Surveyor c.v

  • Published on
    21-May-2015

  • View
    10.438

  • Download
    2

Embed Size (px)

DESCRIPTION

Surveyor & QUANTITY SURVEYOR

Transcript

  • 1. CURRICULUM VITEPERSONAL INFORMATIONName: Ragab Atta RagabNationality: EgyptianCurrent address: Benha / Emam st. no16Tel.no:01066010539E.mail: ragab_ata@yahoo.comDate of birth : 08/06/1973Marital status: MarriedMilitary status : FinishedEducation : Zagazig UniversityB.SC. Sciences (math & computer dep.)Languages: -Arabic (mother tongue) -English (good)SKILLS1- User for total station (LEICA) LEICA 1100 & LEICA 1800 & LEICA 1103 & LEICA 1203 & LEICA 12012- Quantities survey for excavations & backfilling uses computerprograms Autodesk Land Desktop program AutoCAD program Surfer program Microsoft windows Microsoft OfficePage 1 of 12

2. Experiences11-2011 ~ Till Now(Besix-Orascom JV, Egypt)Project:El-Ain El sokhna Supercritical power plantConsultant: PGESCO ENGINEERING AND CONSULTANTS (A & A)Owner:East Delta Electricity Production Company (EDEPC)Position : SurveyorDUTIES: Prepare site layout & surveying work. The scope of civil works includes the construction of 3 pipelines totaling a length of approximately 5.1 km Prepare shop drawing. Controlling execution of work: (Formwork, excavations, and backfilling) Make a surveying in each area. Issue inspection and test plan. Helping the site team and in preparing work procedure and method statement.Page 2 of 12 3. 11-2010 ~ 11-2011:(ARCHIRODON for Construction (Overseas) Co. S.A)Project: Damietta cycle power plant 500mw.Consultant: Power Generation Engineering and Services CompanyPGESCoOwner:East Delta Electricity Production Company (EDEPC) 4 Gas Turbine (500 MW). Piles . Civil . Infra Structure.Position : Survey SeniorDUTIES: Prepare site layout & surveying work. Prepare shop drawing. Controlling execution of work: (Formwork, excavations, and backfilling) Make a surveying in each area. Issue inspection and test plan. Helping the site team and in preparing work procedure and method statement.Page 3 of 12 4. 05-2010 ~ 11-2010:(ARCHIRODON for Construction (Overseas) Co. S.A)Project:El-Ain El sokhna Supercritical power plant(Piling works)Consultant: PGESCO ENGINEERING AND CONSULTANTS (A & A) Owner: East Delta Electricity Production Company (EDEPC)Position : Survey SeniorDUTIES: Prepare site layout & surveying work. Prepare shop drawing. Controlling execution of work: (Formwork, excavations, and backfilling) Make a surveying in each area. Issue inspection and test plan. Helping the site team and in preparing work procedure and method statement.Page 4 of 12 5. 05-2009 ~ 04-2010 : El- Nasr Building & Construction Company " EGYCO "Project:) ( Consultant: Owner:) ( Project description: 64 1 5 ) ( Position : Survey SeniorDUTIES: Prepare site layout & surveying work. Prepare shop drawing. Controlling execution of work: (Formwork, excavations, and backfilling) Make a surveying in each area. Issue inspection and test plan. Helping the site team and in preparing work procedure and method statement.Page 5 of 12 6. 09-2007 ~ 03-2009 :(ARCHIRODON for Construction (Overseas) Co.S.A)(Archirodon Arab Contractor- JV)Project:New container terminal and Quay wall Damietta port EgyptConsultant: HPC Hamburg Port Consulting SELLHORN INGENIEURGESELLSCHAFTOwner:Damietta international ports S.A.E.Project description: Quay wall for 1400m length with 38m height Container terminal area (280000 m2) Administration and amenities buildings and utilitiesPosition : Survey SeniorDUTIES: Prepare site layout & surveying work. Prepare shop drawing. Controlling execution of work: (Formwork, excavations, and backfilling) Make a surveying in each area. Issue inspection and test plan. Helping the site team and in preparing work procedure and method statement.Page 6 of 12 7. 