Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
Michael H Troelsen
Supply Centric Model (EngrosModel)
Michael H Troelsen45 years living in Hammel near Århus in Denmark
Program manager Responsible for development of Xellent for SCMResponsible for implementing Xellent for SCM at 6 Danish customers
Working at EG since 1993 in different roles
Development manager with focus on deregulation of electricity and gas in Denmark since 2003
Participated as member of TI group for SCM at EnerginetMember of all sub working groups
I started as developer and technical engineer
© EG A/S 2
AgendaBackground
Facts about the Danish market
Why Supply Centric Model (wholesale)
How the project was carried out
Lessons learned and what should the Swedish customer think about when the Hub and SCM comes to SE
© EG A/S 3
HistoryDatahub v1 18.02.2013 go-live
Presented in Parliament 25.04.2012 and passed on 18.06.2012
21.06.2013 First BRS/RSM workshop
Planned Go-live 01.10.2014
New Law Presented in Parliament 01.02.2014
Go-live is moved from 01.10.2014 to 01.10.2015
Go-live is moved from 01.10.2015 to 01.04.2016
© EG A/S 4
Facts about the danish market5,6 million people
3,3 million meteringpoints (MP)
Electricity heating 130.000
Sol panels 91.989
Wind turbines 5.776
Profiled customers 3.262.687 / 17,2 TWh
Hourly measured customers 49.277 / 14,6 TWh
Move-in/out 330.000 per year
Change of supply 230.000 per year
© EG A/S 5
Facts about the danish market
© EG A/S 6
1%6%
10%
39%12%
12%
20%
kWh in DK
Subscription Supplier
Subscription Grid
PSO
Electricity TAX
EL
Transport
VAT
Avg. per 2,28 DKR
Avg. consumption 1300 kWh per person
House 5000 kWh
Apartment 3200 kWh
SCM (EngrosModel)Why Supply Centric Model (SCM)
to simplify communication in the market (hub)
to simplify customer contact towards the energy market – 1 contact point – the supplier
to simplify invoicing (1 invoice)
to increase competition in the market to benefit the consumer (customer)
to separate Energy companies into Grid and Supplier to further increase competition in
market
© EG A/S 7
SCM (EngrosModel)What is Supply Centric Model (EngrosModel)?
One communication hub run by TSO (Energinet.dk)
All customer invoicing is done by the supplier
Grid company invoice supplier for Grid cost (Subscription, grid-tarif, fee and tax)
Supplier is single point of contact for customer
Replace DefaultSupplier (Anvisningsleverantör) with Supplier obligation
48 BRS vs 19
XML is used
© EG A/S 8
Supplier obligationA supplier has a contract with the customer until change of supply og end of
supply
A customers need to have an supplier before he can be connected to the grid
Move-in, Connect New meter point
So what happens when the customer do not pay?
First step is reminders 1/2, ask for deposit 5 month, disconnect from grid
Grid company will charge the supplier a fee for disconnecting and
reconnecting the meter
Most bad payer are registered in Credit Rating Bureau (RKI)
© EG A/S 9
Grid CompanyGrid is still performing the following task
Operate, maintain and expand grid
Connect & Disconnect
Ensure supply of power
Technical control of meter
Responsible of meters
Meter reading
Setup and facilitate micro production and solar panels
New task for GridSend all 15/60 values and metered data to datahub
Maintain and send price elements (subscriptions, tarifs and fees) to the datahub
Validate customer contact information from datahub
Invoice supplier on monthly based on actuals
Supply Centric Model
20-04-2016 10EG Copyright
SupplierSupplier
Customer relations
Receive all meter date from Datahub
Invoice customer
Payment and payment owed
Customer service and complaints
Information obligations towards customer
New task for supplierVAT and Taxes
Receive tarif, subscriptions from Datahub
Default supplier (supplier duty)Connection of new installation
Default supplier on end of supply
Supply Centric Model
20-04-2016 11EG Copyright
© EG A/S 12
© EG A/S 13
Customer Masterdata
MeteringpointMasterdata
Settlement Masterdata
SCM (Document hierarchy)
© EG A/S 14
Law
Regulation
BRS/RSM
Development base
Acts
SCM (Document hierarchy)
© EG A/S 15
SCM (Tracks)Migration of data from Grid/supplier to datahub
Data consistency check
End2End test (ATS, IT pilot test, players test)
Settlement test of wholesale artifacts (price elements)
Load share og Profile settlement
Cut over test
Business Process Mapping
Local IT system
© EG A/S 16
MigrationData migration to datahub
Master data meteringpoints, Customers, links
Meter readings and 15/60 values
Data consistency check
© EG A/S 17
This important to start this process as soon as possible to ensure the best quality of the data. All migration must be done from live on a monthly
basis, 9 – 12 month before start!!
End2End testATS test is message format testing
E2E pilot is for IT vendor(s)
E2E test is for players and is a certification testTest cases Supplier (78), Grid (55), balance (5)
All data is to be generated manuel by user
Fictive players for Grid and Supplier
© EG A/S 18
Get IT-vendors and datahub-vendor to start working together on creating the BRS/RSM guides.
The players should test much more than the required test cases
Other testSettlement test of wholesale artifacts
Fixed dataset for allOne or two players must do a full scale test
Load share og Profile settlementuse fixed dataset use migration data
Grid and supplier can compare to own engine
© EG A/S 19
It is important the create some control reports in datahub and in local IT system, so it is possible to
find the cause of the difference.
Cut over testDo a full cut-over test not only the technical part, but also other internal activities
Do more than on cut-over test
Use the cut-over test data for testing that task performed before cut-over still works.
© EG A/S 20
It is very important to plan the cut-over phase down to the last detail and do a full scale test
including the datahub. After cut-over the database could be used for settlement test and BRS that cross cut-over date. Move-in/out and incorrect
moves or change of supply
Business Process MappingMap existing processes ”AS-IS”
Use BRS and Regulation to create “TO-BE”
TO-BE process to be used as basis for development and for training
Customer and Business consultants
© EG A/S 21
training super user and end user gave a much better result when we look at the feedback. Process
was also used in development and ensured that processes was being a first citizen of the final
product
Local IT systemsAlmost all existing process will change
Split of Grid and supplier can result in split into two databases
The number of messages will increase by factor 10
automating shipment process of values is key
automatic handling of correction for billing (delta)
focus on automation and exception handling
optimize process and work by using the TO-BE process mappings
© EG A/S 24
EG customer adviseGet C-level commitment
Set-up a project organization, that is dedicated to the project and get the rest of organization involved
It is NOT only a new version of the IT system, it is a change in how we work
EG involved the customer from the beginning with monthly meetings and blog post often
© EG A/S 25
To-be processes was a great help when planning the test and training.
Sum-upGet the organization involved as soon as possible
Create test scripts and test – test – test
Get involved in the process and give feedback to your IT Vendor
Do not under estimate the number of resource need or the work that it requires.
Go-live is not the end of the project, but and important mile stone
© EG A/S 26
It is NOT only a new version of the IT system, it is an organizational change
Questions
© EG A/S 27
© 2014 EG A/S. All rights reserved.
The content of this material, including the text, images and other graphics and their arrangement, are copyrighted by EG A/S
or its affiliated, associated or related companies. EG A/S makes no warranties, express, implied or statutory, as to the information
in this presentation.