20
Sustainable Construction Without Compromise

Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

Sustainable Construction Without Compromise

75c100m0y25k

0c0m0y44k

PANTONE®

423 CPANTONE®

2627 C

90c40m0y0k

0c0m0y44k

PANTONE®

423 CPANTONE®

285 C

0c53m100y00k

0c0m0y44k

PANTONE®

423 CPANTONE®

Orange 021 C

69c00m100y00k

0c0m0y

k

PANTONE®

Green 361 C

0c95m100y00k

0c0m0y

k

PANTONE®

3 CPANTONE®

Red 485 C

EVENTS

REFURBISHEDBUILDINGS

EVENTS

REFURBISHEDBUILDINGS

WernickTM Ref: 432-08:2017

Page 2: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

1 Modular buildings from Wernick™ Buildings 0800 18 18 22

I am both happy and relieved; I would never have guessed that such a large building project, with an inspection taking place in the middle of it, could have gone so smoothly and looked so good.

Principal Dr Kevin Bawn, Clyst Vale Community College, Devon

“”

Page 3: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

2Full details & specification: www.wernick.co.uk

Why WernickTM Buildings?

WernickTM

Buildings deliver bespoke off-site building solutions to clients nationwide.

The WernickTM Group has been family owned and run since it was founded over 80 years ago, making it Britain’s oldest independent modular building manufacturer.

75c100m0y25k

0c0m0y44k

PANTONE®

423 CPANTONE®

2627 C

90c40m0y0k

0c0m0y44k

PANTONE®

423 CPANTONE®

285 C

0c53m100y00k

0c0m0y44k

PANTONE®

423 CPANTONE®

Orange 021 C

69c00m100y00k

0c0m0y

k

PANTONE®

Green 361 C

0c95m100y00k

0c0m0y

k

PANTONE®

3 CPANTONE®

Red 485 C

EVENTS

REFURBISHEDBUILDINGS

EVENTS

REFURBISHEDBUILDINGS

We know that unique requirements can’t be met with an ‘off the shelf’ building. That’s why we take a flexible approach to our projects, to ensure we deliver a bespoke solution that responds to your needs.

Our approach means you can enjoy all the advantages of off-site construction without compromising on the quality or finish achievable with traditional building methods.

WernickTM are also the only modular building provider in the UK with a dedicated Construction Division, which means that we can take full responsibility for every stage of your project, from inception to completion.

25years structural warranty

50% faster vs.traditional build

60+ years

design life

207689

Page 4: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

CostA more efficient method of construction allows cost savings throughout the project, without compromising on the quality of your finished building.

AccuracyControlled factory conditions lend themselves to a high quality product made to strict tolerances. WernickTM Buildings’ Quality Management System is certified to ISO 9001. With design and manufacturing teams under one roof, off-site construction ensures the building you approve at design stage is the one that is delivered to your site.

Modular buildings are made up of individual factory built modules which are then delivered and combined on-site to form a complete building. When compared to traditional methods of construction, manufacturing a building off-site has a number of advantages:

Why Modular Buildings?

£ £>

3 Modular buildings from Wernick™ Buildings 0800 18 18 22

SpeedWhile your building is being manufactured, foundations are simultaneously being prepared on-site, drastically reducing both the build programme and the impact of on-site factors like poor weather conditions.

SustainabilityFactory manufacture also means better control of materials, leading to a reduction in waste and an increase in recycling. WernickTM Buildings’ Environmental Management System is certified to ISO 14001 and the timber used in our buildings is FSC certified. This means your buildings are made from responsibly sourced materials using processes that minimise waste.

Page 5: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

4Full details & specifi cation: www.wernick.co.uk

Sustainable Construction by WernickTM

The energy used in the construction process is more easily measured; the WernickTM Buildings factory is fi tted with 285 photovoltaic panels, reducing the carbon footprint of your building before it even arrives on-site.

Most of the construction work takes place in the factory which means that the impact on-site, both logistically and environmentally, is greatly reduced.

Waste can be more easily controlled, with far less materials going to landfi ll. The design of WernickTM Buildings’ modules is also informed by the sizes of building materials as they are supplied, to further reduce waste.

A greater degree of precision facilitated by factory manufacture means it is easier to achieve better energy performance.

The controlled factory environment in which our buildings are produced mean more environmentally friendly processes and products:

Less noise

Less materials

Less on-site waste

Sustainablemanufacture

Page 6: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

Procuring a new building doesn’t need to be difficult. At WernickTM Buildings we can take responsibility for your entire project from conception to handover.

