    GENERAL INFORMATION

    SYNCHRONIZATION PRINCIPLE

    GE Energy Products - Europe

    Reference : 172A7791 Rev. : A Section : 01 Page : 1/23

    Ce document, proprit exclusive de GE Energy Products France SNCest strictement confidentiel. Il ne peut tre communiqu,

    copi ou reproduit sans notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNCis strictly confidential. It must not be communicated,

    copied or reproduced without our prior written consent.

    SUMMARY

    1. SUBJECT 4

    2. EQUIPMENT - INTERFACES 5

    2.1. GENERATOR CIRCUIT BREAKER (52G) 5

    2.2. LINE CIRCUIT BREAKER (52L) 5

    2.3. MEASURE CIRCUIT 5

    2.4. GENERATOR CONTROL PANEL 5

    2.5. GAS TURBINE CONTROL SYSTEM SPEEDTRONIC 6

    2.6. OPERATOR INTERFACE ( LOCAL HMI ) 6

    3. SYSTEM OPERATION 7

    3.1. STEADY STATE OPERATION 7

    3.1.1. GT IN NORMAL OPERATION 7

    3.1.2. GT IN STAND-BY 7

    3.1.3. GT ISLANDED 7

    3.1.4. GT ON DEAD BUS OPERATION 8

    3.2. TRANSIENT OPERATIONS 8

    3.2.1. 52G SYNCHRONIZING 9

    3.2.2. 52L SYNCHRONIZING 10

    3.2.3. VOLTAGE RECOVERY 52G DEADBUS CLOSURE 11

    3.2.4. 52G OPENING 11

    3.2.5. 52L OPENING 11

    4. CONTROL AND INSTRUMENTS LOOPS 11

    4.1. PRINCIPLE SCHEME 11

    5. LACKING OF CONTROL AND POWER 11

    5.1. POWER SUPPLY DIAGRAM 11

    5.2. TROUBLE DESCRIPTION 13

    APPENDIX 1 14

    Figure 1 Generator Synchronizing System 15

    Figure 2 Automatic synchronizing on PTUR 16

    DT-1CDT-1C

  • 8/10/2019 Sync System

    3/24

    KHARAFI NATION SABIYA

    GENERAL INFORMATION

    SYNCHRONIZATION PRINCIPLE

    GE Energy Products - Europe

    Reference : 172A7791 Rev. : A Section : 01 Page : 2/23

    Ce document, proprit exclusive de GE Energy Products France SNCest strictement confidentiel. Il ne peut tre communiqu,

    copi ou reproduit sans notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNCis strictly confidential. It must not be communicated,

    copied or reproduced without our prior written consent.

    Figure 3 Synchronization check on PPRO 17

    Figure 3 Hardwire system synchronization 18

    APPENDIX 2 19

    52G SYNCHRONIZING DIAGRAM 20

    52L SYNCHRONIZING DIAGRAM 20

    52L SYNCHRONIZING DIAGRAM 21

    VOLTAGE RECOVERY DIAGRAM - 52G DEAD BUS CLOSING 22

    PRINCIPLE SCHEME 23

  • 8/10/2019 Sync System

    4/24

    KHARAFI NATION SABIYA

    GENERAL INFORMATION

    SYNCHRONIZATION PRINCIPLE

    GE Energy Products - Europe

    Reference : 172A7791 Rev. : A Section : 01 Page : 3/23

    Ce document, proprit exclusive de GE Energy Products France SNCest strictement confidentiel. Il ne peut tre communiqu,

    copi ou reproduit sans notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNCis strictly confidential. It must not be communicated,

    copied or reproduced without our prior written consent.

    STATE OF MODIFICATIONS

    INDEX DATE DESCRIPTION

    A 19/06/07 First issue

  • 8/10/2019 Sync System

    5/24

    KHARAFI NATION SABIYA

    GENERAL INFORMATION

    SYNCHRONIZATION PRINCIPLE

    GE Energy Products - Europe

    Reference : 172A7791 Rev. : A Section : 01 Page : 4/23

    Ce document, proprit exclusive de GE Energy Products France SNCest strictement confidentiel. Il ne peut tre communiqu,

    copi ou reproduit sans notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNCis strictly confidential. It must not be communicated,

    copied or reproduced without our prior written consent.

    BUS

    Synchro.

