Supervisory and Technical Forum Wednesday 4th October 2017

Westwood Network Rail Training and

Centre, Coventry

Page 2: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Agenda Registration 08.15 - 09.30 Westwood introduction and Safety Brief Video 09.45 - 09.50 Welcome and introduction – Neil Johnson, TSA Chairman 09.50 - 10.00

Looking back and Forward – Steve Featherstone 10.00 - 10.40 Benefits of using ZKL3000 RC – David Underwood 10.40 - 11.00 “Our Commitment to Safety” Back to Basics – Reflection Bill Cooke 11.00 - 11.20 Tea Break 11.20 - 11.30

Page 3: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

TSA Work Stream overview 11.30 - 12.20

1. Prep4 Initiatives – Terry Smith 2. Environmental and Sustainability Awareness – Rachael Reilly 3. Ballast Dust – Mark Wright 4. Extraordinary Safety Programme – Saint Maur Miles 5. Fatigue – Bernie Granger and Mark Wright

Work Stream wrap up – Neil Johnson and Bill Cooke 12.20 - 12.30 Lunch (Buffet served outside the auditorium) 12.30 - 13.15 Talking Balls – Andy Heather 13.15 - 13.35 Thank you – Mark Wright 13.35 - 13.40 Body Guard S&C North Cut 5 Gloves – Dave Sowter 13.40 -13.50

Agenda

Page 4: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Agenda

Close Call Champions “We Need You” – Adrian Fricker 13.50 - 14.10

Black Hat Feed Back – Bill Cooke 14.10 -14.30

Questions and Answer session – Open Forum 14.30 - 14.50

Closing comments and thoughts of the day – Neil Johnson, TSA Chairman 14.50 - 15.00

We have various exhibitors available for you to visit during the Day you will find them in situated around the East wing area and Outside Reception

Page 6: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Westwood Safety Video

Page 7: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Welcome and Introduction

Neil Johnson S&C North Alliance Director

TSA Chairman

Welcome to the Track Safety Alliance

“Supervisory and Technical Forum Conference

The theme of todays Conference is

“Back2Basics”

Page 8: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

• TSA Refresh

• Update on Revised Work streams

• Current Progress

• Good Practice

• Future Focus

Welcome

Page 9: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Your Role

• Your role and attendance

• Respect for timings and Presenters

• Participation

Page 10: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Steve Featherstone

Programme Director IP Track

What’s on my mind…

4 October 2017

Page 11: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

4-Oct-17 1

1

If you don’t know the answer ask

the guys digging the hole…

They have known the answer for 20 years but no-

one has bothered to ask them!

Page 12: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Safety first…

Looking back…

Swords of Honour

LTIFR above target

Ballast dust – no beards

Back to basics – black

hats

Looking forward…

5* and Swords of

Honour

Re-focus of the TSA

Points run throughs

Reduce Red Zone

working

LTIFR improving

Page 13: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Standards Looking back…

Plant reliability

Higher speed handbacks

CRT management

Taking Over Certificates

Overrun delay minutes

PIAF

Looking forward…

Safe work leaders

Track Environmental

Management Plan – ISO14001

Globe of Honour

Overrun delay minutes

PIAFip

Page 14: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Suppliers

Looking back…

Babcock Plain Line

Colas Plain Line

Carillion Plain Line

S&C North

S&C South

High Output

Route Services

Looking forward…

Reacting to

falling order book

Introducing new

contracts

Page 15: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Our customers

CP6 contracting strategy

CP6 funding released into

CP5

No surprises

Line speed handbacks on

every renewal

Page 16: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

People

Looking back…

Volunteering

Award success

IP Track re-org

Looking forward…

Impact of reduced workbanks

Professions launched to give

personal development a real

focus

Volunteering

Your Voice

Page 17: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Continuous improvement

Is CI really embedded?

Can we do more?

Taking Project Jedi to the

Supply Chain

Page 18: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

4-Oct-17 1

8

Difficult times ahead

Change causes distraction

Distraction increases risk of lapses leading to injuries

We are in a time of high safety risk

We need to ask the people digging the hole how we take

safety to the next level

What does this all mean

for Safety?

Page 19: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Steve Featherstone

Programme Director IP Track

Page 20: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Using Technology to Improve Safety within High Output:

Safe & Efficient Access

David M Underwood

Director of Engineering, Design & Improvement

Page 21: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

21

Introduction

• Network Rail High Output Fleet:

2 Track Relaying Systems (TRS)

5 Ballast Cleaning Systems (BCS)

• Deploy 5 nights/week, with adjacent lines open and typically handing back at 100mph.

