SUPPORTING REPORT K

FACILITY PLANNING / COST ESTIMATE

Page 2: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

K - i

SUPPORTING-K FACILITY PLANNING / COST ESTIMATE

TABLE OF CONTENTS

Page

1. Introduction ......................................................................................................... K-1

2. Facility Planning ................................................................................................. K-1

3. Construction Plan ............................................................................................... K-3

3.1 Basis of Construction Plan .................................................................................... K-3

3.1.1 Construction Period ...................................................................................... K-3

3.1.2 Procurement of Works .................................................................................. K-3

3.2 Calculation of Workable Days .............................................................................. K-3

3.3 Construction Plan .................................................................................................. K-8

4. Maintenance Plan ............................................................................................... K-10

5. Basis of Cost Estimate ........................................................................................ K-11

6. Unit Price / Cost .................................................................................................. K-12

6.1 Unit Price .............................................................................................................. K-12

6.2 Unit Construction cost .......................................................................................... K-14

7. Project Cost ......................................................................................................... K-14

8. Implementation Schedule ................................................................................... K-15

9. Disbursement Schedule ...................................................................................... K-16

10. Note of Supervision of Construction Work ........................................................ K-16

Page 3: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

K - ii

SUPPORTING-K FACILITY PLANNING / COST ESTIMATE

LIST OF TABLES

Table K.3.1 Number of Rainfall days ...................................................................... K-4

Table K.3.2 Monthly Rainfall (Tegucigalpa, 1963 – 1999) ..................................... K-5

Table K.3.3 Rainfall per One Rainy Day................................................................... K-6

Table K.3.4 Quantity of Structure Measures ............................................................. K-8

Table K.3.5 Quantity of Non-Structure Measures ..................................................... K-8

Table K.6.1 labor Cost of Construction Work in Tegucigalpa................................... K-12

Table K.6.2 Institution Payments added to Basic wages for Labors ........................ K-13

Table K.6.3 Quoted Unit prices of Construction Materials ....................................... K-13

Table K.6.4 Unit Construction Cost ......................................................................... K-14

Table K.7.1 Project Cost .......................................................................................... K-14

Table K.7.2 Breakdown of Project Cost .................................................................. K-18

Table K.8.1 Implementation Schedule ..................................................................... K-15

Table K.8.2 Operating Schedule (1/2) ....................................................................... K-19

Table K.8.3 Operating Schedule (2/2) ....................................................................... K-20

Table K.9.1 Disbursement Schedule ........................................................................ K-16

Table K.9.2 Disbursement Schedule Of O/M cost ................................................... K-16

Page 4: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

K - iii

SUPPORTING-K FACILITY PLANNING / COST ESTIMATE

LIST OF FIGURES

Figure K.2.1 Shaft Works (1) ..................................................................................... K-21

Figure K.2.2 Shaft Works (2) ..................................................................................... K-22

Figure K.2.3 Anchor Works for Right Bank at Berrinche (1) .................................. K-23

Figure K.2.4 Anchor Works for Right Bank at Berrinche (2) .................................. K-24

Figure K.2.5 Anchor Works for Right Bank at Berrinche (3) .................................... K-25

Figure K.2.6 Replacement of Mallol Bridge (1) ...................................................... K-26

Figure K.2.7 Replacement of Mallol Bridge (2) ...................................................... K-27

Figure K.2.8 Outlet of Pescado Lake ......................................................................... K-28

Figure K.3.1 Transportation of the spoil .................................................................... K-29

Figure K.3.2 Reinforcement plan of Mallol Bridge ................................................... K-30

Figure K.3.3 Counter Weight Fill .............................................................................. K-31

Page 5: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

K - iv

Page 6: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

Supporting-K : Facility Planning / Cost Estimate

K - 1

SUPPORTING K FACILITY PLANNING / COST ESTIMATE

1. INTRODUCTION

Flood and landslide damage mitigation measures consist of structure measures and non-structure measures. The structure measures for the Master Plan and Priority Project consist of flood damage mitigation works and landslide damage mitigation works.

Flood damage mitigation works consist of earth excavation, rock excavation, revetment, parapet wall, shaft works, counterweight fill, anchor works, spoil bank, Mallol bridge (replacement), Mallol bridge (reinforcement), Pescado lake outlet improvement, replacement of sewage pipe, and replacement of water supply. Landslide damage mitigation works consist of earthwork and drainage facility works for Berrinche, Reparto and Bambu sites.

Non-structure measures consist of watershed management, warning system for flood damage mitigation, and resettlement and warning system for landslide damage mitigation.

2. FACILITY PLAN

(1) Revetment

Revetment along the river is needed to stabilize the bank against erosion and sliding where built-up area is just next to the river. Revetment works are divided into following three types.

1) Revetment (A): Revetment (A) is a stone-masonry type to be constructed at reach (C40-C60) in the priority project. The revetment (A) is 8m heights, and total length of revetment (A) is about 2.5km.

2) Revetment (B): Revetment (B) is a stone-masonry type to be constructed at part of revetment construction in Master Plan excluding part of between C40 and C60. The revetment (B) is 8m heights, and total length of revetment (B) is about 5.2km.

3) Gabion: Gabion is a gabion mattress type. Gabion mattress is 0.3m thicknesses, and total length of gabion is about 5.2km Gabion mattress is placed temporarily against bank erosion at part of revetment (B) construction in Master Plan excluding part of between C40 and C60. The stone of Gabion mattress is reused as a material of Stone-masonry of revetment (B).

(2) Spoil-Bank

Planned spoil-bank is located at C0-C10. River excavation volume of Priority Project is about 709,000m3. Excavation volume of Repart landslide site is about 40,000m3. Berrinche counterweight fills volume is 40,000m3. Therefore, 709,000m3 volume is transported to the spoil-bank. There are two spoil-banks. Downstream spoil-bank is about 135,000m2 and upper stream spoil-bank is about 63,000m2. Downstream spoil-bank is used for Priority Project. Gabion wall of 4m high surrounds the bank. 400m revetments for chicken farms are planned. 300m parapets are also planned for chicken farms of upper reach.

(3) Shaft works for small-scale landslide near Berrinche landslide

Shaft works on the left bank side planned L=387m to C47-C50 (52 peaces). The paling is

Page 7: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

Supporting-K : Facility Planning / Cost Estimate

K - 2

made the reinforced concrete of the diameter 4m and 16m in length. The paling arrangement is assumed to be one row along the river improvement route. (Figure K.2.1)

Drainage boring (D10cm, L=50m) is installed at 6m intervals for lowering of ground-water level against the stability of small-scale landslide. (Figure K.2.2)

(4) Anchor works for Right Bank at Berrinche

Anchor works were planned against right bank at Berrinche because of following limit. (Figure K.2.3, Figure K.2.4, Figure K.2.5)

1) There is a boundary line between river area and commercial area by the Planning Department of Tegucigalpa City.

