Surveyor Plus
Surveyor AutosamplerUpgrade Guide
60053-97117 Revision B January 2009
© 2009 Thermo Fisher Scientific Inc. All rights reserved.
Surveyor and Xcalibur are registered trademarks and ChromQuest is a trademark of Thermo Fisher Scientific Inc. in the United States. Windows is a registered trademark of Microsoft Corporation. Teflon is a registered trademark of E. I. du Pont de Nemours and Company. PEEK is a trademark of Victrex PLC. All other trademarks are the property of Thermo Fisher Scientific Inc. and its subsidiaries.
Thermo Fisher Scientific Inc. provides this document to its customers with a product purchase to use in the product operation. This document is copyright protected and any reproduction of the whole or any part of this document is strictly prohibited, except with the written authorization of Thermo Fisher Scientific Inc.
The contents of this document are subject to change without notice. All technical information in this document is for reference purposes only. System configurations and specifications in this document supersede all previous information received by the purchaser.
Thermo Fisher Scientific Inc. makes no representations that this document is complete, accurate or error-free and assumes no responsibility and will not be liable for any errors, omissions, damage or loss that might result from any use of this document, even if the information in the document is followed properly.
This document is not part of any sales contract between Thermo Fisher Scientific Inc. and a purchaser. This document shall in no way govern or modify any Terms and Conditions of Sale, which Terms and Conditions of Sale shall govern all conflicting information between the two documents.
Release history: Revision A, September 2005; Revision B, January 2009
Software versions: Xcalibur 1.4 or 2.0; ChromQuest 4.0 SP1, 4.1 SP2, or 4.2
For Research Use Only. Not regulated for medical or veterinary diagnostic use by U.S. Federal Drug Administration or other competent authorities.
WEEE Compliance
This product is required to comply with the European Union’s Waste Electrical & Electronic Equipment (WEEE) Directive 2002/96/EC. It is marked with the following symbol:
Thermo Fisher Scientific has contracted with one or more recycling or disposal companies in each European Union (EU) Member State, and these companies should dispose of or recycle this product. See www.thermo.com/WEEERoHS for further information on Thermo Fisher Scientific’s compliance with these Directives and the recyclers in your country.
WEEE Konformität
Dieses Produkt muss die EU Waste Electrical & Electronic Equipment (WEEE) Richtlinie 2002/96/EC erfüllen. Das Produkt ist durch folgendes Symbol gekennzeichnet:
Thermo Fisher Scientific hat Vereinbarungen mit Verwertungs-/Entsorgungsfirmen in allen EU-Mitgliedsstaaten getroffen, damit dieses Produkt durch diese Firmen wiederverwertet oder entsorgt werden kann. Mehr Information über die Einhaltung dieser Anweisungen durch Thermo Fisher Scientific, über die Verwerter, und weitere Hinweise, die nützlich sind, um die Produkte zu identifizieren, die unter diese RoHS Anweisung fallen, finden sie unter www.thermo.com/WEEERoHS.
Conformité DEEE
Ce produit doit être conforme à la directive européenne (2002/96/EC) des Déchets d'Equipements Electriques et Electroniques (DEEE). Il est marqué par le symbole suivant:
Thermo Fisher Scientific s'est associé avec une ou plusieurs compagnies de recyclage dans chaque état membre de l’union européenne et ce produit devrait être collecté ou recyclé par celles-ci. Davantage d'informations sur la conformité de Thermo Fisher Scientific à ces directives, les recycleurs dans votre pays et les informations sur les produits Thermo Fisher Scientific qui peuvent aider la détection des substances sujettes à la directive RoHS sont disponibles sur www.thermo.com/WEEERoHS.