• Delivering 70% of plain line linear volume in Great Britain in CP5 (Apr 2014 – Mar 2019).

Page 22: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long
Page 23: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long
Page 24: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Blocking the Line:

The Need to Change….

Page 25: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Handbook 8 of the rule book describes the process for taking a Line Blockage:

1. The signaller arranges for a protecting signal to be placed to danger

2. Signaller installs reminder appliance on the panel.

If safety of the line is affected then a form of additional protection is required:

a. Signal disconnection

b. Detonators and Possession Limit Board (PLB)

c. Installation of a Track Circuit Operating Device (TCOD)

25

Current Protection Methods for Line Blockages

Page 26: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Problems with the Current Arrangements

• Protection methods require staff to be lineside.

• Complicated and relies on multiple 1 to 1 verbal communications

• Many parties all with different roles and responsibilities

• The method that tends to be the preferred option is PLB’s and detonators. The activity is:

– Potentially hazardous requiring staff to enter the 4’ every time.

– Slow and time consuming utilising valuable working time

26

Page 27: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Safety Stats – Operational Close Calls

• RAIL INDUSTRY 2017-18 YTD - 157 operational close call incidents relating to Line blockages.

• Protection incorrectly placed

• Miscommunication between COSS and Signaller

• Miscommunication between COSS and Possession support staff

• Signaller error

Page 28: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

The High Output Safe & Efficient

Access Project

Page 29: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Aims of the Safe & Efficient Access Project

• To create a step change improvement in safety by removing staff from the 4 foot when placing and removing protection.

• To reduce the amount of time taken to take and handback blockages of the line (possessions and line blockages)

Network Rail Safety Vision Outstanding safety performance and outstanding business performance go hand in

hand

Page 30: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Line Blockages within High Output

• High Output activities require line blockages of the adjacent line varying from 5-15 minutes per night. – 12 x Line blockages for TRS – 6 x Line blockages for BCS

• All of which affect safety of the line and require a form of additional protection.

The preferred method of additional protection for High Output has been

detonator protection.

Page 31: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Recent Success in High Output

• Introduction of ZKL3000 (RC)

• Sponsored through Product acceptance by High Output

Page 32: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Visits to the 4

foot No. of Phone calls

Average time

taken to place

and remove

protection

Visits to the 4

foot No. of Phone calls

Average time

taken to place

and remove

protection

M 12

24 (2 per line

block)

96 (8 per line

block) 24 minutes 1 (install) 24 4 min

T 12 24 96 24 minutes 0 24 4 min

W 12 24 96 24 minutes 0 24 4 min

T 12 24 96 24 minutes 0 24 4 min

F 12 24 96 24 minutes 1 (remove) 24 4 min

Total 60 120 480 2 hours 2 120 24 mins

Using ZKL3000 (RC) as additional Protection

Day

Line

Blocks

Req

Using PLB and Detonators as additional Protection

WORK

PC / COSS & Workgroup

Protecting Signal

ZK

L

Signaller

WORK

Hand Signaller

PC / COSS & Workgroup

Signaller

Protecting Signal

The difference to TRS since Introducing ZKL

PLB & Detonators ZKL3000 (RC)

Page 33: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

The Logic – ZKL Vs Conventional

Protection Type Visits to the 4 foot (for 1 line blockage)

Communication (for 1 line blockage) Time (for 1 line blockage)

PLB & Dets 1 to take 1 to handback 2 total

4 calls to take 4 calls to handback 8 total

2 mins to deploy and remove

ZKL3000 (RC) installed once prior to shift 1 call to take 1 call to handback 2 total

20 seconds to deploy and remove

TRS • 4 foot visits = reduced by 118 (97%) per week • Phone Calls = reduced by 360 (75%) per week • Protection time = reduced by 1 hour 36 mins

per week

BCS • 4 foot visits = reduced by 58 (97%) per week • Phone Calls = reduced by 180 (75%) per week • Protection time = reduced by 48mins (80%) per

week

Page 34: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

• Reduced the risk of exposing staff to moving trains when placing / removing protection for line blockages.

