PRE FEASIBILITY REPORT
OF
M/s. Sayaji Laminates Pvt. Ltd.
Survey No. : 213,Village-Bahutha,
Ta. :Savli , Dist. : Baroda,
Gujrat-391770
Email: [email protected]
Prepared By:
T. R. Associates
C-605/A, Ganesh Meridian, Opp. Kargil Petrol Pump,
S. G. Highway, Ahmedabad.
Mo. No.: 98253 71099
Email ID: [email protected]
1. Executive summary
M/s. Sayaji Laminates Pvt. Ltd. is proposing to manufacture P. F. Resin, M. F. Resin,
& U. F. Resin at Survey No. : 213,Village-Bahutha, Ta. :Savli , Dist. : Baroda, Gujrat-
391770 Proposed unit will manufacture resin for production within its premises as
well as sell purpose.
The total land area of company is 7611 m2 out of which 2525.33 Sq. Mt. land will be
used for greenbelt area development. The estimated cost of the Resin project is 1.0
Crore. Total budget allocation towards Environmental Management Facilities will be
Rs. 15 Lacs. Total 50 persons will be employed including skilled persons, unskilled
persons and office staff.
M/s. T. R. Associates is carried out EIA/EMP studies for Environmental Clearance.
Production details are given below:
No. Product Total Quantity
( MT/Month)
1. Phenol Formaldehyde Resin 400
2. Melamine Formaldehyde Resin 400
3. Urea Formaldehyde Resin 400
Salient Features with in 10 km radius surroundings area as follows:
S.No Important Features Description
1 Location Survey No. : 213,Village-Bahutha,
Ta. :Savli , Dist. : Baroda, Gujrat-391770
2 Topomap F43H7
3 Longitude 73°12'36.38"E
4 Latitude 22°30'37.66"N
5 MSL 45 m
6. Nearest power station MGVCL (Madhya Gujarat Vij Company Ltd.)
7 Proponent Name Mr. Dhirajbhai J. Patel - 9825043996
8 Corporate office address Survey No. : 213,Village-Bahutha,
Ta. :Savli , Dist. : Baroda,
Gujrat-391770
9 Temperature range 140 C to 430 C
10 Annual Rain fall 510 mm
11 Nearest Road NH 158 (0.57 Km)
12 Nearest Railway station Samlya Jn.– 9.95 Km
13 Nearest city Vadodara (21.0 km)
14 Nearest village Lasundra (1.95 km)
15 National HW NO NH 8 (13.41 Km)
16 State HW No SH – 158 (0.57 Km)
17 Seismic Zone Zone-III (Less Active)
18 National Parks / Sanctuary None within 10 Km radius.
2. Project Proponent and their back ground.
Mr. Dhirajbhai J. Patel has more than 5 years experience in field of manufacturing
Resin.
Brief description of nature of the project.
It is a small scale project for production of resin which is used for Laminated Sheets.
Need for the project and its importance to the country and or region.
Formaldehyde resins are used predominantly in the wood products industry as
adhesives. Growth of these resins is strongly correlated to construction/remodeling
activity (which accounts for over 50% of consumption), and to a lesser degree, to the
automotive industry.
The proposed products like Resins (Melamine Formaldehyde, Urea Formaldehyde
and Phenol Formaldehyde) mainly used to produce Electrical Insulation Board and
H.P. Decorative Laminated Sheets. These sheets have good market demand to
develop the home and office for furniture.
Demand-Supply Gap.
The average production of decorative laminates has crossed approximately 130
million sheets inclusive of all thicknesses but the gap between installed capacity and
demand is growing bigger. During FY 2011-2012 phases that gap narrowed with
sudden demand in lower thickness segment but later capacities came in place and
the Decorative laminate market became a pressure driven market.
The below graph shows the gap which indicates more supply means pressure on
pricing, profits etc. It is caution for any new comer that if he enters, he should be
prepared for "More investments, more efforts and a long wait for margins".
The burgeoning market demands of urban and semi-urban India are estimated at Rs
5,00, 000 crore. The demand-supply gap has already attracted foreign players to
India; and the e-retailing boom offers immense business opportunities. But a mere
15% of India's woodworking industry is organized. Its semi-skilled carpenters, self-
styled interior decorators and small-scale local manufacturers will need to be
trained and organized to meet future market demands and exploit business
opportunities.
Imports v/s Indigenous production.