Thermo Scientific Surveyor Autosampler Upgrade Guide iii
C
About This Installation Guide. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .v
Chapter 1 Unpacking the Upgrade Kit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
Chapter 2 Installing the Needle and the Needle Tubing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3Step 1: Removing the Surveyor AS Needle Assembly. . . . . . . . . . . . . . . . . . . . . . 4Step 2: Installing the Surveyor AS Plus Needle Assembly. . . . . . . . . . . . . . . . . . . 7Step 3: Installing the Surveyor AS Plus Needle Tubing Assembly . . . . . . . . . . . . 8
Chapter 3 Installing the Injection Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13Step 1: Removing the Rheodyne Injection Valve . . . . . . . . . . . . . . . . . . . . . . . . 13Step 2: Installing the Valco Injection Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Chapter 4 Replacing the Transfer Tubing and the Injection Port . . . . . . . . . . . . . . . . . . . . . .17Step 1: Removing the Transfer Tube and Injection Port . . . . . . . . . . . . . . . . . . 17Step 2: Installing the New Transfer Tubing and Injection Port . . . . . . . . . . . . . 20
Chapter 5 ChromQuest Upgrades . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25Installing the Update Files for ChromQuest . . . . . . . . . . . . . . . . . . . . . . . . . . . 25Updating the Firmware for the Surveyor Autosampler Plus . . . . . . . . . . . . . . . . 26
Chapter 6 Configuring the Surveyor Autosampler Plus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31
Chapter 7 Completing the Upgrade . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .33
Contents
Thermo Scientific Surveyor Autosampler Upgrade Guide v
P
About This Installation Guide
This installation guide describes how to upgrade the Surveyor Autosampler to a Surveyor Autosampler Plus.
To upgrade the autosampler, you must replace the following hardware components: the needle tubing assembly, the autosampler injection port, the injection valve, and the transfer tube.
After you modify the hardware, you must upgrade the autosampler firmware. To operate the autosampler from ChromQuest™, you must also upgrade the software.
Safety and Special NoticesMake sure you follow the precautionary statements presented in this guide. The safety and other special notices appear in boxes.
Safety and special notices include the following:
CAUTION You must follow the safety precautions specified at the beginning of the Surveyor Autosampler Hardware Manual as you install the new autosampler components.
Note After you upgrade the autosampler, refer to the Surveyor Autosampler Plus Hardware Manual for maintenance information.
CAUTION Highlights hazards to humans, property, or the environment. Each CAUTION notice is accompanied by an appropriate CAUTION symbol.
IMPORTANT Highlights information necessary to prevent damage to software, loss of data, or invalid test results; or might contain information that is critical for optimal performance of the system.
Note Highlights information of general interest.
Tip Highlights helpful information that can make a task easier.
Preface
vi Surveyor Autosampler Upgrade Guide Thermo Scientific
Contacting UsThere are several ways to contact Thermo Fisher Scientific for the information you need.
To contact Technical Support
Find software updates and utilities to download at mssupport.thermo.com.
To contact Customer Service for ordering information
To copy manuals from the Internet
Go to mssupport.thermo.com and click Customer Manuals in the left margin of the window.
To suggest changes to documentation or to Help
• Complete a brief survey about this document by clicking the link below. Thank you in advance for your help.
• Send an e-mail message to the Technical Publications Editor at [email protected].
Phone 800-532-4752
Fax 561-688-8736
E-mail [email protected]
Knowledge base www.thermokb.com
Phone 800-532-4752
Fax 561-688-8731
E-mail [email protected]
Web site www.thermo.com/ms
Thermo Scientific Surveyor Autosampler Upgrade Guide 1
1
Unpacking the Upgrade Kit
Table 1 lists the items provided in the Surveyor Autosampler Plus Upgrade Kit (P/N 60053-62042).
Table 1. Parts list for the Surveyor Autosampler Plus Upgrade Kit
Description Part Number
Needle assembly 60053-60013
Needle tube assembly 60053-60102S
Valco injection valve with fittings and sample loop 60053-30002
Transfer tube (for Valco injection valve) 60053-60014
Injection port (stainless steel) 60053-20031
Needle port retainer 60053-10035
Cable clamp 00108-02-00011
Upgrade adhesive label 60053-50109
ChromQuest 4.0 SP1 Software CD with new firmware CHROM-98002
ChromQuest 4.1 SP2 Software CD with new firmware CHROM-98003
Surveyor Autosampler Upgrade Guide 60053-97117
Thermo Scientific Surveyor Autosampler Upgrade Guide 3
2
Installing the Needle and the Needle Tubing
This chapter describes how to remove the one-piece needle tubing assembly shown in Figure 1, and how to install the needle assembly shown in Figure 2 and the needle tubing assembly shown in Figure 3.