This gives you a single point of contact to ensure you receive a consistent, professional service throughout the process. If you already have a design or use in house teams for some of your building needs, we’ll be happy to collaborate with them.

Concept design

From your initial enquiry we will liaise directly with you to help define your needs and what you hope to achieve with your building. We offer our expert advice and guidance to produce a variety of concept designs, and can produce visuals to bring to life even the most ambitious ideas.

Building regulations and planning

With your concepts in mind, we conduct thorough site investigations to determine the services and foundation design, and also perform any required demolition. WernickTM Buildings acts as your agent for the purpose of gaining planning approval and Building Regulations approval.

Foundations, infrastructure,

manufacture and delivery

Your building is manufactured in a controlled factory environment to a rigorous quality standard. While your building is being manufactured, preparations can begin on-site. We will also take care of all required landscaping, including multi-use game areas, playgrounds and parking facilities.

Completion and handover

Modules can be delivered to site with decoration and fit–out nearly complete, meaning that once the building is on-site it is often just a matter of adding finishing touches and connecting to services.

5 Modular buildings from Wernick™ Buildings 0800 18 18 22

The WernickTM Turnkey Service

> > >

Page 7: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

6Full details & specifi cation: www.wernick.co.uk

We needed it yesterday! The speed with which Wernick turned things round was incredible.

Clair Wilkins, Director of Resources for Weald of Kent School, Tonbridge, Kent

“”

Page 8: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

7 Modular buildings from Wernick™ Buildings 0800 18 18 22

Education

Page 9: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

8Full details & specification: www.wernick.co.uk

Patients especially like the en-suite facilities and increased availability of side rooms. The new facilities have really enhanced the privacy and dignity elements of care that the hospital can offer. Louise Naylor, Project Manager with Leicester Royal Infirmary.

“”

Healthcare

Page 10: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

9 Modular buildings from Wernick™ Buildings 0800 18 18 22

Leisure In order to meet the growing demands of the sport we need good officials who are properly trained. This is where our new clubhouse will be invaluable. It’s a well designed and equipped purpose-built facility delivered within a very tight time frame. Mark Doel, British Cycling’s Central Region Events Officer.

“”

Page 11: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

10Full details & specification: www.wernick.co.uk

Defence

Page 12: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

11 Modular buildings from Wernick™ Buildings 0800 18 18 22

Industrial

Page 13: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

12Full details & specification: www.wernick.co.uk

Commercial & RetailIt’s spacious, airy and light, it’s really got the wow factor. It’s a much nicer working environment for the staff, and our visitors have nothing but compliments for the building. Tony Bailey, Centre Manager, Edgbaston Community Centre.

“”

Page 14: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

13 Modular buildings from Wernick™ Buildings 0800 18 18 22

Custodial

Page 15: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

14Full details & specification: www.wernick.co.uk

SpecialistThe building has met all our expectations, both our crew and visitors prefer the new facilities and have commented on the accommodation’s open plan design which makes for a light environment.Becky Tinsley, Air Operations Manager, Midlands Air Ambulance.

“”

Page 16: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

15 Modular buildings from Wernick™ Buildings 0800 18 18 22

Our modular buildings are designed and built to order, based on each client’s specific requirements.

RapidplanTM is our permanent modular system designed for maximum flexibility. RapidplanTM can be used in a wide variety of applications, from retail space to sleeping accommodation and classrooms.

PCflexTM is our patented secure modular system with a range of applications. Initially conceived to provide modular custody suites, PCflexTM has also been used in other sectors when secure buildings are needed on short timescales, including healthcare.

WernickTM Modular Products

This is why, instead of having a long list of different products, we have developed building systems flexible enough to meet any requirement.

This offers the best of both worlds; a bespoke building to meet your needs, based on proven design principles.

WernickTM has two permanent modular systems:

Page 17: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

16

WernickTM buildings are built to last, with a backed 25 year structural warranty and a 60 year design life expectancy across all of our building systems.*

*Under current Building Regulations

25years structural warranty

60+ years

design life

207689

Quality Guaranteed

Our modular buildings can be supplied with:

• A range of ceilings including a variety of suspended and exposed soffit.

• A range of suitable cladding considered including brickwork, timber, render and rainscreen.

• Painted internal walls.

• A range of roof configurations including barrel or pitched roofs.

