15
System Design and Deployment Status PDS Management Council Face-to- Face UCLA, Los Angeles, California November 28-29, 2012 Sean Hardman

System Design and Deployment Status

  • Upload
    afia

  • View
    30

  • Download
    0

Embed Size (px)

DESCRIPTION

System Design and Deployment Status. PDS Management Council Face-to-Face UCLA, Los Angeles, California November 28-29, 2012 Sean Hardman. Topics. Status Overall Build 3a Deployment Search Service Status Report Service Status Build 3b and Beyond Next Steps. Overall Status. - PowerPoint PPT Presentation

Citation preview

Page 1: System Design and Deployment Status

System Design and Deployment Status

PDS Management Council Face-to-FaceUCLA, Los Angeles, California

November 28-29, 2012

Sean Hardman

Page 2: System Design and Deployment Status

Topics

• Status- Overall

- Build 3a

• Deployment

• Search Service Status

• Report Service Status

• Build 3b and Beyond

• Next Steps

November 28-29, 2012 System Design and Deployment Update 2

Page 3: System Design and Deployment Status

Overall Status

• Validate software in place supporting validation of PDS4 labels using XML Schema and Schematron files.

• Initial data access and transform software in place for working with PDS4 data.

• Harvest and Registry software in place to support EN and Node registration of PDS3 and PDS4 data.

• Search software in place supporting catalog-level search.

• Report software in place waiting to be populated with web logs.

November 28-29, 2012 System Design and Deployment Update 3

Page 4: System Design and Deployment Status

Build 3a Status

• Upgraded the Data Search interface to remove the dependence on the PDS3 catalog database.

• Refactored the Search Service to better support PDS4.

• Kept up with Information Model changes.• Added support for PDAP search protocol.• Initial support for PDS4 data transformation.• Correct issues discovered during Build 2c

testing.

November 28-29, 2012 System Design and Deployment Update 4

Page 5: System Design and Deployment Status

Build 3a StatusDeployment

• Engineering Node- Deployment of the core components replacing the

central catalog.• Running side-by-side with PDS3 system for six months.

- Existing search interfaces reworked to utilize the PDS4 infrastructure.

• Discipline Nodes- Phased deployment of the core components at the

Nodes is in process.- Once deployment is complete, Nodes may begin

local registration of their PDS4 test bundles.- PDS3 data sets/products may be registered as well.

November 28-29, 2012 System Design and Deployment Update 5

Page 6: System Design and Deployment Status

Build 3a DeploymentEngineering Node

November 28-29, 2012 System Design and Deployment Update 6

Page 7: System Design and Deployment Status

Build 3a DeploymentDiscipline Node

November 28-29, 2012 System Design and Deployment Update 7

Page 8: System Design and Deployment Status

Node Deployment Status

• A couple of early adopters have tackled the installation.- Have received procedure/documentation suggestions and

some RFAs.

• Actively working with Atmospheres to install the software at their Node.

• The other Nodes have been contacted to arrange installation.- Most were waiting for an updated RDD.

• The RDD now includes the Node installation procedure.- http://pds-engineering.jpl.nasa.gov/pds2010/developmen

t/3.0.0/release/index-3.0.0.html

November 28-29, 2012 System Design and Deployment Update 8

Page 9: System Design and Deployment Status

Build 3a DeploymentPDS3/PDS4 Product Registration

November 28-29, 2012 System Design and Deployment Update 9

Page 10: System Design and Deployment Status

Search Service Status

• PDS4 core infrastructure running at the PDS Engineering Node.

• Working with the IPDA to register ESA data sets in search via PDAP protocol.- Working on some metadata quality issues before

integration with operational search.

• Worked with Atmospheres to register archive information web sites for Cassini and Phoenix data access.

• Use demonstration process to affirm the architecture and then expand.

November 28-29, 2012 System Design and Deployment Update 10

Page 11: System Design and Deployment Status

System Design and Deployment Update 11

Search Deployment

November 28-29, 2012

ArchivePages

Facet-BasedSearch

LinkableResultsPage

Page 12: System Design and Deployment Status

Report Service Status

• Sawmill software installed at the EN.- Upgraded to the latest version from the vendor.

• Ready to pull log files from the Nodes and setting up a mechanism for push capability.

• Planned operational phases:- Initiate population of the service and initial report

configuration (December 2012).

- Generate PDS-wide web log reports. (March 2013)

- Generate registry-based reports. (October 2013)

November 28-29, 2012 System Design and Deployment Update 12

Page 13: System Design and Deployment Status

Build 3b and Beyond

• Continue to support Information Model changes.• Add support for content validation.• Tune the Search Service index.• Add support for product-level search.• Develop initial Transport Service.• Add support for additional transformations.• Add support for package generation.• Integrate distribution and transformation

capabilities.• Upgrade PDS web presence.

November 28-29, 2012 System Design and Deployment Update 13

Page 14: System Design and Deployment Status

Next Steps

• Work with the Nodes on Report Service population.

• Continue working with the Nodes to deploy Build 3a software locally.

• Continue Build 3b development.- Align tool development with the tool plan

November 28-29, 2012 System Design and Deployment Update 14

Page 15: System Design and Deployment Status

Questions/Comments