To install the new needle assembly and needle tubing assembly, follow these steps:
• Step 1: Removing the Surveyor AS Needle Assembly
• Step 2: Installing the Surveyor AS Plus Needle Assembly
• Step 3: Installing the Surveyor AS Plus Needle Tubing Assembly
Figure 1. Needle tubing assembly [P/N F1092-101 (obsolete)]
Figure 2. Needle assembly (P/N 60053-60013)
Needle Nut and ferrule
10-32 Nut
Needle flag
Latch nut
Needle
2 Installing the Needle and the Needle TubingStep 1: Removing the Surveyor AS Needle Assembly
4 Surveyor Autosampler Upgrade Guide Thermo Scientific
Figure 3. Needle tubing assembly (P/N 60053-60102S)
Step 1: Removing the Surveyor AS Needle Assembly The Surveyor AS needle assembly consists of an integrated needle tubing and needle.
To remove the one-piece needle (with tubing) assembly
1. Set the XYZ arm of the autosampler to the needle removal position:
• For ChromQuest
From the Instrument Window, choose Control > Instrument Status. Click the Surveyor AS tab. Click Diagnostics, and then click the Direct Control tab to open the Direct Controls Dialog box. Select the Position Arm to Replace Needle direct command, and then click Submit.
• For Xcalibur
From the Instrument Setup Window, choose Surveyor AS > Direct Commands to open the Direct Commands Dialog box. Select the Needle Removal direct command from the list, and then click Apply.
The XYZ arm moves to the front center of the tray compartment, and then the needle descends to approximately one inch below its home position. Figure 4 shows the XYZ arm set to the needle removal position.
Externally-threaded flanged fitting (connects to the syringe valve)
Internally-threaded fitting (connects to the needle assembly)
16.5 cm Needle tubing guide
(Not drawn to scale)
2 Installing the Needle and the Needle TubingStep 1: Removing the Surveyor AS Needle Assembly
Thermo Scientific Surveyor Autosampler Upgrade Guide 5
Figure 4. View of the XYZ arm in the needle removal position
2. To detach the needle from the needle mount, pull the needle latch forward, an then slide the needle upward, out of the needle mount.
3. Detach the needle tubing from the bracket on the XYZ arm.
4. Send the XYZ arm to the back of the tray compartment:
• For ChromQuest
From the Instrument window, choose Control > Instrument Status. Click the Surveyor AS tab. Click Diagnostics, and then click the Direct Control tab to open the Direct Controls Dialog box. Select the Position Arm To Access Tray direct command, and then click Submit.
• For Xcalibur
From the Instrument Setup window, choose Surveyor AS > Direct Control to open the Direct Commands dialog box. Select the Position Arm To Access Tray direct command, and then click Apply.
5. Pull the needle tubing forward to remove it from the bracket on the left wall of the tray compartment. Figure 5 shows the location of the bracket.
The PVC retainer is the last item that secures the needle tubing within the tray compartment.
Solvent tubing clamp XYZ arm in needle removal position
2 Installing the Needle and the Needle TubingStep 1: Removing the Surveyor AS Needle Assembly
6 Surveyor Autosampler Upgrade Guide Thermo Scientific
6. Gently pull the needle tubing upward to release the retainer, and then remove the needle assembly from the autosampler.
Figure 5. View of wall bracket and red retainer for needle tubing
7. Dismount the syringe drive assembly from its three mounting pins (see Figure 6). Do not detach the syringe drive cable from the autosampler.
Figure 6. View of mounting pins for the syringe drive assembly
Wall bracket
PVC retainer (red or black)
Needle tubing
CAUTION Wear gloves to avoid skin contact with the solvent contained in the needle tubing.
2 Installing the Needle and the Needle TubingStep 2: Installing the Surveyor AS Plus Needle Assembly
Thermo Scientific Surveyor Autosampler Upgrade Guide 7
8. Remove the one-piece needle assembly from the right side of the syringe valve (see Figure 7).
Figure 7. View of syringe valve, showing the needle tubing fitting
9. Remount the syringe drive assembly.
Step 2: Installing the Surveyor AS Plus Needle AssemblyTo install the Surveyor AS Plus needle assembly
1. Set the XYZ arm to the needle removal position as described in “Step 1: Removing the Surveyor AS Needle Assembly” on page 4.
2. Carefully slide the needle into the needle mount until the needle flag meets resistance, and then push the latch nut backward (see Figure 8).
One-piece needle assembly fitting
IMPORTANT Do not attempt to remove the needle unless the XYZ arm is in the needle removal position. The needle removal position allows you to slide the needle upward without bending it.