2) Construction of common revetment is difficult because of no space to construct. There are structures such as a church, a school and a police station in close proximity.

3) The height of the cantilever wall becomes 15m in including footing thickness, and it is not allowable, because that height is more than limit of height of cantilever wall (10m).

And, there are school, church and the police behind the revetment. Therefore, stone masonry and cantilever wall types are impossible to construct without destruction the foundation of those structures. Only concrete wall with earth retention by tieback anchor is possible to construct.

4) The earth retention by tieback anchor is needed as the earth retaining under excavation and it is used as permanent anchor after construction works.

Anchor works is 120m long at C47-C48. Its structure is steel frame concrete wall with 1m thickness. H steel frame is type of H300 x B300. Anchor materials remain at under ground of adjacent structures after construction wall.

(5) Replacement of Mallol Bridge

Planned new bridge is a solid-spandrel arch type and has 4 piers, like Carias Bridge. While the existing flow area of Mallol Bridge is only about 300m2, the planned flow area is 480 m2. (Figure K.2.6, Figure K.2.7)

(6) Outlet of the Pescado Lake

Following counter measures are planned in order to prevent reduce outlet width of the Pescado Lake. (Figure K.2.8)

1) Placing of gabion-mattress, which is 15m wide, 60m long and 0.5m thick, at outlet. 2) Placing of gabion wall, which is 2m wide, 3m high and 60m long, at left and right slope

sides. 3) Cut of slope, which is in danger of collapse at right side slope. 4) Make of spoil bank, 50m lengths, 10m widths and 2m height for cutting soil of slope. 5) Make of stone-masonry wall, which is 1m widths, 2m height and total 70m lengths, for

spoil-bank.

(7) Remove of Water Supply and Sewage pipes

Water supply pipes cross the river. Elevation of those pipes is higher than planned riverbed elevation. Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There are sewage pipes in excavation area of Master Plan. But some pipes are not used. Elevation of those pipes is not sure. Therefore, sewage pipes removing of about 1,100m (20 % of total length of sewage pipes in the reach of

Page 8: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

Supporting-K : Facility Planning / Cost Estimate

K - 3

C27-C93) are planned in Master Plan Project.

3. CONSTRUCTION PLAN

3.1 BASIS OF CONSTRUCTION PLAN

The construction plan for the execution of Master Plan and Priority Project was prepared on the basis of following assumption and consideration.

3.1.1 CONSTRUCTION PERIOD

Construction period of the Master Plan was assumed to be 15 years in due consideration of quantity of works, funding and realization of flood control effects at early stage. Construction of the Priority Project will be carried out in 4 years at the initial stage of the Master Plan.

3.1.2 PROCUREMENT OF WORKS

Construction works were assumed to be procured through a package contract system by international tendering.

3.2 CALCULATION OF WORKABLE DAYS

(1) Public Holidays

Working days for construction works are counted by the calendar of year 2001 in accordance with the custom and public holidays in the Honduran society.

The national holidays in Honduras of this year (2001) are as follows.

① 1 January New Year’s Day

② 12 April Maundy Thursday

③ 13 April Good Friday

④ 1 May Labour Day

⑤ 15 September Independence Day

⑥ 3 October Morazán Day

⑦ 12 October Columbus Day

⑧ 25 December Christmas Day

(2) Holidays and Half-holidays

Saturdays are half-holidays and Sundays are full-holidays based on the custom of Honduras. While, the next Saturday of Good Friday is treated as a working day.

(3) Working Days

Working days are counted on the calendar as follows.

① from May to October: 141 days (23.5 days/month)

② from November to April: 138 days (23.0 days/month)

③ Average through a year: 23 days/month *Daily working hour is assumed to be eight (8) hour.

Page 9: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

Supporting-K : Facility Planning / Cost Estimate

K - 4

(4) Number of Rainfall days 1) Rainfall Information

The study is based on the information of number of days of rainfall (over 10 mm, Table K.3.1) of each month and monthly rainfall data in Tegucigalpa (Table K.3.2) during the period from 1963 to 1999. The information of rainfall is divided into the rainy season (May – October) and the dry season (November – April) in the following study.

2) Rainfall

Yearly rainfall in Tegucigalpa shows the extent within 500 – 1,300mm and amount of annual mean rainfall is given as about 900mm/year. Most part of the rainfall occurs in the rainy season from May to October and it has about 800 mm of precipitation in the half year of rainy season. The precipitation in the dry season from November to April is about 100 mm.

3) Number of Rainfall Days

Number of rainfall days (over 10 mm) of each month shows obvious difference between rainy season and dry season. In rainy season, rainfall day counts for 3 – 6 days per month and the number of days of rainfall in a half year shows 26.4 days. In dry season, days of rainfall counts for 1 – 2 days and the number of days of rainfall is 7.6 days in the average of 38 years.

4) Rainfall per One Rainy Day

Rainfall per one rainy day is calculated using combination of the data of monthly rainfall and number of rainy days and each month, and the results are 19 – 26 mm/day in rainy season and 12 – 26 mm/day in dry season (Table K.3.3). The averaged rainfall in one rainy day is seen rather high according to the results.

Table K.3.1 Number of Rainfall Days ( o v e r 1 0 m m / d a y ; T E G U C I G A L P A , 1 9 6 3 - 1 9 9 9 ) U n i t : d a y

Y e a r R a i n y S e a s o n D r y S e a s o n/ M o n t h 5 6 7 8 9 1 0 1 1 1 2 1 2 3 4

