Sustainable Coastal Protection and Management Investment Programme – Karnataka (SCPMIP-K)
Department of Public Works, Ports and Inland Water Transport
Government of Karnataka
Background
• The Central Water Commission, GoI directed all the state
Governments concerned to identify critical reaches of coastal
belts as to prepare a comprehensive scheme called National
Coastal Protection Project(NCPP) during 2007
• Accordingly GoK submitted a Master plan to MoWR to include
critical reaches sustaining sea erosion along Coastal Karnataka
during 2008
• The coastline of Karnataka is 300 km in length, of which about
20% is subject to significant coastal erosion as per National
Coastal Protection Project (NCPP).
• Ullal in Dakshina Kannada district is one of the urban areas that
is severely affected by coastal erosion that needs immediate
attention to mitigate sea erosion.
• As the outcome of NCPP, GoI and MoWR approached ADB for
financial assistance during 2008
• Based on the PPTA prepared during 2009, the ADB agreed to
extend financial assistance in the form of loan to implement
SCPMIP-K and the loan is sanctioned under MFF during sep
2010
Karwar
Ankola
Kumta
Honavar
Bhatkal
Kundapura
Ullal
Sustainable Costal Protection and Management Investment Program
(SCPMIP)
• ADB funded Multi-tranche Financing Facility(MFF) approved in September 2010
• Loan amount of $ 250 million for both Karnataka(142.04) & Maharashtra(107.96)
• Implementation period - 8 years • Tranche- 1 - $ 48.5 million(Rs.223 cr) • Tranche- 2 - $ 93.54 million(Rs.641 cr)
3
SCPMIP Tranche-1
Million $ INR Crore
Project Amount : $ 48.549 223.1
ADB Loan : $ 41.02 188.6
GOK : $ 7.529 34.5
Loan affective date : 17th August 2011
Loan end date : 30th June 2018
No. of subprojects : 4
Coastal protection works carried out under SCPMIP Tranche 1
Sr No Name of the work Length in
Meters
Year of
construction Type of works
1
Construction of
Inshore Berms ,
Ullal Dakishna
Kannada
2.7 KM
December
2013 – May
2017
Groyne-
Composite
structures
2
Rehabilitation of
Ullal Breakwaters,
Dakishna Kannada
550 m north
breakwater &
525 m of south
breakwater
2014-2017
Rubble Mound
breakwater with
tetra-pods
3
Construction of 2
offshore reefs , Ullal,
Dakishna Kannada
North Reef :
387m
South Reef :
309m
(including
Round Head)
2015- 2017
Rubble mound
reef with plain
concrete blocks
and 4t-tetra-
pods
Tranche 1: Ullal Subprojects
7
reef..\helicam 24-5-17\Drone Videos-Offshore
reefs & Breawaters\Construction of Two
Offshore Reefs at Ullal.mp4Offshore
reefs\Construction of Two Offshore Reefs at
Ullal.mp4
b/w..\\North
Breakwater-2.MP4
Ins
berms..100MEDIA\DJI_0002.MOV
Offshore
reefs\DJI_0001.MOVOffshore
reefs\DJI_0002.MOV
b/w
southOffshore
reefs\South
Breakwater-
2.MP4
Construction of 6 inshore berms at Ullal
Estimate amount : Rs.26.25 Crore
Name of the Agency : M/s. RDS Project Ltd.,
Cochin
Date of Commencement : 03-12-2013
Date of completion as per
agreement
: 02-08-2015
Date of completion : 30-06-2017
Contract Amount : Rs.25.51 Crore
Revised Contract Amount Rs.29.20 Crore
Expenditure (up to date) : Rs.24.46 Crore
Inshore Berms at Ullal IB Video link 1
IB Video link 2Berms\DJI_0043.MOV
IB VIDEO LINK -
4Berms\DJI_0013.MOV
Berms\20161130162020_IMG_1
214.MOV
Offshore Reefs at Ullal
Estimate amount : Rs.88 Crore
Name of the Agency M/s. Dharti Dredging &
Infrastructure Ltd.,
Hyderabad
Date of Commencement : 01-12-2014
Date of completion as per
agreement