    GT

    52G

    Electrical diagram

    52L

    1. SUBJECT

    The purpose of the present document is the technical description of the different ways to synchronize theGT Unit with the Customer bus and to open the Gas Turbine Generator circuit breaker (52G). Thisdocument describes Generator circuit breaker synchronization and electrical interfaces between thedifferent cubicles for this operation.

    The evacuation of the energy produced by the Gas Turbine on the networkoccurs mainly across the Generator circuit breaker 52G, situated between thegenerator and the main transformer. The closing of this circuit breaker issecured by the synchronizing function of the generator cubicle.

    The 52G and 52L synchronization can be controlled:- manually or automatically from the local and remote server Gas Turbine

    Control operator interface

    The 52G closing on a dead bus is possible.

    The aim of synchronization is to connect the Gas Turbine Generator voltage with the network voltage tofeed the electrical power on the network. To realize this connection without equipment damage, the 2alternating voltages must have the same phase sequence and frequency and the Gas Turbine Generatorvoltage must correspond to the existing line voltage.

  • 8/10/2019 Sync System

    6/24

    KHARAFI NATION SABIYA

    GENERAL INFORMATION

    SYNCHRONIZATION PRINCIPLE

    GE Energy Products - Europe

    Reference : 172A7791 Rev. : A Section : 01 Page : 5/23

    Ce document, proprit exclusive de GE Energy Products France SNCest strictement confidentiel. Il ne peut tre communiqu,

    copi ou reproduit sans notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNCis strictly confidential. It must not be communicated,

    copied or reproduced without our prior written consent.

    2. EQUIPMENT - INTERFACES

    2.1. GENERATOR CIRCUIT BREAKER (52G)

    It realizes the power connection between the Generator and the GT transformer.In general a local command is powered by 125 VDC.

    Control cubicles interfaces concern circuit breaker closing / tripping commands and circuit breakerposition :

    Closing command is sent on 1 way from the synchronizer. Command voltage must be 125 VDC forthe Speedtronic synchro-check.

    Tripping command is sent on 2 ways from electrical protections, from reverse power when GT shutsdown or from an operators order (by HMI server)

    Circuit breaker position is used to valid closing order in the synchronizer system.

    2.2. LINE CIRCUIT BREAKER (52L)

    It realizes the power connection between the GT transformer and the plant network.If the breaker is controlled by the GCP this system receives:- 1 closing order, (Closing command is sent on 1 away by Speedtronic)- Tripping command is sent on 2 ways from electrical protections and operator order.

    2.3. MEASURE CIRCUIT

    This circuit consists of voltage transformers upstream and downstream of the circuit breaker.

    1 transformer measures the voltage upstream of the generator circuit breaker. The characteristics are

    Un 3/1003.

    1 transformer measures the voltage downstream the generator circuit breaker. The characteristics are

    Un

    3/100

    3. 1 transformer measures the voltage upstream the line circuit breaker. The characteristics are

    Un 3/1003.

    1 transformer measures the voltage downstream the line circuit breaker. The characteristics are

    Un 3/1003.

    2.4. GENERATOR CONTROL PANEL

    This cubicle includes synchronizing facilities.

    -

    52G/52L voltages management, ( Matching Transformer)- Voltage relay for dead bus for all phases operation,- 52G/52L control . ( Closing and Tripping Order 2 ways)

  • 8/10/2019 Sync System

    7/24

  • 8/10/2019 Sync System

    8/24

    KHARAFI NATION SABIYA

    GENERAL INFORMATION

    SYNCHRONIZATION PRINCIPLE

    GE Energy Products - Europe

    Reference : 172A7791 Rev. : A Section : 01 Page : 7/23

    Ce document, proprit exclusive de GE Energy Products France SNCest strictement confidentiel. Il ne peut tre communiqu,

    copi ou reproduit sans notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNCis strictly confidential. It must not be communicated,

    copied or reproduced without our prior written consent.

    3. SYSTEM OPERATION

    The circuit breaker synchronizing or closing is a transient operation which allows the machine set to gofrom a steady state operation to a new one in order to produce electrical power on the network.

    3.1. STEADY STATE OPERATION

    In the Plant, the steady states correspond to the states in which the machine set can stay permanentlyuntil an operator order or automation protection operates. This is a function of the circuit breakerpositions, the Network state, and the GT state.

    3.1.1. GT IN NORMAL OPERATION

    In normal configuration,

    52G circuit breaker is closed

    52L circuit breaker is closed GT is running

    The HV bus is aliveThe GT generator is connected to the network or to the bus.

