11
~ 'n~ ~1\ilIi•• aT ~ .(~~~~~) ""'-~ National Highway Authority of India (Ministry of Road Transport & Highways) ~ I Phone: 0866 - 2483910 2474496 ~ I Fax: 0866 - 248~909 Fmr I E-mail: vij@nhaLorg l1R'41'i111 Cf)1'4r~'41 ~, 'IffiC~ - 21, ~ qm;r;fj, 1b"lI"lCfi "f1R iTs, Pci\1l4qlsl-520 008, \3lt.~. PROJECT IMPLEMENTATION UNIT, Plot No. 21, TEACHER'S COLONY, GURUNANAK NAGA..R ROAD VlJA.YAWADA. 520 008. A.P. Ref:11082/PIUNINHAII2014-151 ~ Date': '24-03-2015 To The Team Leader, MIs. COM Smith Inc JV with Wilbur Smith Associates Pvt. Ltd., D. No. 8-208/1, 1 st Floor, Maithri Nagar, Kannuru, Vijayawada - 520 007. Sir, Sub: NHAI, PIU-Vijayawada - Six laning from Vijayawada - Gundugolanu Section of NH-5 from Km.1022.480 to 1055.650 and from 1060.800 to Km.1076.480 including 6-lane Hanuman Junction Bypass (Length 6.72 Km.) and 4-lane Vijayawada Bypass (Length 47.88 Kms.) (Total length 103.59 Km.) in the State of Andhra Pradesh to be executed as BOT (Toll) on DBFOT Pattern under NHDP Phase V- Shifting I relocation of electrical utilities falling in the alignment - Request to furnish Undertaking as requested by NHAI, HQ - Reg. Ref: Letter no. SE/ONJNComIlF.Turnkey/D.No.2752/14, dt.18.03.2015 of SE, Operation, APSPDCL, Vijayawada. ***** Vide reference cited, APSPDCL, has provided modified estimates for shifting / relocation of electrical utilities falling within the proposed ROW' in the Section of Gollapudi Section of Vijayawada Town Division in Krishna District. Copy of the estimate is enclosed herewith, with a request to ~ examine the estimates with reference to earlier estimates provided by utility dept. ~ verify arithmetically, ~ check the correctness of the estimates prepared by utility agencies as per Circular instructions of NHAI, HQ vide Policy Matter - Technical (127/2013) ~ examine the various provisions made in the estimate with reference to Circular no. Technical (148/2014) of NHAI, HQ, on "Policy for sanction and payment of electrical utility shifting estimates" and submit your report / recommendation at the earliest. ~ to submit undertaking / certificate as called for in the NHAI, HQ, Circular dated 07.03.2013 in the earliest possible time. '. . "i; : ~ . Yours faithfully, .. 4~:' (G. Sreedhar) Project Director LNHAI, PIU, Vijayawada. ""'}\{\> . ~ RECEIVED Enc!. : As above. ~ (,~~- \ .:·_~:·l;tn WSAPL . JV - VJA-GGLN ", "'' '.,-:--=------,r----,r----~___J Oi""!... '-7'"bJ.S Time q't>() A-M ~. No: .l.t '3 ~ SIGN. Wtf4a Cfllqf&lq: ~-5 ~ 6, m-10, ~, ;rt ~-110 075, ~ ire : http:\\~.nhai.org - . . Corporate Office: Plot No. G-5 & 6, Sector -10, Dwarka, New Delhi -110 075, Website: http:\\www.nhai.org ---------------------------------===============================~~~~~~~

t;~~ from Kaza to Gannavaram Road in Gollapudi Section of ...nhai.org.in/spw/CorrespondenceIssues/NHAI L.NO.2636.pdf · and risk,in case of execution of the work is not satisfactory

Embed Size (px)

Citation preview

Page 1: t;~~ from Kaza to Gannavaram Road in Gollapudi Section of ...nhai.org.in/spw/CorrespondenceIssues/NHAI L.NO.2636.pdf · and risk,in case of execution of the work is not satisfactory

~ 'n~ ~1\ilIi••aT ~.(~~~~~)

""'-~ National Highway Authority of India(Ministry of Road Transport & Highways)

~ I Phone: 0866 - 24839102474496

~ I Fax: 0866 - 248~909

Fmr I E-mail: vij@nhaLorg

l1R'41'i111 Cf)1'4r~'41 ~, 'IffiC~ - 21, ~ qm;r;fj, 1b"lI"lCfi "f1R iTs, Pci\1l4qlsl-520 008, \3lt.~.PROJECT IMPLEMENTATION UNIT, Plot No. 21, TEACHER'S COLONY, GURUNANAK NAGA..R ROAD VlJA.YAWADA. 520 008. A.P.