: 31-07-2016
Date of completion : 30-06-2017
Contract Amount : Rs.110.00 Crore
Expenditure (up to date) : Rs.96.17 Crore
Placement of Geogrid and Geotextile for
Soil stabilisation for foundation of
Offshore reefs
Rope Gabion filled with rock to be used for
Soil stabilisation for foundation of Offshore
reefs
Offshore Reef Foundation Soil Stabilization Video link 1
Video link -tetrapodOffshore
reefs\MVI_0960.MP4
Video link –geo-matOffshore
reefs\IMG_8393.MOV
Reef video link mansoonOffshore reefs\MVI_2542-reef.MP4
Reef video link placing of coreC:\Users\Gopal
Naik\Pictures\243_2611\MVI_3007.MP4
Rehabilitation of Breakwaters at Ullal Estimate amount : Rs.46.40 Crore
Name of the Agency M/S R B Chavan & Arjun
Earth Movers, Mumbai
Date of Commencement : 01-12-2014
Date of completion as per
agreement
: 31-07-2016
Actual date of completion : 30-04-2016
Revised date of completion
including leeward side of south
breakwater
: 30-06-2017
Contract Amount : Rs.40.91 Crore
Revised Contract Amount : Rs.57.53 Crore
Expenditure (up to date) : Rs.57.11 Crore
22
Ullal North Breakwater
Before Rehabilitation during
the year 2013
Ullal North Breakwater after
rehabilitation
Ullal North Breakwater Rehabilitation
North BW Video linkbreake-water\IMG_9677.MOV
Before After Before
Ullal South Breakwater Rehabilitation
Before rehabilitation Rehabilitation in progress
South BWbreake-water\IMG_8143.MOV
Bw-video link-breake-water\IMG_9676.MOV
SCPMIP Tranche 1 Disbursement Details
1) Project Amount: $ 48.55 million(Rs. 223 Cr)
2) ADB Loan: $ 41.02 million(Rs. 188 cr)
3) Disbursement Upto Dec 2016: $ 22.54 million
4) Disbursement target CY 2017: $9.67 million
5) Disbursement during the year: $ 6.21 million
24
SCPMIP Tranche-2
Million $ INR Crore
• Project amount : $ 93.54 640.75
• ADB Loan : $ 65.50 448.67
• GOK Amt : $ 28.04 192.07
• No. of sub-projects : 9
• Coastal length protection planned : 54.1 km
• Loan negotiation date : 12th May 2017
25
SCPMIP Tranche-2
• Eight Sub-projects designed and selected for
implementation
• Sub-projects approved by the Empowered Committee
and cleared by the Technical Approval Committee
• Four sub-project contracts have been awarded
• One sub-project tender is under final phase
• Three sub-projects proposal are being finalised
• Loan negotiations of Tranche 2 was held on 12-05-2017
at New Delhi.
26
Tranche-2 sub projects
No Project site
Coastal
protection
option
Estimated
cost/
contract
amount
(INR Cr)
Status
1 Yermal Thenka Rock
Revetment 79.6
Design is to be reviewed by the
project management consultant.
2 Udyavara
Rock Groynes
(35), beach
nourishment
78.44
Contract signed on 20-2-2017
Financial progress is Rs 3.92
Crores.(M A)
3 Maravanthe
Straight (15)
and T-Groynes,
sand
redistribution
88.26
Contract signed on 9-12-2016
Financial progress is Rs 4.41
Crores.(M A)
4 Kodikanyana Beach Planting 0.971 There has been no response to
earlier two tender notifications.
Revised proposal is being
prepared. 5 Pavinakurve
Beach
Planting 0.993
28
Tranche-2 sub-projects
No Project site
Coastal
protection
option
Estimated
cost/
contract
amount
(INR Cr)
Status
6 Someshwara Geotextile
Revetment 27.29 LOA Issuedon 9th May 2017.
7 Kodi Bengre Rock revetment 75.88 LOA Issued on 6th July 2017
8 Murudeshwara
Near shore
reef,
Nourishment,
dune
stabilisation
24.28 Contract signed on 19th Apr 2017
9
Community
Protection Sub-
Project
Dune
reconstruction,
geotextile bags
and planting of
vegetation.