    3.1.2. GT IN STAND-BY

    52G circuit breaker is open

    52L circuit breaker is closed

    GT is in operation or not

    The HV bus is alive

    Two different situations can exist :

    - To start the unit, the bus must supply the electrical cranking motor.If GT generator is excited then the operator has to close 52G breaker by synchronization. If GTgenerator is not excited and the GT is running, the operator has to give a GT STOP order and waitfor GT speed at 14HS state in order to send a GT START order.

    - The group circuit breaker is automatically open as there was a problem on HV line or by anyprotection panel command. In this case, the Unit is islanded. Then, GT speed is at 100,3% nominal

    speed, the GT frequency is automatically and progressively set at 50Hz 0.2% (except forisochronous mode) and the GT load is automatically adjusted.After solving hypothetical HV problem, the operator can re-synchronize the GT with the bus byclosing the 52G circuit breaker by synchronization.

    3.1.3. GT ISLANDED

    52G circuit breaker is closed 52L circuit breaker is open

    GT is running

    The HV bus is aliveThe line circuit breaker is automatically open as there was a problem on HV line or by any protectionpanel command. In this case, the Unit is islanded. Then, GT speed setpoint is at 100,3% nominal speed,After solving hypothetical HV problem, the customer will have to re-synchronize the GT by closing the52L circuit breaker by synchronization.

  • 8/10/2019 Sync System

    9/24

    KHARAFI NATION SABIYA

    GENERAL INFORMATION

    SYNCHRONIZATION PRINCIPLE

    GE Energy Products - Europe

    Reference : 172A7791 Rev. : A Section : 01 Page : 8/23

    Ce document, proprit exclusive de GE Energy Products France SNCest strictement confidentiel. Il ne peut tre communiqu,

    copi ou reproduit sans notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNCis strictly confidential. It must not be communicated,

    copied or reproduced without our prior written consent.

    3.1.4.GT ON DEAD BUS OPERATION

    52G circuit breaker is open

    52L circuit breaker is open

    GT is in operation or not

    The HV bus is dead or notWhen the Gas Turbine is starting, the unit runs until Full Speed No Load. When the dead bus couplingpermissives are present (no voltage downstream the 52G breaker and 52L breaker open), the 52G circuitbreaker can be closed by dead bus closing order, and the GT generator will supply the main transformer.Then, the 52L breaker will have to be closed by synchronization (will be performed by customer facilities).

    If the Gas Turbine is stopped, the operator can close the 52L breaker by an "Override" order, in order tofeed the main transformer (By Customer).

    3.2. TRANSIENT OPERATIONS

    The transient operations allow the transfer from a steady state to an other. In that system, the final targetis to feed the HV Bus. The different steady and transient states are summarized as follow :

    52L SYNCHRONIZING

    GT ISLANDED

    GT IN NORMALOPERATION

    STATE

    GT IN STAND-BY

    52G SYNCHRONIZINGwith 52L closed52G OPENING

    52L OPENING

    GT ON DEAD BUSOPERATION

    VOLTAGE RECOVERY

    52G DEAD BUS CLOSURE

  • 8/10/2019 Sync System

    10/24

  • 8/10/2019 Sync System

    11/24

    KHARAFI NATION SABIYA

    GENERAL INFORMATION

    SYNCHRONIZATION PRINCIPLE

    GE Energy Products - Europe

    Reference : 172A7791 Rev. : A Section : 01 Page : 10/23

    Ce document, proprit exclusive de GE Energy Products France SNCest strictement confidentiel. Il ne peut tre communiqu,

    copi ou reproduit sans notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNCis strictly confidential. It must not be communicated,

    copied or reproduced without our prior written consent.

    3.2.2.52L SYNCHRONIZING

    To realize line circuit breaker synchronization, the Gas Turbine must be islanded and the generator

    circuit breaker (52G) must be closed. The basic principle is to close the Line circuit breaker (52L) whenall conditions (voltages, phases and external permissive) are satisfied.