Ref:11082/PIUNINHAII2014-151 ~ Date': '24-03-2015

To

The Team Leader,MIs. COM Smith Inc JV with

Wilbur Smith Associates Pvt. Ltd.,D. No. 8-208/1, 1st Floor,Maithri Nagar,Kannuru, Vijayawada - 520 007.

Sir,Sub: NHAI, PIU-Vijayawada - Six laning from Vijayawada - Gundugolanu Section of NH-5

from Km.1022.480 to 1055.650 and from 1060.800 to Km.1076.480 including 6-laneHanuman Junction Bypass (Length 6.72 Km.) and 4-lane Vijayawada Bypass (Length47.88 Kms.) (Total length 103.59 Km.) in the State of Andhra Pradesh to be executed asBOT (Toll) on DBFOT Pattern under NHDP Phase V - Shifting I relocation ofelectrical utilities falling in the alignment - Request to furnish Undertaking asrequested by NHAI, HQ - Reg.

Ref: Letter no. SE/ONJNComIlF.Turnkey/D.No.2752/14, dt.18.03.2015 of SE, Operation,APSPDCL, Vijayawada.

*****Vide reference cited, APSPDCL, has provided modified estimates for shifting / relocation of

electrical utilities falling within the proposed ROW' in the Section of Gollapudi Section of VijayawadaTown Division in Krishna District.

Copy of the estimate is enclosed herewith, with a request to

~ examine the estimates with reference to earlier estimates provided by utility dept.

~ verify arithmetically,

~ check the correctness of the estimates prepared by utility agencies as per Circularinstructions of NHAI, HQ vide Policy Matter - Technical (127/2013)

~ examine the various provisions made in the estimate with reference to Circular no.Technical (148/2014) of NHAI, HQ, on "Policy for sanction and payment of electricalutility shifting estimates" and submit your report / recommendation at the earliest.

~ to submit undertaking / certificate as called for in the NHAI, HQ, Circular dated07.03.2013 in the earliest possible time.

'. . "i; : ~ .

Yours faithfully, ..

4~:'(G. Sreedhar)

Project DirectorLNHAI, PIU, Vijayawada.

""'}\{\> .

~ RECEIVEDEnc!. : As above.~ (,~~- \ .:·_~:·l;tnWSAPL . JV - VJA-GGLN","'' '.,-:--=------,r----,r----~___J

Oi""!... '-7'"bJ.S Time q't>() A-M

~. No: .l.t '3 ~SIGN.

Wtf4a Cfllqf&lq: ~-5 ~ 6, m-10, ~, ;rt ~-110 075, ~ ire : http:\\~.nhai.org- . .Corporate Office: Plot No. G-5 & 6, Sector -10, Dwarka, New Delhi -110 075,Website: http:\\www.nhai.org

---------------------------------===============================~~~~~~~/

Page 2: t;~~ from Kaza to Gannavaram Road in Gollapudi Section of ...nhai.org.in/spw/CorrespondenceIssues/NHAI L.NO.2636.pdf · and risk,in case of execution of the work is not satisfactory

~t§> S~I!RNPOW[<:R IlISTIUO ITION COMI'ANY Oil A.I'.LIMITIW

~~O.'ECTDIIy~'\""'~·~'U.vI.:." 14~t<;.·)':

From cS-0 At()

The Superintending F ~m~cl"(Ct fOAII" ,,-- ':f If.;Pmject Director,Operation,APSPDC ~ ;W1~~JAl, Project ImplementationUnit (130'1'),VIJAVAWADA-520. b '5\.i f.' !-4,~ilool',ILNo: 10-3-653/1 O.26913RT.

'(",,~AIRYNo '~~~~~,)iijayanagarColony,~YS AUiu~ .•,.~.. I-IYDERABAD - 500 057,

r:~-Lr.No. SE/O IV.JA/ComIlF.Turnl,c Unsisl I).No. Y 114<It. . 03 .2015Sit"

Sub r- EOCV - Revisedestimate tor shining of HT/LT lines and DTRs dueto 4 lanning ofNH5~~ from Kaza to Gannavaram Road in Gollapudi Section of Vijayawada Town Division

t;( under DC works on Turnkey basis asPCI' the requestofNHAI- Permission to execute the~ ' (work on "Turnkey Basis" by the prospective consumer - Accorded - Reg.

~. \"'

~V/~' Ref:- 1) MemoNo.CGM/OIDE.CommI/F.911D.No.272/13, dt:l1.3.13.

