4
DELHI JAL BOARD: GOVT. OF N.C.T. OF DELHI OFFICE OF ~HE EXECUTIVE ENGINEER (E&M) W&S S-III D-BLOCK SAKEr, OPPOSITE PVR CINEMA, NEW DELHI-ll0017 NO. DJBIEE (E&M) W&S/S-ID/201S/- ~ <D -)-'1L Dated ...... s:\~t) Work Order No. ~ 1- Work No. 31827 Mis Vardhman Trading Co., Shed no. 3/6, Block No.1S & 16, DSIDC Shed, Dakshin Puri Extension, Delhi-ll 0062. Head of A/c:- R&M (W) Subject: - Repair / Rewinding of BS make sub. p/ sets of various T -wells installed at Chhattarpur constituency AC-46 (Ward No. 173 & 176). Sir, With reference to your tender dated 22.06.2015 for the subject cited work, it is to inform you that the same has been accepted by the competent authority. You are requested to start the work under the supervision of concerned AE (E&M) as per specification! terms & conditions as mentioned below:- SNo Particulars Qty Unit Rate Amount 1.1 R1R of 5HP BS make sub. p/set no-CHT 242 by carrying 1 Lot 8400/- 8400/- out following works Rewinding kit of motor-I no, GM bearing bush- 4 nos, Water seal-2 nos, EP impeller-S nos, Thrust plate-l no, inlet ring-I no 1.2 Labour charges for rewinding of motor i/c. rotor sleeve 1 Job 900/- 9001- turning & grinding & replacement of above parts 2.1 RIR of 5.HPBS make sub. plset no-CHT 835 by carrying 1 Lot 6800/- 6800/- out following works Rewinding kit of motor-l no, GM bearing bush- 4 nos, Water seal-2 nos, sand guard-I no, inlet ring-I no 2.2 Labour charges for rewinding of motor' itc. rotor sleeve 1 Job 1800/- 1800/- turning & grinding, epoxy paint of rotor-I job, stamping repairing-I job & replacement of above parts 3.1 RIR of 5HP BS make sub. plset no-CHT 834 by carrying 1 Lot 7800/- 7800/- out following works Rewinding kit of motor-l no, GM bearing bush- 4 nos, Water seal-2 nos, EP impeller-5 nos, coupling sleeve with key-I no, inlet ring-I no 3.2 Labour charges for rewinding of motor itc. rotor sleeve 1 Job 1300/- 1300/- turning & grinding, epoxy paint of rotor-!job & replacement of above parts 4.1 RIR of 5HP BS make sub. plset no-CHT 394 by carrying 1 Lot 8500/- 8500/- out following works Rewinding kit of motor-I no, GM bearing bush- 4 nos, Water seal-2 nos, EP impeller-3 nos, EP stage bowl-7 nos, inlet ring-I no 4.2 Labour charges for rewinding of motor ik: rotor 1 Job 1200/- 1200/- balancing-I job & replacement of above parts 5.1 RIR of 5HP BS make sub. p/set no-CHT 395 by carrying 1 Lot 8500/- 8500/- out following works Rewinding kit of motor-l no, GM bearing bush- 4 nos, Water seal-2 nos, EP impeller-6 nos, EP stage bowl-4 nos, inlet ring-I no 5.2 Labour charges for rewinding of motor i/c. rotor sleeve 1 Job 1000/- 1000/- turning & grinding, rotor end repairing & replacement of above parts 6.1 RlR of 5HP BS make sub. p/set no-CHT 396 by carrying 1 Lot 8300/- 8300/- out following works Rewinding kit of motor-I no, rotor sleeve-4 nos, Water seal-2 nos, EP impeller-6 nos, seal bush-! no, EP stage bowl-S nos, inlet ring-1 no 6.2 Labour charges for rewinding of motor ilc, rotor end 1 Job 900/- 900/- repairing & replacement of above parts 7.1 RlR of 5HP BS make sub. plset no-CHT 287 by carrying 1 Lot 8600/- 8600/- out following works Rewinding kit of motor-I no, OM bearing bush- 4 nos, Water seal-2 nos, EP impeller-S nos, Upper housing-l no, inlet ring-l no 7.2 Labour charges for rewinding of motor ilc. rotor sleeve 1 Job 900/- 900/-