    Two synchronizing main modes are available:- AUTOMATIC SYNCHRONIZING MODE- MANUAL SYNCHRONIZING MODE

    AUTOMATIC SYNCHRONIZING MODE

    When this mode is selected, synchronizing operation is realized directly by the Speedtronicsynchronizing system. The operator will select the circuit breaker to synchronize ( in local, from thelocal and in remote, from the remote or the DCS). Automatic synchronizing operationis activated by a GT START order ( in local, from the local and in remote, from the remote

    or the DCS) if the permissive to synchronize is true. If the gas turbine is already started, theoperator can "re" synchronize the unit if ISOCHRONOUS mode is deactivated by pushing theRESYNC Button . The synchronizing sequence is realized without operators intervening.Generator excitation voltage and turbine speed adjustments are calculated by the Speedtronicsynchronizing system, until the Generator voltage and frequency equal respectively the line voltageand frequency. When the conditions are correct, the automatic-synchro-device gives the closingorder to the generator circuit breaker (52L). During each automatic closing, the SPEEDTRONICcounts and memorises the closing time.For added protection a synchronism check relay (K25P or K25A) is provided in the Speedtronic . It isused in series with both the automatic synchronizing relay and the manual breaker close switch toprevent large out-of-phase breaker closures.

    MANUAL SYNCHRONIZING MODE

    From the local or remote server operator interface , SYNC MANU command activates thismode. In first time, the operator has to select 52L by using the 52G / 52L circuit breaker selectiontarget. By looking voltage, frequency and phase information, the operator can adjust Generator

    frequency and voltage by the SPEED orders and the U orders selectors until Generatorside voltage and bus voltage are equal. The operator with the control switch of the 52L circuit breakergives 52L closing order.

    If voltages, phases or frequencies are not equal, the synchronism check relay of Speedtronicinhibits operators closing order.

    The closing order signal the both case is sent to GCP and the GCP give the final order through thepower

    Contactor.

  • 8/10/2019 Sync System

    12/24

    KHARAFI NATION SABIYA

    GENERAL INFORMATION

    SYNCHRONIZATION PRINCIPLE

    GE Energy Products - Europe

    Reference : 172A7791 Rev. : A Section : 01 Page : 11/23

    Ce document, proprit exclusive de GE Energy Products France SNCest strictement confidentiel. Il ne peut tre communiqu,

    copi ou reproduit sans notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNCis strictly confidential. It must not be communicated,

    copied or reproduced without our prior written consent.

    3.2.3. VOLTAGE RECOVERY 52G DEADBUS CLOSURE

    This is enabled if the following conditions are validated: GT at FSNL.

    Generator breaker selected

    Signal confirming that the HV bus is dead (voltage relay in GCP).

    Generator breaker open

    Line breaker open

    DEADBUS closure order activated on the HMI.

    Then the Gas Turbine control system (Speedtronic) realizes automatically the deexcitation of thegenerator (to avoid to magnetize the main transformer at full voltage), waits around 15 seconds and thencloses the excitation relay and the 52G.

    3.2.4. 52G OPENING

    The generator circuit breaker is automatically opened during GT shutdown operation by the reversepower relay or during load-shedding operation by generator protection relays. It must be noted that theGenerator breaker (52G) can be opened manually at any time during the Turbine running from the HMI

    3.2.5.52L OPENING

    The 52L circuit breaker can be opened manually at any time during the Turbine running from the HMI.

    4. CONTROL AND INSTRUMENTS LOOPS

    4.1. PRINCIPLE SCHEME

    Refer to Appendix 2.

    5. LACKING OF CONTROL AND POWER

    5.1. POWER SUPPLY DIAGRAM

  • 8/10/2019 Sync System

    13/24

    KHARAFI NATION SABIYA

    GENERAL INFORMATION

    SYNCHRONIZATION PRINCIPLE

    GE Energy Products - Europe

    Reference : 172A7791 Rev. : A Section : 01 Page : 12/23

    Ce document, proprit exclusive de GE Energy Products France SNCest strictement confidentiel. Il ne peut tre communiqu,

    copi ou reproduit sans notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNCis strictly confidential. It must not be communicated,

    copied or reproduced without our prior written consent.

    125 VDC

    Motor of Circuit breaker

    Automatic-synchro device

    Tripping coil

    Trippingcoil

    Closingcoil

    D1

    D3

    D2Line 1

    Line 2

  • 8/10/2019 Sync System

    14/24

  • 8/10/2019 Sync System

    15/24

    KHARAFI NATION SABIYA

    GENERAL INFORMATION

    SYNCHRONIZATION PRINCIPLE

    GE Energy Products - Europe

    Reference : 172A7791 Rev. : A Section : 01 Page : 14/23

    Ce document, proprit exclusive de GE Energy Products France SNCest strictement confidentiel. Il ne peut tre communiqu,

    copi ou reproduit sans notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNCis strictly confidential. It must not be communicated,

    copied or reproduced without our prior written consent.

