1 Sustainability Program  ‐ Version 02/ Update 2013 ‐ Semiconductor Metrology Systems 

Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

  • Upload
    lehanh

  • View
    213

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

Sustainability Program ‐ Version 02/ Update 2013 ‐ 

Semiconductor Metrology Systems 

Page 2: Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

 

  

            

 

      Dear valued partners,  Innovation,  trusted partnerships as well as  sustainability  in all our business processes are the foundation of our success. In 2012 we published our first ZEISS SMS sustainability report to emphasize our strength in these areas and to give our partners, employees and the public a deep insight in our company. Since then we made huge efforts in developing our business in  terms  of  sustainability.  We  implemented  certain  sustainability  projects  with  already visible  results and  set challenging  targets  to  reduce consumptions and emissions. We are pleased  that  our  customers  and  partners  honored  that  e.g.  by  granting  us  the  Intel Preferred Quality Supplier Award  (PQS) and  the  successful management  system audits  in 2013.  We are now publishing our first sustainability report.  It contains two additional  indicators: Labor  and Human  Rights.  Visualizing more  indicators  related  to  the  sustainability  of  our specific business will further increase transparency and makes our engagement measurable.  I would  like to thank all employees, customers and business partners for their cooperation and efforts assuring that ZEISS SMS will continue to be a reliable partner.   

  Dr. Oliver Kienzle Managing Director Carl Zeiss SMS GmbH 

    

Page 3: Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

  

     

Table of contents      

1.  Introduction to the SMS sustainability program ....................................................................................................................................................................... 4 2.  Semiconductor Metrology Systems .......................................................................................................................................................................................... 6 3.  Metrics, Trends and Results .................................................................................................................................................................................................... 10 

3.1.  Environment ...................................................................................................................................................................................................................... 10 

3.2.  Labor, Human Rights, Health & Safety ............................................................................................................................................................................... 12 

3.3.  Sustainability Projects – Achievements (first report) .......................................................................................................................................................... 14 4.  Summary ................................................................................................................................................................................................................................ 18     

   

Page 4: Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

4 Version 02 

 1. Introduction to the SMS sustainability program 

 To be more comprehensive and  transparent  for our  stakeholders, we are committed to sustainability reporting. Within this Document, we showcase our achievements and  challenges and provide detailed  information about our  actions  in  terms  of  sustainability.  This  also  contains  the  first  report based on our sustainability program, first published in September 2012.   ZEISS – A sustainable company1  The  sparing  use  of  resources  is  of  central  importance  in  product development at ZEISS: care is always taken to maximize energy efficiency in the  company’s  instruments  and  to  minimize  material  usage  through innovative production processes  and equipment. With  its products,  ZEISS supports  sustainability  in many  different  sectors:  the  company  develops intelligent measuring systems that are utilized for quality  inspection  in the energy, automotive and aerospace  industries. These systems are used, for example,  to  test  the  quality  of  large wind  turbine  components  and  thus ensure a high level of efficiency. ZEISS is also working on the enhancement of  alternative  drive  technologies  and  the  ongoing  development  of electromobility.  ZEISS  is  involved  in  various  projects  in  the  field,  e.g.  the optimization of production systems for powerful battery systems. 

    

                                                                                                                                                                                       

                                                                                                                                                             ZEISS – Portfolio 

Innovation is a way of life at Carl Zeiss.  The company has stood for innovation for more than 160 years. The research and development teams work intensively to constantly expand the company’s technology leadership.  The ownership structure of Carl Zeiss AG – with the Carl Zeiss Foundation as the sole shareholder – ensures that investments in innovations can be made with vision and foresight. Each fiscal year, a significant percentage of the company’s overall revenue is being invested in research and development activities.  ZEISS plays an active role in society. The company focuses on sustainability – whether environmental protection and energy strategies, commitment to society at the company’s sites or supporting educational and scientific projects and institutions. ZEISS is very committed to regional dedication at the company’s sites. The Group therefore created the Carl Zeiss Promotion Fund. Based on the concept of “with society, for society and in the midst of society”, the fund sponsors social, youth, cultural and amateur sports projects. For fiscal year 2011/12, for example, ZEISS provided over 500,000 euros to the fund. Boards of trustees at the sites, comprised of cultural, political and societal representatives decide on how the funds will be used. The Promotion Fund will be expanded to projects in Göttingen and Wetzlar from fiscal year 2012/13.   

