The SIG Notes are a joint document produced and edited by both ALPA and Company SIG Representatives. SIG PROCESS RECAP: Groundhog Day is in February. February was very similar to January for targets and number of disputed pairings. Average bid line guarantees (BLG) remain high in almost all bid packs. Summary of the Build: Different challenges arise with mid-range to higher targets. Minimum days off, days off pattern, and the adhering to the 13 CH spread between high and low line values are the limiting factors building to a higher line guarantee. Some of the bid-packs still need smaller pieces (pairings) to facilitate better line construction. But overall, most of the bid-packs went together with minimal complications. Pairing Assessment Process: Every month, the pilot scheduling improvement team (PSIT) reviews all the pairings. Your PSIT members are listed in the respective PSIT notes below. But, there is a group of volunteers that also review pairings. I would like to thank all of our pairing reviewers that donate their personal time for the benefit of all pilots. Seth Downs Dave Schlichting Pat Meehan Chris Mackay Ben Miller Colleen Mitchard Jack Ruddy Greg Dwight Maurice Newton Lorie Reibeling Steve Brick Teresa Payton J’son Burnett John Siminski

Summary of the Build: Pairing Assessment Process Notes/FEB 2015 SIG Notes.pdf · 2 Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Summary of the Build: Pairing Assessment Process Notes/FEB 2015 SIG Notes.pdf · 2 Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process

The  SIG  Notes  are  a  joint  document  produced  and  edited  by  both  ALPA  and  Company  SIG  Representatives.  

SIG PROCESS RECAP: Groundhog Day is in February. February was very similar to January for targets and number of disputed pairings. Average bid line guarantees (BLG) remain high in almost all bid packs. Summary of the Build: Different challenges arise with mid-range to higher targets. Minimum days off, days off pattern, and the adhering to the 13 CH spread between high and low line values are the limiting factors building to a higher line guarantee. Some of the bid-packs still need smaller pieces (pairings) to facilitate better line construction. But overall, most of the bid-packs went together with minimal complications. Pairing Assessment Process: Every month, the pilot scheduling improvement team (PSIT) reviews all the pairings. Your PSIT members are listed in the respective PSIT notes below. But, there is a group of volunteers that also review pairings. I would like to thank all of our pairing reviewers that donate their personal time for the benefit of all pilots. Seth Downs Dave Schlichting Pat Meehan Chris Mackay Ben Miller Colleen Mitchard Jack Ruddy Greg Dwight Maurice Newton Lorie Reibeling Steve Brick Teresa Payton J’son Burnett John Siminski

Page 2: Summary of the Build: Pairing Assessment Process Notes/FEB 2015 SIG Notes.pdf · 2 Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process

2

Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process continued in the February bid-packs. The issues we focused on were multiple international duty periods without a reset. The 777 had a new sequence the transited multiple arenas (Middle East, Asia, Europe) with a single reset. These pairings start in one direction (east or west) operates three quarters around the globe, then reverses direction (Slingshot). Typically, we find reversing direction like this can be difficult.

Disputed Pairings: ANC     MD11     #13     14  FEB  ANC     MD11     #72     3,  17  FEB    MEM   777       #24     9  FEB  MEM   777       #71     4  FEB  MEM   777       #145   10  FEB    MEM   757       #258                         3,4,5,10,11,12,17,18,19,24,25,26  FEB        Mea Culpa. Errors. Last month, one pairing number on the dispute list was transposed. Previous months, we have copied the wrong date of a dispute. A vigilant crew member last month alerted the SIG and we fixed the error within minutes of publishing. Publishing the SIG Notes in six days is not an easy task. There are currently twelve separate inputs. The publication has a half a dozen people editing on a rigid timeline. Finally, they are formatted and distributed. We believe it is important to publish prior to the bids closing. More pilots read the SIG Notes when published on time. If you notice a discrepancy in the SIG Notes, please let us know and we will fix it promptly. Rich Hughey, ALPA FedEx MEC Scheduling Committee Chairman Marty Harrington, ALPA FedEx MEC Scheduling Committee Vice-Chairman JD Oliver, ALPA FedEx MEC Scheduling Committee Knowledge Manager

Page 3: Summary of the Build: Pairing Assessment Process Notes/FEB 2015 SIG Notes.pdf · 2 Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process

3

Disputes: None PSIT Notes: February is a 4-week bid month. We were able to build 23 lines at an average of 71:19. Our first 75/76 crews will begin training mid February. Flight schedules for the Airbus remain the same for now. There are a number of long night hub turns to/ from ICN and KUL surrounding the min MNL overnight. We have identified it as a difficult sequence. Your feedback is requested on any operational or fatigue issues you experience. We were unable to secure any European flying this month. Flight 5017 PVG-CAN delays due to Chinese ATC/ military ops have continued since July. We have been informed that the company (and other airlines) are trying to improve the situation but we are not aware of an imminent solution. We have voiced our concerns about this flight hub turning, since the average delay is approximately two hours, and eliminates the opportunity for a rest on the hub turn.