~t)...repairing-I job & replacement of aboveparts 3.1 RIR of 5HP BS make sub. plset no-CHT 834 by carrying 1 Lot 7800/- 7800/-out following works Rewinding kit of motor-l no, GM bearing

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ~t)...repairing-I job & replacement of aboveparts 3.1 RIR of 5HP BS make sub. plset no-CHT 834 by carrying 1 Lot 7800/- 7800/-out following works Rewinding kit of motor-l no, GM bearing

DELHI JAL BOARD: GOVT. OF N.C.T. OF DELHIOFFICE OF ~HE EXECUTIVE ENGINEER (E&M) W&S S-III

D-BLOCK SAKEr, OPPOSITE PVR CINEMA, NEW DELHI-ll0017

NO. DJBIEE (E&M) W&S/S-ID/201S/- ~ <D -)-'1L Dated ...... s:\~t)Work Order No. ~ 1-Work No. 31827

Mis Vardhman Trading Co.,Shed no. 3/6, Block No.1S & 16, DSIDC Shed,Dakshin Puri Extension,Delhi-ll 0062. Head of A/c:- R&M (W)

Subject: - Repair / Rewinding of BS make sub. p/ sets of various T-wells installed atChhattarpur constituency AC-46 (Ward No. 173 & 176).

Sir,With reference to your tender dated 22.06.2015 for the subject cited work, it is to

inform you that the same has been accepted by the competent authority. You are requested tostart the work under the supervision of concerned AE (E&M) as per specification! terms &conditions as mentioned below:-

SNo Particulars Qty Unit Rate Amount1.1 R1R of 5HP BS make sub. p/set no-CHT 242 by carrying 1 Lot 8400/- 8400/-

out following works Rewinding kit of motor-I no, GMbearing bush- 4 nos, Water seal-2 nos, EP impeller-S nos,Thrust plate-l no, inlet ring-I no

1.2 Labour charges for rewinding of motor i/c. rotor sleeve 1 Job 900/- 9001-turning & grinding & replacement of above parts

2.1 RIR of 5.HPBS make sub. plset no-CHT 835 by carrying 1 Lot 6800/- 6800/-out following works Rewinding kit of motor-l no, GMbearing bush- 4 nos, Water seal-2 nos, sand guard-I no,inlet ring-I no

2.2 Labour charges for rewinding of motor' itc. rotor sleeve 1 Job 1800/- 1800/-turning & grinding, epoxy paint of rotor-I job, stampingrepairing-I job & replacement of above parts

3.1 RIR of 5HP BS make sub. plset no-CHT 834 by carrying 1 Lot 7800/- 7800/-out following works Rewinding kit of motor-l no, GMbearing bush- 4 nos, Water seal-2 nos, EP impeller-5 nos,coupling sleeve with key-I no, inlet ring-I no

3.2 Labour charges for rewinding of motor itc. rotor sleeve 1 Job 1300/- 1300/-turning & grinding, epoxy paint of rotor-!job &replacement of above parts

4.1 RIR of 5HP BS make sub. plset no-CHT 394 by carrying 1 Lot 8500/- 8500/-out following works Rewinding kit of motor-I no, GMbearing bush- 4 nos, Water seal-2 nos, EP impeller-3 nos,EP stage bowl-7 nos, inlet ring-I no

4.2 Labour charges for rewinding of motor ik: rotor 1 Job 1200/- 1200/-balancing-I job & replacement of above parts

5.1 RIR of 5HP BS make sub. p/set no-CHT 395 by carrying 1 Lot 8500/- 8500/-out following works Rewinding kit of motor-l no, GMbearing bush- 4 nos, Water seal-2 nos, EP impeller-6 nos,EP stage bowl-4 nos, inlet ring-I no

5.2 Labour charges for rewinding of motor i/c. rotor sleeve 1 Job 1000/- 1000/-turning & grinding, rotor end repairing & replacement ofabove parts