                                                            1 Annual Report 2011/2012 

Page 5: Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

5 Version 02 

Business Principles  Corporate Code of Conduct ZEISS  is  committed  to  perfect  solutions,  special services  and  highest  standards,  not  only  in technological  terms. Also with  regard  to  the  "rules" of good and fair behavior ‐ we strive for outstanding results. 

In 2007, ZEISS adopted a corporate code of conduct, defining  basic  rules  for  all  business  activities.  This code has proved to be effective. For complying with the  code’s  principles,  ZEISS  is  being  rewarded everyday  ‐  with  business  confidence  and  a  high reputation  of  its  brand.  It  is  our  firm  belief  that  a sustainable  economic  success  is  inseparable connected to our conduct.  After five years, we have revised the code of conduct. Some aspects such as product safety and protection of personal data have been sharpened and the code is  now  embedded  into  the  corporate  policies  and guidelines. 

We would like to invite you to discover our code ‐ to learn more about us and our culture. Pease visit us at www.zeiss.com/smt  Sustainable use of resources The sustainable use of resources and environmental protection are very important to ZEISS. The company emphasizes  the  respectful  treatment  of  the environment.  A  systematic  environmental management  system  ensures  compliance  with  this directive in business operations.  

 Carl Zeiss SMT – Code of Conduct

Page 6: Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

6 Version 02 

2. Semiconductor Metrology Systems  The  strategic  business  unit  Semiconductor  Metrology Systems  (SMS)  is  part  of  the  Semiconductor Manufacturing  Technology  (SMT)  business  group  of ZEISS.  As  a  leading  global  supplier  of  both  metrology  and manufacturing equipment  ZEISS  SMS  focuses on  a  key component  in  semiconductor  manufacturing  process, the photomask. ZEISS SMS develops, manufactures and distributes  advanced  mask  solutions  along  the  mask manufacturing  chain  empowering  our    customers  in the    mask  making  industry    to  develop  and manufacture  zero‐defect‐  and  in‐specification‐photomasks. We provide innovative solutions and spend in average more  than 25% of our net sales  in  research and development.  

 

  Carl Zeiss SMT – Organizational Structure 

All our solutions are focused on optimizing the performance of a photomask. Our customer’s benefit is manifold: 

‐ an out of specification photomask can be brought back into specification avoiding costly an resource consuming remanufacturing,  

‐ our tools enable to achieve specifications which could not be reached without them enabling to produce next generation photomasks 

‐ the wafer fab benefits obtaining a widened process window which gives higher yields and better performance of the electronic devices. 

The  design  and manufacturing  of  our  tools  follow  the highest  standards  in  safety  and  environmental requirements determined  in the guidelines of ZEISS and German law.  

 

  

 MeRiT® HR II 

Page 7: Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

7 Version 02 

 

 SMS Product Portfolio 

 

The systems developed and manufactured by Carl Zeiss SMS play an  important role  in enabling the Semiconductor Industry to continuously introduce new electronic products that perform better than previous generations and use less energy per electronic function. Also, by producing more powerful chips the S/C industry contributes to improve the quality of life of people world‐wide by introducing affordable communication, by generating new devices and technologies in medical treatment and health care and by enabling our economies to grow. 

In the process flow of mask manufacturing our tools reduce the need for remanufacturing of photomasks which are out of specifications. By this function our tools inherently serve to save costs, material and resources and thereby positively contribute to sustainability.  

       

                                                                                                                                                                

    ZEISS SMS solutions along the mask manufacturing chain  

 

Page 8: Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

8 Version 02 

Commitment to Sustainability  Being  aware  of  its  responsibility,  ZEISS  is  supporting  a multitude of environmental and social related projects.  

