Supplemental Standards for Tree Planting and Protection Guidelines (TPP)
Drawings for Tree Planting and Protection (TPP)
Volume 3 of the Ontario Provincial Standard Drawings (OPSD), and the current City of London Standard Drawings, are amended as follows:
Title of Drawing Date of Drawing
City of LondonDrawing
Classification
Date Drawing
Superseded or Deleted
Old Drawing Title (if
applicable)
Example of Boulevard Trees
12/04/2019 TPP-1
Deciduous Tree Planting Detail
8/27/2012 D-31A 9/22/2010 Deciduous Tree Planting Detail
Coniferous Tree Planting Detail
8/27/2012 D-31B 9/22/2010 Coniferous Tree Planting Detail
Tree Pit Backfill Detail 9/22/2010 D-31C - -Tree Pit Backfill Definition and Reference
11/6/2006 D-31D - -
Tree Gate and Planting Detail
2/29/2000 D-35 - -
Half Tree Grate Specification
2/29/2000 D-35A - -
Tree Grate Support Frame (Half)
2/29/2000 D-35B - -
Tree Grate Detail 2/29/2000 D-35C - -Boulevard Tree Planting Detail with sidewalk
11/6/2006 D-36A - -
Boulevard Tree Location Detail without Sidewalk
11/6/2006 D-36B - -
Tree Concept Plan 2/29/2000 D-37 - -Street Tree Planting –Structural Soil
8/27/2012 D-40 10/16/2007 Street Tree Planting –Structural Soil
Permeable Paving-Structural Soil
10/16/2007 D-41 - -
Raised Planter Open Bed 10/16/2007 D-42 - -
Raised Planter Curb 10/16/2007 D-43 - -