T. Lahey, M. de Salvo, SCCS networking
Undulator Accelerator Network Status [email protected]
1/22/081
LCLS Undulator Week@SLAC
Undulator Network Status
Controls (1300 hrs, Redwood Rm A/B)
T. Lahey, M. de Salvo, SCCS networking
Undulator Accelerator Network Status [email protected]
1/22/082
Agenda
Accelerator Network Infrastructure supports I&C Ethernet and MPS
Design Overview
Cable Plant Davis Bacon Phase IV & Phase V Contracts
Fiber Termination Contract
Integrating with other networks:
Alignment Diagnostics System Network: G. Gassner
Conventional Facilities: J. Sevilla
Photon Sections: G. Haller
SLAC Scientific Computing and Computing Services (SCCS) centralized networking groups are helping with all networks
T. Lahey, M. de Salvo, SCCS networking
Undulator Accelerator Network Status [email protected]
1/22/083
Network Design
Accelerator Switches reside in service buildings 913 and 921 to reduce heatload
B913: UIR 1-15B921: UIR 16-33
3 cat6 cables to each UIR: CA ethernet, power reset, console portCat6 longhauls between service building patch panels and cat6 boxes at racks4 walkup stations: one each COW and wirelessOther IOCs are located in service buildings: MPS, BPM, etc.Fiber Trunks support ethernet switches and MPS
T. Lahey, M. de Salvo, SCCS networking
Undulator Accelerator Network Status [email protected]
1/22/084
Davis Bacon & Fiber Contracts
Phase IV: install and test cat6 longhauls
LNET14 is UIR cables
Phase V: fiber pull
Fiber Termination Contract: terminate and test fibers
T. Lahey, M. de Salvo, SCCS networking
Undulator Accelerator Network Status [email protected]
1/22/085
Phase IV Cable Plant Schedule
T. Lahey, M. de Salvo, SCCS networking
Undulator Accelerator Network Status [email protected]
1/22/086
T. Lahey, M. de Salvo, SCCS networking
Undulator Accelerator Network Status [email protected]
1/22/087
Activate Connections
Commission Switches
Install jumper cables