 

Girl’s day 

To  arouse  the  interest  of  girls  in    technical  professions, the  girl’s  day was  brought  into  being.  Children  get  the chance  of  getting  to  know  the  fields  of  activity  of  the enterprise. 

 

Carl Zeiss Energie GmbH 

In  October  2013,  the  Carl  Zeiss  Energie  GmbH  was founded.  With  this  new  legal  entity,  a  lasting improvement of energy efficiency shall be reached. ZEISS also  starts  the  sensitization  of  the  employees with  the campaign “Energie bei Zeiss” and a roadshow. 

 

Fight against blindness 

Since 2002 ZEISS  is a sponsor of the “VISION 2020 – The Right  to  Sight”,  a  global  campaign  under  leadership  of World  Health  Organization  (WHO)  and  International Agency  for  The  Prevention  of  Blindness  (IAPB).  The campaign  is  aiming  on    improving  medical  supply  in economically  poor  regions  to  overcome  avoidable blindness until 2020. 

 

Education Programs 

ZEISS  supports  the  professional  development  of  its employees  by  offering  comprehensive  and  practical training  solutions  to  sharpen  existing  knowledge  or upgrade ones skill set. 

 

 

 

SMS as part of ZEISS – Some fields of Dedication to Sustainability 

Page 9: Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

9 Version 02 

The SMS  is  focusing  its  improvement efforts on chosen core areas, e.g. ethics‐related  trainings and assessments. To convey  the significance of ethical behavior  for  the brand, an extensive program of compliance trainings was finished in 2013. In addition, SMS is regularly performing the EICC‐ON Risk Assessment to quantify its compliance to the international recognized code of conduct of the Electronic Industry Citizenship Coalition.  

  Electronic Industry Citizenship Coalition The Electronic Industry Citizenship Coalition (EICC) establishes standards to ensure that working conditions in the electronics industry supply chain are safe, that workers are treated with respect and dignity, and that business operations are environmentally responsible. A common Code of Conduct defines operating principles and provides guidance in five critical areas of Corporate Social Responsibility performance: Labor, Health and Safety,  Environment, Management System, Ethics. 

 

 EICC Code of Conduct Elements 

 Committed to the Code’s principles and willing to uphold  its standards, SMS successfully finished an extensive self‐assessment process  in FY 2011/2012  . The result confirmed our conformity to the EICC Code of Conduct. 

Page 10: Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

10 Version 02 

3. Metrics, Trends and Results  

 3.1. Environment 

 Measuring and reducing the environmental footprint In 2011, Carl Zeiss SMS GmbH initiated a common sustainability project, involving the Zeiss Business Units located at the Jena facility: ‐ Carl Zeiss SMS GmbH ‐ Carl Zeiss Jena GmbH ‐ Carl Zeiss Meditec AG ‐ Carl Zeiss Microscopy GmbH. 

The projects goal is to  measure and reduce the environmental footprint of the production activities of these ZEISS units.  The following aspects were considered as essential to describe the units impact on environment: ‐ CO2 emissions  ‐ energy consumption ‐ composition/amount of waste ‐ water consumption ‐ solvents 

To focus on efficiency‐based parameters, the consumption and emission data for all of these aspects were put in relation to the sum of hours of production at Jena site. Comparing the evaluation of the last two years, changes are recognizable. Nevertheless, the data base is today too small to analyze a long‐term trend.   

Energy and Water Consumption The water consumed at ZEISS’ Jena Site  is provided  by  a  municipal  water  supplier which  is  serving  20.000  real  estates; sourcing two‐thirds of  the water from the ground  (45 wells, 5  springs). The water  is sourced  from  the  Ohra‐Talsperre,  a reservoir  located  in the Thuringian Forest. The consumption of ZEISS’ production site Lichtenhain  in  Jena  is not  significant  (less than 5% of the volume). Before channeling used water  into the  local water treatment plants  through  the  public  sewer  systems, an  appropriate  pretreatment  is  being realized. At the  Jena  facility, 21,18  liter of water were consumed to realize one hour of  production.  Compared  to  2011  level, the amount did not change significantly.  