    APPENDIX 1

  • 8/10/2019 Sync System

    16/24

    KHARAFI NATION SABIYA

    GENERAL INFORMATION

    SYNCHRONIZATION PRINCIPLE

    GE Energy Products - Europe

    Reference : 172A7791 Rev. : A Section : 01 Page : 15/23

    Ce document, proprit exclusive de GE Energy Products France SNCest strictement confidentiel. Il ne peut tre communiqu,

    copi ou reproduit sans notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNCis strictly confidential. It must not be communicated,

    copied or reproduced without our prior written consent.

    Figure 1 Generator Synchronizing System

  • 8/10/2019 Sync System

    17/24

    KHARAFI NATION SABIYA

    GENERAL INFORMATION

    SYNCHRONIZATION PRINCIPLE

    GE Energy Products - Europe

    Reference : 172A7791 Rev. : A Section : 01 Page : 16/23

    Ce document, proprit exclusive de GE Energy Products France SNCest strictement confidentiel. Il ne peut tre communiqu,

    copi ou reproduit sans notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNCis strictly confidential. It must not be communicated,

    copied or reproduced without our prior written consent.

    Figure 2 Automatic synchronizing on PTUR

  • 8/10/2019 Sync System

    18/24

    KHARAFI NATION SABIYA

    GENERAL INFORMATION

    SYNCHRONIZATION PRINCIPLE

    GE Energy Products - Europe

    Reference : 172A7791 Rev. : A Section : 01 Page : 17/23

    Ce document, proprit exclusive de GE Energy Products France SNCest strictement confidentiel. Il ne peut tre communiqu,

    copi ou reproduit sans notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNCis strictly confidential. It must not be communicated,

    copied or reproduced without our prior written consent.

    Figure 3 Synchronization check on PPRO

  • 8/10/2019 Sync System

    19/24

    KHARAFI NATION SABIYA

    GENERAL INFORMATION

    SYNCHRONIZATION PRINCIPLE

    GE Energy Products - Europe

    Reference : 172A7791 Rev. : A Section : 01 Page : 18/23

    Ce document, proprit exclusive de GE Energy Products France SNCest strictement confidentiel. Il ne peut tre communiqu,

    copi ou reproduit sans notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNCis strictly confidential. It must not be communicated,

    copied or reproduced without our prior written consent.

    Figure 3 Hardwire system synchronization

  • 8/10/2019 Sync System

    20/24

    KHARAFI NATION SABIYA

    GENERAL INFORMATION

    SYNCHRONIZATION PRINCIPLE

    GE Energy Products - Europe

    Reference : 172A7791 Rev. : A Section : 01 Page : 19/23

    Ce document, proprit exclusive de GE Energy Products France SNCest strictement confidentiel. Il ne peut tre communiqu,

    copi ou reproduit sans notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNCis strictly confidential. It must not be communicated,

    copied or reproduced without our prior written consent.

    APPENDIX 2

  • 8/10/2019 Sync System

    21/24

    KHARAFI NATION SABIYA

    GENERAL INFORMATION

    SYNCHRONIZATION PRINCIPLE

    GE Energy Products - Europe

    Reference : 172A7791 Rev. : A Section : 01 Page : 20/23

    Ce document, proprit exclusive de GE Energy Products France SNCest strictement confidentiel. Il ne peut tre communiqu,

    copi ou reproduit sans notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNCis strictly confidential. It must not be communicated,

    copied or reproduced without our prior written consent.

    52G SYNCHRONIZING DIAGRAM

    SYNC AUTO COMMANDFROM

    SPEEDTRONICSYNCHRO-DEVICE

    VOLTAGES EQUALITY

    PHASES &FREQUENCIES EQUALITY

    EXCITATIONVOLTAGE +/-

    ORDERS

    TURBINESPEED +/-ORDERS

    SPEEDTRONICSYNCHRO CHECK RELAY

    ORDER

    52G CIRCUIT BREAKER

    CLOSING ORDER TOGCP

    52G CIRCUIT BREAKER CLOSINGFROM GCP TO SWITCHYARD

    CIRCUIT BREAKER CLOSED INFORMATION

    SPINNING RESERVE

    ACTIVATED

    no

    no

    no

    yes

    yes

    yes

    VOLTAGE & FREQUENCYMEASURE AT THE

    GENERATOR OUTLET

    VOLTAGE & FREQUENCY MEASUREBY THE MV NETWORK SIDE

    LINE CIRCUIT BREAKERCLOSED AND BUS ALIVE

    Ev. RESYNC(local or remote)

