Beverly Hilton Specific Plan Amendment
Supplemental Environmental Impact ReportScoping Meeting
Cindy Gordon, AICP, Associate Planner310-285-1191 / [email protected]
City of Beverly HillsScoping MeetingJuly 18, 2018
Beverly Hilton Specific Plan Amendment
Scoping Meeting Purposes
• Inform the community and concerned agencies about the project
• Solicit input regarding the Supplemental Environmental Impact Report (SEIR) scope
• Inform the community about future opportunities for input
City of Beverly HillsScoping MeetingJuly 18, 2018
Beverly Hilton Specific Plan Amendment
Project LocationSource: Initial Study
City of Beverly HillsScoping MeetingJuly 18, 2018
Beverly Hilton Specific Plan Amendment
Existing Project Site (viewed from Wilshire/Merv Griffin)
City of Beverly HillsScoping MeetingJuly 18, 2018
Beverly Hilton Specific Plan Amendment
Existing Project Site (viewed from Santa Monica/Merv Griffin)
City of Beverly HillsScoping MeetingJuly 18, 2018
Project History
Beverly Hilton Specific Plan Amendment
• Beverly Hilton Specific Plan approved by City Council in 2008• Project included:
• Demolition of Palm/Oasis Court• Renovation of Beverly Hilton Wilshire Tower and pool area• Construction of:
• 8-story (36 unit) condo building + 18-story (74 unit) condo building• 12-story luxury hotel (Waldorf Astoria, since completed)• 22K SF two-story conference center / 20,253 SF of restaurants• Approx. 143K SF of landscaped gardens + pedestrian amenities• Subterranean parking
City of Beverly HillsScoping MeetingJuly 18, 2018
Proposed Project
Beverly Hilton Specific Plan Amendment
Application submitted: January 2018
Proposed Project• Construction of a single 23-story residential building
• 140 residential units + 10 staff accessory units• Rooftop accessory structures + features
• Demolition of Palm/Oasis Court• Renovation of Beverly Hilton Wilshire Tower and pool area/features• One-story conference and hotel facilities replacement• Approx. 157K of landscaped gardens + pedestrian amenities• Subterranean parking
City of Beverly HillsScoping MeetingJuly 18, 2018
Proposed Project Summary
Beverly Hilton Specific Plan Amendment
Approved Proposed Difference
Floor Area (Site Wide) 973,565 SF 973,565 SF No change
Floor Area Ratio (Site Wide) 2.5 2.5 No change
# of Residential Buildings 2 1 -1
# of Residential Units 110 140 +30
Residential Building Height97’(8 stories)
200’ (18 stories)307’ (23 stories)
+ 107’ (+5 stories)[from Residence B]
Residential Floor Area 371,453 SF 371,453 SF No change
Conference Center Height 29’ (2 stories) 17’ (1 story) -12’ (-1 story)
Parking 2,193 spaces 2,193 spaces No change
Landscape/Pedestrian Areas(ground level)
3.28 ac 3.62 ac +0.39 ac
City of Beverly HillsScoping MeetingJuly 18, 2018
Project Rendering
Beverly Hilton Specific Plan Amendment
Single-Family HomesEl Rodeo School
LA Country Club
Century CityProposed Project
Waldorf Astoria
Beverly Hilton
9900 Wilshire
City of Beverly HillsScoping MeetingJuly 18, 2018
Site Plan
Beverly Hilton Specific Plan Amendment
Beverly Hilton
Waldorf Astoria
Proposed Residential Building
Conference Center + Hilton Pool
Landscaped Gardens
Wilshire Boulevard
City of Beverly HillsScoping MeetingJuly 18, 2018
Beverly Hilton Specific Plan Amendment
Process Overview
Environmental Review (CEQA)• Review required to identify and disclose potential impacts• Scoping meeting is the first public meeting of this process• Supplemental Environmental Impact Report (SEIR) produced
Entitlements• Consideration of request by Planning Commission and City Council
City of Beverly HillsScoping MeetingJuly 18, 2018
City Review Process
Beverly Hilton Specific Plan Amendment
Late Summer / Early Fall 2018Release of Draft SEIR for 45-day public review periodPlanning Commission hearing on Draft SEIR during 45-day review period
Late Fall / Winter 2018Public Hearing(s) on the Final SEIR and project
City of Beverly HillsScoping MeetingJuly 18, 2018
CEQA Purposes
Beverly Hilton Specific Plan Amendment
• Enhance public participation in the planning process
• Disclose the significant environmental effects of proposed actions
• Identify ways to avoid or reduce environmental effects
• Consider feasible alternatives to proposed actions
City of Beverly HillsScoping MeetingJuly 18, 2018
Supplemental Environmental Impact Report
Beverly Hilton Specific Plan Amendment
• Final EIR for the Beverly Hilton Specific Plan was certified by City Council in 2008
• Specific Plan Amendment may result in some environmental impacts above and beyond those identified in the 2008 Final EIR due to:• Substantial change(s) in the project• Substantial change(s) in circumstances• New information previously unavailable
• Supplemental EIR will address these additional impacts
City of Beverly HillsScoping MeetingJuly 18, 2018
CEQA Review Process
Beverly Hilton Specific Plan Amendment
City makes a decision on the project
City prepares Findings
City prepares Final SEIR
Public Review Period (45 day minimum)
City files Notice of Completion
City prepares Draft SEIR
** City circulates Notice of Preparation (30 day minimum) **
City of Beverly HillsScoping MeetingJuly 18, 2018
Initial Study – Topic Areas
Beverly Hilton Specific Plan Amendment
Land Use and Planning
Mineral Resources
Noise
Population/Housing
Public Services
Recreation
Transportation/Traffic
Tribal Cultural Resources
Utilities and Service Systems
Aesthetics
Agricultural and Forestry Resources
