8/6/2019 SunMaxx TitanPower-AL2 Flush Mounting Instructions
1/16
SunMaxxSolar Thermal Systems
Silicon Solar IncInnovative Solar Solutions
TM
Instructions - Flush Mounting Installation System
SunMaxx-M2 Flat Plate Collector
8/6/2019 SunMaxx TitanPower-AL2 Flush Mounting Instructions
2/16
SunMaxx M2 Flush Mounting Installation System 2
EXPLOSION DRAWING
8/6/2019 SunMaxx TitanPower-AL2 Flush Mounting Instructions
3/16
SunMaxx M2 Flush Mounting Installation System 3
PARTS LIST
No. DesignationQuantity
basic kit
Quantity
extension kit
1 Collector2 Rail, 1,155 mm3 Rail, 1,172 mm
020
002
4 Collector fixing kit4.1 4x M8 x 14 hexagonal bolt4.2 4x mounting profile (Z-hooks)4.3 4x 8.4 mm washer4.4 1x installation aid4.5 2x M8 x 10 hexagon socket head cap screw
1 1
5 Rafter anchor for pantiles (variation A) 4 2
6 Rafter anchor kit
6.1 4x 10 wood screw6.2 2x M10 hexagonal bolt6.3 6x 10.5 mm washer6.4 2x M10 hexagonal nut6.5 2x slot nut6.6 4x wooden equalisation board (2 x 5 mm, 2 x 10 mm thick)
2 1
7 Rail connection kit7.1 2x rail connector7.2 4x M8 x 50 hexagonal bolt7.3 8x 8.4 mm washer7.4 4x M8 hexagonal nut7.5 2x 20 mm self-adhesive spacer
0 1
8
Rail end set8.1 4x rail connector8.2 4x end piece8.3 4x M8 x 50 hexagonal bolt8.4 8x 8.4 mm washer8.5 4x M8 hexagonal nut
1 0
9 Corrugated pipe, 800 mm9.1 1x 800 mm corrugated pipe with 12 mm compression fitting and
insulation tube9.2 1 x 12 mm support sleeve9.3 2 x seal
2 0
10 Corrugated pipe, 250 mm10.1 1x 250 mm corrugated pipe with 12 mm compression fittings and
insulation tube10.2 2 x 12 mm support sleeve
0 1
11 Rafter anchor for plain tiles (variation B) 4* 2*
12 Corrugated slab fastening (variation C)12.1 1x hanger bolt12.2 3x M10 hexagonal nut12.3 1x seal12.4 1x rail holder
4* 2*
* optional
8/6/2019 SunMaxx TitanPower-AL2 Flush Mounting Instructions
4/16
SunMaxx M2 Flush Mounting Installation System 4
GENERAL
The on-roof installation kit is for installing the K4-EM2S type collectors vertically or horizontally on
a roof. It can be used on roofs with slopes of 20 and above.The rafter anchors are available in variations for the following roof coverings: pan tiles and similar
roof tiles, and plain tiles. Fastening elements are also available for corrugated slabs (e.g.
corrugated sheeting, corrugated fibre cement). Alternatively, standing seam clamps for standing
seam roofs or fastenings for other types of roofs can be combined with the system. These must
be procured by the contractor from the local roofing supplier.
Extra materials such as ventilation tiles for the roof opening for the collector array connections
(available from specialist suppliers) and tin/lead sheets for sealing the rafter anchors on a plain
tile covering may be required.
In some cases it is necessary to plan a means of transporting the collectors onto the roof. Werecommend considering roof access near to the collectors so that checking and maintenance
work can be carried out more easily.
When connected hydraulically, up to 3 K4-EM2S collectors can be connected in series. If more
than 3 collectors are connected, this must be done using a combination of series and parallel
connection.
We recommend declaring the solar energy system to your insurer as added value to the building,
and taking out insurance against lightning and possibly glass breakage.
SAFETY INSTRUCTIONS
The installation and safety instructions must be observed and adhered to. The accident
prevention regulations of the trade associations must be adhered to, particularly when working
on the roof. Where there is a danger of falling, precautions must absolutely be taken.
The entire solar energy system must be installed and operated in accordance with the recognised
technical regulations.
Due to snow and wind loads, extreme forces can be at work on the collector fixings. Attention
should therefore be paid to carrying out the installation carefully. The roof construction (rafters)
must be capable of withstanding the additional load. Furthermore, care must be taken that the
snow and wind loads are discharged into the roof construction at certain points. It may be
necessary to consult a structural engineer.
In case of snow loads of zone 3 and above, and installation locations more than 600 m above sea
level, we ask that you enquire with us about the static test.