04-2005~ 05-2007: Project:Constructing of village at (Sahl-Eltena)Consultant:Development of Sinai instrumentOwner:Ministry of irrigationProject description: Constructing village on 240,000 m2 includes 350 cabins Constructing a main building for its village Constructing its services (roads & pipe lines & elevated tanketc.)Position : SurveyorDUTIES: Prepare site layout & surveying work. Prepare shop drawing. Controlling execution of work:(Formwork, excavations, and backfilling) Make a surveying in each area. Controlling assembling of pipelines and its joints. Issue inspection and tests of pipelines and elevated tank. Helping the site team and supervisor in preparing work procedure and method statement. Make a restrict and invoice with main contractor and subcontractor.Page 7 of 12 8. 01-2004 ~ 02-2005: (El salam-Misr for trading and contracting)Project:Livestock terminal handing facility & infra structureConsultant:Sabbour for consultantsOwner:Sokhna port development co. (SPDC)Project description: Live stock terminal area (206080 m2). Two roads (walk way & paving road). Cover areas by steel structure. Make water trough and footer trough for live stock terminal.Position : Survey SeniorDUTIES: Make leveling for area for live stock terminal Issue inspection for leveling and compaction test. Maintain document register in connection with quality records. Make leveling for two roads (walk way & paving road). Helping the site team in preparing work procedure and method statement. Make a restrict and invoice with main contractor and subcontractor.Page 8 of 12 9. 01-2002 ~ 12-2003:(ARCHIRODON for Construction (Overseas) Co. S.A)Project:Port Said East Container TerminalConsultant:Posford Duvivier Haskoning, Pacer, U.KOwner:Suez Canal Container Terminal S.A.EProject description: Container terminal area (400000 m2) Administration and amenities buildings Concrete paving blocks (360000 m2) Sand cement under concrete paving block.Position : Survey SeniorDUTIES: Prepare site layout & surveying work. Prepare shop drawing. Controlling execution of work: (Form work, excavations, backfilling Make a surveying in each area. Issue inspection and test plan. Helping the site team and in preparing work procedure and method statement. Make a restrict and invoice with main contractor and subcontractor.Page 9 of 12 10. 10-2000 ~ 12-2001: () Project:Preparing the sites and its roads of drilling for natural gasOwner: Project description: Yard of drilling of ten sites (180000 m2) Roads service for this yards (50.0 km) Backfilling of coarse aggregate with thick (40 cm) Pipe lines services.Position : SurveyorDUTIES: Prepare site layout & surveying work. Make site leveling of areas and backfilling of it by coarse aggregate to prepare it for drilling. Make a surveying in each area and roads. Issue inspection and surveying check. Helping the site team in preparing work procedure and method statement. Make a restrict and invoice with main contractor and subcontractor.Page 10 of 12 11. 05-1999~09-2000:() Project:Intakes 3&5&7 in El-Salam CanalConsultant:Development of Sinai instrumentOwner:Ministry of IrrigationProject description: 3 pump stations Main Pipes lines & sub main Pipes lines for El-Salam canal Roads and excavations& backfilling worksPosition : SurveyorDUTIES: Prepare shop drawing. Controlling execution of work: (Form work, excavations, backfilling) Controlling assembling of pipelines and its joints. Issue inspection and tests of pipelines and elevated tank. Supervising for roads (cut & fill) and pipe lines connected with intakes. Make coarse agg. For roads with thick. (30.0 cm)Page 11 of 12 12. 02-1998~04-1999: Project:Group of resident buildingOwner: Project description: Group of resident building Infrastructure of resident building Make a landscape of resident buildingPosition : SurveyorDUTIES: Prepare site layout & surveying work. Controlling execution of work: (Form wok, excavations, backfilling) Supervising of group of resident building. Supervising of Road service of its group and green area with parking. Helping the site team in preparing work procedure and method statement. Make invoice with main contractor.Page 12 of 12