6.1 RlR of 5HP BS make sub. p/set no-CHT 396 by carrying 1 Lot 8300/- 8300/-out following works Rewinding kit of motor-I no, rotorsleeve-4 nos, Water seal-2 nos, EP impeller-6 nos, sealbush-! no, EP stage bowl-S nos, inlet ring-1 no

6.2 Labour charges for rewinding of motor ilc, rotor end 1 Job 900/- 900/-repairing & replacement of above parts

7.1 RlR of 5HP BS make sub. plset no-CHT 287 by carrying 1 Lot 8600/- 8600/-out following works Rewinding kit of motor-I no, OMbearing bush- 4 nos, Water seal-2 nos, EP impeller-S nos,Upper housing-l no, inlet ring-l no

7.2 Labour charges for rewinding of motor ilc. rotor sleeve 1 Job 900/- 900/-

Page 2: ~t)...repairing-I job & replacement of aboveparts 3.1 RIR of 5HP BS make sub. plset no-CHT 834 by carrying 1 Lot 7800/- 7800/-out following works Rewinding kit of motor-l no, GM bearing

9.2

900/-

turning & grinding & replacement of above parts- ~r-~-+~~~~~~~~~~~--~+-~4-~-r--~~r---~~V 8.1 RJR of 5HP BS make sub. p/set no-CHT 829 by carrying I Lot 8300/- 8300/-

out following works Rewinding kit of motor-l no, OMbearing bush- 4 nos, Water seal-2 nos, EP 'impeller-S nos,EP stage bowl-3 nos, inlet ring-I no

8.2 Labour charges for rewinding of motor i/c. rotor sleeveturning & grinding & replacement of above parts

Job 900/-

9.1 RJR of 5HP BS make sub. plset no-CHT 837 by carryingout following works Rewinding kit of motor-I no, OMbearing bush- 4 nos, Water seal-2 nos, EP impeller-S nos,EP stage bowl-2 nos, inlet ring-I no

Lot 8300/- 8300/-

Labour charges for rewinding of motor i/c. stampingrepairing & replacement of above parts

Job 1200/- 1200/-

10.1 RIR of 5HP BS make sub. plset no-CHT 127 by carryingout following works Rewinding kit of motor-I no, GMbearing bush- 4 nos, rotor sleeve-s nos, Water seaJ-2 nos,EP impeller-4 nos, EP stage bowl-3 nos, inlet ring-I no

Lot 8600/- 8600/-

'10.2 Labour charges for rewinding of motor i/c. rotor endrepairing, epoxy paint of rotor-I job & replacement ofabove parts

Job 1300/- 1300/-

11.1 RJR of 5HP BS make sub. p/set no-CHT 243 by carryingout following works Rewinding kit of motor-I no, OMbearing bush- 4 nos, motor base-l no, Water seaJ-2 nos,EP impeller-3 nos, EP stage bowl-3 nos inlet ring-I no

Lot 8100/- 8100/-

11.2 Labour cbarges for rewinding of motor i/c. epoxy paint of1--__ --+-:::r,.;.,ot:::-o_r--:1job & replacement of above parts

12.1 RIR of 5HP BS make sub. plset no-CHT 783 by carryingout following works Rewinding kit of motor-l no, GMbearing bush- 4 nos, Water seal-2 nos, EP impeller-6 nos,EP stage bowl-7 nos, inlet ring-I no

Job

Lot

1100/-

9000/-

1100/-

9000/-

12.2 Labour charges for rewinding of motor i/c. replacementof above parts

Job 700/- 700/-

13.1 RJR of 7.5HP BS make sub. plset no-CRT 478 bycarrying out following works Rewinding kit of motor-lno, GM bearing bush- 4 nos, Water seal-2 nos, neck ring-5 nos, guide bush- 2 nos, distance bush-l no, upper bush-I no, upper sleeve-l no, impeller key-I 5 nos

Lot 10500/- 10500/-

13.2 Labour charges for rewinding of motor i/c. rotor sleeveturning & grinding, impeller remetalling turning &grinding-4 job & replacement of above parts