  Captain   First  Officer  Average  CH   71:19   71:19  RLG  CH   68:30   68:30  R-­‐day  value  CH   4:34   4:34          #  of  Regular  Lines   23  (40%)   23  (40%)  #  of  Secondary  Lines   12  (21%)   11  (21%)  #  of  Reserve  Lines   22  (39%)   18  (35%)  Total  #  of  Lines   57   52        Total  CH  Available  (no  c/o)   1833   1833  Avg  CH/R  day   5.6   6.8        Carry-­‐in  CH  from  previous  month     321   321  Credit  hours  carry-­‐in  to  Total  CHs   14.9%   14.9%  

 

[email protected]  

PSIT  Brandon  Viuhkola  

Kevin  Kelly  

Page 4: Summary of the Build: Pairing Assessment Process Notes/FEB 2015 SIG Notes.pdf · 2 Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process

4

[Hong Kong A300 Continued] GT crews are experiencing longer than normal delays clearing customs at the border, due to increased tourists during this time of the year. **Heads up** Chinese New Year is Feb 19. The worlds largest human migration, officially known as The Spring Festival travel season/Chunyun runs from Feb 4 –Mar 16. There will be extremely high traffic loads during this period. Plan ahead, caution while deviating, and book your transportation tickets early. I would like to thank the pilots that have taken time to file a scheduling PIREP. Log in at fdx.alpa.org, on the first page under the scheduling tab is the PIREP button. Your feedback is paramount to resolving these issues!

Please communicate with us regarding bid pack pairings & lines, revisions & extra pairings or any scheduling issue. We cannot do our job without your input. Our preferred method of communication and tracking is via the ALPA Scheduling Committee PIREP.

Page 5: Summary of the Build: Pairing Assessment Process Notes/FEB 2015 SIG Notes.pdf · 2 Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process

5

Disputes: None

PSIT Notes: February is a four-week month with no major holidays. Flower flights for Valentines Day had an effect on the flying schedule and build for the second week. Buddy bidders beware! The requested BLG for the Captains was 78 and the First Officers was 76. With the high BLG, you will find extra flying on most lines to bring them up to this level. The lines will have some different pairings to accommodate this split in the BLG.

[email protected]  

PSIT  Mike  Pearcy  Harry  Edwards  Curt  Henry  

  Captain   First  Officer  Average  CH   77+13   75+59  RLG  CH   74+15   73+00  R-­‐day  value  CH   4+57   4+52          #  of  Regular  Lines   210   212  #  of  Secondary  Lines   59   50  #  of  Reserve  Lines   58   48  Total  #  of  Lines   327   310        Total  CH  Available  (no  c/o)   16911   16911  Avg  CH/R  day   19.44   23.48        Carry-­‐in  CH  from  previous  month     1069   1069  Credit  hours  carry-­‐in  to  Total  CHs   6.3%   6.3%  

 

Please communicate with us regarding bid pack pairings & lines, revisions & extra pairings or any scheduling issue. We cannot do our job without your input. Our preferred method of communication and tracking is via the ALPA Scheduling Committee PIREP.

Page 6: Summary of the Build: Pairing Assessment Process Notes/FEB 2015 SIG Notes.pdf · 2 Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process

6

            Disputes: None

PSIT Notes: The Company requested a build target of 72+00 hours. The build patterns were such that the MUC trips were used over the lines resulting in fewer reasonably pure MUC lines. With this number of credit hours, we normally are only able to build 22 lines. This month, we built 23 lines. That means that fewer trips were left in open time. Additionally, we intentionally kept the week after the weeklong MAN/BSL pairings free from duty. Though the construction in BHX is scheduled to be complete on 07Feb15, the Company continued to build BSL as the hook city for MAN. The MAN/BSL pairings are built reflecting the 07Feb15 completion date but the pairing may be revised if BHX construction is not complete on schedule. Last year’s runway work in BHX went several weeks beyond the projected completion date.

