-BKR-133
B TRAIN ANNULUS EXHAUST
HEATER
A D C A D C
B4A Spare N/A N/A N/A N/A
B4B Spare N/A N/A N/A N/A
* The “AS FOUND” and “AS LEFT” columns are BEGINNING and ENDING visual verifications,
initials (A, D, C,) are for craft “INFORMATION ONLY” and may be identified by means of a [].
This DOES NOT AUTHORIZE removal or reinstallation of lock and tags.
** Shift Manager/OE to check required position of breaker for outage.
A= Administrative, D = Danger, C= Caution
Continued on Next Page
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
34 of 36
Data Sheet 3 AP241-EDS-MCC-002 (Cont.)
AP241-EDS-MCC-002
MOTOR CONTROL CENTER
FED FROM: AP271-EDS-MCC-001 ( AP271-EDS-BKR-104 )
( Reference H-14-030003 Sheet #3 )
COMPT. EQUIPMENT I.D. NUMBER
AS FOUND BKR.
POS. ON/OFF
(A, D, C ) []
POSITION
FOR
OUTAGE**
()
OUTAGE
COMPLETE (AS
LEFT) ON/OFF
(A, D, C ) []
INITIALS
OUTAGE
COMPLETE
(AS LEFT) ON OFF
B5
AP241-EDS-BKR-136
DISTRIBUTION PANELS
AP241-EDS-DP-110, AP296-EDS-DP-
111 AND 112 POWER
A D C A D C
C1
AP241-EDS-BKR-137
A TRAIN ANNULUS EXHAUST FAN
VTA-EF-003
A D C A D C
C2
AP241-EDS-BKR-138
B TRAIN ANNULUS EXHAUST FAN
VTA-EF-004
A D C A D C
C3 Spare N/A N/A N/A N/A
C4 Spare N/A N/A N/A N/A
C5
AP241-EDS-BKR-139
MINI POWER CENTER
AP241-EDS-DP-113
D1
AP241-EDS-BKR-163
MINI POWER CENTER
AP241-EDS-DP-349
A D C A D C
D2 SPACE N/A N/A N/A N/A
D3 SPACE N/A N/A N/A N/A
D4 SPACE N/A N/A N/A N/A
D5 SPACE N/A N/A N/A N/A
D6 SPACE N/A N/A N/A N/A
* The “AS FOUND” and “AS LEFT” columns are BEGINNING and ENDING visual verifications,
initials (A, D, C,) are for craft “INFORMATION ONLY” and may be identified by means of a [].
This DOES NOT AUTHORIZE removal or reinstallation of lock and tags.
** Shift Manager/OE to check required position of breaker for outage.
A= Administrative, D = Danger, C= Caution
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
35 of 36
Data Sheet 4 – Comments Sheet
Sheet ____of____
DATE/TIME RECORD INFORMATION
Shift Manager/OE Review
Print (first and last) /Signature/Date
T S R Compliance
Perform Electrical Power Outage for 241-AP Tank Farm
Type
CONTINUOUS Document No.
TO-270-720 Rev/Mod
G-5 Release Date
10/09/2018 Page
36 of 36
Signature Sheet 1
All personnel participating in performance of this procedure SHALL ENTER their printed name,
signature, and initials below.
NAME (PRINT) (first and last) SIGNATURE INITIALS