- - - - - - - - 0 0 0 01 9 6 3 - 6 4 6 5 4 2 5 4 4 0 0 0 0 01 9 6 4 - 6 5 4 8 7 2 5 2 1 0 0 0 0 11 9 6 5 - 6 6 6 1 0 1 7 4 0 1 0 0 2 11 9 6 6 - 6 7 1 0 6 5 2 6 3 0 0 0 0 0 31 9 6 7 - 6 8 1 5 2 0 5 1 0 0 0 0 0 01 9 6 8 - 6 9 1 0 7 0 2 8 2 1 0 0 0 1 11 9 6 9 - 7 0 5 1 1 0 6 1 0 6 1 0 0 0 0 21 9 7 0 - 7 1 5 2 6 5 9 2 2 0 0 0 0 01 9 7 1 - 7 2 6 1 1 4 5 4 1 0 0 0 0 11 9 7 2 - 7 3 5 4 0 0 0 1 0 1 0 0 0 31 9 7 3 - 7 4 3 5 2 5 7 1 0 0 0 0 0 0 01 9 7 4 - 7 5 5 7 3 2 6 4 0 0 0 0 0 11 9 7 5 - 7 6 5 0 3 2 1 3 5 2 0 0 0 0 11 9 7 6 - 7 7 3 1 2 0 1 0 4 1 1 0 0 0 11 9 7 7 - 7 8 5 4 1 1 4 1 1 0 1 0 0 11 9 7 8 - 7 9 7 3 4 1 5 0 0 0 0 0 1 51 9 7 9 - 8 0 1 7 5 2 5 8 2 1 0 0 0 21 9 8 0 - 8 1 7 4 3 2 7 5 0 0 0 1 1 11 9 8 1 - 8 2 6 7 1 6 4 2 1 1 0 0 0 11 9 8 2 - 8 3 7 6 0 1 6 3 0 0 0 0 0 01 9 8 3 - 8 4 0 6 1 4 4 2 3 0 0 0 2 11 9 8 4 - 8 5 3 6 6 3 8 4 1 0 0 0 0 31 9 8 5 - 8 6 1 4 3 1 1 5 0 0 0 0 0 01 9 8 6 - 8 7 6 0 0 1 2 0 1 0 0 0 1 01 9 8 7 - 8 8 3 7 3 2 3 0 0 0 0 0 1 21 9 8 8 - 8 9 6 9 3 9 8 5 1 0 0 0 0 11 9 8 9 - 9 0 4 3 3 5 1 4 2 1 0 0 0 0 01 9 9 0 - 9 1 4 3 0 0 4 1 3 0 0 0 0 11 9 9 1 - 9 2 4 4 0 0 2 6 0 1 0 0 1 11 9 9 2 - 9 3 2 7 1 0 4 3 0 0 0 0 1 01 9 9 3 - 9 4 1 0 7 1 0 7 4 0 0 0 0 0 11 9 9 4 - 9 5 3 2 1 0 5 4 1 0 0 0 0 21 9 9 5 - 9 6 4 6 4 1 4 5 3 0 2 0 0 0 11 9 9 6 - 9 7 4 1 5 8 3 6 0 0 0 0 2 01 9 9 7 - 9 8 3 8 2 2 5 3 3 0 0 0 0 01 9 9 8 - 9 9 4 3 3 4 3 1 5 1 0 0 0 0 0

2 5 2 3 1 0 4A v e r e g e 4 . 7 5 . 3 3 . 0 3 . 4 5 . 9 4 . 1 1 . 6 1 . 1 1 . 0 1 . 0 1 . 3 1 . 6

S u b - t o t a l o f R a i n y S e a s o n 2 6 . 4 S u b - t o t a l o f D r y S e a s o n 7 . 6

N o t e : B l a n k s p a c e s s t a n d f o r t h e l a c k o f m e a s u r e d r e c o r d

1 9 6 3

1 9 9 9

Page 10: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

Supporting-K : Facility Planning / Cost Estimate

K - 5

Table K.3.2 Monthly Rainfall (Tegucigalpa, 1963 – 1999)

(TEGUCIGALPA, 1963 - 1999) Unit: mmYear Rainy Season Dry Season

/Month 5 6 7 8 9 10 11 12 1 2 3 4- - - - - - - - 5.2 6.4 2.3 13.5

1963 - 64 160.5 147.2 163.1 66.8 117.7 97.6 101.1 1.3 1.5 1.6 2.5 0.51964 - 65 111.1 255.2 168.5 70.3 176.4 63.5 38.9 2.8 2.1 5.9 0.0 24.91965 - 66 156.6 90.3 35.5 39.0 262.0 112.8 20.3 16.2 2.5 3.6 35.1 33.21966 - 67 268.5 180.6 131.6 186.6 14.3 4.9 14.3 4.9 12.3 4.1 15.0 103.91967 - 68 54.9 143.9 61.6 34.9 155.2 40.5 8.5 6.0 3.3 0.5 0.3 2.81968 - 69 300.7 242.5 26.1 82.5 237.8 86.5 29.5 12.6 17.4 1.8 19.1 27.11969 - 70 177.3 266.5 53.4 168.1 262.3 179.2 22.0 4.9 9.3 1.3 0.0 90.41970 - 71 112.7 67.4 143.0 101.1 293.1 109.0 53.3 22.1 4.7 4.7 0.0 10.11971 - 72 151.3 38.0 39.5 128.7 158.9 174.2 33.0 6.7 3.6 3.5 0.0 14.71972 - 73 136.3 100.5 33.1 21.3 39.0 58.4 26.2 16.2 0.6 0.9 1.3 85.91973 - 74 135.0 137.6 91.9 104.5 224.6 262.3 20.6 12.7 1.1 2.6 0.0 2.21974 - 75 214.3 168.6 82.0 76.5 200.4 104.1 7.2 1.6 12.2 2.5 5.8 20.01975 - 76 189.6 10.4 57.0 83.9 340.8 195.3 77.2 0.5 3.3 0.3 0.0 25.21976 - 77 127.2 295.5 29.4 38.2 32.7 158.2 23.2 16.5 0.0 8.3 0.0 56.31977 - 78 194.4 211.6 25.8 41.5 134.8 42.3 45.6 15.8 17.2 0.8 11.0 43.31978 - 79 144.6 109.4 124.8 91.5 145.4 23.8 4.5 14.2 1.0 2.6 15.5 130.71979 - 80 68.0 230.6 137.7 117.2 175.8 162.0 115.1 23.9 5.7 0.0 0.0 55.81980 - 81 199.7 164.8 133.2 50.8 204.0 142.4 32.5 6.6 0.8 33.8 60.4 25.31981 - 82 166.6 254.9 70.7 210.0 147.8 81.3 17.2 44.3 3.7 3.3 7.6 32.51982 - 83 185.4 155.3 46.3 34.0 154.1 76.7 12.3 6.3 3.2 3.9 17.4 4.61983 - 84 16.5 195.8 48.2 91.6 166.4 78.3 81.1 11.5 13.0 8.0 34.8 30.11984 - 85 149.2 173.3 170.7 142.7 223.5 120.2 15.0 3.6 4.5 3.7 2.5 120.41985 - 86 50.7 80.0 104.5 36.6 50.7 132.1 17.5 7.1 3.0 10.7 0.0 0.31986 - 87 132.2 51.2 36.4 66.3 98.8 35.7 57.6 10.8 0.0 0.7 15.0 6.41987 - 88 92.2 209.2 103.1 70.4 153.2 25.4 9.3 8.4 0.4 8.3 18.0 90.21988 - 89 127.4 227.4 92.5 264.1 272.5 129.7 31.6 2.0 3.7 1.6 6.0 51.21989 - 90 96.7 95.4 57.2 124.0 333.7 78.8 29.4 0.1 1.7 4.2 16.9 3.81990 - 91 147.1 114.1 33.6 50.7 102.0 52.3 137.3 10.8 4.9 0.0 1.6 20.41991 - 92 132.2 111.0 10.1 29.4 83.5 165.1 3.2 34.0 9.1 0.8 23.7 39.31992 - 93 73.1 226.5 41.2 20.7 177.8 95.9 6.0 14.3 7.0 0.3 17.8 30.91993 - 94 272.4 181.8 39.2 54.1 164.8 135.4 14.8 10.8 5.8 5.3 0.2 25.51994 - 95 149.7 55.5 38.3 25.9 117.9 101.3 30.0 8.9 0.7 2.6 4.5 54.11995 - 96 134.8 111.6 110.0 432.9 153.2 99.3 20.5 22.1 3.2 0.9 5.3 35.21996 - 97 97.1 25.7 116.6 240.8 97.4 236.6 30.5 0.0 4.8 4.9 54.2 0.31997 - 98 46.0 234.3 44.8 67.3 179.6 130.2 68.9 0.0 0.0 0.0 7.0 7.31998 - 99 191.6 88.0 104.3 162.4 76.2 498.6 43.5 1.1 6.8 3.6 2.2 12.9

