Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range nucleon structure ( C. Weiss ) 30’ + 5’ 9:45-10:20 SIDIS (Andrew) 30’ + 5’ 10:20-10:35 Coffee Break 10:30-11:30 All hands meeting 60’ 11:30-11:55 A1n ( Nilanga ) 20’ + 5’ 11:55-12:20 RCS ALL ( David ) 20’ + 5’ 12:20-13:30 Lunch 13:30-13:55 Hall A status ( Cynthia ) 20’ + 5’ 13:55-14:40 SBS design ( Robin ) 30’ + 15’ 14:40-15:25 He3 target ( Gordon ) 30’ + 15’ 15:25-15:25 Coffee break June 3, 2013, SBS collaboration B. Wojtsekhowski June 5 th 9:00-9:25 Fastbus ( Sergey ) 20’ + 5’ 9:25-9:50 NINO Front End ( John ) 20’ + 5’ 9:50-10:15 VME DAQ ( Alexandre ) 20’ + 5’ 10:15-10:30 Coffee Break 10:30-10:55 Electronics ( Chris ) 20’ + 5’ 10:55-11:20 Coordinate detector ( Adam ) 20’+5’ 11:20-11:45 ECAL status ( Mark ) 20’ + 5’ 11:45-12:10 Silicon tracker ( Guido ) 20’ + 5’ 12:10-13:30 Group picture and Lunch 13:30-14:00 A1n Cherenkov ( Sam ) 25’ + 5’ 14:00-14:30 Collaboration business

Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range

Embed Size (px)

Citation preview

Page 1: Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range

B. Wojtsekhowski

Super Bigbite collaboration meeting

4-5 June 2013

slide 1

June 4th

9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range nucleon structure ( C. Weiss ) 30’ + 5’9:45-10:20 SIDIS (Andrew) 30’ + 5’10:20-10:35 Coffee Break

10:30-11:30 All hands meeting 60’11:30-11:55 A1n ( Nilanga ) 20’ + 5’11:55-12:20 RCS ALL ( David ) 20’ + 5’12:20-13:30 Lunch

13:30-13:55 Hall A status ( Cynthia ) 20’ + 5’13:55-14:40 SBS design ( Robin ) 30’ + 15’14:40-15:25 He3 target ( Gordon ) 30’ + 15’15:25-15:25 Coffee break

15:45-16:10 Muon detection ideas with SBS and GEMs ( Alexandre ) 20’ + 5’15:10-16:35 HCAL Design ( Vahe ) 20’ + 5’ 16:35-16:50 HCAL Construction ( Greg ) 20’ +5’ 16:50-17:30 DiscussionJune 3, 2013, SBS collaboration

June 5th

9:00-9:25 Fastbus ( Sergey ) 20’ + 5’9:25-9:50 NINO Front End ( John ) 20’ + 5’9:50-10:15 VME DAQ ( Alexandre ) 20’ + 5’10:15-10:30 Coffee Break

10:30-10:55 Electronics ( Chris ) 20’ + 5’10:55-11:20 Coordinate detector ( Adam ) 20’+5’11:20-11:45 ECAL status ( Mark ) 20’ + 5’ 11:45-12:10 Silicon tracker ( Guido ) 20’ + 5’

12:10-13:30 Group picture and Lunch

13:30-14:00 A1n Cherenkov ( Sam ) 25’ + 5’14:00-14:30 Collaboration business14:30-15:00 Manpower/students/Tasks15:00-15:15 Coffee break

15:15-15:55 GEM INFN ( Paolo/Evaristo) 35’ +5’ 15:55-16:35 GEM UVA ( Nilanga/Kondo ) 35’ +5’16:35-17:00 Discussion and adjournment

Page 2: Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range

B. Wojtsekhowski 2

SBS components (in GEp /GM

p )INFNBNL DOE

BigCal

48D48

+/- 25 mrad

1 - 2 Gauss

June 3, 2013, SBS collaboration

Page 3: Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range

B. Wojtsekhowski 3

SBS components

There are a number of hot topics in each component:

48D48 – many aspects of the design need key input from MC before production drawings can be produced

GEM chambers – prototyping, module quality, production yieldGEM electronics – performance: level of the noise, readout speed