Indian market is open and big that is why every kind of import is booming. Indian
plywood and panel trade has become global place as the consumption of different
imported ply panels are on the rise. Unlike before Indians are now welcomed by
plywood manufacturer of china. Earlier India was a self dependent country for
commercial or high quality plywood, but sharp drop in domestic manufacturing
output has resulted in material sourcing from countries like Burma, Malaysia,
Indonesia, China, Vietnam etc. Now Indian plywood market is somehow curtailed or
competed by incoming panel products from China. Be it film face, decorative,
Laminate or MR plywood everything is now being imported partially or more and is
sold. Indian industrialist must understand the fact that its no more a regional shift, it
is a global shift. Indian technology should be upgraded an updated at par with
international standards.
The working environment in India has changed tremendously. Earlier the trade fairs
were hardly participated by foreign timber, lumber and plywood manufacturing
companies where as now it is flooded with global suppliers.
Export Possibility.
There is only local market of resin. It is an intermediate product for manufacturing
of Laminated Sheets. Liquid resins are quite expensive for export. So we have only
local sale market for distribution.
Employment Generation (Direct and Indirect) due to the project.
This project will provide direct employment to 50 people whereas it will provide
employment to many others indirectly. Plywood and Laminated sheet Industries
provide employment to large number of people.
3. Project Description
(i) Type of project including interlinked and interdependent projects.
Resins including P.F. resin, M.F. resin & U.F. resin are used in production of
laminated sheets and plywood. So Plywood Industries and Laminated sheets
Industries will be interdependent on resin Industries.
(ii) Location
Latitude: 20°37'3.16"N
Longitude: 72°58'5.89"E
Google Image of Proposed Location.
Key Plan of proposed site
(iii) Project description with process details
1. Phenol Formaldehyde Resin:
Manufacturing Process
First all raw materials like phenol, formaldehyde & caustic will be added into closed
vessel.
Stirring & heating will be done up to 60 C. After 60C stop heating.
Reflux is done for 30 minutes up to 98 C.
Vacuum distillation will be started.
Water will be removed from the vessel as per the batch size.
Cooling down to 40C.
Methanol will be added for dilution purpose.
Phenol Formaldehyde Resin will be ready for use in Laminate sheets.
Reaction Chemistry
Process Flow Diagram
Process Flow Diagram
Limped Reaction Vessel
Stirring and heating up
to 60 C
Reflux for 30 Minutes
Vacuum Distillation
Cooling
Dilution
Product: Phenol
Formaldehyde Resin
Phenol
Formaldehyde
Caustic Flakes
Methanol
Water
2. Melamine Formaldehyde Resin:
Manufacturing Process
First all the raw materials melamine & formaldehyde will be added in Limped
reaction vessel.
Stirring & heating will be done upto 95 C for 1 Hr.
Cooling down to 40 C.
Melamine Formaldehyde Resin will be ready for use in Laminate sheets.
Reaction Chemistry
N
N
N
NH2
NH2 NH2
+ CH2 ON
N
N
N
OH
CH2
OH
CH2
fast
melamine formaldehyde
melamine formaldehyde resin
Process Flow Diagram
Limped Reaction Vessel
Stirring and Heating up
to 95C for 1 hr
Cooling at 40C
Product: Melamine
Formaldehyde Resin
Melamine Formaldehyde
3. Urea Formaldehyde Resin:
Manufacturing Process
First all the raw materials Urea & Formaldehyde will be added in Limped
reaction vessel.
pH will be adjusted to pH 9.0 by adding acetic acid.
Stirring & heating will be done upto 95 C for 50 Minutes.
Heating will be continued until tolerance (10:40) is achieved.
pH will be adjusted to 9 by adding Caustic.
Cooling down to room temperature.
Urea Formaldehyde Resin will be ready for use and sale purpose.
Reaction Chemistry
Process Flow Diagram
Stirring and Heating up
to 95C for 50 Minutes
Cooling
Urea Formaldehyde
Resin
Limped Reaction Vessel
Urea Formaldehyde
pH adjusted to 9
Acetic Acid
pH adjusted to 9 Caustic
List of Raw Materials
Sr. No. Name of the
product
Name of Raw
Materials
Quantity in
MT/Month
1 Phenol
Formaldehyde
Resin
Phenol 377.2
Formaldehyde 148.8
Acetic acid 2.0
Caustic 2.0
2 Melamine
Resin
Formaldehyde 240
Melamine 160
3 Urea
Formaldehyde
Resin
Urea 160
Formaldehyde 240
Acetic Acid 2.0
Caustic 2.0
4. Resource optimization/ recycling and reuse envisaged in the project, if any,
should be briefly outlined.