2 Installing the Needle and the Needle TubingStep 3: Installing the Surveyor AS Plus Needle Tubing Assembly
8 Surveyor Autosampler Upgrade Guide Thermo Scientific
Figure 8. View of the needle assembly inserted in the needle mount
Step 3: Installing the Surveyor AS Plus Needle Tubing AssemblyTo install the needle tubing assembly
1. Measure the length of the needle tubing between the end of the internally-threaded fitting and the black shrink-wrap marker. The length should be approximately 16.5 cm (6.5 in.), as shown in Figure 3.
2. Connect the internally-threaded fitting of the needle tubing assembly to the 10-32 nut of the needle assembly.
3. Secure the needle tubing:
a. Thread the tubing through the XYZ arm bracket (under-over-under) as shown in Figure 9. Allow sufficient play in the tubing (see step 1) so that the XYZ arm can move freely within the tray compartment. The black shrink-wrap marker must be cradled in the bracket.
Latch nut
Needle flag
2 Installing the Needle and the Needle TubingStep 3: Installing the Surveyor AS Plus Needle Tubing Assembly
Thermo Scientific Surveyor Autosampler Upgrade Guide 9
Figure 9. View of the needle tubing assembly attached to the needle assembly
b. Insert the two prongs of the needle tubing guide into the holes in the X-axis arm (see Figure 11).
Figure 10. View of the needle tubing guide connected to the X-axis arm
c. Set the XYZ arm to the back of the tray compartment as described in step 4 on page 5.
Internally-threaded fitting
XYZ arm bracket
2 Installing the Needle and the Needle TubingStep 3: Installing the Surveyor AS Plus Needle Tubing Assembly
10 Surveyor Autosampler Upgrade Guide Thermo Scientific
d. Slide the tubing into the bracket on the left wall of the tray compartment (see Figure 11).
Figure 11. Interior view of the autosampler, showing the needle tubing guide and the wall bracket
e. Push the PVC retainer (red or black) below the stainless steel Y-axis runner (see Figure 5 on page 6.
f. Insert the tubing into the solvent tubing clamp on the front-left side of the autosampler (see Figure 4 on page 5).
g. Attach the adhesive cable clamp to the front of the wash bottle bracket, and then slide the needle tubing under the clamp (see Figure 12).
4. Connect the needle tubing into the right side of the syringe valve (see Figure 12).
X-axis lead screw
Needle tubing guide
Wall bracket
2 Installing the Needle and the Needle TubingStep 3: Installing the Surveyor AS Plus Needle Tubing Assembly
Thermo Scientific Surveyor Autosampler Upgrade Guide 11
Figure 12. View of the needle tubing clamp and the syringe valve
5. After you install the needle tubing assembly, home the position of the XYZ arm:
• For ChromQuest
From the Instrument Window, choose Control > Instrument Status. Click the Surveyor AS tab. Click Diagnostics, and then click the Direct Control tab to access the Direct Controls Dialog box. Select the Go To Home direct command, and then click Submit.
• For Xcalibur
From the Instrument Setup Window, choose Surveyor AS > Direct Commands to open the Direct Commands Dialog box. Select the Set Arm To Home Position direct command, and then click Apply.
The home position of the XYZ arm is directly behind the wash station.
Needle tubingclamp
Needle tubing connected to the right side of the syringe valve
Syringe valve
Thermo Scientific Surveyor Autosampler Upgrade Guide 13
3
Installing the Injection Valve
This chapter describes how to replace the Rheodyne injection valve with a Valco injection valve.
Required tools:
• 1/4-in. open-end wrench
• Phillips head screwdriver
To install the Valco injection valve, follow these steps:
• Step 1: Removing the Rheodyne Injection Valve
• Step 2: Installing the Valco Injection Valve
Step 1: Removing the Rheodyne Injection ValveTo remove the Rheodyne injection valve
1. If the autosampler is connected to an LC pump, turn off the LC pump flow if you have not already done so.
2. Disconnect the tubing from ports 2, 3, 5, and 6 of the injection valve. Use a 1/4-in. open-end wrench, if necessary. Figure 13 shows the tubing connections to the Rheodyne injection valve.