70.66
These projects will be identified
by the design consultants during
Tranche 2
Total 446.374
29
Extent of coastal erosion problem in the state (District Wise)
Sl No
District Places of erosion Extent of erosion km
1 D.K Someshwara, Ullal, Kulai, Hosabettu, Guddakopla, Doddakopla, Mukka, Sasihitlu
18.3
2 Udupi Hejamadikodi, Kadipatna, Thenkayermal, Bada Yermal, Uchila, Muloor, Polipu padu, Kaup, Kaup adu, Uliyaragoli, Udyavara Padukere, Gujjarabettu, Thotam, Kydoor padukere, Hoode Kemmannu, Kodi Bengre, Parampalli, Hosa Bengre, Kodi Kanyana, Kotathattu, Mannur Padukere, Hoode, Beejadi, Kundapura kodi, Maravanthe, Gujjadi, Navunda, Adragoli, Hosahitlu, Gangebailu, Uppunda, Alivekodi, Kalihithlu, Krimanjeshwara, Shirur
22.75
3 Uttara Kannada
Gorte, Belke, Mundail, Bhatkal port, Jali, Honnagadde, Tenginagudi, Shirali port, Kalkini, Mavalli, Bailur, Mavalli ,Tari Bagilu, Talkod, Herthar, Bailur, Doddagunda, Manki, Apsarakonda,Tonka , Pavinkurve, Nhoor Mohalla, Dhareshwar, Alvekode, Baad, Holangadde, Jestapura, Kagal Bearkode beach, Gangavali Beach, Belambar, Bhavikere, Belekeri, Hawade, Amadalli, Tagore Beach, Devbhag,Dhandabhag
80.63
Sl
No
Description of
Activity
Estimate
Amount
Contract
amount
Revised
Contract
Amount
Financial
Progress up
to
31-07-2017
Physical
1 Construction of 4 no of
Inshore Berms at Ullal 26.25 25.51 29.20 24.46
6 Inshore berms completed .
2 Rehabilitation of Ullal
Break waters 46.40 40.91 57.53 57.11 Completed
3 Construction of Two
Offshore reefs 88.00 110.00 110.00 96.17
North reef completed, South reef
nearing completion.
4
Sand Nourishment 18.00* - - -
This work will be decided based on
the result of subprojects
5
Consultancy-PMDCK 20.37 25.00 25.00 26.28
Working
6 Survey & others
(Estimate
d) 5.75 5.75 5.43 Spent for survey and equipment
7 PMDCK2
Consultancy 46.34 46.34 4.03 Working
8 Mobilization advance
for Udyavara Project 99.85 78.44 - 3.92 Work is in progress
9 Mobilization advance
for Maravanthe
Project 92.23 88.27 - 8.83 Work is in progress
Total* 419.44 420.22 227.48 226.23
SCPMIP-Physical & Financial Progress up to July – 2017 in Rs Crores
*Sand Nourishment Rs 18.00 Cr Not considered in total
Cost estimate of Tranche-2 Sl.No
.
Item of Expenditure USD in million
Estimated
Total INR in crores
A Investment Costs
1 Civil works (Sea erosion works) 69.97 479.29
2 Equipment and other materials 0.63 4.32
3 Studies and surveys 0.32 2.19
4 Consultant Services (PMDCK) 6.77 46.37
5 Staff and office expenses 5.07 34.73
82.76 566.90
B Recurrent Costs
1 Operation & Maintenance of
Civil works
0.70 4.80
Total Base Cost 83.46 571.70
C Contingencies 7.81 53.50
D Financial charges during
implementation
2.27 15.55
Grand Total 93.54 640.75
Research Activities
• Established a Coastal Information Management System
• Design of coastal protection measures based on
coastal process studies
• On-going monitoring programmes (beach profiles,
wave/tide/current)
• Study of coastal hydrodynamics and coastal processes
for various coastal locations
• Regional Wave Modelling atlas for Karnataka coast †
Workshop/ Training/ Seminars
Organised • Training programmes conducted in association with
CWPRS and PMDCK1 Consultants.