Our main raw materials urea and formaldehyde are easily available from
developmental city like Baroda, Surat etc.
5. Availability of water its source, Energy/ power requirement and source
should be given.
Water source: Bore well
Energy/power requirement: 320 HP from MGVCL
6. Quantity of wastes to be generated (liquid and solid) and scheme for their
Management/disposal.
Solid waste generation and disposal
Sr.
No. Description Category Quantity Mode of Disposal
1 ETP Sludge 34.3 6.1
MT/Month
Collection, storage and
Disposal at TSDF Site
2 Used Oil 5.1
50
Lit./
Month
Collection, storage and
used within premises
as a lubricant / sold to
registered recycler.
3 Discarded
Plastic bags 33.3
6480
Nos./
Month.
Collection, storage &
sell to authorized
vendor
4 Edge Cutting
Waste 23.1
15
MT/Month
Collection, storage &
disposal at common
Incineration facility
Waste water generation and Disposal facility
4800 liter waste water will be generated from the washing activity.
Effluent treatment plant:
(1) 4000 liter/day: boiler Blow down
(2) 200 liter /day: washing
(3) 600 liter/day: cooling tower blow down
Flow Diagram of ETP.
Collection &
Neutralization
Tank
Holding Tank
(Photo Fenton
Reagent)
Evaporator
Primary
Settling Tank Industrial
effluent
7. Schematic representations of the feasibility drawing which give
information of EIA purpose.
4. Site Analysis
(i) Connectivity.
Nearest Railway
station
Samlya Jn. 9.95 Km
Nearest National
highway
NH 8 13.41 Km
Nearest Airport Baroda 20.0 Km
Nearest State highway SH no 158 0.57 km
(ii) Land Form, Land use and Land ownership.
This is a new unit manufacturing of Laminated Sheets.
Fig: 1 Land use pattern
Land possession document are attached as annexure: A.
(iii) Topography (along with map).
Fig: 2 legendry map of Baroda district
(iv) Existing land use pattern.
Existing land use pattern shown in fig no: 1
(v) Existing Infrastructure.
(1) Nearest railway station: Samlya Jn.– Railway station is 9.95 Km from the
project site
(2) Nearest Highway: state highway 158 is 0.57 km from the project site.
(3) Nearest Airport: Baroda is 20.0 km from the project site.
(4) Power: 320 HP from Madhya Gujarat Vij Company limited.
(5) Water : Source of the water is Ground water
(6) Basic amenities:
Educational facility: - Sigma Institute of Technology & Engineering, Waghodiya is 23.1 km from the project site.
Temple: Nilkanth Mahadev Temple is 7.1 km away from the project site.
Hotel: Anand Prakash hotel is 5.7 km away from the project site.
Project site
Post Office: - India post office,Manjusar is 8.8 km away from the project site.
Hospital: - Satyam Hospital, Baroda is 20 km away from the project site.
(vi) Soil classification of district mahesana
Madhya Gujarat region compries of Panchmahal, Dahod, Anand, Kheda, and Baroda
Districts. Dominantly the Soils are very deep, well drained and fine and medium
textured. They are slightly alkaline, slight to strong saline. Soil depth in Madhya Gujarat
is well distributed in two parts. The Soils in western side are dominantly very deep
followed by moderately deep and in eastern part soils are dominantly shallow followed
by moderately shallow. The Soils in Panchmahal, Dahod, Anand, Kheda, and Baroda
District dominantly distributed to very deep soil depth class followed by shallow depth
Moderately deep soil are also observed, Soil salinity in Madhya Gujarat varies from
slight to strong salinity class. In Baroda District soil salinity belongs to slight to
moderate and severe towards coastal. In these districts soil salinity is moderate.
(vii) Climatic data from secondary sources.
