Sustain Ability2012 Honeywell Users Group Americas
Sustain.Ability.
Lessons Learned by Finch Paper’s Power
Steve Padasak – Finch Paper, Benoit Comtois, Rick Van Fleet-Honeywell
1
esso s ea ed by c ape s o eHouse Bailey HMI Migration
FINCH PAPER, GLENS FALLS, NYFINCH PAPER, GLENS FALLS, NY
2
BackgroundBackground
• Finch Paper LLC is located in Glens Falls, NY• Originally built in 1865 as a sawmill, shortly converted
in to a paper mill.• 700 tpd of sulphite pulp700 tpd of sulphite pulp.• Continuous digester, 4 Paper machines• Variety of end products including uncoated text &
d di it lcover, and digital papers.• DCS Migration to Experion started March 2010• Chlorine Dioxide Generator and Bleach Plant I/OChlorine Dioxide Generator and Bleach Plant I/O
converted to Experion R300 controllers• APC completed on both areas using Profit Controller
and BTG specialty sensors
3
and BTG specialty sensors
DCS Modernization ObjectivesDCS Modernization Objectives
• SafetyP l d A t P t ti– Personnel and Asset Protection
– Reduce Risk of Incident Due to Obsolescence– Ensure Regulatory Compliance $$$$
• Business Continuity– Maximize System Reliability – Reduce Unplanned DowntimeReduce Unplanned Downtime
• Business Performance– Reduced Total Cost of Ownership– Support Go-To-Market Strategy with more production agility,
quality improvements and reducing fixed costs
• Enterprise Business Integration
4
p g– Integrating system architecture (I/O; DCS; MES; ERP)
Finch Paper - Current Process Control Systems850# Steam
Boiler # 4Gas/Oil100 K
Bailey DCSBailey + CyTech
Boiler # 5Gas/Oil100 K
Bailey DCSBailey + CyTech
Boiler # 9Bark/Gas/Oil
140 KBailey DCS
Bailey + CyTech
Boiler # 8Liquor125 K
Bailey DCSBailey + CyTech
Boiler # 10Liquor145K
Bailey DCSBailey + CyTech
Boiler # 1 Boiler # 2 Boiler # 3 Boiler # 6 Boiler # 7
21.5 MWTurbine Generator850# / 200# / 50#
GE Mark V Controls50 # Steam
Power HouseControl Room
Oil60 K
Bailey DCSBailey & CyTech
Gas/Oil100 K
Bailey DCSBailey + CyTech
Gas/Oil100 K
Bailey DCSBailey + CyTech
Liquor65 K
Bailey DCSBailey + CyTech
Liquor65 K
Bailey DCSBailey + CyTech
GE Mark V Controls
200 # SteamLiq
uor
Liq
uor
EvaporatorsPulp MillBleach PlantPaper Machines
Evaporator# 1
Bailey DCSBailey + CyTech
Evaporator# 2
Bailey DCSBailey + CyTech
EvaporatorControl Room
Woodyard
PLC &Manual Controls
WoodyardControl Room
COMPLETE 2012
SulphurBurner
Panel Board Controls
DigesterPanel Board
&MxOpen
Brown StockWashers
Panel Board
ScreeningPanel Board
& PLC
Pulp MillControlRoom COMPLETE 2011
Bleach PlantExperion& PLC &
Bleach PlantControl RoomPaper Machine #1
MxOpen DCS & QCSLocal Machine Controls Paper Machine #2
MxOpen DCS & QCSLocal Machine Controls Paper Machine #3
M O DCS & QCS
ConvertingAB PLC
Local Controls R8 / CLO2Experion
& PLC
Stock BlendingMxOPEN
Chemical PrepPCC
5 HONEYWELL - CONFIDENTIAL File Number
& PLC &Panel Board
MxOpen DCS & QCSLocal Machine Controls Paper Machine #4
MxOpen DCS & QCSLocal Machine Controls
ConvertingMultiple
Locations
& PLC
Stock PrepControl Room
ProvoxChemical Prep
Migration Options
6 HONEYWELL - CONFIDENTIAL File Number
Rip and Replace Can be Very Costly
Why Finch Choose to Migrate
• Bailey MCS Consoles obsolete, difficult getting t ( B )parts (eBay)
• Unplanned shutdowns ($$$$)• Poor documentation affecting troubleshooting• Poor documentation affecting troubleshooting
resulting in extended downtime• No remaining Bailey expertise on site and in area
7 HONEYWELL - CONFIDENTIAL File Number
Mi i i O ti l I t Th j t ill b
Project Goals
• Minimize Operational Impact – The project will be installing migrated displays based on the existing Bailey graphics. The new displays will initially be run i ll l ith th t di l Th KPI ill bin parallel with the current displays. The KPI will be considered successful if the commissioning effort is complete in one week and if Finch Operations is able t t iti i ti t th tto transition primary operations to the new system without going back to the Bailey system.
•Retain Productivity – Finch Operations should be able to operate the plant at the same levels of productivity as prior to the cutover. This will beproductivity as prior to the cutover. This will be accomplished by effective use of the Operator Training and by a thorough Acceptance Test.
8 HONEYWELL - CONFIDENTIAL File Number
Bailey Interface / Architecture Bailey Interface / Architecture Options ReviewOptions Review
ARCHITECTURE BASISARCHITECTURE BASISARCHITECTURE BASISARCHITECTURE BASIS
EPKS Data Server BPCS
• Honeywell Experion PKS systems uses OPC to interface bi-directionally with exposedto interface bi directionally with exposed Infi90 exception rate function code data for HMI operations.
