Process Equipment Design
Citation preview
Da Nhim Hydropower Plant Expansion ProjectBidding documents Package 12.02 (DNE-D2)SCHEDULE T-13 List of All Documents submitted with Bid
Name Of Bidder:LILAMA 18/LILAMA 45.4 JOINT VENTURE.
Letter of Technical BidForms of Bid SecurityAcknowledgement of "Code of Etltics and Conduct for Public Procurement"Bidders QualificationFORM Q-1 General Information on BidderFORM Q-2 Joint Venture AgreementFORM Q-3Power of AttorneyFORM Q-4Financial SituationFORM Q-4AFinancial Situation (Banking Information)FORM Q-4BFinancial Situation (Single Bidders or Partners)FORM Q-4CFinancial Data (Joint Venture Summary)FORM Q-5Average Annual TurnoverFORM Q-5AAnnual Turnover (Single Bidder or Partners)FORM Q-5BAnnual Turnover (Joint Venture Summary)FORM Q-6Statement of Credit Line from a Reputable Commercial BankFORM Q-6AStatement of Credit Line from a Reputable Commercial Bank (Summary of Credit lines)FORM Q-6BStatement of Credit Line from a Reputable Commercial BankFORM Q-7 Current Contract CommitmentsFORM Q-8 Historical Contract Non-PerformanceFORM Q-9 General ExperienceFORM Q-10A Specific ExperienceFORM Q-10B Experience in Key ActivitiesTECHNICAL PROPOSAL1. Schedule T-1 Technical Particulars1.1 Schedule T-1-1 Technical Data and Specifications of Inlet Coarse Trashrack1.2 Schedule T-1-2 Technical Data and Specifications of Fine Trashrack Type I1.3 Schedule T-1-3 Technical Data and Specifications of Fine Trashrack Type L1.4 Schedule T-1-4 Technical Data and Specifications of Intake Bulkhead Gate1.5 Schedule T-1-5 Technical Data and Specifications of Intake Service Gate1.6 Schedule T-1-6 Technical Data and Specifications of Intake Gantry Crane1.7 Schedule T-1-7 Technical Data and Specifications of Steel Penstock1.8 Schedule T-1-8 Technical Data and Specifications of Tailrace Gate2. Schedule T-2 Statical Basic Calculation Sheets3. Schedule T-3 General Arrangement and Layout Drawings4. Schedule T-4 Construction Methods and Sequence of the Works4.1 Method Statement for fabrication of steel Penstock4.2 Method Statement for manufacture of Trashrack4.3 Method Statement for manufacture of intake bulkhead gate4.4 Method Statement for manufacture of intake service gate4.5 Method Statement for manufacture of powerhouse tailrace gate4.6 Method Statement for installation of intake gate4.7 Method Statement for installation of powerhouse tailrace gate4.8 Method Statement for installation of steel Penstock4.9 Preliminary welding procedure specifications4.10 Painting Procedure4.11 Labour safety in production and execution5. Schedule T-5 Temporary Facilities and Safety Protections6. Schedule T-6 Construction Time Schedule7. Schedule T-7 Contractors Equipment7.1 Schedule T-7-1 Contractors Equipment (Summary)7.2 Schedule T-7-2 Contractors Equipment (Available in Vietnam)7.3 Schedule T-7-3 Contractors Equipment (Intended to be Imported)7.4 Schedule T-7-4 Contractors Equipment (Intended to be Re-exported after use)7.5 Contractors Equipment (Use schedule)8. Schedule T-8 Labour Forces8.1 Schedule T-8-1 Labour Forces (List of Labour Forces Required)8.2 Schedule T-8-2 Labour Forces (Labour Flow Tabulation)9. Schedule T-9 Organization Chart and Manning Schedule9.1 Schedule T-9-1 Head office Organization Chart9.2 Schedule T-9-2 Site Organization Chart9.3 Manning Schedule10. Schedule T-10 Key Personnel10.1 Schedule T-10-1 Key Personnel (Summary)10.2 Schedule T-10-2 Key Personnel (Detail of Candidate)10.3 Schedule T-10-3 Memorandum of Understanding (MOU) on Technical Design Service of Hydro-mechanical Equipment11. Schedule T-11 List of Subcontractors and Vendors12. Schedule T-12 Health, Safety and Security Control, and Environmental Monitoring and Management12.1 HSE Policy12.2 Certification of Registration12.3 Organization chart of Health, safety and Environmental12.4 Health Management Plan12.5 Health, Safety and Environmental Plan12.6 Safety Control Plan12.7 Security Management Plan12.8 Site Environmental Protection Plan12.9 Workers accommodation Management Plan12.10 Safety Transportation Management Plan12.11 Emergency Evacuation Procedure13. Schedule T-13 List of All Documents submitted with Bid
Bidders Official Representative:
Signature:
Name: Trn S Qunh
Position: General Director
Date:
Company: LILAMA 18 Joint Stock Company.