   

               

The energy consumption raised by 10%, mainly caused by the usual changes of the weather conditions. The course of air humidity and temperature are influencing the need for energy of the central acclimatization system of this site. 

20,26 21,18

0

5

10

15

20

25

2011 2012 2013 2014 2015 2016 2017

water consumption(liter per productive hour, site Jena)

target corridor: water consumption water consumption factor [l/h]

16,6518,24

0

5

10

15

20

2011 2012 2013 2014 2015 2016 2017

energy consumption(kWh per productive hour, site Jena)

target corridor: energy consumption

energy consumption factor [kWh/h]

Page 11: Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

11 Version 02 

 Waste management Waste is systematically sorted. All office materials are selected  and  used  with  environmental  aspects  in mind.  And  the  path  followed  by  the  product  to  the customer’s doorstep is also carefully monitored: every day, experts  in  the  company  seek  the best  solutions for packaging and transportation.  Higher production volumes caused a raise of disposed oil‐water‐emulsion,  effecting  the  quantity  of hazardous waste  in  2012. Also, parts of  the building were  reconstructed,  which  temporarily  caused  an increased amount of non‐hazardous waste.  Emissions Production  at  Carl  Zeiss  plants  in  Jena  creates emissions,  most  notably  CO2  and  solvents  (volatile organic carbon compounds, or VOCs) released  in the cleaning shops.   

  

CO2 emission CO2  emissions  are  calculated  as  an equivalent  of  the  thermal  energy consumed by all of the tenants at the Jena building,  including  Non‐ZEISS  companies. In  2012,  CO2  emissions  from  thermal energy decreased by 17% at  Jena, mostly caused  by  a  change  in  utilization  of  the cold  machines  in  the  acclimatization system.   Solvents Benchmarks  show  that  cleaning technology  for  optical manufacturing  has already reached a very high standard, and as a result further reductions of emissions are  scarcely  possible.  Nevertheless,  the amount  decreased  in  all  solvents categories.  We  will  strive  to  reduce  the low  level  of  VOC  emissions  achieved  to date even further wherever possible. 

 

           

0,20 0,22

0,12 0,13

0,00

0,05

0,10

0,15

0,20

0,25

2011 2012 2013 2014 2015 2016 2017

waste (kg per productive hour, site Jena)

target corridor: waste non‐hazardous [g/h] target corridor: waste hazardous [g/h]

waste non‐hazardous [g/h] waste hazardous [g/h]

4.523

3.765

0500100015002000250030003500400045005000

2011 2012 2013 2014 2015 2016 2017

CO2 emission (metric tons, site Jena)

target corridor: CO2 emission CO2 emission site Lichtenhain [t]

22,31 21,25

10,499,60

39,5438,16

0,0

20,0

40,0

2011 2012 2013 2014 2015 2016 2017

solvents(kg per productive hour, site Jena)

target corridor: solvents consumtion target corridor: waste (recycled)target corridor: air/water emission waste (recycled) [g/h]air/water emission [g/h] consumed solvents factor [g/h]

Page 12: Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

12 Version 02 

 3.2. Labor, Human Rights, Health & Safety 

 ZEISS  is  caring  for  its  people.  From  home  office regulations  to  different  employment  types  to support  for  employees  with  elder‐care responsibilities  ‐ ZEISS  is providing a  flexible work environment  that  support  the work/life  needs  to different employees.   Developed with  feedback  from  stakeholders,  the SMS  started  to  transform  their  Corporate Responsibility  Report  according  to  the international  reporting  standard  of  the  Global Reporting  Initiative  (GRI). We  are  now  expanding our Report by adding  indicators which are related to  Human  Rights  and  Labor.  This  year,  we  are publishing our data the first time.  Labor and Human Rights data are SMS specific and cover our  facilities  in  Jena, Oberkochen, Rossdorf and Karmiel (Israel).  Develop the talents needed  Since 2009, SMS’ workforce increased significantly. This  reflects  the  quick  growth  of  our  business.  It also indicates a raising need for training, especially with  regard  to  our  new  employees.  To  cover  this additional need,  the  SMS division  almost doubled the efforts  in  training compared  to 2011  levels.  In average, 12 hours per employee were  invested for expanding  the  knowledge  base.  Most  of  the trainings were  organized  by  Campus,  the  internal training  program  of  ZEISS  SMT.  It  provides  varied and  interesting  courses  on  current  technologies and  developments,  processes  and  methods.  To support  knowledge  transfer,  the  speakers  are usually ZEISS employees. 