/~ 2) MemoNo.CE/Z/VJA/ADE/AAE.CommI/F.No, ID.No.3550/12, dt:14.3,13.3) Memo.No. CE/Z/VJAIADE/AAE.CommIlF.No. ID.No.2694/14, dt.29.11.14.4) Lr.No.SE/O/VJAIAE.CommI/F.lO.No.2449I1S, dt.1'2.02.1S.5) Memo.No.CE/Z/VJA/ADE/AAE.Comml.lF.No. 15/D.No.6701l S, dt.07.03.1S.

@@@

This has reference to the letter cited above.

As per the delegation of powers and after careful consideration of your aboverepresentation, the Superintending Engineer, Operation, Vijayawada is pleased to accord permissionto execute the above work on "TURN KEY BASIS" by the prospective consumer for shifting ofHT/LT lines and DTRs due to 4 lanning of NH5 from Kaza to Gannavaram Road in GollapudiSection of Gunadala Division under DC works on Turnkey basis as per the request of NHAI underdepartmental supervision subject to following conditions.

1. The works should be executed by a licensed electrical contractor as per standards of APSPDCL

under supervision of APSPDCL officials andshould be completed within 60 days fromthe date of approval.

2. Performance guarantee shall be submitted for an amount of10% of gross estimated value ofworks by way of DD or Bank Guarantee issued by any Nationalized/Scheduled Bank. forperformance guarantee period of 12 months from the date of charging with 6 months claimperiod thereafter.

3. The works should be executed by licensed contractor as per the specification and standards ofAPSPDCL under the supervision of APSPDCL officials.

4. The material used in the works should conform to APSPDCL specification.5. Major material like supports, conductor, structural steel etc., should be purchased from the

approved vendors registered with the APSPDCL original warranty card to be handed over toAPSPOCL officials.

6. The INo. lOOKVA DTRs are to be procured by the consumer from the registered vendors ofAPSPl)CL only.

7. Original purchase bill to he produced to the Divisional EngineerlOperationiTownVijuyowuda.8. The DTR is to be tested at SPM Section, Vijayawada in all aspects after ~a~ment of necessary

fees. .' .

9. The DTR must be of three star rating with low losses and to be guaranteed for a period of 5 yearsfrom the date of manufacturing.

r'1 _ ~_.•..3 _ __ .. - - . "

--

Page 3: t;~~ from Kaza to Gannavaram Road in Gollapudi Section of ...nhai.org.in/spw/CorrespondenceIssues/NHAI L.NO.2636.pdf · and risk,in case of execution of the work is not satisfactory

··2··

10, It is the responsibility of the consumer to replace01' to nrrungc for rcctlflcutlon if the TnmsformerJails within the guarantee period,

II. Maximum allowable losses at rated voltage und frequencyat 75 C shall be uspel' the standardsofBEE(Bureali of Energy Efficieency) I{)\' IOOKVt\ maximum losses ut50% load is 520W at100% LOAD IS 1800W,

12. The Major material likeconductor and supports should be got testedand should be certified byDivil.Elecl.Engineer, Meters & Protection, Yijayawada under the control of the SuperintendingEngineer, Operation, Vijayawada at theManufacturers works 01' by producing testcertificatesfrom the manufacturers by the consumers,

13. If any unforeseen calamities/accidents occurred during the execution of the above works. TheAPSPDCL shall not be held responsible for such incidents andconsequential losses or damage.

14. You are requested to handover all the works executed by you to APSPDCL after completion infull shape.

15. The APSPDCL reserved the right to get the works executed by an alternate agency at your costand risk,in case of execution of the work is not satisfactory and not as per specification by theAPSPDCL.

16. The Project Director/ NHAI, Project Implementation Unit (BOT) would be executing the aboveworks on turnkey basis and the APSPDCL will only collect supervision charges.

17. Theworks will be checked regularly by our quality control wing.18, The defects if any pointed out shall be rectified by the contractor at his cost. Thisclause applies

to defective workmanship or material pointed out during guarantee period. Right of way fortower foundations, erection of towers and stringing shall be arranged by you only.

19.After charging the line will become the property of APSPDCL.20. You have to pay an amount of Rs.7,76,080/- towards10% Supervision charges through

Demand draft and shall be drawn in favour of Divil.Elecl.Engineer, Operation", APSPDCL,Gunadala payable at Vijayawada payable at Vijayawada and the same shall be handed over tothe Asst.Divil.Engineer, Operation, D-l, Vijayawada.

21. You are exempted "from payment of Service Line Charges as you are executing the work ofService Lines including supply of materials in "TURN KEY BASIS".