72.5 157.3 85.1 153.2 235.8 140.5Averege 141.5 151.6 78.1 102.2 166.6 119.7 36.1 11.2 5.3 4.4 14.4 36.0

Sub-total of Rainy Season 759.7 Sub-total of Dry Season 107.4

Note: Blank spaces stand for the lack of measured record

1963

1999

Page 11: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

Supporting-K : Facility Planning / Cost Estimate

K - 6

Table K.3.3 Rainfall per One Rainy Day (TEGUCIGALPA, 1963 - 1999) Unit: mm/day

Year Rainy Season Dry Season/Month 5 6 7 8 9 10 11 12 1 2 3 4

- - - - - - - - 0.0 0.0 0.0 0.01963 - 64 20.3 16.6 22.6 13.0 15.1 15.8 18.3 0.0 0.0 0.0 0.0 0.01964 - 65 21.0 24.0 16.9 14.9 29.2 16.9 20.8 0.0 0.0 0.0 0.0 19.61965 - 66 22.1 22.6 0.0 10.4 32.5 20.2 0.0 13.2 0.0 0.0 16.0 24.41966 - 67 23.1 21.9 17.3 16.3 14.4 45.7 0.0 0.0 0.0 0.0 0.0 29.11967 - 68 46.2 23.5 12.7 0.0 21.5 13.7 0.0 0.0 0.0 0.0 0.0 0.01968 - 69 27.6 30.1 0.0 26.2 23.6 14.7 11.4 0.0 0.0 0.0 18.3 19.11969 - 70 27.7 18.7 0.0 20.2 22.7 20.5 14.1 0.0 0.0 0.0 0.0 40.91970 - 71 20.6 14.9 16.4 14.8 26.2 28.5 11.8 0.0 0.0 0.0 0.0 0.01971 - 72 21.5 14.6 14.1 19.6 24.4 29.8 11.8 0.0 0.0 0.0 0.0 10.91972 - 73 20.3 17.8 0.0 0.0 0.0 14.0 0.0 13.4 0.0 0.0 0.0 27.11973 - 74 34.8 19.5 24.0 16.7 28.0 21.0 0.0 0.0 0.0 0.0 0.0 0.01974 - 75 39.4 19.0 19.8 18.5 25.1 15.0 0.0 0.0 0.0 0.0 0.0 20.01975 - 76 34.2 0.0 13.5 24.1 22.9 26.7 13.6 0.0 0.0 0.0 0.0 14.61976 - 77 32.1 22.7 0.0 19.0 0.0 27.1 13.5 11.2 0.0 0.0 0.0 29.11977 - 78 30.1 40.7 15.4 19.0 26.1 10.2 27.1 0.0 11.5 0.0 0.0 42.11978 - 79 18.2 22.2 19.2 57.6 21.0 0.0 0.0 0.0 0.0 0.0 14.2 24.31979 - 80 27.7 24.1 20.9 26.3 28.1 18.1 55.6 19.0 0.0 0.0 0.0 27.61980 - 81 25.2 28.9 30.4 12.3 24.4 21.7 0.0 0.0 0.0 27.3 54.4 19.91981 - 82 25.2 27.8 22.6 24.7 32.0 18.9 12.8 31.8 0.0 0.0 0.0 30.21982 - 83 21.4 19.6 0.0 13.0 18.5 14.9 0.0 0.0 0.0 0.0 0.0 0.01983 - 84 0.0 28.7 14.6 17.8 29.1 21.0 23.5 0.0 0.0 0.0 16.8 25.71984 - 85 47.4 25.8 20.2 31.8 22.4 23.9 12.4 0.0 0.0 0.0 0.0 37.21985 - 86 15.9 14.3 26.5 11.6 16.7 17.3 0.0 0.0 0.0 0.0 0.0 0.01986 - 87 16.9 0.0 0.0 37.7 30.1 0.0 14.0 0.0 0.0 0.0 10.2 0.01987 - 88 16.5 28.3 14.5 19.8 41.0 0.0 0.0 0.0 0.0 0.0 12.6 30.01988 - 89 17.3 22.2 19.6 22.5 28.4 21.7 25.3 0.0 0.0 0.0 0.0 36.81989 - 90 21.9 24.2 12.1 16.0 21.3 26.4 13.7 0.0 0.0 0.0 0.0 0.01990 - 91 32.8 26.3 0.0 0.0 15.4 16.5 36.3 0.0 0.0 0.0 0.0 19.01991 - 92 23.7 19.0 0.0 0.0 22.3 22.7 0.0 27.5 0.0 0.0 14.1 17.51992 - 93 33.2 29.5 11.7 0.0 23.7 25.4 0.0 0.0 0.0 0.0 15.5 0.01993 - 94 21.4 19.0 26.9 0.0 17.3 21.3 0.0 0.0 0.0 0.0 0.0 10.21994 - 95 39.5 13.0 11.9 0.0 15.4 16.0 12.1 0.0 0.0 0.0 0.0 22.21995 - 96 24.8 17.0 22.3 26.3 15.6 15.3 0.0 10.8 0.0 0.0 0.0 34.71996 - 97 15.7 11.1 19.4 25.8 18.0 31.8 0.0 0.0 0.0 0.0 21.2 0.01997 - 98 13.5 22.8 14.8 27.7 34.5 34.9 14.2 0.0 0.0 0.0 0.0 0.01998 - 99 43.8 20.8 20.5 32.4 13.3 29.6 11.5 0.0 0.0 0.0 0.0 0.0

26.1 22.0 22.3 34.4 18.0 24.1Averege 26.4 22.1 18.7 22.3 23.4 21.8 18.7 18.1 11.5 27.3 19.3 25.5

Note: Blank spaces stand for the lack of measured record

1963

1999

Page 12: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

Supporting-K : Facility Planning / Cost Estimate

K - 7

(4) Calculation of Workable Days

Workable days of earthworks are calculated in the combination of working days by calendar and number of days of rainfall as follows.