When installing the collectors towards the edges of the roof, a minimum gap of 1.5 m from the
eave and of 1.2 m from the ridge must be observed. If this minimum gap cannot be observed, a
structural engineer must be consulted.
8/6/2019 SunMaxx TitanPower-AL2 Flush Mounting Instructions
5/16
SunMaxx M2 Flush Mounting Installation System 5
TECHNICAL INSTRUCTIONS
Anti-freeze protection
The solar energy system may only be filled with antifreeze mixture. As it is not possible to empty
the collectors completely, it is imperative that the system be filled with the antifreeze mixture,
even for function tests. We recommend using premixed antifreeze mixtures; alternatively, the
water and antifreeze must be mixed outside the solar energy system.
Caution! As the collector can reach temperatures of over 200C, an antifreeze which is suitable for
use in such conditions must be chosen (e.g. with a propylene glycol base).
Bleeding
The solar circuit must generally be bled below the roof. If automatic bleed valves are used, it is
imperative that additional ball valves be installed for manual closure of the system. These ball
valves must be closed after filling the plant again. Otherwise, the antifreeze mixture might leak
during high temperatures and steam build-up in the collector.
Recycling
We guarantee that we will take back and recycle our products once they have come to the end of
their life cycle. We have already ensured that our products are suitable for recycling during the
development stage. This is therefore guaranteed.
Electrical connections
A dedicated electrical circuit/circuit breaker should be provided for the solar system.
Earthing and l ightning protectionIf the building already has lightning protection, the solar system's metal pipes must be connected
to the lightning protection by means of a green/yellow conductor of at least 6 mm Cu (H07 V-U
or R). Otherwise it is possible to earth the system to an earth rod.
Pictograms
Here you will find important
instructions which must be
observed under all
circumstances.
Here you will find notices regarding
dangers concerning health, damage
to equipment and financial losses.
Required tools
Cordless screw driver with
6 mm wood drill bit, 13 mm
socket wrench and 14 mm
masonry drill bit
Spanners
13/ 17/ 19/ 20/ 22
Measuring tape
Angle grinder with stone
cutoff wheel
6 mm Allen key
8/6/2019 SunMaxx TitanPower-AL2 Flush Mounting Instructions
6/16
SunMaxx M2 Flush Mounting Installation System 6
RAFTER ANCHOR AND HANGER BOLT INSTALLATION
Vertical
1. The collector array can be installed vertically or
horizontally.
For vertical installation, the rails (2/3) are installed
horizontally. The distance A of the profile rail can be
taken from the adjoining table. The distances B and C
from the rails to the outer edge of the collector must be
between 150 and 350 mm.
Up to 3 collectors can be connected in series (1 basic kit
and 2 extension kits).
A in m
M2 1,2 1,5
Horizontal
2. For horizontal installation, the rails (2/3) are installed
vertically. The distance A of the profile rail can be
taken from the adjoining table. The distances B and C
from the rails to the outer edge of the collector must be
between 150 and 500 mm.
Up to 3 collectors can be connected in series (1 basic kit
and 2 extension kits).
A in m
M2 0,9 1,5
A. Pan tiles and similar roof tiles
1. Remove one (or more) roof tiles above the planned
installation position of each rafter anchor (5). The
horizontal spacing is derived from the rafter spacing
and the vertical spacing is derived from the roof tiles.
The number of rafter anchors is derived from the size of
the collector array (basic kit: 4 rafter anchors, extension
kit: 2 rafter anchors)
2. Determine the position of the rafter anchor (5) so that it
is located in the trough of the roof tile. Mark two fixing
points on the rafter for each rafter anchor and pre-drill
them with a 6 mm wood drill bit.
8/6/2019 SunMaxx TitanPower-AL2 Flush Mounting Instructions
7/16
SunMaxx M2 Flush Mounting Installation System 7
RAFTER ANCHOR AND HANGER BOLT INSTALLATION
3. If necessary, cut a recess in the lower tile with an angle
grinder at the point where the rafter anchor (5) comes
through.
Pay particular attention to the leak-tightness of the roof
at the position where the rafter anchor comes through.
The roof hook must not exert any pressure on the roof
tile.
4. Fix each rafter anchor (5) to the roof rafters with 2
wood screws (6.1) and washers (6.3).
The screws (6.1) must enter into the wood to a depth of
at least 40 mm.
The rafter anchors (5) must not rest on the roof tiles! A
spacing of 5 mm must be kept between the rafter and
the roof tile. If necessary, underlay the rafter anchors with
equalisation boards (6.6).