22. You are requested to handover delivery challan in original and receipt of payment of excise dutyon the material purchased by you to the concerned field officer.

The permission is accorded subject to the conditions if the Major Materials like Supports, Conductors,Insulators, Transformers etc., are not available in the concerned District Stores.Further details you may contactAsst.Divil.Engineer, Operation, D-l,Vijayawada or Divil. Elecl.Engineer, Operation,Town, Vijayawada.

Yours fithfulJ /'

SUPERINTEJ~ ENGINEER,OPERATION:: VIJAYAWADA.

Encl:-List of material

Copy to the Divil.Elecl.Engineer, Operation,.~:rO(tVOl~,Copy to the Divil.Elecl.Engineer,M & P,Vijayawada.(Encl:-lNo. Estimate)

" Copy to the Asst.Divil.Engineer, Operation, D-l,Vijayawada ..Copy to the Asst.Engineer, Operation,Gollapudi.Copy submitted to the Chief Engineer, Zone.Vijayawada.

Page 4: t;~~ from Kaza to Gannavaram Road in Gollapudi Section of ...nhai.org.in/spw/CorrespondenceIssues/NHAI L.NO.2636.pdf · and risk,in case of execution of the work is not satisfactory

SI.No Materials Quantity1 AAA conductor Scrap 230 Kgs

2 MS Scrap 60Kgs

SUPERINTE~ ENGINEER,OPERATION:: VIJAYAWADA.

List of ntlltcriuls to he m'ocul'cd hy thc npplicnnt

... _. ',' .-,-,,------.-.---.--- ...~. .-_._---SI.No Muteriuls Quuntity.-.--.-.-1. AAA C()n~llIctol' 109!~E!~!~!._........____ 1850mb;;

2. AAA Conductor 55 sq.mm 1150mt8--.--, . .... -

3. 33KY 01 Pins 18 Nos33KV METAL PARTS(B&S)

. ---1 •.·.•.· .

4. 60Nos5. 33 KV Pin Insulators 18 Nos6. 33 KV 70 KN Composite Polymer Insulator 48 Nos7. llKY OI Pins 9Nos8. IIKY Metal Parts (C & T) 6 Nos9. llKV Pin Insulators 9Nos10. l1KV Polymer Insulators (C&T) 18 Nos11. LT Shackles 36 Nos12. LT Pin Insulators 18 Nos13. LT Metal Parts 36 Sets14. LT GI Pins 18 Nos15. A TY(SPL)Dist. box with 300A,SOOV,fuse 1 No16. MS channel 100XSO 130 Kgs17. MS Flat 75X8mm 60Kgs18. 9.1Mts 280KGS Pscc poles 6 Nos19. 12.5Mts pscc spun poles 3 Nos20. Alluminium lugs 150sqmm 30 Nos21. MS Bolts & Nuts 5/8"X4" 17 Kgs

22. 33KV M.S.Stay Clamps 2 Nos23. 33 KV MS. Stay sets with base plate 2 Nos24. l1KV GUY Insulators (HT) 4 Nos25. MS Angle 65X65X6 80Kgs

26. 11KV Lightning Arrestors line type 3 Nos27. l1KV Tapping X Arm W 100x50MM MS Channel 2M28. llKV MS M.S Channel cross arm(tapping)75x40 2 Nos29. l1KV MS stay set with clamps 2 Nos30. 11 KV 3-ph HG Fuse set 1 No31. GI staywire 7/3.15MM (lOSWG) SOmts32. GI wire 4MM (No.8) lOmts

33. 11KV 200A TT AB Switch with Insulators 1 SET

34. 33KV Taping channel X arms 6 Nos

35. LT XLPE.Cable single core 150 sqmm. 60M--.36. VI earth pipe 40mm 2.5 mts long 1 No

37. CI earth pipe 80MM DIA 2.5Mts length 2 Nos

38. 3ph 1OOKVA amorphous al cony rate 1No

LESS CREDITS:

Page 5: t;~~ from Kaza to Gannavaram Road in Gollapudi Section of ...nhai.org.in/spw/CorrespondenceIssues/NHAI L.NO.2636.pdf · and risk,in case of execution of the work is not satisfactory