[email protected]  

PSIT  Andrew  Hall  Scott  Hubin  

  Captain   First  Officer  Average  CH   72+07   72+07  RLG  CH   69+15   69+15  R-­‐day  value  CH   4+37   4+37          #  of  Regular  Lines   23  (50%)   23  (58%)  #  of  Secondary  Lines   10  (22%)   07  (18%)  #  of  Reserve  Lines   13  (28%)   10  (25%)  Total  #  of  Lines   46   40        Total  CH  Available  (no  c/o)   1732   1732  Avg  CH/R  day   8.9   11.5        Carry-­‐in  CH  from  previous  month     227   227  Credit  hours  carry-­‐in  to  Total  CHs   11.6%   11.6%  

 

Page 7: Summary of the Build: Pairing Assessment Process Notes/FEB 2015 SIG Notes.pdf · 2 Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process

7

[Europe B757 Continued] For those pilots with R-Days, remember that you are due a contractually compliant 1 in 10 in base. Unlike a 1 in 7, which can take place in the field, this is required to be in base unless waived for phase-in conflict. Please see 12.C.1.c for details. As always, we welcome input from you, the line pilot, in order to make the schedules better.

Please communicate with us regarding bid pack pairings & lines, revisions & extra pairings or any scheduling issue. We cannot do our job without your input. Our preferred method of communication and tracking is via the ALPA Scheduling Committee PIREP.

Page 8: Summary of the Build: Pairing Assessment Process Notes/FEB 2015 SIG Notes.pdf · 2 Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process

8

Disputes: #258 3,4,5,10,11,12,17,18,19,24,25,26 FEB

PSIT Notes: Captain Bid Lines Note: The normal “sorting” of the lines was changed in a clerical error to a sort by ascending line credit hour value instead of the normal groupings you are accustomed to seeing. Please accept our apology if this changes your bid back review/bid input strategy. Expect a return to the normal bid line sorting in March. The Captain and First Officer lines are not matched in number and in many cases the trips vary on similar lines due to the large split in average BLG targets requested by the Company, thus First Officers are cautioned that attempting to bid a particular Captains line will require more due diligence Let us begin by thanking two people who spend countless hours reviewing our pairings for quality and contractual compliance. When you see J’Son Burnett or Teresa Payton, please thank them for the work they do on our behalf. It is greatly appreciated by all of us!

[email protected]  

PSIT                    Paul  Hanson                    J.D.  Oliver                    Rick  Irgens                    Matt  Gandy                      Stu  Ledet                    Tom  Rutledge  

  Captain   First  Officer  Average  CH   75+02   70+59  RLG  CH   72+00   68+00  R-­‐day  value  CH   4+48   4+33          #  of  Regular  Lines   150   158  #  of  Secondary  Lines   30   41  #  of  Reserve  Lines   35   50  Total  #  of  Lines   215   291        Total  CH  Available  (no  c/o)   11255+18   11217+44  Avg  CH/R  day   25   15        Carry-­‐in  CH  from  previous  month     833+03   833+03  Credit  hours  carry-­‐in  to  Total  CHs   7.4%   7.4%  

 

Page 9: Summary of the Build: Pairing Assessment Process Notes/FEB 2015 SIG Notes.pdf · 2 Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process

9

[Memphis 757 Continued] February is a 4-week month with some extra Valentine’s Week flower flights affecting week 2 schedules in some cases. Overall our cities remain stable and some of the “peak” flying has remained in the bid pack. The aircraft routings in and out of EWR and AFW are in many cases “one way” and continue to present challenges in city purity, regional DH problems and in some cases day/night duty swaps. We are asking feedback on any of these pairings that tour America through EWR/AFW as we attempt to find solutions that meet both quality of life concerns managed with crew alertness issues. There are a few pairings (Trips 205/2FEB, 89/8FEB and 182/8FEB) that were held out of lines that will be revised and then made available for the View/Add and/or the secondary line processes. Lastly we continue to dispute the MEM-BFM-QRO critical duty sequence as the PSIT has a number of concerns on this pairing design. Concerns include: 1) Flying the second leg out of a critical duty into a foreign location with high CFIT risk, 2) No radar and a NON-ILS approach, and 3) A customs bag drag into a very short layover. We ask for POR’s and SIG PIREPS and, if required, a Fatigue report if you experience issues on this or any pairing you operate (you don’t have to make a “Fatigue Call” in order to file a fatigue report).

Please communicate with us regarding bid pack pairings & lines, revisions & extra pairings or any scheduling issue. We cannot do our job without your input. Our preferred method of communication and tracking is via the ALPA Scheduling Committee PIREP.