• External canopies and other architectural features.

We are BIM level 2 compliant.

Page 18: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

Advances in sustainable technology mean that not only will your building be kind to the environment, but kind to your pocket as well.

WernickTM buildings typically achieve an energy effi ciency performance rating of ‘B’, but can achieve an ‘A’ rating with the inclusion of sustainable fi ttings.

Our certifi ed in-house energy assessor will provide a building regulation compliance certifi cation and, upon completion of the project on-site, energy performance certifi cates (EPCs) indicating level of energy effi ciency of the fi nished building.

Energy Saving

17 Modular buildings from Wernick™ Buildings 0800 18 18 22

Non concussive push taps. PIR lighting. Dual fl ush toilets. Underfl oor heating. Solar panels. Ground and air source heating solutions. Solar panel water heating systems. PV panel electrical supply. Biomass boilers. Rainwater harvesting solutions. Controlled heating and lighting (BMS). A wide range of highly effi cient

air conditioning and comfort cooling / heating systems.

Fittings / sustainable additions:

Page 19: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

18

Projects featured in this brochure include:

Education:

• Slough & Eton College, London

• Clyst Heath Nursery and Community

College, Exeter

• Godolphin Infant School, London

• Weald of Kent School, Tonbridge

• Brampton Manor Academy, London

• Castleview School, London

• St Giles-on-the-Heath Pre-school,

Launceston

• Edgbaston Community Centre,

Birmingham

Healthcare:

• Velindre Cancer Centre, Cardiff

• Leicester Royal Infi rmary, Leicester

• Warwick Hospital, Warwick

• Hammersmith Hospital, London

Public Sector:

• Tinkers Lane Fire Station, Windsor

• Ruislip Lido Woodland Centre, London

• Twickenham Squadron Air Training Corps,

Twickenham

• RAF Valley, Holyhead

• Cardiff Castle, Cardiff

• Modular Custody Facilities, Fraserburgh

• Temporary Modular Custody Facilities,

Rugby

• Constabulary Custodial Facilities,

Isle of Man

• Birmingham Institute of Forest Research,

Norbury

• Midlands Air Ambulance, Strensham

More projects:

• Carey A & Son, Audenshaw, Manchester

• Goals Soccer Centre, Doncaster

• Hillingdon Cycle Circuit Clubhouse, London

• Privett Park Cricket Club Pavillion, Gosport

• Elephant & Castle, London

• Mole Valley Veterinary Practice,

Newton Abbot

Page 20: Sustainable Construction Without Compromise - …...1 Modular buildings from Wernick Buildings 0800 18 18 22 I am both happy and relieved; I would never have guessed that such a large

Nationwide service

Sustainable construction without compromise

WernickTM Ref: 432-08:2017

Part of the Wernick Group of CompaniesThe information supplied in this folder is for guidance only. A detailed specification is supplied with our design quotation.

75c100m0y25k

0c0m0y44k

PANTONE®

423 CPANTONE®

2627 C

90c40m0y0k

0c0m0y44k

PANTONE®

423 CPANTONE®

285 C

0c53m100y00k

0c0m0y44k

PANTONE®

423 CPANTONE®

Orange 021 C

75c100m0y25k

0c0m0y44k

PANTONE®

423 CPANTONE®

2627 C

90c40m0y0k

0c0m0y44k

PANTONE®

423 CPANTONE®

285 C

0c53m100y00k

0c0m0y44k

PANTONE®

423 CPANTONE®

Orange 021 C

69c00m100y00k

0c0m0y

k

PANTONE®

Green 361 C

0c95m100y00k

0c0m0y

k

PANTONE®

3 CPANTONE®

Red 485 C

EVENTS

REFURBISHEDBUILDINGS

EVENTS

REFURBISHEDBUILDINGS

For details & specifications visit: www.wernick.co.uk

0800 18 18 22Wernick™ Buildings Limited Head Office

Kenfig Industrial Estate, Port Talbot, SA13 2PE Tel: 01656 747 340

email: [email protected]

Wernick Buildings is an approved supplier on local and national frameworks

Nationwide Network of Hire Depots

For your nearest Hire Depot call

0800 51 55 55

Wernick Hire Limited Head Office Molineux House, Russell Gardens, Wickford, Essex SS11 8BL. Telephone: 01268 735544 Fax: 01268 769280 email: [email protected] www.wernick.co.uk

Glasgow

Wickford

Aldridge

Port Talbot

Plymouth