• Reduced line blockage visits to the 4 foot by 97% per week per system

• Reduced the amount of phone calls for line blockages by 75% per week per system

• Gained additional 96minutes (TRS) and 48 mins (BCS) per week per system through introduction of ZKL3000 (RC)

Summary

Page 35: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

The future for High Output and Network Rail

• Incab Flexible Train Arrival Point (FTAP)

• ZKL3000(RC) mobile app

• ZKL’s installed at fixed locations

• Tamping using ZKL3000 as protection

• High Output Protection Zone

• Personal Warning System (PWS)

• Wireless train warning system (SATWS, ATWS)

• Remote TSR Boards

Page 36: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Thank you

For further information contact: Neil Sunner Project Manager (High Output Improvement) Email: [email protected] Phone:07834147559

Page 37: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Back2Basics “Our Commitment to Safety”

Bill Cooke

Page 38: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Back2Basics (cont’d)

• You might remember why I wanted us to get back to basics……

Page 39: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

The important numbers then

• 16 lost time injuries, including 3 broken ankles and wrists, disc cutter and chainsaw cuts

• 60 minor injuries,

• 3 near misses,

• 6 points run throughs

• 30 cable strikes

Many of these events

were late reports

Page 40: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Back2Basics

To stop these accidents we said we need to do a few simple things…… • Remove the hazards that we fall over, down or in

• Comply with all the site rules

• Report unsafe acts and conditions

Page 41: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Make it safe, Keep it Safe That’s really all I ask today,

• Make the sites safe before you start

• Keep the sites safe while you work

• Leave the sites safe when work is complete

So give me any reasons that prevents us doing any of the above?

Page 42: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Tea Break

11.20 – 11.30.

“10 Mins Folks”

Page 43: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Prep4 Initiatives Work Stream

Workstream Lead

Terry Smith Colas Rail

Page 44: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Scope

Joined up and consistent approach to Prep4 Campaigns

Aim

to improve Safety &Sustainable Development (S&SD), through education to reduce accidents and incidents,

with a key focus on Back2Basics.

Page 45: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Prep4 Safety

On site safety is one of our key areas of risk when we look at our incidents and accidents.

We often start a job with inherited hazards and risk, such as: – scrap rail,

– left over materials,

– broken/missing catch pit lids

– Etc., to name but a few;

this can have a significant impact on those working in the site.

This is where Prep4 Safety can help, it’s all about planning and preparation, making sure our sites are clear and ready for our workers before they arrive.

P4S is part of the Grip4Track process its aim is to raise and close out hazards on site before site works start

Current Campaigns

Page 46: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Prep4 Summer

Focussed on specific areas identified as high risk during the summer

• Health & Well Being – Weather and Hydration

• Trespassing – School Holidays

• Driving – More Drivers on Unfamiliar Roads, Traffic Jams

• Site Set Up and Welfare – Water – Increased Fire Risk

• Line side Neighbours – Longer Days, Open Windows, Washing,

Current Campaigns

Page 47: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Current Campaigns Prep4 Winter

Focussed on specific areas identified as high risk during the winter • Welfare –

• Using local accommodation to prevent long journeys

• Planning to allow rotation of work activities and adequate breaks

• Adequate welfare facilities on all sites

• Driving • Driver Competence

• Vehicle Checks

• Low sun/ Sun glare

• Health • Sustenance

• Keeping warm

• Personal Protective Equipment (PPE) • Keeping visible

• Keeping clean and dry

• Correct PPE

Page 48: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Prep4 Spring

Prep4 Site Set Up

Prep4 Sustainabilty

Prep4 New Standard Change

Prep4 Your Ideas are welcome Speak Up

New Campaigns

Page 49: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Looking out for each other this summer

Slide title

Text and pictures

Page 50: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Sustainability working group

Rachael Riley Carillion Rail

Workstream Lead

Page 51: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Sustainability working group

• Rachael Riley, Professional Head of Sustainability, Carillion rail

• Call to action: members needed to re-establish the working group

• TSA members survey, November, to identify priority areas

– Review outputs to date

– Members’ top issues for collaborative working

• Align with RSSB sustainable development principles and ISLG priority areas

• Knowledge share and coordination with RISF (formally RIEF)

Page 52: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Extraordinary Safety Programme

Saint Maur Miles

S&C North Alliance

Workstream Lead

Page 53: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Extraordinary Safety Programme

What are we trying to achieve?

• Having Safety Leaders at all levels and all staff having accountability for safety.

• Black hat behavioural briefings at the beginning of every shift.

Page 54: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Extraordinary Safety Programme

What needs to be done?

• Improve reporting

• Make challenge comfortable for people

• Accountability at all levels

• Safety has no rank

• Share best practise

Page 55: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Extraordinary Safety Programme

How we will achieve it?

• Supervisor development and support

• Visible safety leadership on site

• Buddying/mentoring

• Accept honest mistakes without reprisals

Page 56: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Extraordinary Safety Programme

How we will deliver it?

• Identify leaders within all levels/teams

• Celebrate success

Page 57: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Ballast Dust Workstream

Mark Wright Network Rail David Butler Network Rail

Workstream Lead

Page 58: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Ballast Dust Work Stream

Work Stream Lead Identify what we are trying to achieve?