Page 10: Summary of the Build: Pairing Assessment Process Notes/FEB 2015 SIG Notes.pdf · 2 Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process

10

Disputes: None

PSIT Notes: February is a 4-week month, with Valentine’s Day falling on Saturday, February 14th and President’s day on Monday, February 16th. Neither holiday has any appreciable effect on the IND 767 schedules. The assigned 757 flying this month comprises ABE, some SWF, and assorted EWR or DFW deadheads. Captain and FO lines are identical. As always, please feel free to email your 767 PSIT with any suggestions or concerns you have with the line construction. It is input from our fellow crewmembers that helps us make the best bid packs possible.

[email protected]  

PSIT                    Paul  Hanson                    J.D.  Oliver                    Rick  Irgens                    Matt  Gandy                      Stu  Ledet                    Tom  Rutledge  

  Captain   First  Officer  Average  CH   76+08   76+08  RLG  CH   73+00   73+00  R-­‐day  value  CH   4+52   4+52          #  of  Regular  Lines   12  (71%)   12  (63%)  #  of  Secondary  Lines   2  (11%)   4  (21%)  #  of  Reserve  Lines   3  (18%)   3  (16%)  Total  #  of  Lines   17   19        Total  CH  Available  (no  c/o)   1060   1060  Avg  CH/R  day   23.6   23.6        Carry-­‐in  CH  from  previous  month     32   32  Credit  hours  carry-­‐in  to  Total  CHs   2.9%   2.9%  

 

Please communicate with us regarding bid pack pairings & lines, revisions & extra pairings or any scheduling issue. We cannot do our job without your input. Our preferred method of communication and tracking is via the ALPA Scheduling Committee PIREP.

Page 11: Summary of the Build: Pairing Assessment Process Notes/FEB 2015 SIG Notes.pdf · 2 Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process

11

Disputes: None

PSIT Notes: February is a 4-week month, with Valentine’s Day falling on Saturday, February 14th and President’s day on Monday, February 16th. Neither holiday has any appreciable effect on the MEM 767 schedules. The 767 loses ATL in February. SGF is going back to the 757 bidpack, and BFM (day and night) has come over to the 767 to act as short hook cities for the longer west-coast flights that create 30-in-7 issues (GEG, LAS). LFT is also being used as a hook city with GEG on the night side. As always, please feel free to email your 767 PSIT with any suggestions or concerns you have with the line construction. It is input from our fellow crewmembers that helps us make the best bid packs possible.

[email protected]  

PSIT                    Paul  Hanson                    J.D.  Oliver                    Rick  Irgens                    Matt  Gandy                      Stu  Ledet                    Tom  Rutledge  

  Captain   First  Officer  Average  CH   75+48   72+10  RLG  CH   72+45   69+15  R-­‐day  value  CH   4+51   4+37          #  of  Regular  Lines   35  (70%)   38  (59%)  #  of  Secondary  Lines   7  (14%)   10  (16%)  #  of  Reserve  Lines   8  (16%)   16  (25%)  Total  #  of  Lines   50   64        Total  CH  Available  (no  c/o)   2994   2994  Avg  CH/R  day   24.95   12.48        Carry-­‐in  CH  from  previous  month     146   146  Credit  hours  carry-­‐in  to  Total  CHs   4.8%   4.8%  

 

Please communicate with us regarding bid pack pairings & lines, revisions & extra pairings or any scheduling issue. We cannot do our job without your input. Our preferred method of communication and tracking is via the ALPA Scheduling Committee PIREP.

Page 12: Summary of the Build: Pairing Assessment Process Notes/FEB 2015 SIG Notes.pdf · 2 Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process

12

Disputes:   #13 14 FEB

#72 3, 17 FEB

13/14FEB - Disputed for the multiple circadian disruptions and only one reset. This reset does not mitigate the fatigue risks possible throughout the pairing. 72/03FEB, /17FEB - These two occurrences are disputed for the multiple circadian disruptions after the reset. The constant shifting of your body clock and increasing duty times could pose a fatigue risk. PSIT Notes: There is not much materially different for FEB 2015 than last month. Credit hours for the month remained steady and pairing design was similar. We have two disputes this month operating 3 times.