3 Installing the Injection ValveStep 1: Removing the Rheodyne Injection Valve
14 Surveyor Autosampler Upgrade Guide Thermo Scientific
Figure 13. Rheodyne injection valve with fittings
3. Unscrew the two Phillips head screws that secure the injection valve to the autosampler (see Figure 14). Set the screws aside.
You reuse the screws to secure the Valco injection valve to the autosampler.
Figure 14. Rheodyne injection valve with fittings removed
4. Pull the injection valve forward, out of the column oven compartment.
Port 3 -To waste
Port 6 - To column
Port 5 - From pump
Port 2-Transfer tube
Phillips head screws
3 Installing the Injection ValveStep 2: Installing the Valco Injection Valve
Thermo Scientific Surveyor Autosampler Upgrade Guide 15
Step 2: Installing the Valco Injection ValveTo install the Valco injection valve
1. Check the position of the injector drive. It should be in the inject position (see Figure 15).
Figure 15. View of column oven compartment without an injection valve
2. Ensure that the drive shaft of the injection valve is in the Inject position (see Figure 16).
Figure 16. View of injection valve, showing the drive shaft in the Inject position
Screw holes
Injector drive in the inject position
Holes for Phillips head screws
Drive shaft in the Inject position
Left
Right
3 Installing the Injection ValveStep 2: Installing the Valco Injection Valve
16 Surveyor Autosampler Upgrade Guide Thermo Scientific
3. Insert the drive shaft of the Valco injection valve into the injector drive until the drive shaft clicks in place.
4. Insert the two Phillips head screws into the holes in the lower-left and upper-right corners of the injection valve mounting plate. Use a Phillips head screwdriver to tighten the screws.
Figure 17. Valco injection valve
5. Reconnect the waste line to port 3 (see Figure 17).
6. Reconnect the tubing to ports 5 and 6 (Figure 17).
7. Connect a sample loop to ports 1 and 4.
Note A 25 μL sample loop comes with the Valco injection valve.
Note If you are controlling the autosampler from the ChromQuest data system, check the configured sample loop size after you upgrade the software to ensure that it matches the sample loop. If you make a Full Loop injection with an injection volume that differs from the configured sample loop size, ChromQuest stops the run.
Port 3 - Waste tube
Sample loop
Port 6 - To column
Port 5 - From pump
Thermo Scientific Surveyor Autosampler Upgrade Guide 17
4
Replacing the Transfer Tubing and the Injection Port
This chapter describes how to install the transfer tubing, injection port, and retainer clip for the Surveyor Autosampler Plus.
To install the new hardware, follow these steps:
• Step 1: Removing the Transfer Tube and Injection Port
• Step 2: Installing the New Transfer Tubing and Injection Port
Step 1: Removing the Transfer Tube and Injection PortTo remove the Surveyor Autosampler transfer tube, injection port, and retainer
1. Use both hands to dismount the syringe drive assembly. Pull the bottom of the assembly straight out, away from the mounting studs, and then lift the assembly up and out of the tray compartment. Figure 18 shows the syringe drive assembly being removed from the autosampler.
Note Do not detach the cable on the back of the syringe drive assembly from the autosampler.
4 Replacing the Transfer Tubing and the Injection PortStep 1: Removing the Transfer Tube and Injection Port
18 Surveyor Autosampler Upgrade Guide Thermo Scientific
Figure 18. Dismounting the syringe drive assembly
2. Unscrew the fitting that connects the transfer tube to the injection valve if you have not already done so.
3. Pull the one-piece fitting off the free end of the transfer tube.
4. Pull the free end of the transfer tube into the tray compartment through the hole between the tray compartment and the column oven compartment (see Figure 19).
Syringe drive assembly
Three mounting studs
4 Replacing the Transfer Tubing and the Injection PortStep 1: Removing the Transfer Tube and Injection Port
Thermo Scientific Surveyor Autosampler Upgrade Guide 19
Figure 19. View of injection port, transfer tube, and injection valve
5. Send the XYZ arm to the back of the tray compartment:
• For ChromQuest
From the Instrument window, choose Control > Instrument Status. Click the Surveyor AS tab. Click Diagnostics, and then click the Direct Control tab to open the Direct Controls dialog box. Select the Position Arm to Access Tray direct command, and then click Submit.
• For Xcalibur
From the Instrument Setup window, choose Surveyor AS > Direct Control to open the Direct Commands dialog box. Select the Position Arm to Access Tray direct command, and then click Apply.