1) Rainy Season (May – October), 184 Days

Number of rainfall days: 26.4 days

Probability of a certain day to be a rainy day = 26.4 / 184 = 0.143

Probability of a certain day to be a rainy day = 141.5 / 184 = 0.769

Those are independent events each other and the probability of a certain day to be a working day and not to be a rainy day is calculated as

0.769 X ( 1 – 0.143 ) = 0.659

Number of workable days in rainy season is

0.659 X 184 days = 121.3 days (about 20 days/month)

2) Dry Season (November – April), 181 Days

Number of rainfall days: 7.6 days

Probability of a certain day to be a rainy day = 7.6 / 181 = 0.042

Probability of a certain day to be a rainy day = 137 / 181 = 0.757

Those are independent events each other and the probability of a certain day to be a working day and not to be a rainy day is calculated as

0.757 X ( 1 – 0.042 ) = 0.725

Number of workable days in rainy season is

0.725 X 181 days = 131.2 days (about 22 days/month)

Therefore, the monthly-average operation days of the construction work become the 21 days.

As for others works that will not be affected by rain or weather, the number of workable days is estimated as 23 days/month through a year.

Page 13: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

Supporting-K : Facility Planning / Cost Estimate

K - 8

3.3 CONSTRUCTION PLAN

(1) Structure Measures

The structure measures for flood damage mitigation and landslide damage mitigation are as follows. (Table K.3.4)

Table K.3.4 Quantity of Structure Measures ITEM UNIT Master Plan Priority Project

1.Flood Damage Mitigation Earth Excavation Rock Excavation Revetment (A) Revetment (B)

Gabion Parapet Wall Shaft Works

Counterweight fill Anchor Works

Spoil Bank Mallol Bridge (Replacement)

Mallol Bridge (Reinforcement) Pescado Lake

Replacement of Sewage Pipe Replacement of Water Supply

m3 m3 m m m m

pieces m3 ls. m3 ls. ls. ls. m m

709,810

38,163 2,543 5,175 3,853 2,451

52 42,631

1 959,562

1 0 1

1,100 1,200

709,810

38,163 2,543

0 3,853

290 52

42,631 1

954,794 0 1 1

1,100 1,200

2.Landslide Damage Mitigation Berrinche

Drainage well works Earth removal works

Channel works Reparto

Drainage well works Earth removal works

Channel works Bambu

Gabion (Box-type 1x1) Channel

ls.

pieces m3 m ls.

pieces m3 m ls. m m

1 8

184,000 1,840

1 2

40,000 2,220

1 694 260

1 8

184,000 1,840

1 2

40,000 2,220

1 694 260

(2) Non-Structure Measures

Non-structure measures of the flood damage mitigation measure and the landslide damage mitigation measure are as follows. (Table K.3.5)

Table K.3.5 Quantity of Non-Structure Measures ITEM UNIT Master Plan Priority Project

1.Flood Damage Mitigation Watershed Management Warning System

ls. ls.

1 1

0 1

2.Landslide Damage Mitigation Resettlement Warning System

house

ls.

200

1

10 1

Page 14: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

Supporting-K : Facility Planning / Cost Estimate

K - 9

(3) Construction Method

Construction method was discussed so that work quantities mentioned above would distribute uniformly throughout the construction period. As a result, the following construction method and construction period were proposed:

1) Earth Excavation: Excavation is carried out by backhoe (0.6 m3) and dump truck (10 ton) which is largest truck of the highway use.

Excavation material is conveyed by 10-ton dump truck through river. The distance of transportation is assumed to be 5.4km on the average. (Figure K.3.1)

2) Revetment works: Revetment is constructed as stone-masonry as it is a common practice in Tegucigalpa.

3) Parapet wall: Parapet wall is constructed as stone-masonry as it is a common practice in Tegucigalpa.

4) Shaft works: Shaft is excavated by small backhoe.

5) Anchor works: The H steel piles are driven at intervals of 3m

The H steel piles are anchored by tendons at 1m, 4m and 7m depth respectively. Tendon is used by steel-bar. Excavation for construction of retaining wall is carried out after anchoring. Tension is carried out again after construction of retaining wall.

6) Spoil Bank: The excavated materials are hauled to the disposal areas by dump truck (10 ton). The hauling distance is assumed to be 6.5 km on an average.

7) Mallol Bridge: The bridge is constructed by RC-concrete. The bridge has 4 piers and 2 abutments. The bridge length is 100 m and width is 12 m.

However, at the Priority Project stage, only the pier foundation is reinforced. (Figure K.3.2)

8) Replacement of Sewage Pipe: Replacement lengths of Sewage Pipe are 1,100 m and 500 m for Master Plan and Priority Project respectively.

9) Replacement of Water Supply: Replacement lengths of Water Supply are 1,200 m and 500m for Master Plan and Priority Project respectively.

10) Landslide mitigation works of Berrinche: 4 drainages well are constructed against drainage of ground water. Channel works are constructed against drainage of surface water. Diameter of wells is 3.5m, and depth is 30m.

11) Landslide mitigation works of Reparto: 2 drainages well are constructed against drainage of ground water. Channel works are constructed against drainage of surface water. Diameter of wells is 3.5 m, and depth is 15 m.

12) Landslide mitigation works of Bambu: Channel works are constructed against drainage of surface water.

Page 15: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

Supporting-K : Facility Planning / Cost Estimate

K - 10

13) Counter Weight Fill: Counterweight fills is planned against landslide at left bank in the C45-C47. (Figure K.3.3)

4. MAINTENANCE PLAN

Maintenance was planned according to the following conditions.

1. Maintenance of flood mitigation facilities, which are revetment, parapet wall and earth retention by tieback anchor, is carried out for 50 years.

2. Maintenance cost per year for the facilities is estimated to be 0.5 % of direct construction cost of the facilities.

3. Damage cost by floods per 15 years is assumed to be 10% of direct construction cost of the facilities.

4. Life years of observation facilities of forecast/warning is assumed to be 10years. Renewal cost of the facilities is appropriated every 10 years. Maintenance cost per year for the facilities is estimated to be 0.5 % of cost of the facilities.

(1) Maintenance of Anchor Works

The purpose of maintenance of anchor works is to confirm the planned function. It is necessary to repair when the function of anchor works is insufficient.

In doing maintenance, it is necessary to arrange the anchoring record and keep it.

Items of observation and measurement of anchoring are as follows.

1) Load and displacement caused in anchor bar

2) Displacement and movement of structure

3) Movement and erosional condition of anchor head

4) Groundwater level

5) Others

The check, observation, and measurement for maintenance should be continued during anchoring.

(2) Maintenance of landslide-countermeasures facilities

The purposes of the maintenance of landslide-countermeasures facilities are to prevent decrease of function of the landslide-countermeasures facilities, against reactivation of the landslide.

Landslide-countermeasures facilities of Berrinche are water channel work, horizontal boring works, drainage well, and shaft works etc.

In case something wrong of these facilities is founded, the function of facilities should be recovered by investigation and repairs.

