    Sustaining Power Plant Life Through

    Rehabilitation as A Part of Life Cycle

    Management Program

    Mr. Herdiyanto SoekonoHead of Engineering Division

    Arief Mustaqim

    Staff of Engineering DivisionPT. Indonesia Power

    National Conference On Electricity Business & Technology

    Jakarta, 1-2 October 2014

    Case Study of Kamojang Geothermal Power Plant (KGPP)

    1

  • 7/23/2019 Sustaining Power Plant Life Through Rehabilitation as a Part of Life Cycle Management Program r02

    2/14

    Outline :

    Background

    Life Cycle Management of KGPP

    Feasibility Study for Rehabilitation

    The Compliance of Performance Standards on

    Environmental and Social Sustainability

    Conclusion

    2

  • 7/23/2019 Sustaining Power Plant Life Through Rehabilitation as a Part of Life Cycle Management Program r02

    3/14

    Background

    KGPP- is the first geothermal plant in Indonesia with the totalinstalled capacity 140 MW, almost 30 years in operation and theexistence still needed by the grid.

    KGPP is Owned & operated by PT. Indonesia Power subsidiary of PLNwhile steam supplied by Pertamina Geothermal Energy

    Several references stated, EPRI experiences, rotating part of thepower plant shall be replaced after 200.000 hrs operation orrefurbished due to integrity inspection results, another referencestated the life time of power plant can be achieved 65 years with theschedule of rehabilitation at 25 years and 45 years and after 65 yearsold demolition shall be considered.

    The need to sustaining KGPP life to prolong its existence as perworldwide references

    3

  • 7/23/2019 Sustaining Power Plant Life Through Rehabilitation as a Part of Life Cycle Management Program r02

    4/14

    Life Cycle Management of KGPP

    Business Impact vs Phase of Asset life.

    Source: adapted from several references4

  • 7/23/2019 Sustaining Power Plant Life Through Rehabilitation as a Part of Life Cycle Management Program r02

    5/14

    Life Cycle Management of KGPP

    Deployment of LCM

    LCM has been developed by considering :

    Technical evaluation of system structure component,

    Identification and evaluation of life cycle alternative plan

    Life cycle cost analysis for the justified life cycle alternative

    plan

    Selection of optimum life cycle plan

    5

  • 7/23/2019 Sustaining Power Plant Life Through Rehabilitation as a Part of Life Cycle Management Program r02

    6/14

    Life Cycle Management of KGPP

    O&M Strategy Program

    Maintenance Strategy Program

    EAF > 90%

    Corrective

    Preventive

    & ProActive

    Predictive

    Turbinerepairement

    Generatorrewinding

    RetainningRing

    replacement

    CoolingTower part

    replacement

    coolingsystem and

    some part ofsteam pipeinstalation

    repairment and refurbishment activities

    as a part of Life Management

    6

  • 7/23/2019 Sustaining Power Plant Life Through Rehabilitation as a Part of Life Cycle Management Program r02

    7/14

    Life Cycle Management of KGPP

    Life Assessments Program

    Life Assessments Program of KGPP scenario considering several issues as

    follows :

    Operation &

    maintenance historicalrecords

    Examination analysisboth NDE / DE

    Life prediction withrobust model which give

    high confidence levelusually comes from

    research organization

    statistical review fromsister plant

    7

  • 7/23/2019 Sustaining Power Plant Life Through Rehabilitation as a Part of Life Cycle Management Program r02

    8/14

    Life Cycle Management of KGPP

    Life Assessments Program

    Turbine & Steam

    Blade

    Rotor

    Diaphragm

    Turbine Valve

    Receiving header

    Demister

    Final separator

    Pipeline system

    I&C

    Plant DAS to DCS

    Turbine COntrol

    BOP Main Motor

    Main cooling waterpump

    Cooling tower fanmotor

    Cooling Tower

    Civil Structure

    Cooling Element

    Generator & Trafo

    Rotor

    Stator

    Transformerwinding

    The equipment list of geothermal power plant as a concern of lifeassessment program as follows:

    8

  • 7/23/2019 Sustaining Power Plant Life Through Rehabilitation as a Part of Life Cycle Management Program r02

    9/14

    Feasibility Study for Rehabilitation

    Results:

    The result of material inspection such as NDT and Microstructure

    investigation found some defect as well micro cracks and predicted the

    life time of HIP turbine on the near end of life. Other defect found in

    hot and pressured steam piping such as degradation of wall thickness

    and also predicted the life time on the near end of life phase. (thestatement from several references confirmed)

    Beside the life time to be extended, the turbines efficiency will plant to

    be increased by applied new design of turbine blade as well as the new

    material and digital control system.

    9

  • 7/23/2019 Sustaining Power Plant Life Through Rehabilitation as a Part of Life Cycle Management Program r02

    10/14

    The result of financial analysis show an optimistic result from

    financial indicator with the assumption of steam contract from PGE

    to be establish at least for the next 15 years. (Several studies

    confirmed Kamojang Geothermal field predicted exist for the next

    20 to 25 years from 2005)

    Due to significant budget needed to execute the program and

    regulation of the company, in Order to get financing for the

    rehabilitation program the plant should comply IFC to meet the

    requirement of world wide financing organization.

    Feasibility Study for Rehabilitation

    Results:

    10

  • 7/23/2019 Sustaining Power Plant Life Through Rehabilitation as a Part of Life Cycle Management Program r02

    11/14

    Tentative Illustration

    Rehabilitation Scope of Work

    11

    AVR

    DCIS

  • 7/23/2019 Sustaining Power Plant Life Through Rehabilitation as a Part of Life Cycle Management Program r02

    12/14

    The Performance Standards on Environmental and Social Sustainability

    used in the Feasibility Study is IFC (International Finance Corporation)

    The IFC guideline consists of 8 performance standard to comply;

    Assessment and Management of Environmental and Social Risks and Impacts

    Labour and Working Conditions

    Resource Efficiency and Pollution Prevention

    Community Health, Safety, and Security

    Land Acquisition and Involuntary Resettlement

    Biodiversity Conservation and Sustainable Management of Living Natural

    Resources

    Indigenous Peoples

    Cultural Heritage

    The Environmental and Social Assessment in accordance IFC performance standard

    results KGPP life extension project planning meet majority performance standard

    required

    The Compliance of Performance Standards

    on Environmental and Social Sustainability

    12

  • 7/23/2019 Sustaining Power Plant Life Through Rehabilitation as a Part of Life Cycle Management Program r02

    13/14

    Conclusion:

    Life assessment program for main equipment as an input of life

    cycle management program conducted partially and scheduled with

    outage time of the plant. Based on the life assessment results

    selected life cycle program for KGPP justified.

    The feasibility study results the life extension program to be

    feasible both from technical, financial and risk identification point

    of view including the predicted steam availability for the next 20

    years.

    The Environmental and Social Assessment in accordance IFC

    performance standard results KGPP life extension project planning

    meet majority performance standard required.

    13

  • 7/23/2019 Sustaining Power Plant Life Through Rehabilitation as a Part of Life Cycle Management Program r02

    14/14