Ballast Dust David Butler

To gather a solid data set that highlights a true reflection of the risk to our workers of ballast dust inhalation.

• Challenging conditions of high dust through Close Calls

• Critically reviewed the AECOM report which was commissioned by

SCO

• Part of SCO internal BDWG to help them consider final customer

concerns and opportunities for improvement

• Competence for “face fitter and face fitted” added to Sentinel

• Reviewing possibility of retro fitted suppression systems

• Use of fixed point suppression in blockades

• Completed sampling on IP-Track and High Output activities using

4Rail Services

Page 59: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Ballast Dust Sampling Site Date/ time PC Function Comments

Moreton Cutting Junction,

Didcot20th August Babcock PL Shift cancelled

Osmaston Road, Derby 27th August Amey Sersa S&C North 12 samples obtained

Bristol Parkway 6-7th Sept Colas S&C South 18 samples obtained

Anston, Worksop 10th Sept Carillion PL 15 samples obtained

Dunbar, Scotland 17th Sept Amey Sersa S&C North 12 samples obtained

Old Oak Common 20th Sept Colas S&C South Sampling undertaken - awaiting flash report

Severn Tunnel 23rd Sept Babcock PL Shift cancelled

Severn Tunnel Date TBC Babcock PL Possible future sampling site - rescheduled

Page 60: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

What we need from you?

• Challenge non compliance with RPE, its your friends and

colleagues we are trying to protect

• COSS review of Sentinel card for appropriate “face fit

competence”

• Does the worker have the right mask to match the

competence above?

• Continued support with innovation such as the following

Page 61: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

JSP Air Fed Trials

The trial of the prototype

JSP fully helmet mounted

Air Fed RPE has been

received well.

We are working with JSP

to make these helmets

which can be supplied in

any colour viable.

Page 62: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Fatigue Workstream

Bernie Grainger Babcock Rail

Mark Wright Network Rail Workstream Leads

Page 63: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Fatigue Work Stream

Work Stream Lead Identify what we are trying to achieve?

Fatigue Bernard Grainger

To increase awareness, knowledge and management of fatigue within the workforce. The improvement plan aims to understand the factors which directly and indirectly affect people’s fatigue and to provide guidance and tools to stakeholders to better control, manage and prevent the risk.

• Change of lead from Mark Wright to Bernie Grainger • Collaborated with the RPCG (RIAG) and ISLG • Developed closer ties with the RSSB to help bring about change across the

industry, this will see links to ORR, TOCs and FOCs • Engaging in new technologies to reduce fatigue when trying to gain information

e.g. RSSB Rule Book App • Advertised use of Fatigue video short on TSA share site • Worked with NR to critically review the pending Fatigue Process • Completed a Survey to gain front line concerns/good practice and knowledge

Page 64: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Fatigue Survey Results

Common trends from 303 surveys:

• 37% advised their average shift excluding travel time is 8 hours, 26% advised theirs was up to 10 hours and 12% advised they were working 12+ hours.

• 22% advised they use energy drinks regularly to combat fatigue.

• 70% advised they know how to report fatigue, however 30% advised they were still unsure.

• 65% advised nothing would stop them reporting fatigue.

• 22% of our staff were advised they were working their shift within the last 24 hours, 12% within the last week and 10% 2 weeks prior to their shift.

• 41% advised they way we could improve fatigue is by: better planning, local work, regular/mandated breaks, advanced notice of shifts and driver rest periods. 12% advised that designated drivers would help reduce fatigue.

Page 65: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

A few things you said we could do to improve fatigue

Page 66: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

What we need from you?

• Challenge non compliance with arrangements supplied for pre/post shift hotels etc.

• Use your team mentality to challenge each other, you know each other better than anyone and should feel comfortable in challenging one another

• Close Call “Fatigue” in all its forms, e.g. home/work life balance, mental or physical capability

• Continued support with innovation and work streams

Page 67: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Work Stream wrap up

Neil Johnson and Bill Cooke

Page 68: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Buffet style Lunch served outside

the auditorium 12.3O – 13.15

Page 69: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Andy Heather

“Talking Balls”

Page 70: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long
Page 71: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Who are we? Why are we here?

• We are Andy and Graham.

• We are from the charity It’s in the Bag.

• We are here to talk about Testicular Cancer.

• We are both glad to be here in more than ways than one, as we have both had Testicular Cancer and survived.