[email protected]  

PSIT  Brian  Lessin  Jeff  Sparks  

  Captain   First  Officer  Average  CH   75:50   75:32  RLG  CH   72:45   72:30  R-­‐day  value  CH   4:51   4:50          #  of  Regular  Lines   66(60%)   80(63%)  #  of  Secondary  Lines   23(21%)   25(19%)  #  of  Reserve  Lines   21(19%)   23(18%)  Total  #  of  Lines   110   128        Total  CH  Available  (no  c/o)   5488   6509  Avg  CH/R  day   17.4   18.9        Carry-­‐in  CH  from  previous  month     727   889  Credit  hours  carry-­‐in  to  Total  CHs   13.2%   13.7%  

 

Page 13: Summary of the Build: Pairing Assessment Process Notes/FEB 2015 SIG Notes.pdf · 2 Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process

13

[Anchorage MD-11 Continued] Pairing 29 and pairing 75 will be revised to reflect some changes we requested. The resultant fixes will be available in open time and for the view/add window. We have had some domestic style pairings in the last few months. These are the SEA-OAK turns. This month we also got some PDX-OAK turns on the night side. I attempted to put these pairings together in the bidpack to have some consistency. There are three lines of these scattered within the bidpack. Out sort system did not allow for them to be placed next to each other.

Please communicate with us regarding bid pack pairings & lines, revisions & extra pairings or any scheduling issue. We cannot do our job without your input. Our preferred method of communication and tracking is via the ALPA Scheduling Committee PIREP.

Page 14: Summary of the Build: Pairing Assessment Process Notes/FEB 2015 SIG Notes.pdf · 2 Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process

14

Disputes: NONE

PSIT Notes: February is a 4-week bid month with Valentine’s Day occurring on the second Saturday of the bid month, so don’t forget your flowers. The company requested a target BLG of 76:00 for both seats. Pairing 18 has a duty period that operates MNL-HKG-TPE with a 7:38 sit in HKG. The company has told us that this sit is a one-time issue due to the Spring Festival Golden Week holiday, and will not be a regular occurrence. Cody Chenoweth and I are constantly pursuing opportunities to improve the LAX bidpack and your feedback on line construction to [email protected] is always welcome. Ultimately it is you, the line pilot, whose feedback is critical for any positive improvement in the LAX MD11 flying. Please communicate with us regarding bid pack pairings & lines, revisions & extra pairings or any scheduling issue, good, bad, or other. Our primary method of communication and tracking scheduling issues is via the ALPA Scheduling Committee PIREP.

[email protected]  

PSIT  Chip  Brown  

Cody  Chenoweth  

  Captain   First  Officer  Average  CH   75:32   75:37  RLG  CH   72:30   72:30  R-­‐day  value  CH   4:50   4:50          #  of  Regular  Lines   32(51%)   44(55%)  #  of  Secondary  Lines   14(23%)   16(20%)  #  of  Reserve  Lines   16(26%)   20(25%)  Total  #  of  Lines   62   80        Total  CH  Available  (no  c/o)   2725   3607  Avg  CH/R  day   11.3   12.0        Carry-­‐in  CH  from  previous  month     764   799  Credit  hours  carry-­‐in  to  Total  CHs   21.9%   18.1%  

 

Page 15: Summary of the Build: Pairing Assessment Process Notes/FEB 2015 SIG Notes.pdf · 2 Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process

15

Disputes: None

PSIT Notes: February is a 4-week bid month with President’s Day and Valentine’s Day. The target this month for Memphis was 78 credit hours in both seats, up from 76 in January. With the same amount of flying time, this reduces the number of lines we can build. We’ve seen some change to some of our pairings as flying has shifted to other fleets. This has caused some holes in traditional lines. An example of this is the second week of MCO going to the Airbus, so instead of two MCO lines, we could only build one. Another example would be the Thursday afternoon flight to BOS. Instead of a layover and return to MEM, it is the beginning of a weeklong pairing to the west coast. Pairings 15, 245 and 337 have backend deadheads with minimum turn time after the last live leg. If any of these flights get in late, be advised that you should call GOC and have the pairing rebuilt to make it a legal turn. If you have any questions or wish to pass on information, please feel free to email us.