Ref : 1. Memo.No.CGM/O/DE.Comml./F.91/D.No.272/13,dt: 11-03-13.2. Memo.No.CE/Z/VJA/ADE/AAE.Comml./F.jD.No.3550/12,

dt:14-03-13.3. Memo.No.CE/Z/VJA/ADE/AAE.Comml./F./D.No.2694/14,

dt:29-11-14.4. l-r.No.SE/O/VJA/ AE.Comml./F./D.No.2449/15,dt: 12-02-15

(Received on 18-02-15J

SOUTHERN POWER DISTRIBUTION COMPANY OF A.P.LIMITEDZONAL OFFICE :: VIJAYAWADA

MemQ.NQ.Ce/Z/VJA/ApE/AAe.CQmm!.lE.NQ.15/P,NQ~lO 115.dti1 -03-15

Sub: Elecy(O) - CE/ZONEjVJA - Revised estimate for shifting ofHT/LT lines and DTRs due to 4 lannlng of NH5 from Kaza toGannavaram road In Gollapudl Section of Vljayawada TownDivision under DC works on Turnkey basis as per request ofNHAI - Sanction - Accorded - Regarding.

***The Superintending Engineer, Operation, Vijayawada has submitted

revised estimate vide reference (4) cited for shifting of HT/LT lines andDTRs due to 4 lanning of NH5 from Kaza to Gannavaram road inGollapudi Section of Vijayawada Town Division under DC works onTurnkey basis as per request of NHAI with an estimated cost ofRs.68,46,095/-(G) & Rs.68,39,220/- (N).

After careful consideration of the proposals and in exercise of thepowers delegated in Annexure to S.O.O.(CGM-HRO), MS.No.96, dt:Ol-09-0B,the Chief Engineer, Zone, Vijayawada accords sanction the above estimate foran amount of Rs.68,46,095/-(G) & Rs.68,39,220/- (N) under DC worksduly superseding the estimate vide sanction no.CE/Z/VJADC.No.97/2014-15. dt.29-11-15.

The estimate is sanctioned under DC works and Registered as ChiefEngineer, Zone, Vijayawada DC.No.144/2014-15,dt:07-03-15.

Detailed work estimates may be got sanctioned from competentauthority wherever lumpsum provisions are made.

The expenditure is chargeable to the applicant.

The works is to be taken-up after collecting an amount ofRs.7,76,080/- from the NHAI authoritiestowards 10% Supervision chargesfrom NHAI authorities subject to the following conditions.

1. The 3Nos. 100KVA DTRs are to be procured by the consumer from theregistered vendors of APSPDCLonly.

2. Original purchase bill to be produced to the DivisionalEngineer/Operation/ Town Vijayawada.

3. The DTRs are to be tested at SPM Section, Vijayawada in all aspectsafter payment of necessary fees.

4. The DTR must be of three star rating with low losses and to beguaranteed for a period of 5 years from the date of manufacturing.

5. It is the responsibility of the consumer to replace or to arrange forrectification if the Transformer fails within the guarantee period.

Page 6: t;~~ from Kaza to Gannavaram Road in Gollapudi Section of ...nhai.org.in/spw/CorrespondenceIssues/NHAI L.NO.2636.pdf · and risk,in case of execution of the work is not satisfactory

6. Maximum allowable losses at rated voltage and frequency at 75°C shallbe as per the standards of BEE (Bureau of Energy Efficiency) for100KVA maximum losses at 50% load Is 520W at 100% load Is 1800W.

7. It is the responsibility of the concerned Assistant DivisionalEngineer/Operation to look over the quality of the work.

8. It Is the responsibility of the Divisional Engineer/Operation/TownVijayawada and the Divisional Englneer/M&P/Guntur to check measurethe materials at the site before commencement of the said work dulycollecting the bills for all the materials.

9. The work is to be executed by the approved contractors of APSPDCLduly following all other departmental procedures In vogue.

Note : The removed materials shall be handed over to District Stores,Gunadala.

End: 1 No. Estimate.

Sd/- K.RAlABAPAIAHCHIEF ENGINEER(ZONE)APSPDCL:VIJAVAWADA.

ToThe Superintending Engineer, Operation, APSPDCL,Vijayawada.Copy to the Divisional Engineer, Operation, APSPDCL,Town Vijayawada.Copy to the Divisional Engineer, M&P, APSPDCL,Vijayawada.Copy to Assistant Divisional Engineer, Operation, APSPDCL,01 Vijayawada.Copy to the Senior Accounts Officer, Central Office, APSPDCL,Vijayawada.Copy to the Chief General Manager, Operation, APSPDCL,Tirupati.