HCAL – from the ideas, components, to a prototype and construction

ECAL – not the BigCal, active searching stage

DAQ - development, construction, 18 FastBus crate farm

He-3 – target conceptual design, Au is too soft for hot Rb atom

June 3, 2013, SBS collaboration

Page 4: Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range

B. Wojtsekhowski 4

SBS collaboration

The weekly meetings are productive

5/22/2013 SBS_min_5-22-13.pdfMagnet shipping status/FASTBUS and VME DAQ/Collaboration meeting/DNP meeting5/15/2013 SBS_min_5-15-13.pdfFront Tracker/Back Tracker/Collaboration Charter/Collaboration meeting/3He target5/8/2013 SBS_min_5-8-13.pdfGeneral news/Collaboration meeting agenda 5/1/2013 SBS_min_5-1-13.pdfEcal/Dubna tests/HV maintenance/Collaboration meeting 4/24/2013 SBS_min_4-24-13.pdfPolarized 3He target/Collaboration meeting 4/17/2013 SBS_min_4-17-13.pdfDesign Status/ Back Tracker GEM at UVa 4/10/2013 SBS_min_4-10-13.pdfFront Tracker GEM & Electronics/Collaboration Meeting/UVa GEM news4/3/2013 SBS_min_4-3-13.pdfPara Hydrogen target/Collaboration Meeting/GMn preparations 3/27/2013 SBS_min_3-27-13.pdfGRINCH/GEMS 3/20/2013 SBS_min_3-20-13.pdfScintillators for HCAL 3/13/2013 SBS_min_3-13-13.pdfPion Form Factor/Design Status 3/6/2013 SBS_min_3-6-13.pdfGEM status at UVa 2/27/2013 SBS_min_2-27-13.pdfDAQ status/Deadtime reduction effort status 2/20/2013 SBS_min_2-20-13.pdfFront Tracker/MPD readout/Magnet and supports status 2/13/2013 SBS_min_2-13-13.pdfSBS/A1n Polarized 3He Target Update/Monthly Report 2/6/2013 SBS_min_2-6-13.pdfHERA B modules/Design Status 1/30/2013 SBS_min_1-30-13.pdfPhoto-multiplier testing/Coordinate detector prototype/Design Status 1/23/2013 SBS_min_1-23-13.pdfGEM Conditioning/HCAL Developments/GEM status 1/16/2013 SBS_min_1-16-13.pdfGRINCH/Magnet Modifications and Stand/Research Management Plan 12/12/2012 SBS_min_12-12-12.pdfGEM's at INFN/BNL visit/Coordinate Detector 12/5/2012 SBS_min_12-5-12.pdfGEM's and GEM electronics.11/28/2012 SBS_min_11-28-12.pdfDAQ/APS meeting in April (Denver) 11/14/2012 SBS_min_11-14-12.pdfSBS Design Plan/Ecal for GEp5 11/7/2012 SBS_min_11-7-12.pdfGEM electromics studies at UVa

June 3, 2013, SBS collaboration

Page 5: Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range

B. Wojtsekhowski 5

SBS in 2009 (2 years old)

today 11 GeV beam

June 3, 2013, SBS collaboration

Page 6: Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range

B. Wojtsekhowski 6

SBS in 2013 (6 years old)FY13 FY14 FY15 FY16

June 3, 2013, SBS collaboration

Page 7: Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range

B. Wojtsekhowski 7

SBS in 2013 (6 years old)FY13 FY14 FY15 FY16

June 3, 2013, SBS collaboration

Page 8: Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range

B. Wojtsekhowski 8

SBS in 2013 (6 years old)FY14 FY15 FY16 FY17

June 3, 2013, SBS collaboration

Page 9: Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range

B. Wojtsekhowski 9

SBS projects time line

today

June 3, 2013, SBS collaboration

Page 10: Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range

B. Wojtsekhowski 10

SBS collaboration

There is a need for an Experiment Coordination Committee

1) Each experiment accepted to be the SBS collaboration experiment will be presented at the ECC meetings and share the load of work

2) ECC should include a Hall A leader and one representative from each experiment selected by the experiment spokespeople 3) The goal of ECG is to expedite the SBS program and coordinate all efforts in development, running and publication plans/results of SBS.

June 3, 2013, SBS collaboration

Page 11: Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range

B. Wojtsekhowski 11

SBS second group of experiments

There are several exciting suggestions post FFs:

SIDIS – talk by A. Puckett (experiment was approved in 2010)

PionSF(s) – see talk by T. Keppel at SBS meeting, 3/13/13

DDVCS (muons) – talk by A. Camsonne

June 3, 2013, SBS collaboration