• Participated in ADB Trainings programmes including
Climate Change Adaptation Guidelines.
Availability of Schedules of Rates
Applicable for Coastal Protection Works
• PWD Schedule of Rates are followed for Mangalore
and Dharawad Circle.
Damages Due to Coastal Erosion
• Erosion of Land , Property, Fisheries Roads and House
Holds at various coastal stretches
• Costs yet to be estimated.
Status of Development of Shoreline
Management Plan / Master Plan for
Coastal Protection
• Draft SMPs have been developed for the three coastal
districts of Karnataka viz. Dakshina Kannada, Udupi and
Uttara Kannada
• The Draft SMPs will be modified, updated and finalized
based on the field data and comments received
• Littoral environmental data and beach profiles pertaining
to the whole Karnataka coast are proposed to be collected
during October – November 2017
List of Sites for Coastal Data Collection Beach profile data
• Pre-monsoon and post-monsoon beach profiles for Someshwara, Ullal,
Yermal Thenka, Udyavara, Kodi Kanyana, Kodi Bengre, Maravanthe, and
Murudeshwara (completed)
• † Entire Karnataka coast at 500 m interval (Planned for October – November 2017)
Bathymetry
• Ullal-Bengre coast for 2013, 2014 and 2016
• Someshwara, Ullal, Yermal Thenka, Udyavara, Kodi Kanyana, Kodi Bengre, Maravanthe,
and Murudeshwara (planned for September /October 2017)
Waves, currents and tides
• One – month long measurements at 8 m depth ongoing (monsoon of 2017) at
Someshwara, Yermal Thenka, Udyavara south, Udyavara central, Kodi Kanyana, Kodi
Bengre, Maravanthe, and Murudeshwara
Coastal Data Inventory • CIMS is proposed as a platform for Integrated Coastal
Information Management System
• Works on a customized and user friendly Web based
application with GIS data, both spatial and attribute on
its back end.
• The current initiatives of Karnataka as a part of ADB
project works on all base level information form data
on State level, District level, Taluk level, Block level,
Village level and Panchayat level.
• All general information like boundaries, roads, rivers,
soil, topography, drainage, slope, relief etc. are already
available as spatial data will be collated in a single
platform.
Coastal Information and Management System
A web-Application to enable easy access to coastal management
Coastal Data Inventory
The coastal data to be incorporated in CMIS include :
• Project information
• CRZ and EIA information
• Hydrodynamic data (like wind, waves, currents,
tides),
• Bathymetric and beach profile data (subject to
approval)
• Land use/land cover data
• Coastal geomorphology
• Coastal inventory like coastal structures, protection
sites, sea walls, etc.
Infrastructure available like numerical modelling,
physical modelling, availability of instrument for
coastal data collection
• Presently infrastructure is lacking for numerical
modelling, physical modelling, and coastal data
measurements.
• Coastal Infrastructure Management Unit (CIMU)
has already been established as part of the
SCPMIP
• CIMU will be equipped with some of the above
facilities in the next 3 years including capacity to
undertake coastal projects
A coherent and results-based approach to project planning, performance
monitoring, and evaluation of results.
During the design phase, PPMS emphasizes :
stakeholder participation
builds on a cause-effect relationship in problem analysis;
assesses alternative approaches
ensures a consequential relationship between inputs, activities, outputs,
outcome, and impact and
determines a set of measurable process and result indicators with
performance targets
The Project Performance Report provides early warning of emerging problems that
require corrective actions
It is a system that facilitates efficient project progress monitoring & reporting.
PPMS
Draft PPMS developed in Microsoft Excel to track the progress of the
project achievements
Work is progressing to complete the PPMS.
Issues Tranch I subproject:
1. Review of impact of the off-shore reef on the shore in between the Gap of North and South reef.
2. Additional inshore berm location ( Berms\video BERM.mp4)
3. Stabilisation of spit area between south B/W and jetty .(break-water\IMG_0007.JPG break-water\IMG_0004.JPG)
Tranch 2.
1.Redesign of Yermal Tenka sub project