STATION:- BARODA YEAR: - 2014 MONTH: - MARCH
ELEMENTS: - (1) WIND DIRECTION & (2) WIND SPEED REPORTED IN KMPH
DA
TE
0830 HRS
IST
1730 HRS
IST
0230 HRS
IST
0530 HRS
IST
1130 HRS
IST
1430 HRS
IST
2030 HRS
IST
2330 HRS
IST
DIR SP
D DIR
SP
D DIR
SP
D DIR
SP
D DIR
SP
D DIR
SP
D DIR
SP
D DIR
SP
D
01 CA
LM 000 W 012 NW 006 NE 004
WN
W 014
SS
W 006
NN
E 006 SW 012
02 S 004 NW 008 SS
W 010 S 004 W 012 NW 014 NW 008 NW 008
03 S 006 N 008 NW 008 NE 006 NN
E 006 NW 008
CA
LM 000
WS
W 012
04 CA
LM 000 W 014
WS
W 008
CA
LM 000
CA
LM 000 W 008 NW 006 NW 006
05 SE 008 w 014 CA
LM 000 NW 006 SW 006 W 014
NN
E 006 SW 008
06 NW 006 NW 008 SW 008 W 010 W 006 W 018 NN
E 006 W 008
07 CA
LM 000 W 014 W 006 W 008 W 012 W 010 NW 008 NW 008
08 W 010 W 018 NW 006 W 010 W 010 NW 018 NW 006 NW 006
09 SE 006 N 012 NW 006 NN
E 006 E 008 NE 010 N 006 N 012
10 E 006 CA
LM 000 NE 010 NE 008 E 022 NE 012
NN
E 008
NN
E 008
11 NN
E 012 NW 008
CA
LM 000
NN
E 012
NN
E 012
NN
E 008 NW 010 NW 010
12 W 010 WN
W 022 N 008 W 010 W 008
WN
W 018 NW 012 NW 012
13 NE 004 NN
E 012
WN
W 008 NW 008 NE 012
NN
E 012
NN
E 010
NN
E 012
14 NN
E 006 NE 012 N 010
NN
E 006 E 018 NE 010
NN
E 010
NN
E 008
15 NN
E 012
CA
LM 000 NE 008
NN
E 014 S 008
CA
LM 000 NW 008 N 008
16 CA
LM 000 W 014 S 006
CA
LM 000
CA
LM 000 NW 008 NW 012 NW 010
17 NW 010 NW 004 N 010 NW 010 NN
E 010 NW 014 SE 004 W 012
18 CA
LM 000 W 010 NW 008
CA
LM 000 N 010 NW 012 E 006 E 006
19 E 006 W 014 S 006 NW 006 NN
E 006 W 012 S 004 W 012
20 W 004 NW 014 CA
LM 000 N 004 NW 004 NW 014
NN
W 006 NW 006
21 NN
W 008 N 012
NN
W 004
NN
W 008 N 006 NW 008 NW 012 NW 012
22 CA
LM 000 NE 010
CA
LM 000
CA
LM 000 E 012 NE 010 N 012 N 010
23 NN
E 012 NW 008
NN
E 008
NN
E 008 NE 010 NE 008 NW 012 N 012
24 CA
LM 000 NW 014
NN
E 012
CA
LM 000
CA
LM 000 NW 008 NW 012 NW 012
25 SW 006 NW 014 NE 008 NE 006 NW 006 NW 008 NW 010 N 012
26 NW 004 NN
W 010
CA
LM 000 NW 012 NW 012
NN
W 012 NW 006
NN
W 006
27 W 008 W 008 N 004 CA
LM 000
NN
E 006 W 008 W 006
CA
LM 000
28 N 012 NW 014 W 014 CA
LM 000 N 008
WN
W 010
WN
W 008 NW 006
29 NE 004 NW 014 WN
W 006 NE 006
NN
W 006 NW 014 W 012 NW 012
30 CA
LM 000
WN
W 012 NW 012 NW 010 NW 006
WN
W 006 SW 006 SW 014
31 SS
W 012 W 008 W 010
SS
W 014 SW 008 W 008 W 008 SW 008
DAILY METEOROLOGICAL DATA
STATION: - BARODA YEAR:- 2014 MONTH:- MARCH
ELEMENT: - RELATIVE HUMIDITY IN % (PERCENTAGE)
DATE 0830
HRS
IST
1730
HRS
IST
0230
HRS
IST
0530
HRS
IST
1130
HRS
IST
1430
HRS
IST
2030
HRS
IST
2330
HRS
IST
1 061 043 066 080 049 044 054 062
2 077 044 069 081 057 041 061 079
3 081 034 080 084 044 036 053 063
4 082 037 079 084 047 036 044 057
5 061 023 068 082 033 026 037 049
6 058 048 055 064 054 042 055 060
7 072 032 064 078 045 030 055 059
8 066 035 072 082 039 033 055 064
9 082 032 073 082 038 037 025 042
10 047 015 051 064 015 013 027 038
11 046 022 047 048 020 022 027 044
12 054 020 059 065 031 020 036 052
13 057 022 058 062 056 031 027 038
14 053 022 044 065 019 016 030 053
15 060 017 068 076 027 020 034 053
16 043 023 057 062 026 020 035 040
17 054 023 052 066 031 025 035 044
18 054 025 051 066 028 023 031 033
19 058 022 059 070 031 023 031 039
20 054 024 048 062 041 028 034 044
21 044 020 052 046 030 019 028 039
22 044 021 045 060 022 015 029 037
23 063 019 054 075 024 019 027 034
24 042 020 058 057 018 017 027 031
25 052 017 056 065 023 016 035 042
26 052 014 048 053 025 016 035 043
27 044 027 048 053 038 022 033 042
28 052 019 049 049 033 023 038 044
29 048 020 047 063 029 019 030 031
30 042 022 038 043 027 027 036 038
31 075 032 043 075 044 033 041 044
(viii) Social Infrastructure available.