In particular, drainage function of strainer of catchment boring hole of drainage well decrease in

Page 16: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

Supporting-K : Facility Planning / Cost Estimate

K - 11

several years after construction, because strainer is clogged with soil. In this case, the strainer should be washed.

And, the horizontal drainpipes from the drainage well also regularly should be checked.

5. BASIS OF COST ESTIMATE

The project cost consists of costs for the following items:

1) Construction base cost

- Structure measures - Non-Structure measures

2) Administration

3) Engineering service

4) Physical contingency

The project cost was estimated based on the following conditions and assumptions:

(1) Unit Prices of Labor, Material and Equipment

The unit price of labor wages, construction materials and equipment are based on the Standard price of Honduras. (Camara Hondurena de la industria de la construccion (CHICO)).

Construction price index of Japan in August 2001 is used in case of no price description in the CHICO.

(2) Production rate of the Work:

Production rate of the work is expressed based on following data.

? Standards for Cost Estimations of Public Works (Ministry of Land, Infrastructure and Transport, the Government of Japan; 2001)

? Tables of depreciation cost of construction equipment (Japan Construction Mechanization Association; 2001)

(3) The cost of general temporary works: The cost of general temporary works is assumed to be 20 % of the direct construction cost to calculate construction base cost.

(4) The indirect cost: The indirect cost (7.5 % of the accumulated direct construction cost is assumed empirically) which consists of overhead expenses, profit and so on, is added to calculation the construction base cost.

(5) Exchange Rate of Currencies: The basic prices for import products are estimated based on the exchange rate of currencies as follows (November 1, 2001);

1 US Dollar = 122.44 J Yen = 15.84 Lempiras.

(6) Engineering Service Cost: Engineering service cost is assumed as 15% of the total of construction cost.

(7) Physical Contingency: A physical contingency is required for the construction work and

Page 17: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

Supporting-K : Facility Planning / Cost Estimate

K - 12

is estimated empirically as 10 % of construction cost.

(8) Administration Cost: Administration cost (be borne by the administrative agency of the construction project) is estimated as 5 % of the summation of construction cost.

(9) O/M Cost: The operation and maintenance cost at full operation stage of facilities after the completion of construction works was assumed to be annually 0.5 % of the total construction cost.

6. UNIT PRICE/COST

6.1 UNIT PRICE

The unit price of labor wages, construction materials and equipment are based on the Standard price of Honduras. (Table K.6.1)

Table K.6.1 Labor Cost of Construction Work in Tegucigalpa Basic Additional Payment Total

NO Item Description Unit Wage Insurances Bornus Severance Wage(USD) 24.00% 46.11% 9.43% (USD)

L-1 Foreman Maestro de Obra day 18.94 4.55 8.73 1.79 34.01L-2 Group Leader Capataz day 15.78 3.79 7.28 1.49 28.34L-3 Skilled Labour Mano de Obra Especializada day 6.93 1.66 3.20 0.65 12.44L-4 Common Labour Peon Jornalero day 5.05 1.21 2.33 0.48 9.07L-5 Scaffolding Man Trabajador de altura day 6.93 1.66 3.20 0.65 12.44L-6 Carpenter Carpintero day 12.63 3.03 5.82 1.19 22.67L-7 Mechanic Mecanico day 0.00 0.00 0.00 0.00 0.00L-8 Electrician Electricista day 12.63 3.03 5.82 1.19 22.67L-9 Operator (heavy) Operador(Equipo Pesado) day 14.49 3.48 6.68 1.37 26.02L-10 Operator (light) Operador(Equipo Ligero) day 10.14 2.43 4.68 0.96 18.21L-11 Truck Driver Camionero day 6.00 1.44 2.77 0.57 10.78L-12 Welder Soldador day 12.63 3.03 5.82 1.19 22.67L-13 Steel Fixer Fierrero day 12.63 3.03 5.82 1.19 22.67L-14 Mason Albanil day 9.47 2.27 4.37 0.89 17.00L-15 Painter Pintor day 6.31 1.51 2.91 0.60 11.33L-16 Plumber Fontanero day 12.63 3.03 5.82 1.19 22.67L-17 Surveyor Topografo day 22.10 5.30 10.19 2.08 39.67L-18 Assistant Surveyor Ayudante de Topografo day 7.58 1.82 3.50 0.71 13.61L-19 Dynamiter Dinamitero day 11.36 2.73 5.24 1.07 20.40L-20 Skilled Labour of Tunnel day 7.58 1.82 3.50 0.71 13.61

Note: Basic Wage is adopted from Table . Additional Payment (Insurance: 24.0%, Bounus: 46.12%, and Severance Payment: 9.43%) is considered from Table .

Table K.6.2 shows the list of Honduran institutional payments and allowances added to basic wages for labors. About 80 % of basic wage is to be added as allowances of social insurance, bonus, severance pay and so on.

Page 18: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

Supporting-K : Facility Planning / Cost Estimate

K - 13

Table K.6.2 Institution Payments added to Basic Wages for Labors

Item Description %1 IHSS Instituto Hondureno de Seguridad Social (borne by employer) 7.002 IHSS (borne by employee) 4.503 FOSOVI Social Housing Fund 1.504 INFOP National Training Institute 1.005 Misce llaneous Payments for Commutation, safety devices, etc. 10.00

Sub-total (Social Insurance) 24.006 FERIADOS(13/365) National Holidays (11days)+2 days(24&31Dec.) 3.567 VACACIONES(10/365)10 days of paid vacations for employee over 1 year 2.748 SABADOS 44/48 Half-day Bonus for employee who has worked 6 workdays in a week 8.909 SEPTIMO DIAS One-day Bonus for employee who has worked 6 workdays in a week 14.25

10 AGUINALDO Christmas Bonus (One-month's salary per year) 8.3311 DECIMO CATORECE MES14th month salary (One-month's salary) 8.33

Sub-total (Bonus) 46.1112 CESANTIA Severance Payment; One-month's salary for employee over 1 year 8.3313 PREAVISO Payment of Dismissal Notice (4 day's salary) 1.10

Sub-total (Severance) 9.4379.54

Table K.6.3 Quoted Unit Prices of Construction Materials

* Procured in Tegucigalpa/Honduras

No. Item Description Unit (Lempira) (USD) (Yen) (USD)M-1 Steel Bar (D13) Varilla de Acero Corrugada, 1/2" dia. ton 7,912.09 499.50

Steel Bar (D16) Varilla de Acero Corrugada, 5/8" dia. ton 7,503.51 473.71Steel Bar (D19) Varilla de Acero Corrugada, 3/4" dia. ton 6,903.26 435.81Steel Bar (D22) Varilla de Acero Corrugada, 7/8" dia. ton 7,136.69 450.55Steel Bar (D25) Varilla de Acero Corrugada, 1" dia. ton 7,254.74 458.00Steel Bar (D35) Varilla de Acero Corrugada, 11/8" dia. ton 8,223.04 519.13