II F.B.O. /1

ADDL. ASSIST~EER/COMML'

E:\20IJ-15'~"AE.{"nll\lHI\I='~I;"'''IM:\nr ••·•••.l-~II' D.••·;~~.• (' •.,•.•:_..••••. , .•••. _.•.•.•..••••. ., •.•

Page 7: t;~~ from Kaza to Gannavaram Road in Gollapudi Section of ...nhai.org.in/spw/CorrespondenceIssues/NHAI L.NO.2636.pdf · and risk,in case of execution of the work is not satisfactory

SOUTHERN POWER DISTRIBUTION COMPANY OF AP LIMITED

Shifting 33KV,11KV ,& LT Lines @ NHAI

REPORT TO ACCOMPANY THE ESTIMATE

The revised estimate is for shifting of 33KV,11 KV & LT lines along NH5 from Kaza to Gannavaram road of Gollapudlsection due to proposed 41ane of NH5 by NHAI under DC works under Turnkey basis as per cost data 2014-15.

The National Highway Authority of India has Informed that they have proposed new 4 lane of Kaza to Gannavaram ofNH5 road and requested for shifting of electrical lines which are causing obstruction for widening of road under Turnkeybasis.

Hence an estimate was prepared and sanctioned for shifting of lines under DC works on Turnkey basis vide CE/ZNJADC.No.122/2012-13, Dt,14.03.2013,but the NHAI Authorities have not paid the amount so far. Further the NHAIauthorities have represented that the proposed towers in the sanctioned estimate are not sufficient to arrange verticalClearance as per standards. Hence the revised estimate is sanctioned for modifying the size of towers with cost data2013-14 vide sanction nO.CE/ZNJA DC.No.97/2014-15,dt:29-11-14. But the cost is revised w.e.f 19-02-15. Hence theestimate is revised as per cost data 2014-15.

The proposal involves the following:

1.Erection of 2set of (4No's) M+12 Towers for 2Nos. 33KV line crossings on both sides of roads (location No.21&23).2.Erection of 1 set of (2no's) M+ 12 Towers for 11KV line crossing on both sides of road.(Location No.19)3. Erection of 1 set of (2no's) M+9 Towers for LT line crossing on both sides of road.(location No.16).4. Erection of 1 set of (2no's) M+9 Towers for LT line crossing on both sides of road.(location No.18).5 ..Erection of 1 set of (2no's) M+12 Towers for LT line crossing on both sides of road. (location No.20).6. Erection of O.09KM 33KV line with 100sqmm AM Conductor over proposed 12.5mtsSpun poles.(location No.21 &23).7. Erection of 0.01 KM 11KV line with 1OOsqmm AAA Conductor over proposed 12.5mts Spun poles. (location No.19).8. Erection of 1No. 100KVA DTR to avoid LT crossing(location No.19).9. Dismantlement of 0.23km 33KV line(location No.21&23).10. Dismantlement of O.08KM 11KV line (location No.19).11. Dismantlement of 0.24KM LT line(location No.16,18,19 & 20).

The total cost of the estimate works out to Rs.68,46,095/-(Gross) & Rs.68,39,220/-(Net).

10% Quality Control & Testing charges: An amount of RS.7,76,0801- is to be collected from the NHAI authoritiestowards 10% Quality Control & Testing charges as non-refundable amount before take-up the work.

The revised estimate is sanctioned under DC works vide sanction nO.·CEIZNJA DC.No.144/2014-15,dt07-03-15.

DATA FOR QUALITY CONTROL sTESTING CHARGES

1).Cost of the estimate2).10% Quality Control & Testing charges3).12.36% on Quality Control & Testing charges4).1%BWW cess on Quality Control & Testing charges5).Total for Quality Control & Testing charges (2+3+4)

Or say RS.7,76,080/-

:Rs.68,46,095/-(G).:Rs.6,84,61 0/-

:Rs.84,618/-:Rs.6,846/-

:Rs.7,76,074/-

Page 8: t;~~ from Kaza to Gannavaram Road in Gollapudi Section of ...nhai.org.in/spw/CorrespondenceIssues/NHAI L.NO.2636.pdf · and risk,in case of execution of the work is not satisfactory

SOUTHERN POWER DISTRIBUTION COMPANY OF AP LIMITED

...•,.,_ •.•.•.,.=.-~.. ~.. _.__...._.._.__ ._----_.- -. ._-Dlvl810n ; DE OPN VIJ TOWN1 Soctlon : AE GOLLAPUDI

"__ .___ .___ ~_._..___ ~ ...___ ....N._ .._._______ ,.,.t_·~....~.. ......._-Profit Center : 301400001 Cost Center : 301411601t------ - •••••••••• :< ••• ----_. -----_.-.-. -.----_.---._', .---- ... .... " ....•. _ ...._ ..._-_.__ ...... , ..-.._._...__...._---.•.._.-.--- ..... ---..-

Estimate No. : 0·2014·01·04·11·06·013 Est. Dose : Shifting 33KV ,11KV ,& t,T lInes @ NHAI. --

Notwork No. : 530000020800 Est Croated Data : 09.01.2015

RasorV<ltlcm No. ; 8000534865 ProJoct Type : DCW5 Shifting of 33KV lines

Application No : 64356COOO192014DEC02 ApI. Group No :--

Consumer Name : N.H.A.!