6. Remove the aluminum retainer from the wash station housing. Pull the retainer forward until the circular notch meets the screw, and then pull the retainer upward to remove it from the autosampler.
Washstation
Injection port
Transfer tube(with fittingremoved)
4 Replacing the Transfer Tubing and the Injection PortStep 2: Installing the New Transfer Tubing and Injection Port
20 Surveyor Autosampler Upgrade Guide Thermo Scientific
7. Pull the injection port out of the autosampler (see Figure 20). Set the spring aside. You reuse it when you install the new injection port.
Figure 20. Removing the needle port retainer
Step 2: Installing the New Transfer Tubing and Injection PortTo install the new transfer tubing, injection port, and retainer clip
1. Slip the spring onto the transfer tube (see Figure 21).
2. Screw the injection port onto the transfer tube fitting, and then slip the spring over the bottom of the injection port.
Slot for retention clip
Washstation
PEEK injection port
Spring
Retaining clipfor PEEKinjection port
4 Replacing the Transfer Tubing and the Injection PortStep 2: Installing the New Transfer Tubing and Injection Port
Thermo Scientific Surveyor Autosampler Upgrade Guide 21
Figure 21. Connecting the transfer tubing to the injection port
3. Insert the injection port with spring into the circular opening located in front of the Wash Station (see Figure 20 and Figure 22).
Figure 22. View of the injection port for the Surveyor Autosampler Plus
Injection port
Transfer tube fitting
Spring
Assembled
22μL
Slot for the injection port retention clip
Washstation
Injection port
Alignment screw
Hole in wall between components
Transfer tubing
4 Replacing the Transfer Tubing and the Injection PortStep 2: Installing the New Transfer Tubing and Injection Port
22 Surveyor Autosampler Upgrade Guide Thermo Scientific
4. Align the retention clip with the slot located in front of the wash station (see Figure 22).
5. Using the retention clip to push the injection port down as you align the circular cutout in the retention clip over the alignment screw, insert the end of the retention clip into the wash station slot as far as it will go (see Figure 23).
Figure 23. Installing the retention clip for the injection port
6. Thread the free end of the transfer tube through the hole in the wall that separates the tray compartment and the column oven compartment, and then attach it to port 2 of the Valco injection valve (see Figure 24).
IMPORTANT Remember to configure the “Dead Volume” of the transfer tubing.
Slot in wash station
Injection port
Alignment screw
Retaining clip shown:- Aligned with slot in wash station- Pushing down on injection port- Aligned over screw
4 Replacing the Transfer Tubing and the Injection PortStep 2: Installing the New Transfer Tubing and Injection Port
Thermo Scientific Surveyor Autosampler Upgrade Guide 23
Figure 24. View of the transfer tubing connected to the injection valve
7. Remount the syringe drive assembly to the autosampler.
22µL
Port 2 ofValco injection valve
Transfer tube
Label on transfer tubing, for its “Dead Volume”
Thermo Scientific Surveyor Autosampler Upgrade Guide 25
5
ChromQuest Upgrades
If you are using the ChromQuest data system to operate your autosampler, you must install one of the ChromQuest data system service packs provided in the upgrade kit, and you must upgrade the firmware version of the autosampler.
Firmware upgrade files have a .bin extension. The Surveyor Firmware Upgrade Utility enables you to download firmware files to your Surveyor instrument modules.
For the ChromQuest data system, the firmware files and the Surveyor Firmware Upgrade utility reside on the ChromQuest CD. Because they are not automatically installed during the installation of the data system, you must copy them to an appropriate folder on your PC.
This chapter contains the following sections:
• Installing the Update Files for ChromQuest
• Updating the Firmware for the Surveyor Autosampler Plus
Installing the Update Files for ChromQuestYou can find the firmware files for the Surveyor Modules on the ChromQuest CD. These files are not automatically loaded to your computer when you install ChromQuest.
