Upload
adeniji-adetayo
View
7
Download
0
Embed Size (px)
DESCRIPTION
Sustainability Class Project
Citation preview
Sustainability Class Project 2Due: Noon, Oct. 6, 2015Develop an Aspen Plus flowsheet for the simulation of the core part a hazardous waste incineration process. Submit the report file in word and the Aspen Plus file. Both the electronic submission and hard copy are expected.Your group can choose topic A or B.Capacity: 30 ton/day, 10000 ton/year. Operation hour/year: 8000.Waste feedstock Ultimate analysis ( weight %):CarbonHydrogenOxygenNitrogenSulphurChlorine
56.156%8.522%21.409%0.145%0.645 0%0.5%
MoistureAshVolatilesFixed Carbon
7.345%5.278%79.811%7.569%
Lower heating value of the waste feedstock: 25.652 MJ/kg A. It consists of a rotary klin as the primary combustion chamber, followed by a secondary combustion chamber. Simulate the product distribution when the incinerator operates at 850 oC, 950 oC,1100 oC, 1200 oC respectively. Percent of excess air: 50%.
B. It consists of a fixed bed pyrolysis chamber as the primary combustion chamber, followed by a secondary combustion chamber. Simulate the product distribution when the pyrolysis incinerator operates at 600 oC, 700, 800 oC respectively. Percent of excess air: 30%.