Page 1: T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status lahey@slac.stanford.edu 1/22/08 1 LCLS Undulator Week@SLAC Undulator Network

T. Lahey, M. de Salvo, SCCS networking

Undulator Accelerator Network Status [email protected]

1/22/081

LCLS Undulator Week@SLAC

Undulator Network Status

Controls (1300 hrs, Redwood Rm A/B)

Page 2: T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status lahey@slac.stanford.edu 1/22/08 1 LCLS Undulator Week@SLAC Undulator Network

T. Lahey, M. de Salvo, SCCS networking

Undulator Accelerator Network Status [email protected]

1/22/082

Agenda

Accelerator Network Infrastructure supports I&C Ethernet and MPS

Design Overview

Cable Plant Davis Bacon Phase IV & Phase V Contracts

Fiber Termination Contract

Integrating with other networks:

Alignment Diagnostics System Network: G. Gassner

Conventional Facilities: J. Sevilla

Photon Sections: G. Haller

SLAC Scientific Computing and Computing Services (SCCS) centralized networking groups are helping with all networks

Page 3: T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status lahey@slac.stanford.edu 1/22/08 1 LCLS Undulator Week@SLAC Undulator Network

T. Lahey, M. de Salvo, SCCS networking

Undulator Accelerator Network Status [email protected]

1/22/083

Network Design

Accelerator Switches reside in service buildings 913 and 921 to reduce heatload

B913: UIR 1-15B921: UIR 16-33

3 cat6 cables to each UIR: CA ethernet, power reset, console portCat6 longhauls between service building patch panels and cat6 boxes at racks4 walkup stations: one each COW and wirelessOther IOCs are located in service buildings: MPS, BPM, etc.Fiber Trunks support ethernet switches and MPS

Page 4: T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status lahey@slac.stanford.edu 1/22/08 1 LCLS Undulator Week@SLAC Undulator Network

T. Lahey, M. de Salvo, SCCS networking

Undulator Accelerator Network Status [email protected]

1/22/084

Davis Bacon & Fiber Contracts

Phase IV: install and test cat6 longhauls

LNET14 is UIR cables

Phase V: fiber pull

Fiber Termination Contract: terminate and test fibers

Page 5: T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status lahey@slac.stanford.edu 1/22/08 1 LCLS Undulator Week@SLAC Undulator Network

T. Lahey, M. de Salvo, SCCS networking

Undulator Accelerator Network Status [email protected]

1/22/085

Phase IV Cable Plant Schedule

Page 6: T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status lahey@slac.stanford.edu 1/22/08 1 LCLS Undulator Week@SLAC Undulator Network

T. Lahey, M. de Salvo, SCCS networking

Undulator Accelerator Network Status [email protected]

1/22/086

Page 7: T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status lahey@slac.stanford.edu 1/22/08 1 LCLS Undulator Week@SLAC Undulator Network

T. Lahey, M. de Salvo, SCCS networking

Undulator Accelerator Network Status [email protected]

1/22/087

Activate Connections

Commission Switches

Install jumper cables