5. Cut a recess in the upper tile with an angle grinder at the
point where the rafter anchor (5) comes through.
6. Replace the upper roof tile.
Pay particular attention to the leak-tightness of the roof
at the position where the rafter anchor comes through.
The roof tile must not be pushed up by the rafter anchor
(5).
8/6/2019 SunMaxx TitanPower-AL2 Flush Mounting Instructions
8/16
SunMaxx M2 Flush Mounting Installation System 8
RAFTER ANCHOR AND HANGER BOLT INSTALLATION
B. Plain tiles
1. Remove several roof tiles above the planned installation
position of each rafter anchor (11). The spacing to the side
is derived from the rafter spacing and the number of rafter
anchors. The spacing between the rails must be observed
as described on Page 6.
2. Determine the position of the rafter anchor (11) so that it
is located on a roof rafter directly above a roof batten.
Mark two fixing points on the roof rafter for each rafter
anchor and pre-drill them with a 6 mm wood drill bit.
3. Fix the rafter anchors (11) to the roof rafters using
wood screws (6.1) and the washers which go with these
(6.3).
The wood screws (6.1) must enter into the wood to a
depth of at least 40 mm.
4. Using an angle grinder, at the point where the rafter
anchor (11) comes through, cut a recess in the upper tile
which overlaps the crown of the rafter anchor.
8/6/2019 SunMaxx TitanPower-AL2 Flush Mounting Instructions
9/16
SunMaxx M2 Flush Mounting Installation System 9
RAFTER ANCHOR AND HANGER BOLT INSTALLATION
5. Replace the roof tiles.
Pay particular attention to the leak-tightness of the roof
at the position where the rafter anchor comes through.
6. Cover each rafter anchor (11) with a metal sheet.
7. As you do so, hang the plate with the standing seam
edge on the upper edge of the roof tiles and fix it here.
Replace the roof tiles.
Once all the roof tiles have been replaced, check the
leak-tightness of the roof!
C. Corrugated slabs
1. In accordance with the planning, pre-drill the
corrugated slabs at the crest with a 14 mm drill bit.
Remove existing hanger bolts as an alternative. The
spacing to the side is derived from the rafter spacing and
the number of rafter anchors. The spacing between the
rails must be observed as described on Page 6.
Do not drill the rafters!
8/6/2019 SunMaxx TitanPower-AL2 Flush Mounting Instructions
10/16
8/6/2019 SunMaxx TitanPower-AL2 Flush Mounting Instructions
11/16
8/6/2019 SunMaxx TitanPower-AL2 Flush Mounting Instructions
12/16
SunMaxx M2 Flush Mounting Installation System 12
INSTALLING THE RAILS ON THE ROOF
Vertical
4. Lock the lower rail (2/3) with the studs into the
mounting profiles (4.2); mount the rail facing upwards. To
do so, position the M10 hexagonal bolt (6.2) with slot nut
(6.5) in the rail according to the positions of the rafter
anchors and fix it to the rafter anchor (5/11) by hand with a
washer (6.3) and an M10 hexagonal bolt (6.4).
Vertical
5. Attach the upper rail (2/3) as described in steps 1 to 3
and position it sideways.
To do so, position the rails with respect to each other so
that the diagonals D and E are of equal length. Mark the
correct position before installing them. Next, fasten both
rails in place by tightening the M10 hexagonal bolts (6.4).
The rail end pieces (8) must be on the side where the first
collector is to be installed.
Horizontal
4.1 Mount the first rail (2/3). Lock the stud into the
mounting profiles (4.2), align towards the planned position
of the collector connections. To do so, position the M10
hexagonal bolt (6.2) with slot nut (6.5) in the rail according
to the positions of the rafter anchors and fix it to the rafter
anchor (5/11) by hand with a washer (6.3) and an M10
hexagonal bolt (6.4).
Horizontal
5.1 Attach the second rail (2/3) as described in steps 1 to
3 and position it vertically.
To do so, position the rails with respect to each other so
that the diagonals D and E are of equal length. Mark the
correct position before installing them. Next, fasten both
rails in place by tightening the M10 hexagonal bolts (6.4).
The rail end pieces (8) must be at the bottom end of the
rails.
8/6/2019 SunMaxx TitanPower-AL2 Flush Mounting Instructions
13/16
SunMaxx M2 Flush Mounting Installation System 13
PREPARING THE COLLECTORS
1. Position the square nuts in the slot on the back of the
collector with a screwdriver and secure them with the
installation aid (4.4).
Using the installation aid, the square nut can easily be
positioned for further installation of the fixing profile (4.2)
when the collector (1) has been erected.