Job 2300/- 2300/-

14.1 RIR of 7.5HP BS make sub. plset no-CHT 802 bycarrying out following works Rewinding kit of motor-lno, GM bearing bush- 4 nos, Water seal-2 nos, neck ring-3 nos, guide bush- 4 nos, distance bush-5 nos, upperbush-l no, upper sleeve-I no, impeller key-l 5 nos

Lot 11000/- 11000/-

14.2 Labour charges for rewinding of motor i/c. rotor sleeveturning & grinding, impeller remetalling turning &grinding-l job & replacement of above parts

Job 1600/- 1600/-

15.1 RIR of 7.5HP BS make sub. plset no-CRT 512 bycarrying out following works Rewinding kit of motor-lno, GM bearing bush- 4 nos, Water seaJ-2 nos, neck ring-I no, guide bush- 5 nos, distance bush-I no, upper bush-lno, upper sleeve-l no, impeller key-I 5' nos

Lot 10100/- 10100/-

15.2 Labour charges for rewinding of motor i/c. rotor sleeveturning & grinding, impeller remetalling turning &grinding-6 job & replacement of above parts

Job 2700/- 2700/-

16.1 RIR of 7.5HP BS make sub. plset no-CRT 552 bycarrying out following works Rewinding kit of motor- Ino, GM bearing bush- 4 nos, Water seal-2 nos, neck ring-4 nos, guide bush- 3 nos, distance bush-2 nos, upperbush-I no, upper sleeve-I no, impeller key-I 5 nos

Lot 10600/- 10600/-

16.2 Labour charges for rewinding of motor i/c. rotor sleeveturning & grinding, impeller remetalling turning &grinding-4 job & replacement of above. parts

Job 2300/- 2300/-

17.1 RlR of 7.5HP BS make sub. plset no-CHT 51 I bycarrying out following works Rewinding kit of motor-lno, OM bearing bush- 4 nos, Water seal-2 nos, neck ring-4 nos, guide busb- 2 nos, distance bush-3 nos, upperbush- I no, upper sleeve-l no, impeller key-I 5 nos

Lot 10600/- 10600/-

Labour charges for rewinding of motor i/c. rotor sleeveturning & grinding, impeller rernetalling turning &

~ ~~w~iin_d_in~1~~-3~j<~'0_b_&__re~ep_lla_c_e_m_e_nt_o~f_a~b,.;.,ov_e~p~lart~s~ L- ~ ~ ~

17.2 Job 2100/- 21001-

Page 3: ~t)...repairing-I job & replacement of aboveparts 3.1 RIR of 5HP BS make sub. plset no-CHT 834 by carrying 1 Lot 7800/- 7800/-out following works Rewinding kit of motor-l no, GM bearing

18.1 RIR of 7.5HP BS make sub. plset no-CHT 293 bycarrying out following works Rewinding kit of motor-Ino, GM bearing bush- 4 nos, Water seal-2 nos, neck ring-2 nos, guide bush- 4 nos, distance bush-2 nos, upperbush-I no, Lipper sleevc-I no, impeller key-l 5 nos

Lot 10300/- 10300/-

18.2 Labour charges for rewinding of motor i/c. rotor sleeveturning & grinding, impeller remetalling turning &arindina-t iob & replacement of above parts

Job 2300/- 2300/-

19.1 RlR of 10HP BS make sub. plset no-CHT 462 bycarrying out following works Rewinding kit of motor-Ino, GM bearing bush- 4 nos, Water seaJ-2 nos, neck ring-7 nos, guide bush- 2 nos, distance bush-3 nos, upperbush-l no, upper sleeve-l no impeller key-l S nos

Lot 12300/- 12300/-

19.2 Labour charges for rewinding of motor ilc. rotor sleeveturning & grinding, impeller rcmetalling turning &grinding-S job & replacement of above parts

Job 2500/- 2500/-

20.1 RlR of 10HP BS make sub. plset no-CHT 121 bycarrying out following works Rewinding kit of motcr-lno, GM bearing bush- 4 nos, Water seal-Z nos, neck ring-5 nos, guide bush- 5 110S, distance bush-S nos, upperbush-l no, upper sleeve- I no, impeller key-I 5 nos

Lot 12800/- 12800/-

20.2 Labour charges for rewinding of motor ik: rotor sleeveturning & grinding, impeller re-metalling turning &grinding-S iob & replacement of above parts

