Swiss Re InstituteBIM: Converting concept into practiceAntoine RÉROLLE, Head of Engineering27 February 2018
Antoine Rérolle – Head of Engineering
2
Antoine Rérolle graduated as Civil Engineer from the ESTP (Paris).
Mr. Rérolle has over 30 years’ experience working for Bouygues Construction SA, one of the world’s largest construction companies. He has been involved in transportation, power, industry and hospital projects, both as site manager and as commercial / Business Unit manager.
He created the Technical Department at Losinger Marazzi AG in 1999 in line with the evolution of the company as total contractor and property developer. He is now Chief Technical Officer and Chief Information Officer for Losinger Marazzi AG, and manages a team of over 130 architects and engineers.
The team elaborates projects and tenders for property and business developers, supports the construction teams as technical consultants in regard to building regulations and standards, as well as defines and operates the company's strategy for sustainable development, energy efficiency and digitalization - including BIM.
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
Overview
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 3
1. Losinger Marazzi: a Swiss company in an international group
2. BIM @ Losinger Marazzi
3. BIM : Organisation & workflow
4. BIM : Examples & Use Cases
5. BIM : Lessons learned & feedback from the field
Losinger Marazzi1
4LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
5
Losinger Marazzi : A century of history
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
Losinger Marazzi: A national player
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 6
• Headquarters in Bern
• Five regional subsidiaries
• Proximity to our clients
Losinger Marazzi: unrivalled know-how in Switzerland
7
• Losinger Marazzi : 800 employees
Architects, engineers, executives
Administrative employees
Construction workers and
foremen
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
Sustainable Development in Switzerland
8
• Pioneer in sustainable construction
• Over 95% of its project developments with environmental certificates
• First 2'000-Watt districts in Switzerland
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
Working safely : Goals
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 9
Goal : ZERO accident
Member of an international Group
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 10
©Véronique Paul, Arema
Bouygues Construction: A global player
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 11
Bouygues Construction: Four business areas
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 12
• Concessions• Energy &
Services
• Civil Works• Building
Reference projects
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 13
Hospital
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 14
Limmattal Hospital, Schlieren (ZH)
• Design & Build Contract
• «light» BIM specification in the tender
• 57'000 m2
• 1 helipad
• 130 bedrooms (200 Beds)
• 1 MRI (1.5 T) + 1 spare
• 3 radiology rooms
• 1 mammography room
• 7 endoscopy rooms
• 9 operation rooms
Sustainable Neighbourhood
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 15
Eikenøtt, Gland (VD)
• 71'000 m2 land area• 23 buildings• 485 apartments (about 1'200 inhabitants)• 3'500 m2 commercial spaces
• 2 car parks with 600 parking spots• 800 bike parking spots
• 250 m2 thermal solar panels• 1’0000 m2 photovoltaic panels
• Commitment to urban biodiversity vegetable gardens, flowering meadows, fruit trees etc.
Sustainable Neighbourhood
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 16
• 8 Ha land area• 13 buildings• 731 apartments (about 2'000 inhabitants)
• 55‘000 m2 office spaces (about 3’000 workplaces)
• 10’000 m2 hotel• 6’600 m2 commercial spaces• 6'000 m2 school• 2 carsharing stations
10% for electric vehicles• 100% renewable energies• Energy-contracting with EWZ• “Greencity App”
• Minergie et Minergie-(P)-ECO labels• LEED Platine Core & Shell label• 2'000-Watts-Site certificate
Greencity, Zurich
Big development and projects
17
Prime Tower, Zurich (ZH)
• 40'000 m2 office space• 126 meters high • 36 floors• LEED Gold Core & Shell
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
Big development and projects
18
Rolex Learning Center, Lausanne (VD)
• 35'000 m2 multifunctional space• University / EPFL• Library• Restaurant & cafeteria• Minergie
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
Big development and projects
19
Stade de Suisse, Berne (BE)
• Stadium with 32'000 seats • 20'000 m2 for sports use• 62'000 m2 commercial spaces• 8'700 m2 photovoltaic panels on the rooftop
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
BIM @ Losinger Marazzi
20
2
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
21
BIM in Switzerland
• BUILDINGDIGITALSWITZERLAND:
> association founded in 2016> 2nd BIM congress in 2017> First norm:
SIA 2051 : BIM methodology
• International awards
bSI Awards (2016)
International Category
(2015)
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
bSi Awards (2017)
BIM dimensions
22LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
Customers
Architects
Consultants
SuppliersSubcontractors
Globalcontractor
Users
BIMApproval ProcessData Management
Coordination 2D/3D
BIM dimensions
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 23
+ life cycle management
+ timing
+ costs
4D
5D6D
7D
3D
+ geometric data
+ property management
24
BIM jobsSource : SIA2051
BIM-Manager
BIM-Coordinator
BIM-Referent
BIM-Users
BIM-modeler
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
1 per company
25
Why go for BIM?