2. Preassemble the mounting profile (4.2) with an M8
hexagonal bolt (4.1) and washer (4.3) on the square nuts
on the rear side of the collector.
3. Determine the definitive lower spacing C of the
mounting profiles (4.2) on the collector. To do so, keep a
distance from the lower edge of the collector of 150-
350 mm for vertical installation and 150-500 mm for
horizontal installation.
Attach the upper mounting profiles (4.2) in accordance
with the spacing A of the rails (2/3) to the lower
mounting rails (4.2). The distance B to the top edge of
the collector must also be within the range given above.
The mounting profiles must be facing downwards.
Preassemble the securing screw (4.5) 100 mm beneath
the lower mounting profiles.
4. Punch the two drainage holes at each bottom corner of
the collector, according to how it is positioned on the
roof, with the aid of a slotted screwdriver. To do so,
punch at the bottom edge.
To ensure that water can drain properly from the
collector, it is absolutely essential that all drainage holes
are punched at the bottom of the collector (depending
how it is oriented on the roof).
8/6/2019 SunMaxx TitanPower-AL2 Flush Mounting Instructions
14/16
SunMaxx M2 Flush Mounting Installation System 14
INSTALLING THE COLLECTORS ON THE ROOF
5. Hoist the collectors (1) onto the roof. For hoisting onto
the roof, fix two sufficiently sturdy ropes to the collector
as shown in the diagram. When doing so, make sure that
the ropes are not fed over the plastic edges of the
collector. We recommend using a crane for doing the
lifting If necessary, carefully hoist the collector up onto
the roof via a ladder. Work as a pair: one installer secures
the collector, the second guides it
Observe the labour safety regulations! Do not walk under
suspended loads. Secure the collectors (1) to prevent
them falling!
Vertical
6. Carefully lift the collector (1) onto the rails (2), remove
the hoisting guys and position the collector. To do so,
position the collector against the rail end pieces (8) and
slowly let it slide downwards until the mounting profiles
(4.2) lock into the rails (2). Next, position the securing
screws (4.5) against the rail from underneath and tighten
it.
Horizontal
6.1 Carefully lift the collector (1) onto the rails (2), remove
the hoisting guys and position the collector. To do so, let
the collector slowly slide downwards against the rail end
pieces (8) and move it sideways until the mounting
profiles (4.2) lock into the rails (2). Next, position the
securing screws (4.5) against the rail from the side and
tighten it.
7. Installing more collectors
For both horizontal and vertical installation, first stick the
spacer (7.5) onto the rails with the stopper against the
first collector. Install another collector as described in
subsection 5 and 6 or 6.1. This collector must be
positioned next to the spacers.
After installing the last collector, attach two rail end
pieces (8) to the open ends of the rails (2/3).
8/6/2019 SunMaxx TitanPower-AL2 Flush Mounting Instructions
15/16
SunMaxx M2 Flush Mounting Installation System 15
HYDRAULIC CONNECTION
1. Replace one roof tile with a ventilation tile above each
connecting pipes (9.1) feed-through.
2. Feed the connecting pipes (9.1) through the ventilation
tile into the interior of the building. Next, if necessary,
seal the sarking membrane with suitable adhesive tape.
The piping (9.1) should be laid so that it rises upwards in
order to allow ventilation at the highest point of the solar
energy system.
3. Install the connecting pipes (9.1) to each of the
external collector connections. To do so, insert the
support sleeve (9.2) into the connecting pipe. Push the
screw connection until it meets the collector
connections. Tighten the nut by hand first, then tighten
by one turn with the spanner. Push the previously pulled
back insulation tube over the connection until it meets
the collector frame.
When tightening, make sure you keep the screw fitting
tight with a second spanner in order to prevent damageto the collector!
4. Connect the collectors together in series. To do so,
attach the connection pipe (10.1) to the appropriate
collector connection. Insert the support sleeves (10.2) into
the connecting pipes. Push the screw connection until it
meets the collector connections. Tighten the nut by hand
first, then tighten by one turn with the spanner. Push the
previously pulled back insulation tube over the connection
until it meets the collector frame.
8/6/2019 SunMaxx TitanPower-AL2 Flush Mounting Instructions
16/16
SunMaxx M2 Flush Mounting Installation System 16
INSTALLING THE SENSOR
1. Carefully remove the plugs from the collector frame.
2. Slide the plugs over the temperature sensor (included
with the solar controller).
3. Coat the temperature sensor with heat-conducting
paste (included with the solar controller).
4. Insert the temperature sensor fully into the immersion
sleeve. Seal the collector frame with plugs. To do so, make
sure that the plugs are positioned correctly.