    ACTIVATED

    VOLTAGES EQUALITY

    PHASES &FREQUENCIES EQUALITY

    OPERATOR VISUAL CHECK ATTHE DIFFERENTIAL VOLTMETER

    OPERATOR VISUAL CHECK ATTHE SYNCHRONOSCOPE

    52G MANUAL CLOSINGORDER (local or remote)

    EXCITATIONVOLTAGE +/-

    MANUALORDERS

    TURBINESPEED +/-MANUALORDERS

    SPEEDTRONICSYNCHRO CHECK RELAY

    PERMISSION

    no

    no

    no

    yes

    yes

    yes

    ACTIVATED

    SYNC MANU COMMANDFROM

    ACTIVATED

    GT at FULL SPEED NOLOAD AND 52G OPEN

    MONITOR

  • 8/10/2019 Sync System

    22/24

    KHARAFI NATION SABIYA

    GENERAL INFORMATION

    SYNCHRONIZATION PRINCIPLE

    GE Energy Products - Europe

    Reference : 172A7791 Rev. : A Section : 01 Page : 21/23

    Ce document, proprit exclusive de GE Energy Products France SNCest strictement confidentiel. Il ne peut tre communiqu,

    copi ou reproduit sans notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNCis strictly confidential. It must not be communicated,

    copied or reproduced without our prior written consent.

    52L SYNCHRONIZING DIAGRAM

    SYNC AUTO COMMANDFROM

    SPEEDTRONICSYNCHRO-DEVICE

    VOLTAGES EQUALITY

    PHASES &FREQUENCIES EQUALITY

    EXCITATIONVOLTAGE +/-

    ORDERS

    TURBINESPEED +/-ORDERS

    SPEEDTRONICSYNCHRO CHECK RELAY

    CLOSE

    52L CIRCUIT BREAKERCLOSING ORDER TO

    GCP

    52L CIRCUIT BREAKER CLOSINGFROM GCP TO SWITCHYARD

    CIRCUIT BREAKER CLOSED INFORMATION

    ACTIVATED

    no

    no

    no

    yes

    yes

    yes

    VOLTAGE & FREQUENCYMEASURE UPSTREAM LINE

    CIRCUIT BREAKER

    VOLTAGE & FREQUENCY MEASURE

    DOWNSTREAM LINE CIRCUIT BREAKER

    GENERATOR CIRCUITBREAKER CLOSED AND

    BUS ALIVE

    52L Selection validation(local or remote)

    ACTIVATED

    52L Selection validation

    52L

    VOLTAGES EQUALITY

    PHASES &FREQUENCIES EQUALITY

    OPERATOR VISUAL CHECK ATTHE DIFFERENTIAL VOLTMETER

    OPERATOR VISUAL CHECK ATTHE SYNCHRONOSCOPE

    52L MANUAL CLOSINGORDER (local or remote)

    EXCITATIONVOLTAGE +/-

    MANUALORDERS

    TURBINESPEED +/-MANUALORDERS

    SPEEDTRONICSYNCHRO CHECK RELAY

    PERMISSION

    no

    no

    no

    yes

    yes

    yes

    ACTIVATED

    SYNC MANU COMMANDFROM

    ACTIVATED

    GT at FULL SPEED NOLOAD AND 52L OPEN

    52G / 52L SELECTORSWITCH

  • 8/10/2019 Sync System

    23/24

    KHARAFI NATION SABIYA

    GENERAL INFORMATION

    SYNCHRONIZATION PRINCIPLE

    GE Energy Products - Europe

    Reference : 172A7791 Rev. : A Section : 01 Page : 22/23

    Ce document, proprit exclusive de GE Energy Products France SNCest strictement confidentiel. Il ne peut tre communiqu,

    copi ou reproduit sans notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNCis strictly confidential. It must not be communicated,

    copied or reproduced without our prior written consent.

    VOLTAGE RECOVERY DIAGRAM - 52G DEAD BUS CLOSING

    52G AND EXCITATION CIRCUITBREAKER CLOSING ORDER

    52G CIRCUIT BREAKER CLOSING

    CIRCUIT BREAKER CLOSED INFORMATION

    GT at FULL SPEED NO LOADAND 52G OPEN

    SPEEDTRONICPERMISSIVE27BN

  • 8/10/2019 Sync System

    24/24