Complexity of projects
Customer Requirements
Multiple partners
Increasing digitalisation
Anticipation Quality
Collaboration Efficiency
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
Customer-focused and ROI
26
Focus on Customer
Project Management
Construction site
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
27
Projects
25 projects
Draft
Design
Execution
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
30 architects
20 Civil Engineers
20 MEP Consultants
5Surveyors
BIM : Organisation and workflow3
28LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
29
Sequential development
Phase_1 Phase_2 Phase_3 Phase_4 Phase_5 Phase_6
Client
Consultants
Enterprises
Suppliers
Facility Manager
Goals
definitio
n
Pre
limin
ary
st
udy
Pro
ject
stu
dy
Subm
issi
on
Execu
tion
Faci
lity
Managem
ent
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
30
Concurrent development
Phase_1 Phase_2 Phase_3 Phase_4 Phase_5 Phase_6
Client
Agents
Enterprises
Suppliers
Facility
Manager
Go
als
de
fin
itio
n
Pre
limin
ary
stu
dy
Pro
ject stu
dy
Su
bm
issio
n
Exe
cu
tio
n
Fa
cili
ty
Ma
na
ge
me
nt
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
31
Our commitment
openBIM
• Use of IFC / BCF / COBie standards
• centralised and collaborative project database
• software with buildingSMART certifications
Integrate BIM to the project development process
• Graphical documentation from partners up until delivery
• Definition of roles
• BIM execution plan
Deploy BIM with partners, one project at a time
• Adapt the strategy with partners for each project
•Free collaboration (voluntary basis)•Full transparency•Sharing of experience
Define simple & reproducible use cases
• Use cases workshop
• Training
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
32
Data organization agility
• Software and release management
• Model exchange platform
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
LODLevel of development
LOGLevel of
Geometry
LOILevel of
Information
+
33
Coordination meeting
Hôtel Palexpo, Grand-Saconnex (GE)
& Neuroscience Labs Cery, Prilly (VD)
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
34
Coordination meeting
D - 2 D -1 D-Day: coordination meeting D +1
Uploads 3D models in native and IFC format
Project collaboration Platform: Syncplicity, eDoc, etc
Preparation / update of coordination model
Preparation of the coordination report: list of conflicts
Minutes of meeting
List of conflictsReport
Minutes, report and conflicts
Coordination Model in .SMC format
List of conflicts in .BCF format
to LM teams to partners
Upload document to exchange platform
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
=> to LM teams=> to Consultants
Minutes, reports and conflicts
Coordination model in .SMC format
List of conflicts in .BCF format
D + 1
UPLOAD DOCUMENTS to exchange platform
Selecting a coordination tool
35
• LM: Solibri Model checker
• Standard IFC: models
• Standard BCF: clash coordination
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
BIM : Examples & Use cases4
36LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
Virtual reality
37
Neuroscience Labs Cery, Prilly (VD)
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
Virtual reality
38
Les Vernets District , Geneva (GE)
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
Digital mock-up: Decision support
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 39
Hôtel Palexpo, Grand-Saconnex (GE)
Digital mock-up: Decision support
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 40
Clinique CIC Riviera, Clarens (VD)
Noise simulation
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 41
Les Vernets District , Geneva (GE)
Wind simulation
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 42
Les Vernets District , Geneva (GE)
Daylight simulation
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 43
Les Vernets District , Geneva (GE)
Augmented reality
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 44
L’Atelier, Plan-les-Ouates (GE)
• Storage and offices
Room by room specifications
45
• Collaborative data base for project team
> client, consultants, contractors, etc.