M-2 Structural Steel Acero Estructural (I, H, C, etc.) ton 34,500 281.77M-3 Liner Plate D3.0m t=3.2mm m 90,700 740.77

Liner Plate D4.0m t=3.2mm m 120,000 980.07M-4 Reinforcing ring ton 69,000 563.54M-5 Expanded Metal ( lid ) m2 7,540 61.58M-7 Tendon (Anchor) kg 221 1.80M-8 Portland Cement Cemento Portland ton 2,800.00 176.77M-9 Ready-mixed Concrete Concreto Premezclado

Strength: 210 kg/cm2 Resistencia 3000 lbs/pulg2 m3 1,301.00 82.13

Strength: 280 kg/cm2 Resistencia 4000 lbs/pulg2 m3 1,413.00 89.20M-10 Grout (1 : 5) 14,000 114.34M-11 Asphalte mixture Asfalto mezcla ton 6,900 56.35M-12 River Sand Arena de Rio m3 200.00 12.63M-13 River Gravel Greva de Rio m3 215.00 13.57M-14 Cobble Stone Cantos Rodados (piedra) m3 250.00 15.78M-15 River Stone Grava de Rio m3 150.00 9.47M-16 Crushed Stone Grava o Piedra Triturada m3 160.00 10.10M-17 Fine Aggregate Agregado Fino para Concreto ton 0.00 0.00M-18 Coarse Aggregate Agregado Grueso para Concreto ton 0.00 0.00M-19 Ductile Cast-Iron Pipe DN= 150 mm, L= 5 m 25,100 205.00

DN= 200 mm, L= 5 m no. 33,100 270.34 DN= 300 mm, L= 6 m no. 62,400 509.64 DN= 350 mm, L= 6 m no. 72,700 593.76 DN= 400 mm, L= 6 m 88,900 726.07 DN= 600 mm, L= 6 m 168,000 1,372.10 DN= 800 mm, L= 6 m 254,000 2,074.49

M-20 Concrete Pipe D=1200mm (48") m 1,848.00 116.67M-21 Sod Grama (Cesped) para engrama m2 120.00 7.58

Tierra Organica para Grama m3 120.00 7.58M-22 Gasoline Gasolina litre 10.76 0.68M-23 Diesel Oil Aceite diesel litre 7.45 0.47M-24 Gabion (box type) Gabion (tipo caja) 0.5 m x 1.0 m m 1,380 11.27M-25 Gabion (box type) Gabion (tipo caja) 1.0 m x 1.0 m m 2,760 22.54

Camara Hondurenade la industria

de la construccion

Construction ResearchInstitute of Japan

Page 19: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

Supporting-K : Facility Planning / Cost Estimate

K - 14

6.2 UNIT CONSTRUCTION COST

Standard unit construction costs applied to the cost estimate are as follows. (Table K.6.4)

Table K.6.4 Unit Construction Cost

ITEM UNIT Local Currency Foreign Currency AmountFlood Damage Mitigation (USD) (USD) (USD)

Earth excavation (Riverbed) m3 2.72 3.72 6.44Rock excavation(Riverbed) m3 7.99 6.51 14.50Revetment (A) m 1,703.59 179.66 1,883.25Revetment (B) m 1,698.77 179.66 1,878.43Gabion m 309.50 55.17 364.67Parapetment m 273.74 22.83 296.57Shaft works pieces 62,820.55 30,237.75 93,058.30Counterweight fill m3 0.33 0.46 0.79Ancher works ls. 205,597.52 164,623.37 370,220.89Spoil Bank m3 0.33 0.46 0.79Gabion m 27.26 6.57 33.83Mallol Bridge reinforcement ls. 293,487.93 28,957.65 322,445.58Mallol Bridge Reolacement ls. 826,256.29 125,611.70 951,867.99Demolition work(bridge) ls. 160,439.05 156,139.75 316,578.80Pescado Lagoon ls. 52,578.76 24,825.54 77,404.30Replacement of Sewage pipes m 428.70 26.85 455.55Replacement of Water Supply (MM) ls. 78,863.85 209,292.53 288,156.38Replacement of Water Supply (PP) ls. 32,910.30 80,877.08 113,787.38Watershed Management ls. 1,210,682.38 308,200.87 1,518,883.25Warning System(transmitter) ls. 17,000.00 17,000.00

Land Damage MitigationBerrinche ls. 1,973,840.91 1,116,906.12 3,090,747.03Reparto ls. 860,894.59 323,418.47 1,184,313.06Bambu ls. 67,308.33 20,641.25 87,949.58Resettlement houses 3,500.00 3,500.00Warning System(transmitter) ls. 15,000.00 15,000.00Warning System(Receiver) ls. 125,000.00 125,000.00

OtherEducation ls. 1,000,000.00 1,000,000.00Disaster Mitigation System ls. 1,000,000.00 1,000,000.00

7. PROJECT COST

The project cost is estimated for the Master Plan and Priority Project at the fixed price as of November 2001 as follows. (Table K.7.1)

Table K.7.1 Project Cost UNIT: million USD

ITEM Master Plan Priority Project Construction works 40.0 25.1

Administration 2.5 1.7 Engineering service 6.8 3.6

Physical contingency 4.0 2.5 Total 53.3 32.9

Breakdown of cost estimate is shown in Table K.7.2 for the Master Plan and Priority Project.

Page 20: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

Supporting-K : Facility Planning / Cost Estimate

K - 15

8. IMPLEMENTATION SCHEDULE

Implementation schedule of the Priority Project and the rest of the Master Plan was prepared as shown in Table K.8.1 based on the following assumptions:

Priority Project:

1) Detailed design including topographical and geological survey will be carried out for 6 month of 2002.

2) Tendering procedures of the construction works will be started at the beginning of 2003. 3) Construction works will be carried out for three (3) years from the beginning of 2004 to

the end of 2006.

Rest of Master Plan Project:

1) Detailed design including topographical and geological survey will be carried out for 6 month of 2007.

2) Tendering procedures of the construction works will be started at the beginning of 2008. 3) Construction works will be carried out for three (3) years from the beginning of 2009 to

the end of 2011.

Table K.8.1 Implementation Schedule

Items 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

Detailed Design

Construction1 Structural Measures

Earth excavationRock excavationRevetment (A)Revetment (B)GabionParapet wallShaft worksCounterweight fillAnchor worksSpoil Bank

Gabion(Spoil Bank)Revetment(Spoil Bank)

Parapet wall (spoil Bank)Pescado LagoonMallol Bridge(Reinforcement)Mallol Bridge(Replacement)

Demolition WorkReplacement of Sewage PipesReplacement of Water Supply

NoN-Structural MeasuresWatershed ManagementWarning System

2 Landslide PreventionStructural Measures

BerrincheRepartoBambu

NoN-Structural MeasuresResettlementWarning System

3 OtherEducationDisaster ManagementInformation System

AdministrationConstruction Supervision

Tendering Procedure

The operating schedules of typical construction works are shown in Figures K.8.2 and K.8.3.