To install these files
1. Insert the ChromQuest CD into your CD-ROM drive.
2. From the Windows™ Start menu, double-click My Computer.
3. Right-click the CQ icon to open the shortcut menu.
4. Choose Explore from the shortcut menu to access the contents of the CD.
5. Copy the contents of the Firmware folder to your ChromQuest directory.
5 ChromQuest UpgradesUpdating the Firmware for the Surveyor Autosampler Plus
26 Surveyor Autosampler Upgrade Guide Thermo Scientific
Updating the Firmware for the Surveyor Autosampler PlusTo download firmware to the Surveyor Autosampler Plus
1. Prepare your system before you start the Surveyor Firmware Upgrade Utility application:
a. Make sure you have the Surveyor AS firmware files that you intend to download and the Surveyor Firmware Upgrade Utility on your computer. See “Installing the Update Files for ChromQuest” on page 25.
b. Make a note of the current settings of the rotary switches on the back panel of the Surveyor Autosampler Plus. You return the switches to these settings at the conclusion of this procedure.
c. Make sure that your autosampler is connected to your data system computer with the standard Ethernet connection.
d. Turn off the power to the Surveyor Autosampler Plus.
e. Use a small flat-head screwdriver to set the rotary switches on the back panel of the autosampler to 00.
f. Turn the autosampler power on. The Comm LED blinks amber to confirm that the Surveyor Autosampler Plus is configured for downloading the firmware.
2. Start the Surveyor Firmware Upgrade Utility by double-clicking the Surveyor Firmware Upgrade Utility application. The Surveyor Firmware Upgrade Utility window appears (see Figure 25).
Figure 25. Surveyor Firmware Upgrade Utility window with the Surveyor Autosampler device selected
5 ChromQuest UpgradesUpdating the Firmware for the Surveyor Autosampler Plus
Thermo Scientific Surveyor Autosampler Upgrade Guide 27
3. In the Surveyor Firmware Upgrade Utility window, initiate communication between the utility and the Surveyor Autosampler Plus:
a. In the Device Type box, select the Surveyor Autosampler option button.
b. Click Connect.
The status display at the bottom of the Surveyor Firmware Upgrade Utility window indicates that a connection has been made (see Figure 26).
Figure 26. Surveyor Firmware Upgrade Utility, showing a successful connection to the autosampler
4. Under File Names, select the appropriate firmware files for the Surveyor Autosampler Plus:
a. Use the ROM Browse button to select the ROM file (ROM*.bin). The filename appears in the ROM box (see Figure 27).
b. Use the App1 Browse button to select the APP1 file (AS*.bin). The filename appears in the App1 box (see Figure 27).
IMPORTANT Do not interrupt the firmware download process. After you click the Connect button, do not turn off the power to the Surveyor Autosampler Plus or close the Surveyor Firmware Upgrade Utility window until the download process is finished. If you terminate the connection during the download process or lose power to the autosampler, contact your local Thermo Fisher Scientific representative. The firmware board must be reprogrammed.
5 ChromQuest UpgradesUpdating the Firmware for the Surveyor Autosampler Plus
28 Surveyor Autosampler Upgrade Guide Thermo Scientific
c. Use the App2 Browse button to select the APP2 file (AS*.bin). The filename appears in the App2 box (see Figure 27).
Figure 27. Surveyor Firmware Upgrade Utility, showing selection of Surveyor AS firmware files
5. After you select the appropriate firmware files, click Download and wait for the download to finish. The utility notifies you when the download is complete (see Figure 28).
CAUTION You must select a ROM file, an APP1, and an APP2 file. Your Surveyor AS will not work properly if these files are not downloaded together.
Note Once the message Download Completed Successfully appears, you can safely turn off the power to the autosampler and close the Surveyor Firmware Upgrade Utility.
5 ChromQuest UpgradesUpdating the Firmware for the Surveyor Autosampler Plus
Thermo Scientific Surveyor Autosampler Upgrade Guide 29
Figure 28. Surveyor Firmware Upgrade Utility, showing the ROM and AS* .bin files selected
6. To return to normal operation after you finish upgrading your firmware:
a. Close the Surveyor Firmware Upgrade Utility to terminate the connection with the Surveyor Autosampler Plus.
b. Turn the Surveyor Autosampler Plus power off.
c. Set the rotary switches back to their original settings.
d. Turn the Surveyor Autosampler Plus power on to resume normal operation.
CAUTION Turn the Surveyor Autosampler Plus power off before adjusting the rotary switches.
Note The Surveyor Autosampler Plus will not connect to your data system when the rotary switch address is set to 00.