Air Quality
Biological Resources
Cultural Resources
Geology and Soils
Greenhouse Gas Emissions
Hazards and Hazardous Materials
Hydrology/Water Quality
City of Beverly HillsScoping MeetingJuly 18, 2018
Aesthetics
• Potentially increased impacts on scenic vistas• View of Beverly Hilton• Panoramic views from Wilshire Tower
• Potentially increased visual character/quality impacts• Increased height would be prominent from adjacent areas• Shade/shadow impacts
• Potentially increased light and glare impacts
Beverly Hilton Specific Plan Amendment
Aesthetics
City of Beverly HillsScoping MeetingJuly 18, 2018
Air Quality
• Potentially increased air quality impacts associated with:• Demolition• Alterations to grading/development plans• Changes to proposed uses on-site
Beverly Hilton Specific Plan Amendment
Air Quality
City of Beverly HillsScoping MeetingJuly 18, 2018
Cultural Resources
• Partial demolition of potentially significant historical resources
• New City policies on historic preservation since 2008
• Potentially increased alteration of historic setting for historical resources on and near project site
Beverly Hilton Specific Plan Amendment
Cultural Resources
City of Beverly HillsScoping MeetingJuly 18, 2018
Geology and Soils
• Potentially increased impacts from seismic activities• January 2018 map shows new earthquake fault zone immediately
south of project site
Beverly Hilton Specific Plan Amendment
Geology and Soils
City of Beverly HillsScoping MeetingJuly 18, 2018
Greenhouse Gas Emissions
• Not a required study topic in 2008• No significance thresholds in 2008• No quantitative analysis in 2008
• Potentially significant greenhouse gas emissions associated with:• Demolition/grading/construction• Operation (project traffic, day-to-day activities)
Beverly Hilton Specific Plan Amendment
Greenhouse Gas Emissions
City of Beverly HillsScoping MeetingJuly 18, 2018
Land Use and Planning
• City adopted new General Plan in 2010
• Potential conflicts with applicable General Plan goals/policies and zoning requirements due to:• Increased building height• Incompatibility between commercial and residential areas
Beverly Hilton Specific Plan Amendment
Land Use and Planning
City of Beverly HillsScoping MeetingJuly 18, 2018
Noise
• City adopted new General Plan Noise Element in 2010 and Noise Regulations in 2011
• Potentially increased noise/vibration impacts from:• Demolition/grading/construction• Operational activities
• Heating and air conditioning systems• Delivery trucks and trash hauling• Increased usable outdoor space
Beverly Hilton Specific Plan Amendment
Noise
City of Beverly HillsScoping MeetingJuly 18, 2018
Transportation/Traffic
• Potentially increased traffic impacts due to:• Potentially changed local traffic conditions since 2007 traffic study• Modifications to site access and on-site circulation
• Potential impacts to transit services and pedestrian facilities
Beverly Hilton Specific Plan Amendment
Transportation/Traffic
City of Beverly HillsScoping MeetingJuly 18, 2018
Tribal Cultural Resources
• Original project approved prior to tribal consultation requirement (AB 52)
• Formal consultation process established• Currently in progress• Results to be included in SEIR
Beverly Hilton Specific Plan Amendment
Tribal Cultural Resources
City of Beverly HillsScoping MeetingJuly 18, 2018
Utilities and Service Systems
• Potentially increased impacts related to water supply• Ongoing drought conditions correlate to potentially restricted water
supplies• New City policies established since 2008 to help conserve water
Beverly Hilton Specific Plan Amendment
Utilities and Services Systems
City of Beverly HillsScoping MeetingJuly 18, 2018
Cumulative Impacts
• New developments constructed/approved since 2008 review
• Potentially significant effects in combination with existing/planned projects may have cumulatively considerable effect
• Impacts of proposed project in combination with existing/planned projects will be studied in the SEIR.
Beverly Hilton Specific Plan Amendment
Cumulative Impacts
City of Beverly HillsScoping MeetingJuly 18, 2018
Alternatives to the Proposed Project
• EIR requires an analysis of a “reasonable range” of alternatives
• Alternatives to be determined after analysis of environmental impacts associated with the Proposed Project
• Alternatives will include other “Build” alternatives and the required "No Project" alternative
Beverly Hilton Specific Plan Amendment
Project Alternatives
City of Beverly HillsScoping MeetingJuly 18, 2018
July 23, 2017Last day to submit comments on SEIR scope
Late Summer / Early Fall 2018Release of Draft EIR for 45-day public review periodPlanning Commission hearing on Draft EIR during 45-day review period
Late Fall / Winter 2018Public Hearing(s) on the Final EIR and project
Beverly Hilton Specific Plan Amendment
Timeline
City of Beverly HillsScoping MeetingJuly 18, 2018
Tell us what potential environmental issues or impacts the EIR should examine, and/or submit written comments by filling out
the comment sheets.
You can also send letters and emails to:
Cindy Gordon, AICP, Associate Planner455 North Rexford DriveBeverly Hills, CA 90210
Email: [email protected]: (310) 285-1191
Thank You!
Beverly Hilton Specific Plan Amendment
Beverly Hilton Specific Plan Amendment
Supplemental Environmental Impact ReportScoping Meeting
Cindy Gordon, AICP, Associate Planner310-285-1191 / [email protected]