Page 21: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

Supporting-K : Facility Planning / Cost Estimate

K - 16

9. DISBURSEMENT SCHEDULE

Disbursement schedule for the Master Plan and Priority Project were estimated as shown in Table K.9.1 according to the implementation schedule presented in Chapter 8. Total funds required for the implementation of the project were also estimated in the table. The required funds including the price contingency during the construction period are as follows:

Table K.9.1 Disbursement Schedule

Total Annual Disbursement Schedule (Master Plan & Priority Project) (million USD)cost 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

1 Constraction Cost Total 40.31 0.00 0.00 10.05 7.82 7.08 0.22 0.21 4.77 4.44 4.44 0.32 0.32 0.32 0.32

F.C. 9.48 0.00 0.00 3.13 2.48 2.29 0.00 0.00 0.58 0.42 0.42 0.04 0.04 0.04 0.04

L.C. 30.83 0.00 0.00 6.92 5.34 4.79 0.22 0.21 4.19 4.02 4.02 0.28 0.28 0.28 0.28

2 Administration Total 2.50 0.24 0.24 0.50 0.39 0.35 0.01 0.01 0.24 0.22 0.22 0.02 0.02 0.02 0.02

F.C. 0.00

L.C. 2.50 0.24 0.24 0.50 0.39 0.35 0.01 0.01 0.24 0.22 0.22 0.02 0.02 0.02 0.02

3 Engineering Cost Total 6.79 1.36 0.00 0.77 0.76 0.75 0.96 0.00 0.74 0.74 0.71 0.00 0.00 0.00 0.00

F.C. 5.09 0.94 0.57 0.56 0.56 0.75 0.57 0.57 0.57

L.C. 1.70 0.42 0.20 0.20 0.19 0.21 0.17 0.17 0.14

4 Physical Total 3.95 0.00 0.00 0.99 0.77 0.70 0.02 0.02 0.47 0.43 0.43 0.03 0.03 0.03 0.03

Contingency F.C. 0.93 0.00 0.00 0.31 0.25 0.23 0.00 0.00 0.06 0.04 0.04 0.00 0.00 0.00 0.00

L.C. 3.02 0.00 0.00 0.68 0.52 0.47 0.02 0.02 0.41 0.39 0.39 0.03 0.03 0.03 0.03

5 Sub-total Total 53.55 1.60 0.24 12.31 9.74 8.88 1.21 0.24 6.22 5.83 5.80 0.37 0.37 0.37 0.37

(1+2+3+4) F.C. 15.50 0.94 0.00 4.01 3.29 3.08 0.75 0.00 1.21 1.03 1.03 0.04 0.04 0.04 0.04

L.C. 38.05 0.66 0.24 8.30 6.45 5.80 0.46 0.24 5.01 4.80 4.77 0.33 0.33 0.33 0.33

6 Price Contingency Total 10.22 0.05 0.01 1.14 1.22 1.41 0.24 0.06 1.66 1.77 1.99 0.15 0.16 0.17 0.19

F.C. 2.51 0.03 0.00 0.37 0.41 0.49 0.15 0.00 0.32 0.31 0.35 0.02 0.02 0.02 0.02

L.C. 7.71 0.02 0.01 0.77 0.81 0.92 0.09 0.06 1.34 1.46 1.64 0.13 0.14 0.15 0.17

7 Total Total 63.77 1.65 0.25 13.45 10.96 10.29 1.45 0.30 7.88 7.60 7.79 0.52 0.53 0.54 0.56

(5+6) F.C. 18.01 0.97 0.00 4.38 3.70 3.57 0.90 0.00 1.53 1.34 1.38 0.06 0.06 0.06 0.06

L.C. 45.76 0.68 0.25 9.07 7.26 6.72 0.55 0.30 6.35 6.26 6.41 0.46 0.47 0.48 0.50

Disbursement schedule for O/M cost is as follows. (Table K.9.2)

Table K.9.2 Disbursement Schedule of O/M Cost

UNIT: million$Total cost 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

O & M cost L.C 11.74 0.00 0.00 0.00 0.05 0.09 0.12 0.13 0.13 0.15 0.17 0.44 0.20 0.20 0.20 0.78 0.20

Price Contingency L.C 16.90 0.01 0.01 0.02 0.03 0.03 0.05 0.06 0.17 0.09 0.09 0.10 0.44 0.12

Total L.C 28.64 0.00 0.00 0.00 0.06 0.10 0.14 0.16 0.16 0.20 0.23 0.61 0.29 0.29 0.30 1.22 0.32

2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034

O & M cost L.C 0.20 0.20 0.20 0.20 0.44 0.20 0.20 0.20 0.20 0.20 0.78 0.20 0.20 0.20 0.64 0.20 0.20

Price Contingency L.C 0.13 0.14 0.15 0.16 0.38 0.18 0.19 0.21 0.22 0.23 0.95 0.26 0.27 0.29 0.96 0.32 0.33

Total L.C 0.33 0.34 0.35 0.36 0.82 0.38 0.39 0.41 0.42 0.43 1.73 0.46 0.47 0.49 1.60 0.52 0.53

2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050 2051

O & M cost L.C 0.20 0.20 0.20 0.20 0.20 0.78 0.20 0.44 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20

Price Contingency L.C 0.35 0.36 0.38 0.40 0.41 1.69 0.45 1.04 0.49 0.51 0.53 0.56 0.58 0.60 0.63 0.65 0.68

Total L.C 0.55 0.56 0.58 0.60 0.61 2.47 0.65 1.48 0.69 0.71 0.73 0.76 0.78 0.80 0.83 0.85 0.88

10. NOTE OF SUPERVISION OF CONSTRUCTION WORK

In the construction of the shaft work of Berrinche, following matter should be noted.

1) In the first place, the drainage boring should be constructed, and the ground-water level should be lowered.

2) Continuous construction of the shaft works should not be done, because it causes the landslide.

3) In the construction of the shaft works, geologic map and photograph should be recorded for safety management and maintenance.

Page 22: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

Supporting-K : Facility Planning / Cost Estimate

K - 17

4) The strain gauge, the reinforcing bar stress transducer, the clinometers, and the earth pressure gauge for the landslide observations should be installed, and the data of observation should be used for the safety management and maintenance of construction of shaft works.

Page 23: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There
Page 24: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There
Page 25: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There
Page 26: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There
Page 27: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There
Page 28: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There
Page 29: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There
Page 30: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There
Page 31: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There
Page 32: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There
Page 33: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There
Page 34: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There
Page 35: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There
Page 36: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There
Page 37: SUPPORTING REPORT K FACILITY PLANNING / COST …Therefore, those pipes (total 1,200m) are needed to remove under planned riverbed. Sewage pipes run along the Choluteca River. There

Supporting-K : Facility Planning / Cost Estimate

K - 32