  

            

        The composition of contract and employment types did not change significantly. Due to the knowledge‐intensive technologies  in our business environment, the rate won’t change fundamentally.   

130171 192

224

0

33

7

0

50

100

150

200

250

2009 2010 2011 2012

total workforce

Total Number of Employees external workforce

(as per December, 31st ‐ excluding worldwide service teams)

0,67

4,16 4,86

11,71

0

2

4

6

8

10

12

14

16

2009 2010 2011 2012

average hours of training

128166

188216

2 5 4 80 3 3 70

50

100

150

200

2009 2010 2011 2012

type of contract

permanent temporary external workforce

129167 186 215

14

69

0

50

100

150

200

250

2009 2010 2011 2012

employment type

full‐time part‐time

(excluding external workforce)

Page 13: Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

13 Version 02 

   

Striving for zero incidents  Health  and  safety  performance  is  a  key measure  of  our  organization’s  duty  of  care.  Low  injury  and  absentee  rates  are  generally  linked  to  positive  trends  in  staff morale  and productivity. Carl Zeiss SMS GmbH is striving for zero incidents. Our Indicator will show whether health and safety management practices are resulting in fewer occupational health and safety incidents.  

                   

                            

 

Human Rights  

     We have not identified any operations with significant risk for child labor or forced or compulsory labor.    

0,00

2,56

0,00

2,00

4,00

6,00

8,00

10,00

12,00

FY 10/11 FY 11/12

SMS' Total Recorded Injury Rate (TRI)

[way‐to‐work accidents]

TRI = LTI + MTC (acc. to ILO‐standard)

LTI (LTI ‐ Lost Time Injuries) = (quantity of way‐to‐work‐accidents which caused absence > 1 day / working hours) * 106MTC (MTC ‐Medical Treatment Cases) = (quantity of way‐to‐work‐accidents which caused absence < 1 day / working hours) * 106

5,63

2,56

0,00

2,00

4,00

6,00

8,00

10,00

12,00

FY 10/11 FY 11/12

SMS' Total Recorded Injury Rate (TRI)

[occupational injuries]

TRI = LTI + MTC (acc. to ILO‐standard)

LTI (LTI ‐ Lost Time Injuries) = (quantity of work related injuries which caused absence > 1 day / working hours) * 106MTC (MTC ‐Medical Treatment Cases) = (quantity of work related injuries which caused absence < 1 day / working hours) * 106

Page 14: Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

14 Version 02 

3.3. Sustainability Projects – Achievements (first report)  To continuously improve the sustainability of our business activities, several improvement projects were started in August 2012.  They relate to different aspects of sustainability, e.g. Management System, Labor, Health & Safety and Environment. All of the projects are owned by the SMS.  