Clo ; N.H.A.I Cat: I Contr.Load : NA

Estimate Status: (ESTIMATE APPROVED)

Application Reg. date 02.12.2014

'Estimate Ceated bv AI: on 09.01.2015 (after 38 days )

Estimate Re-Anproval triouered on 09.03.2015

Estimate Forwarded bv AE on 10.03.2015 ( after 1 days)

Estimate Forwarded by ADE on 10.03.2015 (after o days)

Estimate Forwarded bv DE on 10.03.2015 ( after o days)

Estimate Forwarded by SE on 10.03.2015 ( after o davs)

I;stimate Approved bv CE Zone 10.03.2015 ( after o days I

SL.No. Proposals involves Total in Rs.

1 10 - Shiftinq of HT/LT lines along and across 477140.77

2 20 - LABOUR & TRANSPORT 5811881.00

Estimate Cost (Gross) : 6289021.77

10 % suoervtstcn cnaraes on M+L: 557073.28

Total Estimate Cost (Gross):"

6846095.05

Less Oreditst-) : 6877.00

Estimate Cost (Net) : 6839218.05

Less Credits (Optional):

S.No Materials Materials Text Item Quantity Unit Rate in Rs. Amount in Rs.Code cataocrv

1 SCROOO20 AAA CONDUCTOR SCRAP Stock item 230.000 KG 23.90 5,497.00

2 SCROOO66 MS SCRAP Stock item 60.000 KG 23.00 1,380.00

Total less credits 6,877.00

F. e,1).

ASSista~co"'ml'0/0. CHIEF ENG1NEEB (Z(ji'{L)

APSPDCL, VIJAYA..•.NADA·2

Page 9: t;~~ from Kaza to Gannavaram Road in Gollapudi Section of ...nhai.org.in/spw/CorrespondenceIssues/NHAI L.NO.2636.pdf · and risk,in case of execution of the work is not satisfactory

SOUTHERN POWER DISTRIBUTION COMPANY OF AP LIMITED

Activity No: 10 Activity D08crlptlon : Shifting of HT/LT lines along and across

Shifting of HT/LT lines along and across the National Highway In Jurisdicationof operation section Gollapudi.

.- ...... _-S.No Materials Materials Text Item Quantity Unit Rate In Rs. Amount in Rs.

Code Catagory --1 HWROOO04 33KV METAL PARTS(B&S) Stock Item 60 SeT 180.00 10800.00