Page 72: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Our Story’s

Page 73: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Testicular Cancer

• Testicular cancer is a relatively rare disease

• Around 2,400 cases diagnosed in the UK each year

• Out of every 100 cancers diagnosed in men, only 1 or 2 are testicular cancer

• Accounts for approximately 0.7% of all cancers

• Around 70 people die every year from testicular cancer

Page 74: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Testicular Cancer • Different from many other types of cancer

• Most cancers tend to affect older people, where as testicular cancer is more common in young and middle-aged men

• Most common cancer of men aged 15-49 in the UK

• Rates of testicular cancer peak in the 25-34 age group

Page 75: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Testicular Cancer

• Cancer of the testicles is also one of the most treatable forms of cancer

Page 76: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

And now a short film:

Click here

Page 77: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Testicular Cancer Symptoms

A LUMP (WHICH

MIGHT BE

PAINLESS)

INCREASED

SIZE

HARDNESS

PAIN OR

HEAVINESS IN

THE BALL SACK

Page 78: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Testicular Cancer Symptoms • Discomfort or pain; dull ache in the

affected testicle or in the lower abdomen

• Symptoms that the cancer has spread to the lymph nodes; back pain

• Symptoms that the cancer has spread to other parts of the body; cough, short of breath, difficulty swallowing

• Hormones in the blood; Tumour markers, AFP, HCG, LDH

Page 79: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

How to self examine • Get to know your

balls

• Once a month check for any changes

• After a bath or shower

• Rest balls in hand

• Gently roll each one between thumb & finger

• Avoid doing it in public!

Page 80: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

What to do if something is not quite right

• Don’t panic!

• Do not stew over it

• Go straight to your GP

Remember: 9 out of 10 ball problems are

not testicular cancer. Your symptoms are

likely caused by something much less

serious. But because early diagnosis of

TC means better cure rates and more

straightforward treatment, you should get

yourself to the doctor ASAP.

Page 81: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Risk Factors

• More common in white men than African-Caribbean or Asian men

• Being taller than average increases the risk

• Undescended testicle(s) as a baby

• Hyperspadia as a baby

• Low Fertility

• Previous testicular cancer

Page 82: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Myth Busters

• Can’t be caused by knocks or injuries to the balls (but any lump or swelling

after an injury should be checked by your GP)

• Vasectomy does not increase chances

• Testicular Cancer is not infectious and cannot be passed on to other people

Page 83: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Our Campaigns

Page 84: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

What we want you to do

• It’s quite simple……

• Keep checking every month

• ANY worries see your GP

• Don’t put it off!

• Take the pledge

Page 85: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

The Pledge Join the winning team in the battle against testicular cancer! A few minutes once a month to check your balls out – that’s all it takes. Thinking it’s a good idea is one thing, remembering to get round to it is another. But we’re here to help. Pledge to check your balls today, and we’ll send you a free reminder every month via your preferred method, so you can make sure you get it done. Sign up now at http://itsinthebag.org.uk/ball-checking/pledge-to-check/

Page 86: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Useful Resources

• www.nhs.uk

• www.cancerresearchuk.org

• www.macmillan.org.uk

Page 87: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Thank you for listening

Page 88: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long
Page 89: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Dave Sowter S&C North

Working with Bodyguard Cut 5 Gloves

Page 90: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

New Samurai CUT 5 Gloves

• Bodyguard Workwear Launches New Samurai CUT 5 Hand Protection for Rail Industry

Features Inc:

- Touchscreen Sync

- Thermal Insulation

- Waterproof

- Metal Free

- Outstanding Dexterity

Page 91: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long
Page 92: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

CLOSE CALL CHAMPIONS

Our senior leaders have each made a personal commitment to fully supporting anyone who reports a Close

Call

We need to hear from all Close Call Champions

Key contacts needed

for all Close Call

Champion companies

Please send all names and contact details to

[email protected]

P

Are you a Close Call Champion?

Do you know your Close Call Champion?

Have you recently attended any TSA CCC

training?

L

Page 93: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Marketing and Communications - Social Media

Adrian Fricker

Page 94: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

TSA Social Media

@TSA_NWR

917 Facebook Followers

Track Safety Alliance - TSA

@tracksafetyalliance

Page 95: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Social Media Plan Q4

• 2-3 TSA targeted and relevant posts a week

• Sharing of industry and member news

• Interactive posts

– Q&A

– Surveys

– Videos

Page 96: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Recent Social Media

Page 97: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long
Page 98: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Black Hat Feedback Bill Cooke

Page 99: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Questions and Answer session

Open forum

Page 100: Supervisory and Technical Forum Wednesday 4th October … and... · Supervisory and Technical Forum Wednesday 4th October 2017 ... • Using local accommodation to prevent long

Closing Comments and thoughts on the day!

Neil Johnson

TSA Chairman