12
SUSTAINABLE ENERGY ANALYTICS Mandatory Requirements Mandatory Documents Duct Test Report 403.3.3 Must be from a certified HERS Rater or BPI Agent Fresh Air Ventilation Documentation 403.6 Must be from a certified HERS Rater or BPI Agent IECC Energy Certificate 401.3 Lists Building Attributes, including HERS Rating Mandatory Requirements Optional Documents Air Barrier & Insulation QC Checklist 402.4.1.1 Table 402.4.1.1 Air Infiltration Test 3 ACH 402.4.1.2 Blower Door Test Report Equipment Sizing 403.7 Manual J or Equivalent Compliance Path Specific Documents ERI Index HERS Rating Pre-construction Projected HERS Rating Certificate Not required but strongly recommended Post construction Confirmed HERS 406.6.1 Confirmed HERS Rating Certificate with RESNET Registration Number ENERGY STAR Certification Pre-construction ENERGY STAR Documentation MA 406.1.2.1 Projected HERS Rating Certificate ENERGY STAR Home Report Rater Design Review Checklist Post Construction ENERGY STAR Documentation MA 406.1.2.1 Confirmed HERC Certificate with RESNET Registration Number ENERGY STAR Rater Field Checklist Passive House US Pre-construction Passive House Documentation MA 406.1.2.2 List of Compliance Features Specific Space Heat Demand Statement Post construction Passive House Documentation MA 406.1.2.2 PHIUS+ 2015 Final Report Simulated Performance Alternative Pre-construction Documentation 405.4.2.1 Post construction Documentation 405.4.2.2 Prescriptive Path Non-Stretch Code Duct Test Report 4% Total Leakage 403.3.3 Mandatory Requirement, must be from a certified HERS Rater or BPI Agent Table 402.1.2 Thermal Requirements 402.1.2 Building Component Narrative not required but recommended Total UA Alternative 402.1.5 REScheck 4.6.2 report is optional, not mandatory

SUSTAINABLE ENERGY ANALYTICS · SUSTAINABLE ENERGY ANALYTICS ... MEP Data\SEA3394MJ 50 Standish Rd Wellesley.rup Calc = MJ8 Front Door faces: W Load Short Form Job

Embed Size (px)

Citation preview

SUSTAINABLE ENERGY ANALYTICS

4 Militia Drive, Suite 6, Lexington, MA 02421 [email protected] (781) 652 - 8282 www.sea.us.com

Mandatory Requirements Mandatory Documents

Duct Test Report 403.3.3 Must be from a certified HERS Rater or BPI Agent

Fresh Air Ventilation Documentation 403.6 Must be from a certified HERS Rater or BPI Agent

IECC Energy Certificate 401.3 Lists Building Attributes, including HERS Rating

Mandatory Requirements Optional Documents

Air Barrier & Insulation QC Checklist 402.4.1.1 Table 402.4.1.1

Air Infiltration Test 3 ACH 402.4.1.2 Blower Door Test Report

Equipment Sizing 403.7 Manual J or Equivalent

Compliance Path Specific Documents

ERI Index HERS Rating

Pre-construction Projected HERS Rating Certificate Not required but strongly recommended

Post construction Confirmed HERS 406.6.1 Confirmed HERS Rating Certificate with RESNET Registration Number

ENERGY STAR Certification

Pre-construction ENERGY STAR Documentation MA 406.1.2.1 Projected HERS Rating Certificate

ENERGY STAR Home Report

Rater Design Review Checklist

Post Construction ENERGY STAR Documentation MA 406.1.2.1 Confirmed HERC Certificate with RESNET Registration Number

ENERGY STAR Rater Field Checklist

Passive House US

Pre-construction Passive House Documentation MA 406.1.2.2 List of Compliance Features

Specific Space Heat Demand Statement

Post construction Passive House Documentation MA 406.1.2.2 PHIUS+ 2015 Final Report

Simulated Performance Alternative

Pre-construction Documentation 405.4.2.1

Post construction Documentation 405.4.2.2

Prescriptive Path Non-Stretch Code

Duct Test Report 4% Total Leakage 403.3.3 Mandatory Requirement, must be from a certified HERS Rater or BPI

Agent

Table 402.1.2 Thermal Requirements 402.1.2 Building Component Narrative not required but recommended

Total UA Alternative 402.1.5 REScheck 4.6.2 report is optional, not mandatory

Copyright 2016 Sustainable Energy Analytics

HERS Certificate (HERC)• When is a HERC valid?

50

Now v15.3

Copyright 2016 Sustainable Energy Analytics

What are the options For New Construction?

Dwelling

Is There A Residential Dwelling Unit?

Stretch

Stretch Code Town?Yes

Above Grade Floors

Number of Above Grade Floors?