2 HWROOO15 LTGI PINS Stock Item 18 EA 29.00 522.00

3 HWROOO16 LT METAL PARTS Stock Item 36 SET 32.00 1 152.00

4 INSOOOOl LT PIN INSULATORS Stock Item 18 EA '11.00 198.00

5 INSOOO02 LT SHACKLES Stock Item 36 EA 12.00 432.00

6 INS10001 11KV PIN INSULATORS Stock Item 9 EA 54.00 486,00·

7 INS10003 11KV POLYMER INSULA TORS Stock Item 18 EA 196.00 3,528.00(C&T)

B INS10005 11KV GUY INSULATORS (HT) Stock Item 4 EA 41,00 164.00

9 INS30001 33KV PIN INSULATORS Stock item EA,

18 387,00 6966.00

10 INS30004 33KV 70KN COMPOSITE Stock Item 48 EA 649.00 I 31,152,00

POLYMER INSULATOR

. 11 LASOOO01 11KV LIGHTNING Stock item 3 EA 1,473.00 4,419.00

ARRESTORS LINE TYPE

12 MSTOOO03 MS ANGLE 65X65X6 Stock item 80.000 KG 53,89 4311.20

13 MSTOOO12 MS CHANNEL 100X50 Stock item 130.000 KG 54.00 7020,00

14 MSTOOO15 MS FLAT 75X8 Stock item 60.000 KG 54.00 3240.00

15 PLSOOO04 9.1 MTS 280KGS PSCC Stock item 6 EA 3,600.00 21,600.00

POLES

16 PLSOO014 12.5 MTS PSCC SPUN POLES Stock item 3 EA 11700.00 35100.00

17 SCBOUU:!9 ALLUMINIUM LUGS 150 Stock item 30 EA 6.76 202.80

SQMM

18 WRSOOOO5 . G.t. WIRE 4MM ( NO.8) Stock item 10.000 KG 62.30 623.00

19 WRSOOOO6 GI STAYWIRE 7/3.15MM (10 Stock item 50.000 KG 65.65 3,262.60SWG)

20 ABS10002 11KV 200A TT AB SWITCH Stock item 1 EA 8,322.00 8,322.00

WITH INSULATORS

21 BNTOO026 MS BOLTS & NUTS 5/8" X 4" Stock item 17.000 KG 80.63 1,370.71

22 BXSOO011 A TY(SPL) DIST. BOX WITH Stock item 1 EA 5,562.00 5,562.00

300A 500V FUSE

23 CBXOO024 LT XLPE CABLE SINGLE Stock item 60.000 M 91.11 5,466.60

CORE 150 SQMM

24 COROOO03 AAA CONDUCTOR 55 SQ. MM Stock item 1,150.000 M 29.49 33,913.50

25 COROOO04 AAA CONDUCTOR 100 SQ. Stock item 1,850.000 M 50.95 94,257.50

MM

26 DTC30122 3PH 1OOKVAAMORPHOUS AL Stock item 1 EA 142,800.00 142,800.00

CONY ···"RATE

27 EMTOOOO6 CI EARTH PIPE 80 MM DIA Stock item 2 EA 2,471.00 4,942.00

2.5MTS LENGTH

28 EMTOOO22 GI !:ARTH PIPE 40 MM 2.5 Stock Item 1 EA 592.00 592.00

MTS LONG

29 FBEOO026 33KV TAPING CHANNEL X Stock item 6 EA 1,112.00 6.672.00ARMS

30 FBE10004 11KV M.S Channel Cross Stock item 2 EA 545.00 ·1,090.00

Page 10: t;~~ from Kaza to Gannavaram Road in Gollapudi Section of ...nhai.org.in/spw/CorrespondenceIssues/NHAI L.NO.2636.pdf · and risk,in case of execution of the work is not satisfactory

SOUTHE:RN POWER DISTRIBUTION COMPANY OF AP LIMITED

ArmlTaoolna)75X40

31 FBE10022 11KVMS STAY SET WITH Siock Item 2 EA 448.00 896.00

CLAMPS

32 FBE10033 11KV Tapping X Arm W Stock Item 2 EA 649.00 1,298.00

100X50MM MS Channel

33 FBE30002 33KV M.S.Stay Clamos Stock Item 2 EA 218.00 436.00

34 FBE3000a 33KV MS Stay Sets with Base Stock Item 2 EA 433.00 866.00Plate

35 HGF10002 11KV:3 Ph HG FUSE SeTS Stock Item 1 EA 2493.00 2493.00

36 HWROOO01 11KVGI PINS Stock Item 9 EA 59.00 531.00

37 HWROOOO2 11KV METAL PARTS(C&T) Stock Item 6 SET 82.00 492.00

38 HWROOO03 33KVGI PINS Stock Item 18 EA 163.00 2934.00

Material Cost 450,132.81

3 % S & H Charges on materials: 13503.98

3 % Contingencies on materials: 13503.98

Total: 477140.77

"fu0. ASSi~~':ear/comml:_

/0 CHIEF ENGINEEH (20~k'.)o A?SPDCL, V1JAYAWADA-2

Page 11: t;~~ from Kaza to Gannavaram Road in Gollapudi Section of ...nhai.org.in/spw/CorrespondenceIssues/NHAI L.NO.2636.pdf · and risk,in case of execution of the work is not satisfactory

SOUTHERN POWER DISTRIBUTION COMPANY OF AP LIMITED

Activity No: 20 Activity Description: LABOUR & TRANSPORT

/

S.No Services Services Text Item Quantity Unit Rate In Rs. Amount in Rs.

r---' Code Catagory

1 SWR01090 Supply & Erection of M+12 type - 8 EA 439,200.00 3,513,600.00MS tower

2 SWR20429 Supply & Erection of M+9 - 4 EA 372,500.00 1,490,000.00Tower

3 SWROOOO1 Labour and Transport Lump - 1 LS 117,000.00 117,000.00sum - Data 1

Service Cost 5,120,600.00

Incidental expences @ 12.50% on service 640075.00

BW Welfare Cess @ 1% on service cost: 51206.00

Total: 5811881.00

Amounts to be collected from the consumer ( in Rs.):

IQuality Control & Testing Charges 776080.001Total Amount in Rs: 776,080.00