Thermo Scientific Surveyor Autosampler Upgrade Guide 31
6
Configuring the Surveyor Autosampler Plus
When you configure the Surveyor Autosampler Plus from either the ChromQuest or Xcalibur data system, you must enter the correct values or select the correct settings for the following:
• “Dead Volume” of the transfer tubing
The transfer tubing has a label that specifies its internal volume. The internal volume of the transfer tubing is a value that you type in the Dead Volume box.
• Sample loop size
The Valco injection valve is shipped with a 25 μL sample loop. For the ChromQuest data system, type 25 in the Loop Size box. For the Xcalibur data system, type 25 in the Sample Loop Size box.
• Input signal polarities
If your Surveyor Stack contains a Surveyor LC Pump Plus, a Surveyor MS Pump, or a Surveyor MS Pump Plus, you must select the check boxes for the input signals. For the ChromQuest data system, select the Run Starts When Pump Ready and the Inject When Inject Hold Signal Is “Off ” check boxes. For the Xcalibur data system, select the Pump Ready Active High and the Injection Hold Release Active High check boxes.
Thermo Scientific Surveyor Autosampler Upgrade Guide 33
7
Completing the Upgrade
Your upgrade kit contains an adhesive label that you apply to the back panel of the Surveyor Autosampler Plus once you complete the installation.
If you are operating the autosampler from the ChromQuest data system, you must also install ChromQuest 4.0 SP1, ChromQuest 4.1 SP2, or ChromQuest 4.2 and upgrade the firmware for the autosampler. See Chapter 5, “ChromQuest Upgrades.”
Install the adhesive label as shown in Figure 29.
Figure 29. Back panel of the Surveyor Autosampler
Now that you have completed the upgrade, complete a brief survey about this document by clicking the link below. Thank you in advance for your help.
i
I
DISCONNECT INPUT POWER BEFORE OPENING COVER
SERVICE BY QUALIFIEDPERSONNEL ONLY
This device complies with FCC Rules, part 15.Operation is subject to the following two conditions:
(1) This device may not cause harmful interference and(2) This device must accept any interference received,
including interference that may cause undesired operation.
This product is covered by one or more of the following patents:4957009, 5238654, 4953075, 5029065
Made in U.S.A.
I
Thermo Scientific Surveyor Autosampler Upgrade Guide 35
I
Aadhesive label for upgraded autosampler 33
Bback panel of autosampler (figure) 33bin files 25
Ccable clamp
attaching to the Wash Bottle bracket 10figure 11
CAUTIONSWear gloves to avoid skin contact with solvents. 6
ChromQuestGo to Home direct command 11Position Arm to Access Tray direct command 5Position Arm to Replace Needle direct command 4
ChromQuest CDfirmware files 25upgrade utilities 25
configuring the Surveyor Autosampler Plus 31Converter board, updating firmware 26
Ddead volume
configuring 31label on transfer tubing (figure) 23
drive shaft orientation (figure) 15
Ffigures
inserting the needle assembly into the needle mount 8needle assembly 3needle removal position 5needle tubing assembly 4needle tubing guide 10orientation of Valco Injection valve for installation 15PVC retainer for needle tubing 6
wall bracket for needle tubing 6file types, bin 26firmware downloads
cable connections 26file types 25rotary switch settings 26
Iinjection port
installing 20removing 20
injection valveinstalling 15removing 13
Mmoving the XYZ arm
to the back of the tray compartment 5to the needle removal position 4
Nneedle assembly
figure 3installing 7
needle port, replacing 17needle removal position, figure 5needle tubing assembly
figure 4securing 8
needle tubing guide, figure 10
Ppart numbers 1PVC retainer for needle tubing 6
Rreplaceable parts 1
Index
36 Surveyor Autosampler Upgrade Guide Thermo Scientific
Index: S
Rheodyne injection valvefigure 14removing 13
Ssample loop size
configuring 31note 16
securing the needle tubing 8signal polarities, configuring 31Surveyor Firmware Upgrade Utility 26syringe drive assembly, removing 17syringe valve, figure 7
Ttools required to remove injection valve 13transfer tube
installing 20removing 18
VValco injection valve
figure 16installing 15
Wwall bracket for needle tubing, figure 6
XXcalibur
Needle Removal direct command 4Position Arm to Access Tray direct command 5Set Arm to Home Position direct command 11
XYZ armmoving to the back of the tray compartment 5moving to the front center of the tray compartment 4