13
Digitaligence@work Supply Chain Risk Management ©2019 ITC Infotech. All Rights Reserved. 1

Supply Chain Risk Management with anyLogistix · Digitaligence@work | Data flow for the solution 6 Simulation model 1. Production Plan 2. Current inventory (finished products/ raw

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Supply Chain Risk Management with anyLogistix · Digitaligence@work | Data flow for the solution 6 Simulation model 1. Production Plan 2. Current inventory (finished products/ raw

Digitaligence@work

Supply Chain Risk Management

©2019 ITC Infotech. All Rights Reserved. 1

Page 2: Supply Chain Risk Management with anyLogistix · Digitaligence@work | Data flow for the solution 6 Simulation model 1. Production Plan 2. Current inventory (finished products/ raw

Digitaligence@work | 2

Even the best supply chain designs perform sub optimally – Why? 

©2019 ITC Infotech. All Rights Reserved.

Supply chain reliability and variation

• Demand variation

• Transportation lead time variation

• Production output variation

• Supplier delays

• Quality issues

Supply chain disruptions

• Bad weather

• Road closure

• Factory/line closure

• Unplanned holidays

• Political crisis

• Fill rate

• Order fulfillment

• Excess stock

• Higher transportation cost

• Reduced asset utilization

SOLUTION: Prior anticipation and pre‐emptive action

Variations, disruptions and incorrect decisions under uncertainty

Impact on Supply chain KPIs

Page 3: Supply Chain Risk Management with anyLogistix · Digitaligence@work | Data flow for the solution 6 Simulation model 1. Production Plan 2. Current inventory (finished products/ raw

Digitaligence@work |

Solution flow

©2019 ITC Infotech. All Rights Reserved. 3

Variations and events

Sensed demand based on recent sales at every node

Preempt supply chain service and cost 

impacts

Simulation based future supply chain performance

Classify the problems by root causes

Root cause classification based on simulation output

Action reports sent to concerned process 

owners

Prescriptive actions

Page 4: Supply Chain Risk Management with anyLogistix · Digitaligence@work | Data flow for the solution 6 Simulation model 1. Production Plan 2. Current inventory (finished products/ raw

Digitaligence@work |

Network

©2019 ITC Infotech. All Rights Reserved.

Page 5: Supply Chain Risk Management with anyLogistix · Digitaligence@work | Data flow for the solution 6 Simulation model 1. Production Plan 2. Current inventory (finished products/ raw

Digitaligence@work |

Operation Logic

©2019 ITC Infotech. All Rights Reserved. 5

Factory

Hub

DC

DC

Branch/ Customer

Factory

DC DC

Branch/ Customer

Branch/ Customer

Branch/ Customer

Supplier

• Actual production plan• Fair Share distribution 

algorithm• Anticipated days of 

cover

Shipment after building x % FTL

• Pipeline consideration• Fair Share distribution algorithm• Anticipated days of cover

Demand generated using demand sensing along with an induced variability to cater to forecast errors 

Page 6: Supply Chain Risk Management with anyLogistix · Digitaligence@work | Data flow for the solution 6 Simulation model 1. Production Plan 2. Current inventory (finished products/ raw

Digitaligence@work |

Data flow for the solution

6

Simulation model

1. Production Plan2. Current inventory (finished 

products/ raw materials)3. Raw material receipt plan4. Replenishment policy at 

different facilities

1. Stock levels2. Fill Rate3. Logistics cost4. Other KPIs

1. Demand surge2. Delays in RM3. Facility/warehouse shutdown4. Production reductionInputs from ERP systems

Planned/unplanned Events information

Output from simulation 

©2019 ITC Infotech. All Rights Reserved.

1. Root cause analysis

2. Reason classification for Service level

Auto Classification of root cause

Recommended Actions

Sensed Demand

Using proprietary Demand Sensing Tool  of ITC Infotech 

Prescriptions

Page 7: Supply Chain Risk Management with anyLogistix · Digitaligence@work | Data flow for the solution 6 Simulation model 1. Production Plan 2. Current inventory (finished products/ raw

Digitaligence@work |©2019 ITC Infotech. All Rights Reserved. 7

Solution roadmap

Capture the current 

snapshot of supply chain

Predict the future supply 

chain KPIs (stock levels, 

cost, fill rate)

Navigate to the root cause 

of underperformance at 

specific points

Recommended 

countermeasures

Page 8: Supply Chain Risk Management with anyLogistix · Digitaligence@work | Data flow for the solution 6 Simulation model 1. Production Plan 2. Current inventory (finished products/ raw

Digitaligence@work |©2019 ITC Infotech. All Rights Reserved. 8

Solution roadmap

Capture the current 

snapshot of supply chain

Predict the future supply 

chain KPIs (stock levels, 

cost, fill rate)

Navigate to the root cause 

of underperformance at 

specific points

Recommended 

countermeasures

Page 9: Supply Chain Risk Management with anyLogistix · Digitaligence@work | Data flow for the solution 6 Simulation model 1. Production Plan 2. Current inventory (finished products/ raw

Digitaligence@work |©2019 ITC Infotech. All Rights Reserved. 9

Solution roadmap

Capture the current 

snapshot of supply chain

Predict the future supply 

chain KPIs (stock levels, 

cost, fill rate)

Navigate to the root cause 

of underperformance at 

specific points

Recommended 

countermeasures

Page 10: Supply Chain Risk Management with anyLogistix · Digitaligence@work | Data flow for the solution 6 Simulation model 1. Production Plan 2. Current inventory (finished products/ raw

Digitaligence@work |©2019 ITC Infotech. All Rights Reserved. 10

AI supported automated root cause analysis

Low fill Rate @ Customer

Production planning

Production planning issues

Plan compliance problem

Distribution/supply planning

Unbalanced distribution

Logistics issues (Truck shipment frequency/load 

building)

Inventory

Forecast error

Inventory norms inaccurate

Production Schedular

Schedular

Logistics manager

Supply planner

Demand Planner

Inventory Manager

Page 11: Supply Chain Risk Management with anyLogistix · Digitaligence@work | Data flow for the solution 6 Simulation model 1. Production Plan 2. Current inventory (finished products/ raw

Digitaligence@work |©2019 ITC Infotech. All Rights Reserved. 11

Solution roadmap

Capture the current 

snapshot of supply chain

Predict the future supply 

chain KPIs (stock levels, 

cost, fill rate)

Navigate to the root cause 

of underperformance at 

specific points

Recommended 

countermeasures

Page 12: Supply Chain Risk Management with anyLogistix · Digitaligence@work | Data flow for the solution 6 Simulation model 1. Production Plan 2. Current inventory (finished products/ raw

Digitaligence@work |©2019 ITC Infotech. All Rights Reserved. 12

Countermeasures to balance inventory and mitigate shortages

Fill rateFill rate

Transfer stock 

from nearby 

warehouses

Transfer stock 

from nearby 

warehouses

Adjust the 

inventory 

norms

Adjust the 

inventory 

norms

Prepone/defe

r shipments

Prepone/defe

r shipments

Increase

shipment 

frequency

Increase

shipment 

frequency

Revise the 

production 

plan

Revise the 

production 

plan

Page 13: Supply Chain Risk Management with anyLogistix · Digitaligence@work | Data flow for the solution 6 Simulation model 1. Production Plan 2. Current inventory (finished products/ raw

Thank youConnect with us to understand how ITC Infotech can help your business Email: [email protected]: www.itcinfotech.com

©2019 ITC Infotech. All Rights Reserved.All trademarks are the registered property of the respective companies and are acknowledged.

Digitaligence@work