• Contract management
• Validation workflow
• Versioning
Neuroscience Labs Cery, Prilly (VD)
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
Architect
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 46
Limmattal Hospital, Schlieren (ZH)
Neuroscience Labs Cery, Prilly (VD)
Elevator shaft Section
Overview
Reinforcement
Structure
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 47
Hôtel Palexpo, Grand-Saconnex (GE)
Oassis district, Crissier (VD)
Prefabricated elements
Plumbing
Mechanical, electrical and plumbing
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 48
Hôtel Palexpo, Grand-Saconnex (GE)
Electrical
M&E global overview
49
Areas management (contract vs. project)
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
Pre-construction phase
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 50
Neuroscience Labs Cery, Prilly (VD)
Delivery & logistics onsite
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 51
Eikenøtt Eco-neighborhoodBuilding A2, Gland (VD)
Prefabrication and construction
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 52
Student housing ETH, Zürich
BIM to field
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 53
Earthworks management
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 54
Oassis, Crissier (VD)• With drones
55
Quality and progress management
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
Oassis, Crissier (VD)• With drones
56
Commissionning
Bâleo – Erlenmatt, Basel (BS)• Digitize tracking of execution• Communicate with full team• Update model with
modifications made at construction site
• Manage knowledge
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
57
As built Model
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
58
Facility Management
• Work in progress for Hospital FM
• Connection between BIM database and CAFM
• Area management
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
Lessons learned & feedback from the field5
59LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
Challenges and rewards
60
Difficulties
• Quantifying the ROI • Convincing the stakeholders• Change management• Management of training• Quality of the project management /
contract management• Poor implication by sub-contractors
Advantages
• Better quality of construction work• To try it is to adopt it• Splitting LOG from LOI improves
user experience• Easier commissioning with sub-contractors• Improvement of Health & Safety onsite
> better identification of risk situations> Automation for riskier activities
• New opportunities with > Drones> Scans> Robots> IOT
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
Lessons learned
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 61
Digital
• open BIM and split of LOG / LOI• ICT coordinator• Right software for the right need• BIM execution plan
Organization
• Each partner has their own model• Clear understanding of new roles• Voluntary basis and team training
Collaboration
• Workshop to define project use cases• Validation on 2D printed documents (issued from 3d models)
Risks management
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 62
Digital• Quality of softwares• Availability and compatibility of the releases of softwares• Hacking: network, models, data base…
Human• Actors or contributors authorisation / accreditation• Modelling without understanding• Blind trust in softwares and their results/reports
Common sense• Wrong understanding of the user needs or user behaviours (comfort, mobility, energy)
Contract• Organization of the BIM management and related interfaces
Toward a Professional Certification: buildingSMART
63
https://www.buildingsmart.org/compliance/professional-certification/
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018
Launch in progress: S1 2018
BIM: converting concept into practice
LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 64
• Be user oriented
• Bring added value
• Keep it simple and smart
• Be humble and agile
• Manage change
• Manage data during the full project cycle
• Don’t forget the ROI
losinger-marazzi.ch
Basic Copyright Notice & Disclaimer
©2018 This presentation is copyright protected. All rights reserved. You may
download or print out a hard copy for your private or internal use. You are not permitted to
create any modifications or derivatives of this presentation without the prior written
permission of the copyright owner.
This presentation is for information purposes only and contains non-binding indications.
Any opinions or views expressed are of the author and do not necessarily represent those
of Swiss Re. Swiss Re makes no warranties or representations as to the accuracy,
comprehensiveness, timeliness or suitability of this presentation for a particular purpose.
Anyone shall at its own risk interpret and employ this presentation without relying on it in
isolation. In no event will Swiss Re be liable for any loss or damages of any kind,
including any direct, indirect or consequential damages, arising out of or in connection
with the use of this presentation.