• Data is retrieved by “Rovisys OPC90” via a
Rovisys OPC90Server
Data is retrieved by Rovisys OPC90 via a communication interface unit “CIU”.
CIUCIU
Infi90 Loop
Server Redundancy FailoverServer Redundancy Failover
Failure ScenarioS S
Server Redundancy FailoverServer Redundancy Failover
OPC ServerFailureExperion FailureStation1 Station2
Running
StandBy
Failed
ExpREDServerA ExpREDServerB
Transparent to OperationOPC Reconnect delay
See Next slide
RDM RDM
OPCA OPCB
RDM Manage Failover
CIU CIU
Experion failover
SCADA Point StructureSCADA Point StructureSCADA Point StructureSCADA Point Structure
OPC Client access can be directly linked to an OPC source item.
Native parameter exposed by Experion OPC Server Data Access.Can be Accessed Read Only or Read and Write by an OPC client.
User defined parameter exposed by Experion OPC Server Data Access.
Can be accessed Read Only or Read and Writeb OPC li tby an OPC client.
OPC Process Used To Populate DatabaseOPC Process Used To Populate DatabaseOPC Process Used To Populate Database OPC Process Used To Populate Database
Upon Experion Server failover:
OPC Data Access ClientOPC Data Access Client-Starts-Create connection to OPC Server-Adds Items 1 by one and Itemsbecomes available 1 by one
OPC Integrator -Starts-Create connection to OPC ServerAdds Items 1 by one and Items
v
-Adds Items 1 by one and Itemsbecomes available 1 by one
The rate at which this happens isdependant of few things like:
v
p gComputer performancesRAM memory availableNetwork performance
Experience says in the order of:v
Experience says in the order of:1000 items per seconds. This means only test will validate
Experion PKS / Bailey Points Building Utilityp y g y
Experion PKS / Bailey Points Building Utilityp y g y
Project Schedule
Project Phase Milestone DateKick-off Meeting and Bailey System Review 18-Jan-11 System Specification R0 Submitted to Finch 18-Jan-11 Bailey CIU Shipment to site 28-Jan-11Bailey CIU Shipment to site 28-Jan-11 System Specification R1 Submitted to Finch 31-Jan-11 Hardware Shipment to Atlanta 28-Mar-11 Hardware Shipment to site 18-Jun-11 Customer Acceptance Test 02-May-11 Operator Training 16-May-11
System commissioning and startup 23-Aug-11
16 HONEYWELL - CONFIDENTIAL File Number
Honeywell.com
HMI Migration stepsHMI Migration stepsConnection of OPC Server to
Bailey CIUBailey CIU
Existing Bailey
Infinet loop systemInfinet loop system
Honeywell Proprietary
Honeywell.com
HMI Migration step 2 – Establish Experion C i tiCommunications
Step2
• Connect and configure the Experion PKS Server and Client.
• Build the Experion PKS Server database and OPC Integrator database using the Honeywell Bailey bulk build utilitythe Honeywell Bailey bulk build utility.
Honeywell Proprietary
Honeywell.com
HMI Migration stepsConnection of Experion EPKS
Server / Client to the OPC Server
HMI Migration steps
Server / Client to the OPC Server
Remove Bailey HMI at your convenience
Honeywell Proprietary
Honeywell.com
Powerhouse Bailey HMI Migration –R d d t S FTERedundant Servers on FTE
Switch A
Router/Firewall to Finch B i N t kS it h B
Existing L3.5 DMZ
Existing eServer
on F
TE
Fault Tolerant Ethernet (FTE)Business Network
Redundant Experion & Rovisys OPC Servers w/ KVM Switch in Server/Switch Cabinet
Switch B
Existing PHD
Existing eServer
Experion Server A
ntro
l LA
N
CIU AExisting Customer Installed Base Bailey DCSCIU A
Experion Server B
pe o Se e
OPC Server A
Honeywell Engineering ro
cess
Co OPC Server B
CIU B
Honeywell Operator Stations (Desktops Mounted in Server Cabinet)g g
Station (Desktop)
oney
wel
l P
Honeywell Proprietary
Ho
Remote Video/Keyboard/Mouse via Honeywell Remote Peripheral Evaporator Control Room
Nema 4X Enclosurefor 6 & 7 Boilers
Honeywell.com
Interface Cabinets
Honeywell Proprietary
Honeywell.com
Experion Consoles
Honeywell Proprietary
Honeywell.com
Schematic Conversions
Honeywell Proprietary
Lessons Learned
• Careful review of existing database is required.• Be careful about simply cloning database if it isBe careful about simply cloning database if it is
not properly documented.• Upfront systems assessment (FEED) can save
money in the long runmoney in the long run.• Involve operators in review of graphic design to
learn their hot buttons.• Allow for sufficient time to fully check system out
before cutover.
24 HONEYWELL - CONFIDENTIAL File Number
Results and Next Steps
• Operator acceptance increasing with use and t i itraining
• Experion trending is a big improvement over Bailey.a ey
• Project execution went well.
25 HONEYWELL - CONFIDENTIAL File Number
Questions?
26 HONEYWELL - CONFIDENTIAL File Number