Job 2100/- 21001-

21.1 RlR of 10HP BS make sub. p/set no-CHT 302 bycarrying out following works Rewinding kit of rnotor-Ino, GM bearing bush- 4 nos, Water seal-Z nos, neck ring-2 nos, guide bush- 6 nos, distance bush- 7 nos, upperbush-I no, upper sleeve-I no, lm_jJ_ellerkey-If nos

Lot 12700/- 12700/-

21.2 Labour charges for rewinding of motor i/c. rotor sleeveturning & grinding, impeller re-rnetalling turning &grinding-S iob & replacement of above parts

Job 21001- 2100/-

22.1 RlR of 10HP BS make sub. plset no-CHT 95 by carryingout following works Rewinding kit of motor-I no, GMbearing bush- 4 nos, Water seal-2 nos, neck ring-7 nos,guide bush- 5 nos, distance bush-2 nos, upper bush-I no,upper sleeve-I no, impeller key-If nos

Lot 12600/- 12600/-

22.2 Labour charges for rewinding of motor i/c. rotor sleeveturning & grinding, stamping repairing-I job &replacement of above parts

Job 2200/- 2200/-

23.1 RJR of 10HP BS make sub. p/set no-CHT 108 bycarrying out following works Rewinding kit of motor-Ino, GM bearing bush- 4' nos, Water seal-2 nos, neck ring-I no, guide bush- 4 nos, distance bush-4 nos, upper bush-I no, upper sleeve-I no, impeller key-I 5 nos

Lot 116001- 11600/-

23.2 Labour charges for rewinding of motor i/c, rotor sleeveturning & grinding, impeller remetalling turning &grinding-S job & replacement of above parts

Job 2700/- 2700/-

24.1 RlR of 10HP BS make sub, p/set no-CHT 126 bycarrying out following works Rewinding kit of motor-Ino, GM bearing bush- 4 nos, Water seal-Z nos, neck ring-2 nos, guide bush- 6 nos, distance bush-3 nos, upperbush-l no, upper sleeve-I no impeller key-15 nos

24.2 Labour charges for rewinding of motor ilc. rotor sleeveturning & grinding, impeller remetalling turning &grinding-s iob & replacement of above parts

Lot

Job

11900/-

23001-

11900/-

2300/-

Rs. 276700.00VAT 5% on material Component Rs. 11815.00

Rs. 2, 88,515.00Terms & Conditions:

1. The Work is to be completed within 30 days.2. The time of completion is an essence of this work.3. Payment will be made aftercompletion of work as per actual work done.4. Any other Item/Work, not mentioned specifically in the Departmental specification,

but essential for making the Pump set functional will be supplied/executed, by the'Contractor free of charges.

5. The firm will have to stand guarantee, at least for a period of Six months, against thematerial used and workmanship.

6. The firm has to submit the procurement vouchers of items along with all otherrelevant documents of the material used for execution of work.

Page 4: ~t)...repairing-I job & replacement of aboveparts 3.1 RIR of 5HP BS make sub. plset no-CHT 834 by carrying 1 Lot 7800/- 7800/-out following works Rewinding kit of motor-l no, GM bearing

.) . 7. The firm will have to abide by all the statutory/legislations as applicable.8. While carrying out the job, if any accident or mishap occurs due to any reasons •

whatsoever may be, DJB will neither be responsible nor compensate in any way. Thefirm shall be solely responsible for the same.

9. The residue material shall be returned to the department and shall be deposited in thestore of concerned JE In-charge. ..s;;z. cJ)-

EX.ENGINEER (E&M) W&S(S)-llICopy to1 CE (South)/ DOV/SE (E&M) W&S-I/ EE (EDP) Cell.2 A.O. (E&M) S-I /AE (E&M)-WJE concerned.3. AAO. IDM / C.A.File.4. Mis B.S. Pumps Pvt Ltd.·

Basai Road, Gurgaon-122001 (Hr) India. Acceptance of this order m,please be send to this office duly stamped & signed. ~

EX.ENGINEER (tr~ &S(8)-I11