Educational facility: - Sigma Institute of Technology & Engineering,
Waghodiya is 23.1 km from the project site.
Temple: Nilkanth Mahadev Temple is 7.1 km away from the project
site.
Hotel: Anand Prakash hotel is 5.7 km away from the project site.
Post Office: - India post office,Manjusar is 8.8 km away from the
project site.
Hospital: - Satyam Hospital, Baroda is 20 km away from the project
site.
5. Planning Brief
(i) Planning Concept (type of industries, facilities transportation etc) Town
and Country Planning/Development authority Classification.
It is Laminated sheet manufacturing industry located in Baroda district. Total
available area is 7611 sq. meter out of it 2525.33 sq. meter area will be
provided as a greenbelt area. Industry wants to manufacture different types
of resin used in laminated sheets manufacturing plant.
(ii) Population Projection
In 2011, Vadodara had population of 4,165,626 of which male and female
were 2,153,736 and 2,011,890 respectively. In 2001 census, Vadodara had a
population of 3,641,802 of which males were 1,897,368 and remaining
1,744,434 were females. Vadodara District population constituted 6.89
percent of total Maharashtra population. In 2001 census, this figure for
Vadodara District was at 7.19 percent of Maharashtra population.
(iii) Land use planning (breakup along with green belt etc).
1 Built Up Area 3303.75 Sq mt
2 Green belt area 2525.33 Sq. mt
3 Open/ Road area 1781.92 Sq. mt
Total Area 7611.00 Sq. mt
(iv) Assessment of Infrastructure Demand (Physical & Social).
Super Specialty and modern health facilities and medical stores are needed
around.
(v) Amenities/Facilities.
Industry will provide 2.5 % of total profit for CSR activity.
6. Proposed Infrastructure
(i) Industrial Area
Industry will provide 3303.75 square meters built up area for industrial
process activity. Which provide all needed facility including proper
ventilation, safe handling system, etc.
(ii) Residential Area
Industry will provide labor quarter for their labors and provide all basic
facilities to them.
(iii) Green Belt.
2525.33 sq. meter area will be proposed for greenbelt development. Approx
1262.66 sq. mt area will be proposed for tree cover area (approx 46 trees).
(iv) Social Infrastructure.
The PP proposes the following social infrastructure facilities within 10.0 km periphery of the proposed project.
Education Facilities:-Many Facilities for village schools like game kits, drawing kits, table-chairs; school construction (classroom/toilet/school boundary), ceiling fans/ coolers or books for school library are proposed.
Health Facilities:-The PP proposes to provide assistance to existing health facilities in Nearest Hospital, for improvement in health facilities or services.
(v) Connectivity
The nearest city is Vadodara. Approaching road state highway no 158 is 0.57 km
away from the project site.
(vi) Drinking Water Management
Out of 20362 liter/day water approx 6750 liter water will be consume for
domestic purpose; 4500 L/day water will be consume for green belt
development and 9112 liter/ day fresh water will be used for industrial purpose.
(vii) Sewerage System.
Domestic waste water 6500 liter/day will be disposed through soak pit system.
(viii) Industrial Waste Management.
9840 liter/day waste water will be generated from the process activity. It
will be treated in effluent treatment plant and evaporate after treatment.
(ix) Solid Waste Management
Used oil, ETP waste, discarded bags are the main solid hazardous waste
generated from the proposed unit. Used oil will be send to register recycler,
ETP sludge will collected from sludge drying bed, stored into solid waste
storage area and disposed to authorized TSDF site. Discarded bags will be
sold to approved vendor.
(x) Power Requirement & Supply / source
320 HP from MGVCL.
7. Project Schedule & Cost Estimates
(i) Likely date of start of construction and likely date of completion
Start construction work: 1st week of December, 2015
Completion of construction work: June, 2016
(ii) Estimated project cost along with analysis in terms of economic viability of the
project.
Total project cost of resin is around 1 crore.