26
Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

Embed Size (px)

Citation preview

Page 1: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

Superload Move

April 06, 2013

Prasad Nallapaneni & Jonathan Mallard

Structure and Bridge, VDOT

Page 2: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

2

Superload - Route

Page 3: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

3

Superload- Details

Total Distance : Approximately 96 Miles

Number of Structures: 62 (61 VDOT)Bridges: 25

Culverts: 37

VDOT Structures:Analyzed in-house: 47

Third Party Analysis: 16

Page 4: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

4

Superload - Detials

Analysis Method: In house: LFR/LRFR –

»VIRTIS if available»Compared Simple span moments

with HS20 ratings

Third Party: LRFR -16 Bridges

Verified hand calculations

/ LFR analysis

Structures Jumped: 5 (five)

Page 5: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

5

Superload - Permit

Page 6: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

6

Superload - Permit

Page 7: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

7

Superload - Jump

Page 8: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

8

Superload - Restrictions

Page 9: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

9

Superload - Crabs

Page 10: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

10

Superload

Page 11: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

11

Superload

Page 12: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

12

Superload

Attempt Made:• Run few bridges in 6.5 with Non

Standard Gage Vehicle • Compare with calculations received

from Third Party and in-house STAAD runs

Page 13: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

13

Superload

Bridge Fed ID: 24505

Page 14: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

14

Superload

BrR ModelHand Clacs % Diff Reason

Dead Load Moment (K ft) 1550 1519 2.04%

Model has slightly higher Superimposed loads

Capacity (K Ft) 6271 6221 0.80% Round of error

Rating Factor 2.01 2.09 -4.22%  

Live Load (K ft) 2355 2246 4.83%

May be round off error in Distribution Factor. No detail output in BrR for

Live Load.

Bridge Fed ID: 24505

Wheel Configuration: Straight

Page 15: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

15

Superload

Bridge Fed ID: 25334

Page 16: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

16

Superload

BrR ModelHand Clacs % Diff Reason

Dead Load Moment (K ft) 5701 5691 0.18%

Round OffCapacity (K Ft) 15475 15463 0.08% Round OffRating Factor 1.11 1.19 -6.48%  

Live Load (K ft) 8805 8233 6.95%

May be round off error in Distribution Factor. No detail output in BrR for

Live Load.

Bridge Fed ID: 25334

Wheel Configuration: Straight

Page 17: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

17

Superload

Bridge 24231

Page 18: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

18

Superload

BrR ModelHand Clacs % Diff Reason

Dead Load Moment (K ft) 320 320 0.0%

Capacity (K Ft) 1828 1828 0.08%

Rating Factor 2.07 2.19 -5.6%  

Live Load (K ft) 729 688 5.93%

May be round off error in Distribution Factor. No detail output in BrR for

Live Load.

Bridge Fed ID: 24231

Wheel Configuration: Straight

Page 19: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

19

Superload

Difficulties Faced• Installation issues with 64 vs. 32 bit• Long time run process• Memory issues• Run only from bridge explorer • Not able to get a detailed LL output.

Page 20: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

20

Superload

Page 21: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

21

Superload

http://www.youtube.com/watch?v=Dmacnt5GaHw

 

http://www.youtube.com/watch?v=v8_3uyecXSc

Page 22: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

22

Field Operations

Field Surveys• LIDAR survey was taken before and after on 5 long

span structures.• Calculated LL deflections from vehicle were up to 6”• Survey showed before and after elevations of the

bridge deck surface and the bottoms of the girders were within the tolerance of the method used.

• Any post move deflection was undetectable from a survey perspective.

Page 23: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

23

Field Operations

Structure 10720, Lee County• Originally designated to be ‘jumped’• Field review of route raised concerns about limited

hospital access for an extended period.• Detour length = 50 miles.• Hauler’s consultants recommended removing a 20 kip

counterweight from each of the tractors.• Tractors effectiveness was limited due to traction

loss.

Page 24: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

24

Field Operations

Structure 24362, Norton• Rated by private consultant. Substructure controlled

at pier due to uneven span arrangement• Travel restrictions were issued. • During transport, hydraulic line broke while crossing

the structure. Lead tractor was over critical pier.• After line replacement, vehicle initiated movement

from rear tractor, which was not on bridge.

Page 25: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

25

Field Operations

Structure 22454, Norton• Simple Span Plate Girder with partial depth welded

diaphragms• First diaphragm on girder 4 cracked at the base.• Retrofitted by drilling, arrested by next inspection

cycle.

Page 26: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT

26