31
Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015

Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Sustainable Building Design

Nicole Gaetjens Green Purchasing Roundtable

May 20, 2015

Page 2: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Background

h Center, LEED Platinum

Page 3: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Alameda County Buildings

~100 buildings ~8 million sq ft ~9,000

employees

~90% of County-operated space is owned by County New Construction: LEED Silver min.

Ashland Youth Center: LEED Platinum

Page 4: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Why Building Products?

10%-40% of building emissions are embodied in materials Building materials impact indoor air quality Maintenance and durability have

operational impacts

Page 5: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Why Building Operations?

Page 6: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Going Beyond LEED

Meeting County-Specific: Sustainability Priorities Mandates Operational Needs

Page 7: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Integrating Sustainability Into

Design

Page 8: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Critical Stages in Process

General Design

ConstructionDetails

Construction Modifications

Programming Conceptual

Design Design

Drawings

Construction Documents (Schematics and Specifications)

Construction Occupancy

Page 9: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Challenges Engaging at right time with the right info

General Design

ConstructionDetails

Construction Modifications

Page 10: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Challenges Engaging at right time with the right info

General Design

ConstructionDetails

Construction Modifications

Budget cut Project Manager Leaves

Page 11: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Challenges Engaging at right time with the right info

General Design

ConstructionDetails

Construction Modifications

Budget cut Project Manager Leaves

5 yrs?

Page 12: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Challenges Engaging at right time with the right info

General Design

ConstructionDetails

Construction Modifications

Budget cut Project Manager Leaves

10 yrs?

Page 13: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Challenges

Balancing sustainability goals with space and cost limitations Uniqueness of each project

Page 14: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Strategies for Success

Describe sustainability goals as early as possible in design process Identify critical times in design process to

consult Sustainability Program Define performance criteria, but allow

designers to meet goals creatively

Page 15: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Alameda County Case Study

Page 16: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

How We Did It

Convene key stakeholders Produced specifications in several

formats:▫ Checklist – easy reference during initial

design▫ Design Narratives– requirements &

recommended best practices Continuous iteration from lessons learned

after each project

Page 17: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

County Focus Areas

Products Carpet Paint/Coating Composite Wood

Finishes Hard Surface Flooring Adhesive/Sealant Lighting

Operations Janitorial Waste & Recycling Landscaping

Page 18: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Example: Carpet

Page 19: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Critical Stages in Process

General Design

ConstructionDetails

Construction Modifications

Carpet durability

Carpet tile Non-glue

installation

Surplus given to County for replacements

Page 20: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Other Carpet Specifications

PVC-free – OR – 40% recycled content PVC backing NSF/ANSI-140 Platinum certified Solution-dyed Low-Emitting

More on carpet at: http://www.acgov.org/sustain/what/purchasing/success/carpet.htm

Page 21: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Example: Waste & Recycling

Page 22: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Critical Stages in Process

General Design

ConstructionDetails

Construction Modifications

Enclosure capacity

Interior bin capacity

Cabinetry for Interior Bins

Modify future enclosure gates: lessons learned

Page 23: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Other Considerations

Restrooms with Appropriate Waste Bins Path of Travel for Janitors Waste Hauler Access Public Receptacles for Waste & Recycling

Page 24: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County
Page 25: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County
Page 26: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Strategies for Success

Engage earlyIdentify critical decision pointsAllow flexibility

Page 27: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Resources

Page 28: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

http://www.acgov.org/sustain/what/greenbuilding/susdesign.htm

Page 29: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

http://www.acgov.org/sustain/what/greenbuilding/grlease.htm

Page 30: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County
Page 31: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County

Questions?

Karen CookSustainability Project Manager

(510) [email protected]

www.acsustain.org