[email protected]  

PSIT  Charlie  Sutton   Rich  Coombs  Dan  Opp     Pat  Rink  

Joe  Brewster   Harley  Troyer  

  Captain   First  Officer  Average  CH   77+46   77+46  RLG  CH   74+38   74+38  R-­‐day  value  CH   4+59   4+59          #  of  Regular  Lines   306  (64%)   341  (66%)  #  of  Secondary  Lines   87  (18%)   89  (17%)  #  of  Reserve  Lines   86  (18%)   83  (16%)  Total  #  of  Lines   479   513        Total  CH  Available  (no  c/o)   26658   29923  Avg  CH/R  day   19.6   22.5        Carry-­‐in  CH  from  previous  month     1311   1688  Credit  hours  carry-­‐in  to  Total  CHs   4.9%   5.7%  

 

Page 16: Summary of the Build: Pairing Assessment Process Notes/FEB 2015 SIG Notes.pdf · 2 Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process

16

Disputes:     #24 9 FEB #71 4 FEB #145 10 FEB #24/9 FEB This 10 day pairing operates MEM-ANC-KIX-(NRT)-PVG-TPE-HKG all before the first reset. It then operates HKG-NRT-KIX-MEM. We believe the reset should occur in the first or at least second layover in theater. #71/4 FEB, #145/10 FEB These two pairings are very similar. They operate to CDG (one from MEM the other from IND), and then operate to DEL for a reset. They continue eastbound to NRT and then Sling-shot back to CDG and finally MEM without a reset. We believe these trips should continue east to MEM from NRT or get a reset in CDG before the ocean crossing.

[email protected]  

PSIT            Gregg  Hall              Pat  Hagerty  Amadee  Pepper      Jon  Casello  

  Captain   First  Officer  Average  CH   74:50   75:21  RLG  CH   71:45   72:15  R-­‐day  value  CH   4:47   4:49          #  of  Regular  Lines   124  (58%)   262  (66%)  #  of  Secondary  Lines   45  (45%)   79  (20%)  #  of  Reserve  Lines   45  (45%)   59  (15%)  Total  #  of  Lines   214   400        Total  CH  Available  (no  c/o)   10,314   21,186  Avg  CH/R  day   15.3   23.9        Carry-­‐in  CH  from  previous  month     2,044   3,592  Credit  hours  carry-­‐in  to  Total  CHs   16.5%   14.5%  

 

Page 17: Summary of the Build: Pairing Assessment Process Notes/FEB 2015 SIG Notes.pdf · 2 Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process

17

[Memphis 777 Continued]

PSIT Notes:

February is another 4-week bid month, with President’s Day on the 16th. We were tasked to build to a 75CH BLG in both seats.

We again did not have enough small pairings to match with the much larger pairings. You will see several 67-62 CH pairings in weeks 3 and 4 that were left over because we did not have the EWR 6 CH pairing to match with them. Most of the left over pairings (10) were carryover in the Captain’s seat and only a couple were carryover in the First Officers seat.

Single Departure Lines (SDLs) are again high for Captains 50 (40%) with the First Officers falling back into the average range of 62 (24%). We have had very little feedback on how well you like or dislike this new trend.

Because we are still a growing fleet and do not have all the pieces/cities that we will have when all of the aircraft are delivered; we are getting more sling-shots between Europe and Asia. Hopefully, when we have all the pieces, we only fly in one direction throughout an entire trip. To help mitigate some of the fatigue associated with these sling-shots, the company will look at the possibility of putting a reset either before or after the NRT-CDG leg

Please communicate with us regarding bid pack pairings & lines, revisions & extra pairings or any scheduling issue, good, bad, or other. We cannot do our job without knowing the good and the bad. Our preferred method of communication and tracking is via the ALPA Scheduling Committee PIREP.

Please communicate with us regarding bid pack pairings & lines, revisions & extra pairings or any scheduling issue. We cannot do our job without your input. Our preferred method of communication and tracking is via the ALPA Scheduling Committee PIREP.

Page 18: Summary of the Build: Pairing Assessment Process Notes/FEB 2015 SIG Notes.pdf · 2 Disputed Pairing Process: A trend of having fewer trips discussed during the disputed pairing process

18

Pilot Ops Report (POR) – The most efficient way for management to be made aware of and correct issues pertaining to hotels, catering and ground transportation is via the Pilot Ops Report (POR). This electronic form is accessed via the pilot.fedex.com website home page. If you have a hotel, catering or ground transportation concern/issue, positive or negative, we encourage you to submit the report. Please submit a separate POR for each issue (for example, please submit one POR for a hotel issue and if there was also a ground transportation issue please submit a second POR.) These Ops Reports, combined with your correspondence to the Trip Services Committee, are reviewed at our quarterly meetings with the Company and are instrumental in making changes. We encourage input. Please e-mail us at [email protected]. Mark Stafiej, Trip Services Committee Chairman Mike Pearcy, Trip Services Committee Vice-Chairman  

Trip  Services  Solutions