Yes

Commercial Provisions1. Prescriptive2. Performance (90.1)3. Source Energy

No

Above Grade Floors

No

Residential Provisions1. ERI (HERS = 55)2. ENERGY STAR Rev 3.13. Passive House

1-4 FL

Commercial Provisions1. Prescriptive2. Performance (90.1)3. Source Energy4. Individual HERS Ratings

5 FL

Commercial Provisions1. Prescriptive2. Performance (90.1)3. Source Energy

>5 FLResidential Provisions

1. Prescriptive2. ERI (HERS = 55)3. ENERGY STAR Rev 3.14. Passive House

1-3 FL

Commercial Provisions1. Prescriptive2. Performance (90.1)3. Source Energy

>5 FL

Commercial Provisions1. Prescriptive2. Performance (90.1)3. Source Energy4. Individual HERS Ratings

4-5 FL

SUSTAINABLE ENERGY ANALYTICS

4 Militia Drive, Suite 6, Lexington, MA 02421 [email protected] (781) 652 - 8282 www.sea.us.com

IECC 2015 R402.1 PRESCRIPTIVE Building Component Narrative

Component Required Proposed

Fenestration U Factor 0.30 or Lower

Skylight U Factor 0.55 or Lower

Ceiling R Value R 49 or

R402.2.1 Exception, please describe

Framed Wall R 20 or 13+5

Mass Wall R 13/17

Floor R 30

Basement & Crawlspace R 15/19

Slab R 10, 2 ft.

All Attic Ducts R 8

Duct Test Allowed Leakage 4% Total Leakage or

Exempt, please describe

Building Infiltration 3 ACH

In accordance with Massachusetts 780 CMR 51 (IECC 2015), I / we attest that the features / components described above will be incorporated in the work.

Project Address

Builder Name

Builder Telephone

Signature

SUSTAINABLE ENERGY ANALYTICS

4 Militia Drive, Suite 6, Lexington, MA 02421 [email protected] (781) 652 - 8282 www.sea.us.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.

2017-Feb-01 12:49:46Right-Suite® U niv ersal 2017 17.0.03 RSU15874 Page 1

...MEP Data\SEA3394MJ 50 Standish Rd Wellesley.rup Calc = MJ8 Front Door faces: W

Job:Load Short FormDate:

Entire House KERILLE BRUNOBy:

SUSTAINABLE ENERGY ANALYTICS

4 MILITIA DRIVE (STE 6), LEXINGTON, MA 02421 Phone: 781-652-8282 Email: [email protected] / [email protected]

Project InformationFor:

Design InformationInfiltrationClgHtg

SimplifiedMethod866Outside db (°F)Semi-tightConstruction quality7568Ins ide db (°F)

1 (Average)Fireplaces1162Design TD (°F)M-Daily range

5050Inside humidity (%)2645Moisture difference (gr/lb)

HEATING EQUIPMENT COOLING EQUIPMENT

Make Generic Make GenericTrade TradeModel AFUE 96 Cond SEER 13.0AHRI ref Coil

AHRI refEfficiency 96 AFUE Efficiency 11.6 EER, 13 SEERHeating input Btuh58248 Sensible cooling Btuh26186Heating output Btuh55918 Latent cooling Btuh6546Low output baseboard Btuh/ft600 Total cooling Btuh32732Total low baseboard ft93 Actual air flow cfm1091High output baseboard Btuh/ft850 Air flow factor cfm/Btuh0.038Total high baseboard ft66 Static pressure in H2O0Space thermostat Load sensible heat ratio 0.91

ROOM NAME Area Htg load Clg load Baseboard (ft) Clg AVF(ft²) (Btuh) (Btuh) Low High (cfm)

1st Floor 1815 21537 15670 36 25 5882nd Floor 1796 22294 16166 37 26 606Bsmt Zone 1839 12087 1064 20 14 40

Entire House 5450 55918 28776 93 66 1091Other equip loads 0 0Equip. @ 0.91 RSM 26186Latent cooling 2682

TOTALS 5450 55918 28868 93 66 1091

SUSTAINABLE ENERGY ANALYTICS

4 Militia Drive, Suite 6, Lexington, MA 02421 [email protected] (781) 652 - 8282 www.sea.us.com

AIR BARRIER AND INSULATION INSTALLATION CHECKLIST (Table R402.4.1.1 IECC 2015)

a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400.

Contents from Table R402.4.1.1 in the 2015 International Energy Conservation Code, International Code Council

SEA 170201

R = Rater; B = Builder; NA = Not Applicable Location:

COMPONENT AIR BARRIER CRITERIA R/B/NA INSULATION INSTALLATION CRITERIA R/B/NA

General

Requirements

A continuous air barrier shall be installed in the building

envelope.

Air-permeable insulation shall not be used as a sealing

material.

The exterior thermal envelope contains a continuous air

barrier.

Breaks or joints in the air barrier shall be sealed.