Project 1: Implementing and updating a Business Recovery Plan  statusSMS is implementing a Business Recovery Plan which defines a set of emergency measures for all sites of the SMS. Following the plan ensures the ability to deliver and service our products which ensures business continuity in case of disruptive events.  The project consists of different sub targets such as a specific risk analysis, the definition of emergency procedures and training elements. Twice a year, the target achievement is being reviewed.   Target 2012/2013 3 completed BCP´s incl. roll out for Jena, Rossdorf and Karmiel until Q IV/2013   Sub targets & measures 2012/2013: sub target 1 ‐ Realization of a business continuity plan for three of four SMS sites sub target 2 ‐ realize actions defined in the stage plan BRP (per locations) sub target 3 ‐ Training 100% of risk‐class‐I‐Manager in emergency procedures and processes until 12/2012     (initial training done) sub target 4 ‐ Emergency drill for management team (incl. site managers) until QII/2013  The number of tool orders made an expansion of our industrial capacities necessary. At the moment, the SMS is taking huge efforts to reorganize and expand the clean room production area. Regarding sub target #4, an emergency drill was successfully performed at site Jena in October 2013. The roll‐out to the other sites will be realized during the upcoming FY. After finishing the roll‐out, BCP‐ audits will be realized to verify the implementation.  For 2014, the following program is defined:  Target 2013/2014: BCP roll out completed and implemented   Sub targets & measures 2013/2014: sub target 1 ‐ Emergency drill for management team (site managers) Rossdorf until QIV/2014 sub target 2 ‐ Training 100% of risk‐class‐II and III‐Manager in emergency procedures and processes until 09/2014     (yearly instruction in future) sub target 3 ‐ BCP‐Audits (Jena, Rossdorf, Karmiel) – 2015 sub target 4 ‐ Realization of follow up workshops (lessons learned) after the 3th. BCP‐Audit  

 

       

sub target 1         sub target 2         sub target 3         sub target 4                    

sub target 1         sub target 2         sub target 3         sub target 4        

Page 15: Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

15 Version 02 

      

Project 2: Continuous Reduction of overtime of specialists  statusAn effective and efficient recruiting process is supporting the reduction of overtime. Goal of project 2 is the reduction of the average time to hire new employees.  Target 2012/2013: average hiring time 3,75 months until Sept. 2013   Sub targets & measures in 2012/ 2013: sub target 1 ‐ optimize the recruitment process sub target 2 ‐ focus on pre‐selection by HR and manager (phone interviews, check of references) to improve quality sub target 3 ‐ competency based interviews sub target 4 ‐ focus on clear milestones and deadlines for HR as well as for the managers in the process to increase speed)  The hiring time was reduced successfully. We further strive to optimize our process, setting challenging goals for the upcoming months:  Target 2013/2014: average hiring time 3 months until Sept. 2014   Sub targets & measures in 2013/2014: sub target 1 ‐ review and optimization of the process sub target 2 ‐ focus active sourcing approach to keep “pipeline” of candidates filled      

 

     

sub target 1         sub target 2    

     sub target 3         sub target 4        

sub target 1         sub target 2    

 

    

Page 16: Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

16 Version 02 

 Project 3: Realize Supplier‐Sustainability‐Program status To develop SMS’ supply chain in terms of sustainability, a specific supplier sustainability program is being realized.  Target 2012/2013: ‐ realize a sharing of experiences / workshops regarding the sustainability program of the SMS with chosen Managed Suppliers   Sub targets & measures in 2012/2013: sub target 1 ‐ realization of 2 supplier‐sustainability‐assessments in FY2012/2013 sub target 2 ‐ embedding of a Managed Supplier into a common SMS‐supplier‐sustainable‐design‐development project  In 2013/2014, we continue to develop our supply chain by further communicating sustainability expectations and performing assessments to our vendors. Based on conducted pilot assessments in 2013 and benchmarking visits, the supplier sustainability program will be refined. Changes of the assessment scope might be necessary, therefore a specific number of assessments is going to be defined within 2014.  Target 2013/2014: continue to develop supply chain in terms of sustainability  

Sub targets & measures 2014: sub target 1 ‐ EICC based questionnaire: acknowledgement for all managed  suppliers; target approval rate of > 70% within 2014 sub target 2 ‐ refinement of supplier sustainability program and further roll out  sub target 3 ‐ definition an appropriate number of sustainability assessments within 2014 sub target 4 (from previous fiscal year) ‐ embedding of a Managed Supplier into a common SMS‐supplier‐sustainable‐design‐development project     

