TIA-162-A Telecommunications Cabling Guidelines for Wireless Access Points Page 1 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Interim, Dallas, Texas Contribution to IEEE 802.3bq 40GBASE-T Task Force Plenary Meeting November 2013 Dallas Texas Wayne Larsen CommScope

Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

TIA-162-A Telecommunications Cabling Guidelines for Wireless

Access Points

Page 1IEEE 802.3bq 40GBASE-T Task Force – November 2013 Interim, Dallas, Texas

Access Points

Contribution to IEEE 802.3bq 40GBASE-T Task ForcePlenary Meeting November 2013

Dallas Texas

Wayne LarsenCommScope

Page 2: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

Overview

• Evolving wireless LAN landscape • Telecommunications cabling topology for WAPs• Flexibility for coverage, capacity, and growth• Occupancy considerations

Page 2IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 2

• Installation considerations• Conclusions and Recommendations

Page 3: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

• Advances in wireless technology ( IEEE 802.11ac) require improvements in supporting cabling infrastructure

• MU-MIMO and beam forming technologies allow simultaneous wireless Gigabit access to multiple clients

• This results in potential backhaul data rates over the supporting cabling infrastructure over 6.9 Gbps

What is changing in Wireless LANs?

Page 3IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 3

supporting cabling infrastructure over 6.9 Gbps• Cabling infrastructure and LAN applications must

anticipate and allow for these backhaul data rates• Widespread use of WAPs requires “WAP ready cabling”

pre-installed and pre-certified to allow “plug and play” WAP deployment

Page 4: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

Comparing IEEE 802.11n and 802.11acFeature 802.11n 802.11ac

Peak data rates 1x1: 150 Mbps2x2: 300 Mbps3x3: 450 Mbps4x4: 600 Mbps

1x1: 866 Mbps2x2: 1.7 Gbps4x4: 3.4 Gbps8x8: 6.9 Gbps

Modulation BPSK & QPSK (binary and quadrature phase-shift

BPSK & QPSK,16 & 64 QAM

Page 4IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 44

quadrature phase-shift keying)

16 & 64 QAM256 QAM (optional)

RF band 2.4 GHz and 5 GHz 5 GHz

Channel width 20MHz40MHz optional

20,40 & 80 MHz160 & 80+80 (optional)

MIMO Single-user Multi-user (optional)Feature 802.11n 802.11ac

Page 5: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

TIA TSB-162-A Scope

This TSB provides guidelines on the topology, design, installation, and testing of telecommunications cabling infrastructure, in compliance with ANSI/TIA-568-C.0 and ANSI/TIA-569-C, for supporting wireless local area networks (WLANs). This TSB describes the cabling between local area network (LAN) equipment and wireless

Page 5IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 5

between local area network (LAN) equipment and wireless access points including pathways and spaces to support the cabling and wireless access points.

Page 6: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

Factors impacting wireless coverage

• Building materials (e.g., concrete, drywall, wood, steel) • Building configuration (i.e., closed, semi-closed, or open

space) • Building furnishings (e.g., cabinets, partitions, furniture)

Page 6IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 6

• Building furnishings (e.g., cabinets, partitions, furniture) • WLAN radio frequency (RF) coverage design (e.g.,

adjacent floors, directional antennas) • Occupant density • Number and types of devices and their usage

Page 7: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

Wireless cell and cabling grid sizing

• The cell size is determined by the capacity, throughput, occupancy, and RF survey information.

• Once the cell size is determined, the maximum length of the equipment cord used to attach the WAP to the TO is the fundamental metric to determine horizontal cable length to the outlet serving the access point.

• For the 18.3 m ( 60 ft) square grid illustrated in TIA TSB-162-A, this

Page 7IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 7

• For the 18.3 m ( 60 ft) square grid illustrated in TIA TSB-162-A, this maximum radial length of the equipment cord is 13 m (42 ft).

• Using this length and assuming a 20% additional insertion loss in the equipment cord, the maximum length of the permanent link from the TO to the patch panel in the TR is limited to 80 m (242 ft).

Page 8: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

Cabling for typical 60 feet (18.3 m) square uniform cell size

Page 8IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 8

Page 9: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

WAP density for places of assembly (TIA-4966)

Occupancy (people) Number of WAPs needed1-25 1

26-50 251-75 3

Page 9IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 9

51-75 376-100 4

101-125 5126-200 9201-300 14301-400 18401-500 21

Page 10: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

Adding an additional WAP to a cell

Page 10IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 10

Page 11: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

Example of link aggregation

Page 11IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 11

Page 12: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

Mounting and Installation

• Wall mount above drop ceiling• Wall mount below drop ceiling• In the grid ceiling mount

Page 12IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 12

Page 13: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

Wall mount below drop ceiling

Page 13IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 13

Page 14: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

Wall mount above drop ceiling

Page 14IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 14

Page 15: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

In-grid ceiling mount example

Page 15IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 15

Page 16: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

Local and remote power options

Page 16IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 16

Page 17: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

Direct cabling from the telecommunications room to WAPs

13 m (42 ft)

Range

18.3 m

(60 ft)TOTOTOTO TOTO

AP

Page 17IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 17

TR

TOTO TOTO

TOTO

Page 18: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

Zone cabling topology for WAPs

Local and remote power options

Page 18IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 18

Local and remote power options

Page 19: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

Square-grid WAP cabling design for a typical office building

Page 19IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 19

Page 20: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

RF planning for a typical office building

Page 20IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 20

Page 21: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

Structured cabling in accordance with TIA TSB-162-A for the typical office building

TR AP

Cord

TO /MUTOA Grid

Cell

Page 21IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 21

Figure 10: Structured cabling diagram to support the AP design illustrated in Figure 8

Page 22: Summary of TIA-162-A Telecommunications Cabling Guidelines ...grouper.ieee.org/groups/802/3/bq/public/nov13/larsen_3bq_01_1113.… · 16 & 64 QAM Version 1.0 IEEE 802 ... and RF survey

TIA TSB-162-A recommendations

• Pre-cabling using the square cell grid strategy that allows easy plug-in and flexible positioning of WAPs

• Maximum 60 ft (18.3 m) square cell that can be smaller to allow higher data rates or support

Page 22IEEE P802.3 Maintenance report – July 2008 PlenaryVersion 1.0 IEEE 802.3bq 40GBASE-T Task Force – November 2013 Plenary Dallas Page 22

smaller to allow higher data rates or support increased occupancy

• Category 6A cabling to each WAP for higher data rates and increased power delivery