Ceiling/Attic

The air barrier in any dropped ceiling/soffit shall be

aligned with the insulation and any gaps in the air barrier

shall be sealed.

The insulation in any dropped ceiling/soffit shall be

aligned with the air barrier.

Access openings, drop down stairs or knee wall doors to

unconditioned attic spaces shall be sealed.

Walls

The junction of the foundation and sill plate shall be

sealed.

Cavities within corners and headers of frame walls shall

be insulated by completely filling the cavity with a

material having a thermal resistance of R-3 per inch

minimum.

The junction of the top plate and the top of exterior

walls shall be sealed.

Exterior thermal envelope insulation for framed walls

shall be installed in substantial contact and continuous

alignment with the air barrier.

Knee walls shall be sealed.

Windows,

Skylights and

Doors

The space between window/door jambs and framing,

and skylights and framing shall be sealed.

Rim Joists Rim joists shall include the air barrier. Rim joists shall be insulated.

Floors (including

above garage and

cantilevered

floors)

The air barrier shall be installed at any exposed edge of

insulation.

Floor framing cavity insulation shall be installed to

maintain permanent contact with the underside of subfloor

decking, or floor framing cavity insulation shall be

permitted to be in contact with the top side of sheathing,

or continuous insulation installed on the underside of

floor framing and extends from the bottom to the top of

all perimeter floor framing members.

Crawl Space

Walls

Exposed earth in unvented crawl spaces shall be covered

with a Class I vapor retarder with overlapping joints

taped.

Where provided instead of floor insulation, insulation

shall be permanently attached to the crawlspace walls.

Shafts,

Penetrations

Duct shafts, utility penetrations, and flue shafts opening

to exterior or unconditioned space shall be sealed.

Narrow Cavities Batts in narrow cavities shall be cut to fit, or narrow

cavities shall be filled by insulation that on installation

readily conforms to the available cavity space.

Garage

Separation Air sealing shall be provided between the garage and

conditioned spaces.

Recessed

Lighting Recessed light fixtures installed in the building thermal

envelope shall be sealed to the drywall.

Recessed light fixtures installed in the building thermal

envelope shall be air tight and IC rated.

Plumbing and

Wiring

Batt insulation shall be cut neatly to fit around wiring and

plumbing in exterior walls, or insulation that on

installation readily conforms to available space shall

extend behind piping and wiring.

Shower/Tub on

Exterior Wall The air barrier installed at exterior walls adjacent to

showers and tubs shall separate them from the showers

and tubs.

Exterior walls adjacent to showers and tubs shall be

insulated.

Electrical/Phone

Box on Exterior

Walls

The air barrier shall be installed behind electrical or

communication boxes or air-sealed boxes shall be

installed.

Rater Name __________________________________

Company ____________________________________

Builder Rep __________________________________

Rater Signature_____________________ Date _______

HVAC Register

Boots

HVAC register boots that penetrate building thermal

envelope shall be sealed to the subfloor or drywall.

Concealed

Sprinklers

When required to be sealed, concealed fire sprinklers

shall only be sealed in a manner that is recommended by

the manufacturer. Caulking or other adhesive sealants

shall not be used to fill voids between fire sprinkler

cover plates and walls or ceilings.

SUSTAINABLE ENERGY ANALYTICS

4 Militia Drive, Suite 6, Lexington, MA 02421 [email protected] (781) 652 - 8282 www.sea.us.com

2015 Energy Code Compliance Testing Results

Testing Date SEA#

Project Address Permit #

Client Company Contact Name

Contact Phone Email

Tested By (Print) Signed

HERS Provider Performance Systems Development, Ithaca, NY Cert #

Tests Conducted: (Check all that apply)

Massachusetts Base Code (IECC 2015) Test Options

Duct Test – All Types “Total Leakage” – 4 CFM/100 ft2 Conditioned Floor Area Served

Building Infiltration Test – 3 ACH50 at 50 pa

Mechanical Ventilation - to meet ENERGY STAR®3.1 or ASHRAE 62.2 -2013 Standard (ERV, HRV, exhaust only bath fans)

Building Infiltration Test Results

Building Volume (FT3) (Volume X Test Limit Req/60 = CFM50) Test Result

(CFM50) Test Result

(ACH) Pass/Fail

Duct Test Results

System Description Conditioned Area Served

(FT2)

TL or LTO

Test Limit (Conditioned Area*Req/100 = CFM)

Test Result (CFM)

% Pass/Fail

Mechanical Ventilation Massachusetts Base Code Only (IECC 2015)

System Description Conditioned Area Served

(FT2) Test Limit – CFM

(NBr +1)* 7.5 + 3% CFA Test Result

(CFM)

Pass/Fail

Operational Instructions

Form ID____________

SUSTAINABLE ENERGY ANALYTICS

4 Militia Drive, Suite 6, Lexington, MA 02421 [email protected] (781) 652 - 8282 www.sea.us.com