     

sub target 1         sub target 2   open          

sub target 1         sub target 2         sub target 3         sub target 4    

 

    

Page 17: Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

17 Version 02 

 Project 4: Develop SMS‐Tools with sustainable content > 5% until 2015  status For our company to grow and secure its growth in the future, it needs to embed sustainability into our products. Appropriate indicators need to be developed to identify the impact of our tools in terms of the environment. SMS is focusing on the energy efficiency of its products and a sustainable product and packaging design.  Energy efficiency of products Measuring and analyzing the energy consumption of our tools and components during the production process is very much depending on the degree of capacity utilization at our customers sites. High production activity required a temporal moving of this project. In QI/2014 we will further look for project partners to monitor the energy consumption of our tools during the production process at the facility of a customer.  Sustainable product & packaging design The Substitution Principle in sustainability is the maxim that processes, services and products should, wherever possible, be replaced with alternatives which have a lower impact on the environment. Following this principle, the SMS is analyzing the content of its products to identify such alternatives. The amount and type of packaging material is also part of this research.  

                    

Target 2012/2013: define the 5 important key sustainable performance indicators for the new SMS‐product generation until QIII/2013   Sub targets & measures in 2012/2013: subtarget 1 ‐ definition of common sustainability requirements for design, packaging and energy efficiency (metrics: accordance with CEA‐requirements; technical feasibility) subtarget 2 ‐ common kick‐off meeting within SCM/Q/R&D and managed/ preferred suppliers of CZ SMT group at the next supplier day (Oct. 2013); start of research groups involving both parties to investigate further component‐related sustainability projects    Target 2013/2014: Realizing a sustainable content of 5% at common SMS‐supplier‐development‐projects for the new tool generation   Sub targets & measures in 2013/2014: subtarget 1 ‐ realization of pre‐project with important SMS customer to measure and analyze the consumption of tools and components in the production cycle (metric: achievement of the project goals/compliance to budget and time targets) subtarget 2 main project of SMS R&D‐department with chosen managed suppliers, involving chosen components for tools of the new generation until QIII 2015 subtarget 3 ‐ Follow up with customer: lessons learned about CIP‐measures for prospective common sustainability projects subtarget 4 ‐ creating KPI’s (after baseline evaluation) 

                 

sub target 1   open 

     sub target 2   open 

     

                              sub target 1    

     sub target 2       

Page 18: Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

18 Version 02 

 

4. Summary  

 

With publication of this 2nd version of the sustainability program we confirm the content of our sustainability program and emphasize our aim of realizing it.  The results of our first review, described in chapter 4, show that a further progress must be obtained on almost all subject areas.  

‐ The definition and improvement of supplier related requirements in terms of sustainable design, packaging and energy efficiency  must be continued.  

‐ A common sustainable‐design‐project with one of our suppliers could not be realized.  

‐ The supplier sustainability program needs to be refined.  

Nevertheless, many improvements have been implemented. 

‐ Metrics, trends and targets for consumptions and emissions were defined at the Jena site; first analysis were made.  

‐ Additional indicators for Labor, Human Rights and Health & Safety were included, following the GRI‐format.  

‐ Nearly all sustainability related improvement projects were finished in time. 

The next reporting about the sustainability program is planned in November 2014. In the meantime, we will continue to increase the meaningfulness of our indicators. The SMS will furthermore pursue sustainability within the ZEISS group. 

 

 

 

 

 

 

 

 

    

Page 19: Sustainability Program Vs 02 mod 20140401 - ZEISS · PDF fileWe are now publishing our first sustainability report. It ... 1 Annual Report 2011/2012. 5 ... Right to Sight”, a global

19 Version 02 

Copyright © 2013 Carl Zeiss SMS GmbH 

 

Download this document at  

http://smt.zeiss.com/semiconductor‐manufacturing‐technology/en_de/about‐us/responsibility‐‐‐sustainability.html 

 We value your interest in our report and welcome questions, 

comments and improvement suggestions.  

Please use the following email address to contact us. 

 

[email protected] 

Sustainability Reporting